Asbestos Removal and Disposal Contractors for the HSE

161208

PRICING DOCUMENT

FOR

REQUEST FOR APPLICATIONS

FOR

APPOINTMENT TO A MULTI-PARTY FRAMEWORK AGREEMENT

FOR

ASBESTOS REMOVAL AND DISPOSAL CONTRACTORS

FOR

THE HEALTH SERVICE EXECUTIVE (HSE)

Asbestos Removal and Disposal Contractors for the HSE

161208

CONTENTS

Section Description 1.0 1.1 1.2 1.3

Pricing Document Preliminaries Schedule of Works General Summary page

Asbestos Removal and Disposal Contractors for the HSE

161208

1.0 PRICING DOCUMENT 1.01 Pricing Requirements

Applicants must fully complete the Pricing Document. The Applicant is advised that the Pricing Document is

notional only which is based on a notional project as described below.

This pricing document will be used to establish the following:

i. The award criteria for appointment to the Framework. Tenderers will be assessed on price and

ranked in accordance with the criteria set out in section 3.0 of the Instructions Document.

ii. The maximum daily rate for site supervision. This ceiling rate will establish the maximum daily rate

for adequate site supervision (ref sections 3.4a and 3.4b of the Suitability Assessment

Questionnaire) that may be proposed at Mini-Competition stage. Contractors who submit

responses to a Mini-Competition may reduce the maximum daily rate submitted in this Form of

Tender but may not exceed the rate. This ceiling rate is referenced in section 3.4 of the HSE

Framework Agreement for Asbestos Removal and Disposal Contractors and shall be fixed as the

maximum rate applying for the initial two-year term of the framework only. The ceiling rate is to

be priced in the Preliminaries section of the Pricing Document and brought forward to the Form of

Tender.

The Applicant at the time of tendering must furnish (1) Form of Tender and (2) the Pricing Document

completed and signed by an authorised person, fully priced in ink.

No Applicant will be remunerated for any time or expense incurred in the preparation of his tender.

The Pricing Document, fully priced, must be submitted at the time of tendering.

Applicants must not insert additional items or make any alterations to the Pricing Document.

Amounts must be included for all items listed in the Pricing Document. Blank spaces, the terms ‘nil’ or

‘included’, or dashes or the like must not be used.

All items in the Pricing Document must be priced. Applicants must not use negative rates or prices, or omit

rates, or use zero rates, in the Pricing Document.

1.02 Notional Project

The notional project included within this Pricing Document consists of works associated with the removal

and disposal of Asbestos Containing Materials (ACMs) within the basement of a hospital which is part of

the corporate estate of the Health Service Executive (HSE).

The description of the works is as follows:

The hospital is part of the HSE corporate estate with no issues associated with access to the site

"basement" or any traffic restrictions. The basement is self-contained and fully secured. The basement is

40m x 20m in dimension.

Asbestos Removal and Disposal Contractors for the HSE

161208

The requirements of the Contractor are to safely remove and dispose of lagging, insulation, boarding, tiles,

coatings, paints and sprayed applications, containing "Chrysotile" (white asbestos). The Contractor is also

to reinsulate existing pipework. These works are fully defined in the Pricing Document.

The Contractor should assume a travel distance of 100 kilometres between their registered company

address and the site. In addition, the Contractor should also assume a travel distance of 100 kilometres

between the site and the location for disposal of asbestos containing materials.

1.03 Errors

The HSE may, without any responsibility for this, examine the Pricing Document for errors in addition or

extension.

If there is an error in extension, the rate will be adjusted, so that the extension remains the same.

If there is an error in addition, the amounts added (and the rates making them up) will be adjusted pro

rata to the error, so that the total remains the same. This will apply if the total of the tendered rates and

prices, does not add up to the Notional Tender Total.

No adjustment made under this section will affect the Notional Tender Total.

1.04 Unbalanced Tenders

If, in the HSE’s opinion, the tendered rates or prices in the Pricing Document (after adjustment under

Errors section above) do not reflect a balanced allocation of the Notional Tender Total, the Employer may

(but is not obliged to) do either or both of the following:

i. require the Applicant to provide a breakdown of any tendered amounts, to show that they reflect a

fair allocation of the Notional Tender Total and / or

ii. invite the Applicant to adjust rates or prices tendered in the Pricing Document, but without

adjusting the Notional Tender Total.

1.05 Abnormal Tenders and Rates

Applicants must not use abnormally high or low rates or prices. This prohibition includes using strategies

that might allow the Applicant to benefit disproportionately. Each amount in the Pricing Document must

cover the full inclusive value of the relevant work, and, where applicable, a balanced allocation of the

Notional Tender Total.

Asbestos Removal and Disposal Contractors for the HSE

161208

Section Nr 1.1

PRELIMINARIES

Description UnitQty Rate € c

(06) - (07) PRELIMINARIES

PRELIMINARIES

A A A A Pricing Document: Method of Measurement -Pricing Document: Method of Measurement -Pricing Document: Method of Measurement -Pricing Document: Method of Measurement -

This Elemental Pricing Document has beenThis Elemental Pricing Document has beenThis Elemental Pricing Document has beenThis Elemental Pricing Document has been

measured in accordance with the Agreedmeasured in accordance with the Agreedmeasured in accordance with the Agreedmeasured in accordance with the Agreed

Rules of Measurement (ARM 4) however hasRules of Measurement (ARM 4) however hasRules of Measurement (ARM 4) however hasRules of Measurement (ARM 4) however has

been simplified to incorporate weights ofbeen simplified to incorporate weights ofbeen simplified to incorporate weights ofbeen simplified to incorporate weights of

asbestos for removal and for ease of use.asbestos for removal and for ease of use.asbestos for removal and for ease of use.asbestos for removal and for ease of use. notenotenotenote

GENERALLY

B B B B The Contractor shall include for all costsThe Contractor shall include for all costsThe Contractor shall include for all costsThe Contractor shall include for all costs

associated with these preliminaries.associated with these preliminaries.associated with these preliminaries.associated with these preliminaries. notenotenotenote

C C C C Contract: Compliance with the Short PublicContract: Compliance with the Short PublicContract: Compliance with the Short PublicContract: Compliance with the Short Public

works Contract PW-CF6works Contract PW-CF6works Contract PW-CF6works Contract PW-CF6 ItemItemItemItem 1 1 1 1

D D D D (1) Supervision and co-ordination of the(1) Supervision and co-ordination of the(1) Supervision and co-ordination of the(1) Supervision and co-ordination of the

works, (2) scaffolding and access, (3)works, (2) scaffolding and access, (3)works, (2) scaffolding and access, (3)works, (2) scaffolding and access, (3)

plant, tools and vehicles, (4) Health &plant, tools and vehicles, (4) Health &plant, tools and vehicles, (4) Health &plant, tools and vehicles, (4) Health &

Safety, (5) Provision of ProjectSafety, (5) Provision of ProjectSafety, (5) Provision of ProjectSafety, (5) Provision of Project

Supervisor Construction Stage, (6)Supervisor Construction Stage, (6)Supervisor Construction Stage, (6)Supervisor Construction Stage, (6)

security, (7) protection of the works, (8)security, (7) protection of the works, (8)security, (7) protection of the works, (8)security, (7) protection of the works, (8)

temporary services - water and temporarytemporary services - water and temporarytemporary services - water and temporarytemporary services - water and temporary

lighting and power for the works, (9)lighting and power for the works, (9)lighting and power for the works, (9)lighting and power for the works, (9)

temporary accommodation and storage areas,temporary accommodation and storage areas,temporary accommodation and storage areas,temporary accommodation and storage areas,

(10) welfare facilities, (11) transport(10) welfare facilities, (11) transport(10) welfare facilities, (11) transport(10) welfare facilities, (11) transport

for workpeople, (12) insurancesfor workpeople, (12) insurancesfor workpeople, (12) insurancesfor workpeople, (12) insurances ItemItemItemItem 1 1 1 1

CEILING RATE

The Contractor is to include here for theThe Contractor is to include here for theThe Contractor is to include here for theThe Contractor is to include here for the

maximum daily rate for site supervision. Thismaximum daily rate for site supervision. Thismaximum daily rate for site supervision. Thismaximum daily rate for site supervision. This

rate will be used as a ceiling rate andrate will be used as a ceiling rate andrate will be used as a ceiling rate andrate will be used as a ceiling rate and

cannot be exceeded by the Contractor whencannot be exceeded by the Contractor whencannot be exceeded by the Contractor whencannot be exceeded by the Contractor when

tendering for works at mini competitiontendering for works at mini competitiontendering for works at mini competitiontendering for works at mini competition

stage. This ceiling rate will be preservedstage. This ceiling rate will be preservedstage. This ceiling rate will be preservedstage. This ceiling rate will be preserved

over the initial two year term of theover the initial two year term of theover the initial two year term of theover the initial two year term of the

framework only.framework only.framework only.framework only.

E E E E maximum daily rate for site supervisionmaximum daily rate for site supervisionmaximum daily rate for site supervisionmaximum daily rate for site supervision daydaydayday 1 1 1 1

HEALTH SERVICE EXECUTIVE (HSE) REQUIREMENTSAND CONSIDERATIONS

F F F F The Contractor is to fully adhere to HSEThe Contractor is to fully adhere to HSEThe Contractor is to fully adhere to HSEThe Contractor is to fully adhere to HSE

Health & Safety requirementsHealth & Safety requirementsHealth & Safety requirementsHealth & Safety requirements ItemItemItemItem 1 1 1 1

To Collection €To Collection €To Collection €To Collection €Asbestos Removal and DisposalPrel/1

Description UnitQty Rate € c

(06) - (07) PRELIMINARIES

(Cont'd) HEALTH SERVICE EXECUTIVE (HSE)REQUIREMENTS AND CONSIDERATIONS

A A A A The Contractor is to implement InfectionThe Contractor is to implement InfectionThe Contractor is to implement InfectionThe Contractor is to implement Infection

Control Measures associated with the worksControl Measures associated with the worksControl Measures associated with the worksControl Measures associated with the works

including required air sampling /including required air sampling /including required air sampling /including required air sampling /

monitoring and reportingmonitoring and reportingmonitoring and reportingmonitoring and reporting ItemItemItemItem 1 1 1 1

B B B B The Contractor will liase with EstatesThe Contractor will liase with EstatesThe Contractor will liase with EstatesThe Contractor will liase with Estates

Department HSE Maintenance staff on siteDepartment HSE Maintenance staff on siteDepartment HSE Maintenance staff on siteDepartment HSE Maintenance staff on site ItemItemItemItem 1 1 1 1

C C C C The Contractor is to develop and implementThe Contractor is to develop and implementThe Contractor is to develop and implementThe Contractor is to develop and implement

a site specific Method Statement detailinga site specific Method Statement detailinga site specific Method Statement detailinga site specific Method Statement detailing

how the works are to be carried out.how the works are to be carried out.how the works are to be carried out.how the works are to be carried out. ItemItemItemItem 1 1 1 1

D D D D Work under a strict Permit to Work SystemWork under a strict Permit to Work SystemWork under a strict Permit to Work SystemWork under a strict Permit to Work System ItemItemItemItem 1 1 1 1

E E E E Risk assessing and setting up the site inRisk assessing and setting up the site inRisk assessing and setting up the site inRisk assessing and setting up the site in

a manner which prevents exposure of nona manner which prevents exposure of nona manner which prevents exposure of nona manner which prevents exposure of non

site personnel to hazards associated withsite personnel to hazards associated withsite personnel to hazards associated withsite personnel to hazards associated with

the works.the works.the works.the works. ItemItemItemItem 1 1 1 1

F F F F Survey of the existing site "Basement"Survey of the existing site "Basement"Survey of the existing site "Basement"Survey of the existing site "Basement" ItemItemItemItem 1 1 1 1

PROTECTION

G G G G Setup and mobilisation requirements: TheSetup and mobilisation requirements: TheSetup and mobilisation requirements: TheSetup and mobilisation requirements: The

contractor shall allow for a fully trainedcontractor shall allow for a fully trainedcontractor shall allow for a fully trainedcontractor shall allow for a fully trained

crew including site supervisor in thiscrew including site supervisor in thiscrew including site supervisor in thiscrew including site supervisor in this

type of health care environment to createtype of health care environment to createtype of health care environment to createtype of health care environment to create

an enclosure, fixed and secured hoardingan enclosure, fixed and secured hoardingan enclosure, fixed and secured hoardingan enclosure, fixed and secured hoarding

to decompartment the work are into decompartment the work are into decompartment the work are into decompartment the work are in

accordance with HSE requirements.accordance with HSE requirements.accordance with HSE requirements.accordance with HSE requirements. ItemItemItemItem 1 1 1 1

H H H H triple airlock construction shall be triple airlock construction shall be triple airlock construction shall be triple airlock construction shall be

erected for entrance / egress from eacherected for entrance / egress from eacherected for entrance / egress from eacherected for entrance / egress from each

work enclosure and for transfer of thework enclosure and for transfer of thework enclosure and for transfer of thework enclosure and for transfer of the

bagged waste to storage area. Wherebagged waste to storage area. Wherebagged waste to storage area. Wherebagged waste to storage area. Where

possible there should be a separate airpossible there should be a separate airpossible there should be a separate airpossible there should be a separate air

lock and bag lock. The structure will belock and bag lock. The structure will belock and bag lock. The structure will belock and bag lock. The structure will be

adequate for the purposes of removing,adequate for the purposes of removing,adequate for the purposes of removing,adequate for the purposes of removing,

repairing & encapsulating asbestos basedrepairing & encapsulating asbestos basedrepairing & encapsulating asbestos basedrepairing & encapsulating asbestos based

products. It will be sealed directly toproducts. It will be sealed directly toproducts. It will be sealed directly toproducts. It will be sealed directly to

the enclosure by means of heavy-duty tapethe enclosure by means of heavy-duty tapethe enclosure by means of heavy-duty tapethe enclosure by means of heavy-duty tape

and high adhesive glue. Where enclosuresand high adhesive glue. Where enclosuresand high adhesive glue. Where enclosuresand high adhesive glue. Where enclosures

are adjacent to occupied areas theare adjacent to occupied areas theare adjacent to occupied areas theare adjacent to occupied areas the

enclosure wall and air lock will beenclosure wall and air lock will beenclosure wall and air lock will beenclosure wall and air lock will be

constructed of a double skin of 1000gconstructed of a double skin of 1000gconstructed of a double skin of 1000gconstructed of a double skin of 1000g

polyethylene sheeting.polyethylene sheeting.polyethylene sheeting.polyethylene sheeting. ItemItemItemItem 1 1 1 1

To Collection €To Collection €To Collection €To Collection €Asbestos Removal and DisposalPrel/2

Description UnitQty Rate € c

(06) - (07) PRELIMINARIES

(Cont'd) PROTECTION

A A A A There shall be negative pressure unitsThere shall be negative pressure unitsThere shall be negative pressure unitsThere shall be negative pressure units

fitted with pre and high efficiency mainfitted with pre and high efficiency mainfitted with pre and high efficiency mainfitted with pre and high efficiency main

filters will be installed in each workfilters will be installed in each workfilters will be installed in each workfilters will be installed in each work

area and airlock system. These units willarea and airlock system. These units willarea and airlock system. These units willarea and airlock system. These units will

be sufficiently sized to achieve andbe sufficiently sized to achieve andbe sufficiently sized to achieve andbe sufficiently sized to achieve and

create approximately a minimum of 8 to 10create approximately a minimum of 8 to 10create approximately a minimum of 8 to 10create approximately a minimum of 8 to 10

air changes per hour. They shall beair changes per hour. They shall beair changes per hour. They shall beair changes per hour. They shall be

situated at suitable locations within thesituated at suitable locations within thesituated at suitable locations within thesituated at suitable locations within the

enclosure to achieve maximum levels of airenclosure to achieve maximum levels of airenclosure to achieve maximum levels of airenclosure to achieve maximum levels of air

changes and prevent 'dead-spots' for thechanges and prevent 'dead-spots' for thechanges and prevent 'dead-spots' for thechanges and prevent 'dead-spots' for the

purposes of this project (locations mustpurposes of this project (locations mustpurposes of this project (locations mustpurposes of this project (locations must

be detailed in method statement and agreedbe detailed in method statement and agreedbe detailed in method statement and agreedbe detailed in method statement and agreed

prior to work starting). The contractorprior to work starting). The contractorprior to work starting). The contractorprior to work starting). The contractor

shall also provide a certified negativeshall also provide a certified negativeshall also provide a certified negativeshall also provide a certified negative

pressure monitor with print out facilitypressure monitor with print out facilitypressure monitor with print out facilitypressure monitor with print out facility

to be permanently fixed to each workingto be permanently fixed to each workingto be permanently fixed to each workingto be permanently fixed to each working

enclosure for the duration of the works,enclosure for the duration of the works,enclosure for the duration of the works,enclosure for the duration of the works,

records shall be maintained.records shall be maintained.records shall be maintained.records shall be maintained. ItemItemItemItem 1 1 1 1

B B B B Provisions shall be made for a self-Provisions shall be made for a self-Provisions shall be made for a self-Provisions shall be made for a self-

contained hygiene unit (i.e. mobilecontained hygiene unit (i.e. mobilecontained hygiene unit (i.e. mobilecontained hygiene unit (i.e. mobile

decontamination caravan) complying withdecontamination caravan) complying withdecontamination caravan) complying withdecontamination caravan) complying with

HSG 247. The clause of limitations stateHSG 247. The clause of limitations stateHSG 247. The clause of limitations stateHSG 247. The clause of limitations state

it will not be possible to site theit will not be possible to site theit will not be possible to site theit will not be possible to site the

decontamination unit or to locate thedecontamination unit or to locate thedecontamination unit or to locate thedecontamination unit or to locate the

decontamination unit directly to thedecontamination unit directly to thedecontamination unit directly to thedecontamination unit directly to the

enclosure. This decontamination unit willenclosure. This decontamination unit willenclosure. This decontamination unit willenclosure. This decontamination unit will

be situated adjacent to the enclosure inbe situated adjacent to the enclosure inbe situated adjacent to the enclosure inbe situated adjacent to the enclosure in

the hospital boiler room area and will bethe hospital boiler room area and will bethe hospital boiler room area and will bethe hospital boiler room area and will be

cordoned off with Harris fencing. The unitcordoned off with Harris fencing. The unitcordoned off with Harris fencing. The unitcordoned off with Harris fencing. The unit

is purpose built, consisting of threeis purpose built, consisting of threeis purpose built, consisting of threeis purpose built, consisting of three

separate compartments; a clean area, aseparate compartments; a clean area, aseparate compartments; a clean area, aseparate compartments; a clean area, a

shower area and a nominally titled "dirty"shower area and a nominally titled "dirty"shower area and a nominally titled "dirty"shower area and a nominally titled "dirty"

end. A self-closing door physicallyend. A self-closing door physicallyend. A self-closing door physicallyend. A self-closing door physically

separates each compartment. Extractseparates each compartment. Extractseparates each compartment. Extractseparates each compartment. Extract

ventilation is provided which is designedventilation is provided which is designedventilation is provided which is designedventilation is provided which is designed

to provide airflow from the clean end toto provide airflow from the clean end toto provide airflow from the clean end toto provide airflow from the clean end to

the "dirty end". In all other respects thethe "dirty end". In all other respects thethe "dirty end". In all other respects thethe "dirty end". In all other respects the

unit conforms with the requirements ofunit conforms with the requirements ofunit conforms with the requirements ofunit conforms with the requirements of

Guidance Note EH 47 (The provision, useGuidance Note EH 47 (The provision, useGuidance Note EH 47 (The provision, useGuidance Note EH 47 (The provision, use

and maintenance of hygiene facilities forand maintenance of hygiene facilities forand maintenance of hygiene facilities forand maintenance of hygiene facilities for

work with asbestos insulation andwork with asbestos insulation andwork with asbestos insulation andwork with asbestos insulation and

coatings).coatings).coatings).coatings). ItemItemItemItem 1 1 1 1

To Collection €To Collection €To Collection €To Collection €Asbestos Removal and DisposalPrel/3

Description UnitQty Rate € cDescription UnitQty Rate € c

(06) - (07) PRELIMINARIES

COLLECTION

Page No. Prel/1 Page No. Prel/1 Page No. Prel/1 Page No. Prel/1

Page No. Prel/2 Page No. Prel/2 Page No. Prel/2 Page No. Prel/2

Page No. Prel/3 Page No. Prel/3 Page No. Prel/3 Page No. Prel/3

(06) - (07) PRELIMINARIESCarried to Summary

Asbestos Removal and DisposalPrel/4

Asbestos Removal and Disposal Contractors for the HSE

161208

Section Nr 1.2

SCHEDULE OF WORKS

Description UnitQty Rate € c

(14) ASBESTOS REMOVAL AND DISPOSAL

INFORMATION

Asbestos Removal

A A A A Where asbestos containing insulation willWhere asbestos containing insulation willWhere asbestos containing insulation willWhere asbestos containing insulation will

be removed it will be removed using abe removed it will be removed using abe removed it will be removed using abe removed it will be removed using a

technique which minimises breakage.technique which minimises breakage.technique which minimises breakage.technique which minimises breakage.

Removal methods must include the use ofRemoval methods must include the use ofRemoval methods must include the use ofRemoval methods must include the use of

injection systems to saturate theinjection systems to saturate theinjection systems to saturate theinjection systems to saturate the

insulation materials. Dry removalinsulation materials. Dry removalinsulation materials. Dry removalinsulation materials. Dry removal

processes are unacceptable. As theprocesses are unacceptable. As theprocesses are unacceptable. As theprocesses are unacceptable. As the

asbestos containing material is removed itasbestos containing material is removed itasbestos containing material is removed itasbestos containing material is removed it

must be bagged immediately, thus ensuringmust be bagged immediately, thus ensuringmust be bagged immediately, thus ensuringmust be bagged immediately, thus ensuring

that the working zone is kept as clean asthat the working zone is kept as clean asthat the working zone is kept as clean asthat the working zone is kept as clean as

possible and reducing the amount of finalpossible and reducing the amount of finalpossible and reducing the amount of finalpossible and reducing the amount of final

decontamination required. All asbestosdecontamination required. All asbestosdecontamination required. All asbestosdecontamination required. All asbestos

material will be manually removed andmaterial will be manually removed andmaterial will be manually removed andmaterial will be manually removed and

deposited directly into 800g red polythenedeposited directly into 800g red polythenedeposited directly into 800g red polythenedeposited directly into 800g red polythene

sacks. Bags will be sealed and brought tosacks. Bags will be sealed and brought tosacks. Bags will be sealed and brought tosacks. Bags will be sealed and brought to

the bagging airlock where they will bethe bagging airlock where they will bethe bagging airlock where they will bethe bagging airlock where they will be

further sealed in clear polythene bags.further sealed in clear polythene bags.further sealed in clear polythene bags.further sealed in clear polythene bags. notenotenotenote

B B B B Inner and outer bags will all bear theInner and outer bags will all bear theInner and outer bags will all bear theInner and outer bags will all bear the

appropriate markings. The double baggedappropriate markings. The double baggedappropriate markings. The double baggedappropriate markings. The double bagged

material will be transferred to thematerial will be transferred to thematerial will be transferred to thematerial will be transferred to the

storage areas. The work area will bestorage areas. The work area will bestorage areas. The work area will bestorage areas. The work area will be

cleaned on an on-going basis to avoidcleaned on an on-going basis to avoidcleaned on an on-going basis to avoidcleaned on an on-going basis to avoid

build up of asbestos waste. All affectedbuild up of asbestos waste. All affectedbuild up of asbestos waste. All affectedbuild up of asbestos waste. All affected

areas are to be wire brushed and dust fromareas are to be wire brushed and dust fromareas are to be wire brushed and dust fromareas are to be wire brushed and dust from

all surfaces within the work area is to beall surfaces within the work area is to beall surfaces within the work area is to beall surfaces within the work area is to be

cleaned using vacuum equipment fitted withcleaned using vacuum equipment fitted withcleaned using vacuum equipment fitted withcleaned using vacuum equipment fitted with

HEPA filters. The entire area affected isHEPA filters. The entire area affected isHEPA filters. The entire area affected isHEPA filters. The entire area affected is

to be asbestos free upon completion ofto be asbestos free upon completion ofto be asbestos free upon completion ofto be asbestos free upon completion of

these works. These operations willthese works. These operations willthese works. These operations willthese works. These operations will

comprise of final vacuum and mechanicalcomprise of final vacuum and mechanicalcomprise of final vacuum and mechanicalcomprise of final vacuum and mechanical

cleaning of surfaces (e.g. floor, walls &cleaning of surfaces (e.g. floor, walls &cleaning of surfaces (e.g. floor, walls &cleaning of surfaces (e.g. floor, walls &

roof, fittings and fixtures) within theroof, fittings and fixtures) within theroof, fittings and fixtures) within theroof, fittings and fixtures) within the

working enclosure. Air extraction will beworking enclosure. Air extraction will beworking enclosure. Air extraction will beworking enclosure. Air extraction will be

utilised at all times throughout allutilised at all times throughout allutilised at all times throughout allutilised at all times throughout all

removal operations to ensure a negativeremoval operations to ensure a negativeremoval operations to ensure a negativeremoval operations to ensure a negative

pressure within the working enclosures andpressure within the working enclosures andpressure within the working enclosures andpressure within the working enclosures and

to eliminate the risk of fibre levelto eliminate the risk of fibre levelto eliminate the risk of fibre levelto eliminate the risk of fibre level

becoming greater than nominal protectionbecoming greater than nominal protectionbecoming greater than nominal protectionbecoming greater than nominal protection

factor of the respirator equipment used byfactor of the respirator equipment used byfactor of the respirator equipment used byfactor of the respirator equipment used by

the approved asbestos removal contractorsthe approved asbestos removal contractorsthe approved asbestos removal contractorsthe approved asbestos removal contractors

operatives.operatives.operatives.operatives. notenotenotenote

To Collection €To Collection €To Collection €To Collection €Asbestos Removal and DisposalSch/1

Description UnitQty Rate € c

(14) ASBESTOS REMOVAL AND DISPOSAL

Asbestos Disposal

A A A A The Contractor shall allow for the wasteThe Contractor shall allow for the wasteThe Contractor shall allow for the wasteThe Contractor shall allow for the waste

to be transferred under C1 form from site.to be transferred under C1 form from site.to be transferred under C1 form from site.to be transferred under C1 form from site.

Waste to be exported under TFS form to aWaste to be exported under TFS form to aWaste to be exported under TFS form to aWaste to be exported under TFS form to a

licensed disposal site. Completed C1 andlicensed disposal site. Completed C1 andlicensed disposal site. Completed C1 andlicensed disposal site. Completed C1 and

TFS forms to be provided. Note: that aTFS forms to be provided. Note: that aTFS forms to be provided. Note: that aTFS forms to be provided. Note: that a

copy of C1 documentation and disposalcopy of C1 documentation and disposalcopy of C1 documentation and disposalcopy of C1 documentation and disposal

certificates will be made available to thecertificates will be made available to thecertificates will be made available to thecertificates will be made available to the

Client and all record documentation uponClient and all record documentation uponClient and all record documentation uponClient and all record documentation upon

completioncompletioncompletioncompletion notenotenotenote

B B B B After the execution of all asbestos work,After the execution of all asbestos work,After the execution of all asbestos work,After the execution of all asbestos work,

all asbestos waste shall be wrapped,all asbestos waste shall be wrapped,all asbestos waste shall be wrapped,all asbestos waste shall be wrapped,

packaged, labelled, stored and sealedpackaged, labelled, stored and sealedpackaged, labelled, stored and sealedpackaged, labelled, stored and sealed

waste will be disposed of in accordancewaste will be disposed of in accordancewaste will be disposed of in accordancewaste will be disposed of in accordance

with the following Statutory Regulation:with the following Statutory Regulation:with the following Statutory Regulation:with the following Statutory Regulation: notenotenotenote

C C C C SI 33 European Communities (Toxic SI 33 European Communities (Toxic SI 33 European Communities (Toxic SI 33 European Communities (Toxic

Dangerous Waste) Regulations 1992Dangerous Waste) Regulations 1992Dangerous Waste) Regulations 1992Dangerous Waste) Regulations 1992 notenotenotenote

D D D D SI No. 30 The European Communities SI No. 30 The European Communities SI No. 30 The European Communities SI No. 30 The European Communities

(Asbestos Waste) Regulations 1990.(Asbestos Waste) Regulations 1990.(Asbestos Waste) Regulations 1990.(Asbestos Waste) Regulations 1990. notenotenotenote

E E E E Waste Management Act 1996 Waste Management Act 1996 Waste Management Act 1996 Waste Management Act 1996 notenotenotenote

F F F F Hazardous Waste Regulations 1998 Hazardous Waste Regulations 1998 Hazardous Waste Regulations 1998 Hazardous Waste Regulations 1998 notenotenotenote

G G G G Trans-frontier Shipment of Waste Trans-frontier Shipment of Waste Trans-frontier Shipment of Waste Trans-frontier Shipment of Waste

Regulation 2007Regulation 2007Regulation 2007Regulation 2007 notenotenotenote

H H H H Collection Permits Regulation 2001 & Collection Permits Regulation 2001 & Collection Permits Regulation 2001 & Collection Permits Regulation 2001 &

AmendmentsAmendmentsAmendmentsAmendments notenotenotenote

I I I I All polythene bags will be 800 gaugeAll polythene bags will be 800 gaugeAll polythene bags will be 800 gaugeAll polythene bags will be 800 gauge

marked "Asbestos Waste" and polythenemarked "Asbestos Waste" and polythenemarked "Asbestos Waste" and polythenemarked "Asbestos Waste" and polythene

sheeting will be 1000 gauge.sheeting will be 1000 gauge.sheeting will be 1000 gauge.sheeting will be 1000 gauge. notenotenotenote

J J J J The disposal vehicle will be provided byThe disposal vehicle will be provided byThe disposal vehicle will be provided byThe disposal vehicle will be provided by

the approved Asbestos removal contractor.the approved Asbestos removal contractor.the approved Asbestos removal contractor.the approved Asbestos removal contractor.

Transportation will be carried out inTransportation will be carried out inTransportation will be carried out inTransportation will be carried out in

accordance with SI 492 2001 (Carriage ofaccordance with SI 492 2001 (Carriage ofaccordance with SI 492 2001 (Carriage ofaccordance with SI 492 2001 (Carriage of

Dangerous Goods by Road Regulations 2001).Dangerous Goods by Road Regulations 2001).Dangerous Goods by Road Regulations 2001).Dangerous Goods by Road Regulations 2001). notenotenotenote

To Collection €To Collection €To Collection €To Collection €Asbestos Removal and DisposalSch/2

Description UnitQty Rate € c

(14) ASBESTOS REMOVAL AND DISPOSAL

WORK IN EXISTING BUILDINGS

DEMOLITION & ALTERATIONS

ALTERATIONS (ASBESTOS REMOVAL AND DISPOSAL)

Removing and disposing of the followingRemoving and disposing of the followingRemoving and disposing of the followingRemoving and disposing of the following

lagging, insulation, boarding, tiles,lagging, insulation, boarding, tiles,lagging, insulation, boarding, tiles,lagging, insulation, boarding, tiles,

coatings, paints and sprayed applications,coatings, paints and sprayed applications,coatings, paints and sprayed applications,coatings, paints and sprayed applications,

containing "Chrysotile" (white asbestos);containing "Chrysotile" (white asbestos);containing "Chrysotile" (white asbestos);containing "Chrysotile" (white asbestos);

allow for temporary protection to otherallow for temporary protection to otherallow for temporary protection to otherallow for temporary protection to other

finishes and structures as the works proceed;finishes and structures as the works proceed;finishes and structures as the works proceed;finishes and structures as the works proceed;

making good to any damage caused uponmaking good to any damage caused uponmaking good to any damage caused uponmaking good to any damage caused upon

completion. The Contractor shall include forcompletion. The Contractor shall include forcompletion. The Contractor shall include forcompletion. The Contractor shall include for

the complete decontamination / cleaning ofthe complete decontamination / cleaning ofthe complete decontamination / cleaning ofthe complete decontamination / cleaning of

all areas from which asbestos materials areall areas from which asbestos materials areall areas from which asbestos materials areall areas from which asbestos materials are

removed.removed.removed.removed.

Thermal insulation; lagging to pipeworkThermal insulation; lagging to pipeworkThermal insulation; lagging to pipeworkThermal insulation; lagging to pipework

A A A A 20mm diameter pipe, (25 metres in 20mm diameter pipe, (25 metres in 20mm diameter pipe, (25 metres in 20mm diameter pipe, (25 metres in

length), nominal weight of 1.21kgs tolength), nominal weight of 1.21kgs tolength), nominal weight of 1.21kgs tolength), nominal weight of 1.21kgs to

be disposedbe disposedbe disposedbe disposed itemitemitemitem 1 1 1 1

B B B B 25mm diameter pipe, (50 metres in 25mm diameter pipe, (50 metres in 25mm diameter pipe, (50 metres in 25mm diameter pipe, (50 metres in

length), nominal weight of 5.5kgs to belength), nominal weight of 5.5kgs to belength), nominal weight of 5.5kgs to belength), nominal weight of 5.5kgs to be

disposeddisposeddisposeddisposed itemitemitemitem 1 1 1 1

C C C C 50mm diameter pipe, (50 metres in 50mm diameter pipe, (50 metres in 50mm diameter pipe, (50 metres in 50mm diameter pipe, (50 metres in

length), nominal weight of 25.8kgs tolength), nominal weight of 25.8kgs tolength), nominal weight of 25.8kgs tolength), nominal weight of 25.8kgs to

be disposedbe disposedbe disposedbe disposed itemitemitemitem 1 1 1 1

D D D D 75mm diameter pipe, (50 metres in 75mm diameter pipe, (50 metres in 75mm diameter pipe, (50 metres in 75mm diameter pipe, (50 metres in

length), nominal weight of 55kgs to belength), nominal weight of 55kgs to belength), nominal weight of 55kgs to belength), nominal weight of 55kgs to be

disposeddisposeddisposeddisposed itemitemitemitem 1 1 1 1

E E E E 100mm diameter pipe, (40 metres in 100mm diameter pipe, (40 metres in 100mm diameter pipe, (40 metres in 100mm diameter pipe, (40 metres in

length), nominal weight of 83kgs to belength), nominal weight of 83kgs to belength), nominal weight of 83kgs to belength), nominal weight of 83kgs to be

disposeddisposeddisposeddisposed itemitemitemitem 1 1 1 1

F F F F 125mm diameter pipe, (40 metres in 125mm diameter pipe, (40 metres in 125mm diameter pipe, (40 metres in 125mm diameter pipe, (40 metres in

length), nominal weight of 102kgs to belength), nominal weight of 102kgs to belength), nominal weight of 102kgs to belength), nominal weight of 102kgs to be

disposeddisposeddisposeddisposed itemitemitemitem 1 1 1 1

G G G G 150mm diameter pipe, (40 metres in 150mm diameter pipe, (40 metres in 150mm diameter pipe, (40 metres in 150mm diameter pipe, (40 metres in

length), nominal weight of 178kgs to belength), nominal weight of 178kgs to belength), nominal weight of 178kgs to belength), nominal weight of 178kgs to be

disposeddisposeddisposeddisposed itemitemitemitem 1 1 1 1

H H H H 250mm diameter pipe, (15 metres in 250mm diameter pipe, (15 metres in 250mm diameter pipe, (15 metres in 250mm diameter pipe, (15 metres in

length), nominal weight of 194kgs to belength), nominal weight of 194kgs to belength), nominal weight of 194kgs to belength), nominal weight of 194kgs to be

disposeddisposeddisposeddisposed itemitemitemitem 1 1 1 1

To Collection €To Collection €To Collection €To Collection €Asbestos Removal and DisposalSch/3

Description UnitQty Rate € c

(14) ASBESTOS REMOVAL AND DISPOSAL

Thermal insulation; lagging to boilersThermal insulation; lagging to boilersThermal insulation; lagging to boilersThermal insulation; lagging to boilers

A A A A boiler size 3.00m x 2.00m x 2.00m; boiler size 3.00m x 2.00m x 2.00m; boiler size 3.00m x 2.00m x 2.00m; boiler size 3.00m x 2.00m x 2.00m;

nominal weight of 250kgs to be disposednominal weight of 250kgs to be disposednominal weight of 250kgs to be disposednominal weight of 250kgs to be disposed itemitemitemitem 1 1 1 1

Ceiling tiles; boards / panelsCeiling tiles; boards / panelsCeiling tiles; boards / panelsCeiling tiles; boards / panels

B B B B (100 m2 in area) nominal weight of (100 m2 in area) nominal weight of (100 m2 in area) nominal weight of (100 m2 in area) nominal weight of

700kgs to be disposed700kgs to be disposed700kgs to be disposed700kgs to be disposed itemitemitemitem 1 1 1 1

Wall linings SystemsWall linings SystemsWall linings SystemsWall linings Systems

C C C C (60 m2 in area) nominal weight of (60 m2 in area) nominal weight of (60 m2 in area) nominal weight of (60 m2 in area) nominal weight of

420kgs to be disposed420kgs to be disposed420kgs to be disposed420kgs to be disposed itemitemitemitem 1 1 1 1

Perforated AIB ceiling panelsPerforated AIB ceiling panelsPerforated AIB ceiling panelsPerforated AIB ceiling panels

D D D D (50 m2 in area) nominal weight of (50 m2 in area) nominal weight of (50 m2 in area) nominal weight of (50 m2 in area) nominal weight of

350kgs to be disposed350kgs to be disposed350kgs to be disposed350kgs to be disposed itemitemitemitem 1 1 1 1

Thermoplastic vinyl floor tilesThermoplastic vinyl floor tilesThermoplastic vinyl floor tilesThermoplastic vinyl floor tiles

E E E E (65 m2 in area) nominal weight of (65 m2 in area) nominal weight of (65 m2 in area) nominal weight of (65 m2 in area) nominal weight of

455kgs to be disposed455kgs to be disposed455kgs to be disposed455kgs to be disposed itemitemitemitem 1 1 1 1

Textured coatings and paints to wallsTextured coatings and paints to wallsTextured coatings and paints to wallsTextured coatings and paints to walls

F F F F (100 m2 in area) nominal weight of (100 m2 in area) nominal weight of (100 m2 in area) nominal weight of (100 m2 in area) nominal weight of

150kgs to be disposed150kgs to be disposed150kgs to be disposed150kgs to be disposed itemitemitemitem 1 1 1 1

Sprayed fire protection to structuralSprayed fire protection to structuralSprayed fire protection to structuralSprayed fire protection to structural

steelworksteelworksteelworksteelwork

G G G G steel member size 500mm in perimeter (40 steel member size 500mm in perimeter (40 steel member size 500mm in perimeter (40 steel member size 500mm in perimeter (40

m2 in area) nominal weight of 240kgs tom2 in area) nominal weight of 240kgs tom2 in area) nominal weight of 240kgs tom2 in area) nominal weight of 240kgs to

be disposedbe disposedbe disposedbe disposed itemitemitemitem 1 1 1 1

H H H H steel member size 600mm in perimeter (40 steel member size 600mm in perimeter (40 steel member size 600mm in perimeter (40 steel member size 600mm in perimeter (40

m2 in area) nominal weight of 288kgs tom2 in area) nominal weight of 288kgs tom2 in area) nominal weight of 288kgs tom2 in area) nominal weight of 288kgs to

be disposedbe disposedbe disposedbe disposed itemitemitemitem 1 1 1 1

I I I I steel member size 750mm in perimeter (20 steel member size 750mm in perimeter (20 steel member size 750mm in perimeter (20 steel member size 750mm in perimeter (20

m2 in area) nominal weight of 180kgs tom2 in area) nominal weight of 180kgs tom2 in area) nominal weight of 180kgs tom2 in area) nominal weight of 180kgs to

be disposedbe disposedbe disposedbe disposed itemitemitemitem 1 1 1 1

J J J J steel member size 900mm in perimeter (20 steel member size 900mm in perimeter (20 steel member size 900mm in perimeter (20 steel member size 900mm in perimeter (20

m2 in area) nominal weight of 216kgs tom2 in area) nominal weight of 216kgs tom2 in area) nominal weight of 216kgs tom2 in area) nominal weight of 216kgs to

be disposedbe disposedbe disposedbe disposed itemitemitemitem 1 1 1 1

To Collection €To Collection €To Collection €To Collection €Asbestos Removal and DisposalSch/4

Description UnitQty Rate € cDescription UnitQty Rate € c

(14) ASBESTOS REMOVAL AND DISPOSAL

COLLECTION

Page No. Sch/1 Page No. Sch/1 Page No. Sch/1 Page No. Sch/1

Page No. Sch/2 Page No. Sch/2 Page No. Sch/2 Page No. Sch/2

Page No. Sch/3 Page No. Sch/3 Page No. Sch/3 Page No. Sch/3

Page No. Sch/4 Page No. Sch/4 Page No. Sch/4 Page No. Sch/4

(14) ASBESTOS REMOVAL AND DISPOSALCarried to Summary

Asbestos Removal and DisposalSch/5

Description UnitQty Rate € c

(59) REINSULATING PIPEWORK

INFORMATION

A A A A After four stage clearance, the thermalAfter four stage clearance, the thermalAfter four stage clearance, the thermalAfter four stage clearance, the thermal

re-insulation of pipe work shall bere-insulation of pipe work shall bere-insulation of pipe work shall bere-insulation of pipe work shall be

carried out in accordance with thecarried out in accordance with thecarried out in accordance with thecarried out in accordance with the

requirements of B.S. 1334, B.S. 1558 andrequirements of B.S. 1334, B.S. 1558 andrequirements of B.S. 1334, B.S. 1558 andrequirements of B.S. 1334, B.S. 1558 and

B.S. 1589 and thickness specified inB.S. 1589 and thickness specified inB.S. 1589 and thickness specified inB.S. 1589 and thickness specified in

accordance with B.S 5422:2009.accordance with B.S 5422:2009.accordance with B.S 5422:2009.accordance with B.S 5422:2009. notenotenotenote

B B B B The Contractor shall clearly identify andThe Contractor shall clearly identify andThe Contractor shall clearly identify andThe Contractor shall clearly identify and

label all insulated and encapsulatedlabel all insulated and encapsulatedlabel all insulated and encapsulatedlabel all insulated and encapsulated

pipework in accordance with BS 1710. Thepipework in accordance with BS 1710. Thepipework in accordance with BS 1710. Thepipework in accordance with BS 1710. The

contractor shall allow for the printingcontractor shall allow for the printingcontractor shall allow for the printingcontractor shall allow for the printing

and application of labelling. Theand application of labelling. Theand application of labelling. Theand application of labelling. The

contractor shall allow for additional pipecontractor shall allow for additional pipecontractor shall allow for additional pipecontractor shall allow for additional pipe

bracket fixing as deemed necessary tobracket fixing as deemed necessary tobracket fixing as deemed necessary tobracket fixing as deemed necessary to

provide additional support to existingprovide additional support to existingprovide additional support to existingprovide additional support to existing

pipe work.pipe work.pipe work.pipe work. notenotenotenote

C C C C The contractor shall include for theThe contractor shall include for theThe contractor shall include for theThe contractor shall include for the

supply and application of asbestos warningsupply and application of asbestos warningsupply and application of asbestos warningsupply and application of asbestos warning

labels to all encapsulated and asbestoslabels to all encapsulated and asbestoslabels to all encapsulated and asbestoslabels to all encapsulated and asbestos

containing insulated pipes. The choice ofcontaining insulated pipes. The choice ofcontaining insulated pipes. The choice ofcontaining insulated pipes. The choice of

label fixing method shall take account oflabel fixing method shall take account oflabel fixing method shall take account oflabel fixing method shall take account of

the environmental conditions within thethe environmental conditions within thethe environmental conditions within thethe environmental conditions within the

appropriate works area.appropriate works area.appropriate works area.appropriate works area. notenotenotenote

MECHANICAL INSTALLATIONSMECHANICAL INSTALLATIONSMECHANICAL INSTALLATIONSMECHANICAL INSTALLATIONS

INSULATION

Thermal insulation; thermal fibre-glass foilback "Class O" insulation; taped and glued atthe joints; all in accordance B.S. 1334, B.S.1558, B.S. 1589 and thickness specified inaccordance with B.S 5422:2009. The insulationand method of fixing must be suitable forsteam (150C) and hot water pipework.

PipeworkPipeworkPipeworkPipework

D D D D pipework; 15 - 20mm nominal diameter pipework; 15 - 20mm nominal diameter pipework; 15 - 20mm nominal diameter pipework; 15 - 20mm nominal diameter

(25 metres in length)(25 metres in length)(25 metres in length)(25 metres in length) itemitemitemitem 1 1 1 1

E E E E pipework; 25 - 80mm nominal diameter pipework; 25 - 80mm nominal diameter pipework; 25 - 80mm nominal diameter pipework; 25 - 80mm nominal diameter

(150metres in length)(150metres in length)(150metres in length)(150metres in length) itemitemitemitem 1 1 1 1

F F F F pipework; 100mm nominal diameter pipework; 100mm nominal diameter pipework; 100mm nominal diameter pipework; 100mm nominal diameter

(40metres in length)(40metres in length)(40metres in length)(40metres in length) itemitemitemitem 1 1 1 1

G G G G pipework; 125 - 200mm nominal diameter; pipework; 125 - 200mm nominal diameter; pipework; 125 - 200mm nominal diameter; pipework; 125 - 200mm nominal diameter;

(80metres in length)(80metres in length)(80metres in length)(80metres in length) itemitemitemitem 1 1 1 1

To Collection €To Collection €To Collection €To Collection €Asbestos Removal and DisposalSch/6

Description UnitQty Rate € c

(59) REINSULATING PIPEWORK

A A A A pipework; 200 - 250mm nominal diameter pipework; 200 - 250mm nominal diameter pipework; 200 - 250mm nominal diameter pipework; 200 - 250mm nominal diameter

(15 metres in length)(15 metres in length)(15 metres in length)(15 metres in length) itemitemitemitem 1 1 1 1

Thermal insulation; to existing boiler;Thermal insulation; to existing boiler;Thermal insulation; to existing boiler;Thermal insulation; to existing boiler;

thermal fibre-glass "Class O" insulation; allthermal fibre-glass "Class O" insulation; allthermal fibre-glass "Class O" insulation; allthermal fibre-glass "Class O" insulation; all

in accordance B.S. 1334, B.S. 1558, B.S. 1589in accordance B.S. 1334, B.S. 1558, B.S. 1589in accordance B.S. 1334, B.S. 1558, B.S. 1589in accordance B.S. 1334, B.S. 1558, B.S. 1589

and thickness specified in accordance withand thickness specified in accordance withand thickness specified in accordance withand thickness specified in accordance with

B.S 5422:2009.B.S 5422:2009.B.S 5422:2009.B.S 5422:2009.

Plant and EquipmentPlant and EquipmentPlant and EquipmentPlant and Equipment

B B B B 1 nr. boiler; size 3.00m x 2.00m x 1 nr. boiler; size 3.00m x 2.00m x 1 nr. boiler; size 3.00m x 2.00m x 1 nr. boiler; size 3.00m x 2.00m x

2.00m2.00m2.00m2.00m itemitemitemitem 1 1 1 1

To Collection €To Collection €To Collection €To Collection €Asbestos Removal and DisposalSch/7

Description UnitQty Rate € cDescription UnitQty Rate € c

(59) REINSULATING PIPEWORK

COLLECTION

Page No. Sch/6 Page No. Sch/6 Page No. Sch/6 Page No. Sch/6

Page No. Sch/7 Page No. Sch/7 Page No. Sch/7 Page No. Sch/7

(59) REINSULATING PIPEWORKCarried to Summary

Asbestos Removal and DisposalSch/8

Description UnitQty Rate € cDescription UnitQty Rate € c

SUMMARY

SUMMARY Page No.

(14) ASBESTOS REMOVAL AND DISPOSAL(14) ASBESTOS REMOVAL AND DISPOSAL(14) ASBESTOS REMOVAL AND DISPOSAL(14) ASBESTOS REMOVAL AND DISPOSAL Sch/5 Sch/5 Sch/5 Sch/5

(59) REINSULATING PIPEWORK(59) REINSULATING PIPEWORK(59) REINSULATING PIPEWORK(59) REINSULATING PIPEWORK Sch/8 Sch/8 Sch/8 Sch/8

TOTAL AMOUNT TO GENERAL SUMMARY PAGE

Sch/1 - Sch/8. Sch/1 - Sch/8. Sch/1 - Sch/8. Sch/1 - Sch/8.

Asbestos Removal and Disposal(i)

Asbestos Removal and Disposal Contractors for the HSE

161208

Section Nr 1.3

GENERAL SUMMARY PAGE

Asbestos Removal and Disposal Contractors for the HSE

GENERAL SUMMARY PAGE

TOTAL OF EACH SECTION SUMMARY BROUGHT FORWARD

Section NR 1: Preliminaries B / F

Section NR 2: Asbestos Removal and Disposal B / F

Section NR 3: Re-insulating Pipework B / F

SUB-TOTAL €

TOTAL FORWARD TO FORM OF TENDER (excl VAT) €

Duly authorised to sign on behalf of the Tenderer:

Signed: _____________________________________________________

Print Name of Signatory: ______________________________________

Dated: ______________________________________________________ Capacity or authority of signatory: ______________________________

On behalf of (Registered Company Name or Trading Name):______________________________

Companies Registration Office (CRO) Number (If Applicable): _________________________________

Postal Address of Registered Head Office: ________________________

_______________________________________________________________ _______________________________________________________________ VAT Number: __________________________________________________ Contact Email Address: __________________________________________ www.supplygov.ie (SupplyGov) ID: ______________________________