Page 1(c) 2005, Bentley Systems

Noah Eckhouse, [email protected]

TRB Asset Management Conference – November 2, 2005

(c) 2005, Bentley Systems.

Focused Work:Focused Work:

Prioritized Linear Asset Prioritized Linear Asset Management for RailManagement for Rail

Page 2: Prioritized Linear Asset Management for Rail - Main · Prioritized Linear Asset Management for Rail (c) 2005, Bentley Systems Page 2 ... Bentley Systems Page 6 Ballast Rail, Track,

Page 2(c) 2005, Bentley Systems

The Problem

Too much of: Not Enough of:

Infrastructure Problems Maintenance Budget

Page 3: Prioritized Linear Asset Management for Rail - Main · Prioritized Linear Asset Management for Rail (c) 2005, Bentley Systems Page 2 ... Bentley Systems Page 6 Ballast Rail, Track,

Page 3(c) 2005, Bentley Systems

Data By Itself Isn’t The Solution

Too much of: Not Enough of:

LegacySystems

InternalDatabases

Aerial and Ground Radar

TrackCharts

GISSystems

Track & RailGeometry Car

WorkHistory

TrackInspection

Data Direction

Page 4: Prioritized Linear Asset Management for Rail - Main · Prioritized Linear Asset Management for Rail (c) 2005, Bentley Systems Page 2 ... Bentley Systems Page 6 Ballast Rail, Track,

Page 4(c) 2005, Bentley Systems

Goals

How Do You:

1) Know where to work

2) Prioritize work

3) Track work progress, costing and material

4) Squeeze the most out of your assets, but avoid run-to-fail

5) Improve safety, reliability and ROI

Page 5: Prioritized Linear Asset Management for Rail - Main · Prioritized Linear Asset Management for Rail (c) 2005, Bentley Systems Page 2 ... Bentley Systems Page 6 Ballast Rail, Track,

Page 5(c) 2005, Bentley Systems

Let’s Define Our Terms...

Effective linear asset management (“LAM”) provides a unified system view and tools for collecting, viewing and analyzing any dimension of a corridor asset’s condition and performance over time…

Linear asset

LAM OBJECTIVES

Target resources to a specific need

Reduce maintenance occupancy and costs

Apply cost reducing long-term solutions to areas of high costs

Enhance track capacity and on-time reliability

Improve margins with increased asset life without spending additional capital

Page 6: Prioritized Linear Asset Management for Rail - Main · Prioritized Linear Asset Management for Rail (c) 2005, Bentley Systems Page 2 ... Bentley Systems Page 6 Ballast Rail, Track,

Page 6(c) 2005, Bentley Systems

Ballast

Rail, Track,Ties, etc

Locomotivesand Cars

EAM vs. LAM

Traditional Enterprise Asset Management:

• Discreet assemblies (can be bar coded)

• Readily identifiable

• Rolling stock, stations, signals

Linear Asset Management (“LAM”):

• Connected assets that don’t move

• Hard to differentiate

• Poor performance can have huge effect on throughput

Page 7: Prioritized Linear Asset Management for Rail - Main · Prioritized Linear Asset Management for Rail (c) 2005, Bentley Systems Page 2 ... Bentley Systems Page 6 Ballast Rail, Track,

Page 7(c) 2005, Bentley Systems

What’s An EAM System?

EAM Screenshot

Page 8: Prioritized Linear Asset Management for Rail - Main · Prioritized Linear Asset Management for Rail (c) 2005, Bentley Systems Page 2 ... Bentley Systems Page 6 Ballast Rail, Track,

Page 8(c) 2005, Bentley Systems

Linear Asset Network

ORIM supports > 300 discrete corridor asset

types

MaintenanceChannels

ORIM supports > 100 data types

Cuts & Fills - FEET

Roughness Left Profile - STANDARD DEVIATION

Left Profile - INCHES

Work Input - YEAR

Crosslevel - INCHES

Radar - DEPTH & MOISTURE

What’s a Linear Asset Management System?

ORIM provides a single source to visualize and act on many types of relevant information...

Page 9: Prioritized Linear Asset Management for Rail - Main · Prioritized Linear Asset Management for Rail (c) 2005, Bentley Systems Page 2 ... Bentley Systems Page 6 Ballast Rail, Track,

Page 9(c) 2005, Bentley Systems

Bringing EAM and LAM Together

Page 10: Prioritized Linear Asset Management for Rail - Main · Prioritized Linear Asset Management for Rail (c) 2005, Bentley Systems Page 2 ... Bentley Systems Page 6 Ballast Rail, Track,

Page 10(c) 2005, Bentley Systems

Prioritized work: Distilling Data into Actions

Page 11: Prioritized Linear Asset Management for Rail - Main · Prioritized Linear Asset Management for Rail (c) 2005, Bentley Systems Page 2 ... Bentley Systems Page 6 Ballast Rail, Track,

Page 11(c) 2005, Bentley Systems

Accurately Know Where You Worked!

Page 12: Prioritized Linear Asset Management for Rail - Main · Prioritized Linear Asset Management for Rail (c) 2005, Bentley Systems Page 2 ... Bentley Systems Page 6 Ballast Rail, Track,

Page 12(c) 2005, Bentley Systems

LAM answers thekey question:

What Asset Do I need to Fix and When?

EAM takes Optram Rail datato the next step:

How Do I BestPerform the Work?

» More accurate MoW labor, material, and equipment cost planning and execution

Based upon actual asset condition, work history and performance» Automatic generation of pre-planned work orders and associated

logistic support elements» Reduced errors » Tight integration = lower overall IT support costs

Linear Assets + EAM = A Natural Fit

Page 13: Prioritized Linear Asset Management for Rail - Main · Prioritized Linear Asset Management for Rail (c) 2005, Bentley Systems Page 2 ... Bentley Systems Page 6 Ballast Rail, Track,

Page 13(c) 2005, Bentley Systems

Platform Power: Emergency Response

Page 14: Prioritized Linear Asset Management for Rail - Main · Prioritized Linear Asset Management for Rail (c) 2005, Bentley Systems Page 2 ... Bentley Systems Page 6 Ballast Rail, Track,

Page 14(c) 2005, Bentley Systems

Summary

Using EAM/LAM Technology can help you to:

1) Work smart

2) Work efficiently

3) Use the right tools for the job!