Prime Focus Option (Ming Liang) Prime Focus Option (Ming Liang) Actuator Intro/Overview/Status Actuator Intro/Overview/Status Prime focus slides from M. Liang (NOAO) M. Sholl University of California at Berkeley Space Sciences Laboratory & Lawrence Berkeley National Laboratory 20 November 2009

Prime Focus Option (Ming Liang) Actuator Intro/Overview/Status Prime focus slides from M. Liang (NOAO) M. Sholl University of California at Berkeley Space

Embed Size (px)

Citation preview

Prime Focus Option (Ming Liang)Prime Focus Option (Ming Liang)Actuator Intro/Overview/StatusActuator Intro/Overview/Status

Prime focus slides from M. Liang (NOAO)M. Sholl

University of California at BerkeleySpace Sciences Laboratory &

Lawrence Berkeley National Laboratory20 November 2009

2

Prime Focus Option 1Prime Focus Option 1Designs by Ming Liang (NOAO)Designs by Ming Liang (NOAO)

From Ming Liang

CurvedFocal

Surface

3

Prime Focus Option 3Prime Focus Option 3Designs by Ming Liang (NOAO)Designs by Ming Liang (NOAO)

From Ming Liang

4

Prime Focus OptionPrime Focus Option

• Pros— No secondary mirror!

— Simplified baffling (no sneak paths to focal plane, see Sholl Optics & Requirements talk from previous session)

— Fiber view camera may be closer

• Cons— Curved focal plane

• Corrected Ritchey Chretien design has flat focal surface

— Harnessing and fibers must be routed through telescope pupil

— Corrector/ADC has six elements• Magnification function shifted from M2 to corrector

— Focal plane and actuator mass supported by prime focus structure

5

LAMOST Telescope Fiber Actuators & Fiber LAMOST Telescope Fiber Actuators & Fiber Alignment VerificationAlignment Verification

6

LAMOST Reflective Schmidt TelescopeLAMOST Reflective Schmidt Telescope

7

Focal PlaneFocal Plane

8

Focal PlaneFocal Plane

9

Focal PlaneFocal Plane

Note: fiber/harness

bundle

10

Integrated Focal PlaneIntegrated Focal Plane

11

Fiber Position Verification systemFiber Position Verification system

12

Fiber Measurement System CharacterizationFiber Measurement System Characterization

• CCD distortion calibrated with “standard plate”— Standard plate (upper right)

with 784 precision-spaced holes, back-illuminated

— 4096x4096 CCD, 6m from focal plane

— 6m separation on LAMOST and BigBoss (closer with prime focus option)

— Focal plane divided into 16 parts, with overlaps

— Measurement precision (accuracy) 0.013mm

13

Fiber View Camera FOV Too Small?Fiber View Camera FOV Too Small?

• CCD Pan Head (Jin, Proc. SPIE Vol. 62693B-1)

• Small focal plane measurement system.

• Solution for CCD that is too small to measure entire focal plane

14

Status of Actuator DesignsStatus of Actuator Designs

• Professor Chao Zhai (USTC) to provide details on LAMOST actuator

15

Lamost 25.6/33 Actuator DesignLamost 25.6/33 Actuator Design

• Hongzhuan Hu, Prof., Precision Machine and Precision Instrument Department, USTC

• Real, working hardware, meets LAMOST performance requirements!

• 25.6/33mm

• Stepping motors and electrical zero

16

LBNL/Ghiorso 19.2mm GTC ActuatorLBNL/Ghiorso 19.2mm GTC Actuator

• R-θ design

• DC Brush motor

• Magnetic encoder

• Very fast! (<10s)

• SPIE paper

• Performance verification underway

17

New 15/18mm Actuator (Hu)New 15/18mm Actuator (Hu)

• Theta-Theta stepper drive• USTC expects performance to be

similar to LAMOST actuators (not verified yet)

• Eccentric axis connected directly to output of gearmotor

• No electrical zero• Testing with CCD camera

underway

18

Smaller actuators?Smaller actuators?

• Bill Ghiorso presented a concept for a 11mm pitch actuator on 20 May 2009— Theta-theta arrangement

— Only one output gear or pulley set used for second rotation

— 8mm motor features• DC brushed servomotor

• Encoder with index pulse

• Anti-backlash gearhead

— Fiber held by bearing. Does not “wind up.”

— Rotation limited by hard stop (370º)

— Arm travel limited to 190º

• USTC now has a design for a 10mm actuator (Hongzhuan Hu, designer, Prof. Zhai to present)

19

Actuator Status & Paths ForwardActuator Status & Paths Forward• USTC (Hu) 25.6mm θ-θ actuators (too large for BigBoss)

— Successful design/fabrication effort— Stepper motor, actuators run slowly (9min center-edge-center)

• LBNL (Ghiorso) 19.2mm R-θ actuator (Ghiorso) (too large for BigBoss)— Prototype built (SPIE 7018-205_4)— Brush DC servomotor and magnetic encoder— Very fast (20s reconfiguration)— W. Ghiorso to comment on testing status

• USTC (Hu) 15mm θ-θ actuator (too large for BigBoss)— Requires fiber precision and accuracy verification (underway)— Stepper motor

• LBNL (Ghiorso) 11mm θ-θ actuator concept— Has design. Modify/Build/fab/test?

• USTC (Hu) 10mm θ-θ actuator— Chao Zhai to present details at this session