23
GLOBAL CONSTRUCTION SOFTWARE AND SERVICES User Guide Price IT Copyright 2016 © Computer and Design Services Ltd Version: 2016.0

Price IT - Scaffolding design and estimating software - SMART … · 2016-11-15 · Price IT user guide 3 ... The Price IT project browser helps you to organise your scaffolding items

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Price IT - Scaffolding design and estimating software - SMART … · 2016-11-15 · Price IT user guide 3 ... The Price IT project browser helps you to organise your scaffolding items

GLOBAL CONSTRUCTION SOFTWARE AND SERVICES

User Guide

Price IT

Copyright 2016 © Computer and Design Services Ltd Version: 2016.0

Page 2: Price IT - Scaffolding design and estimating software - SMART … · 2016-11-15 · Price IT user guide 3 ... The Price IT project browser helps you to organise your scaffolding items

Price IT user guide

Copyright 2016 © Computer and Design Services Limited

Contents

Introduction ............................................................................................................................................ 1

Create a new project ............................................................................................................................... 2

Setting up your project ........................................................................................................................... 3

Calculating a price for the item ............................................................................................................... 5

Sections of the report ......................................................................................................................... 6

Changing values .................................................................................................................................. 7

Changing a setting ........................................................................................................................... 7

Saving a setting ............................................................................................................................... 7

Saving to My Rates / Shared Rates ................................................................................................. 8

Why can’t I save these settings? ..................................................................................................... 8

Setting up multiple rate sets ................................................................................................................... 9

Create a ‘Set-Up’ Project ..................................................................................................................... 9

Setting up banded rates ........................................................................................................................ 10

Calculate a price for the project ........................................................................................................... 13

Sections of the report ....................................................................................................................... 13

Changing values ................................................................................................................................ 14

Changing multiple items at once .................................................................................................. 14

Changing the columns shown on the project pricing report ............................................................ 14

Printing the pricing reports ................................................................................................................... 15

Set labour options ................................................................................................................................. 16

Set material options .............................................................................................................................. 16

Set transport options ............................................................................................................................ 17

Labour pricing methods explained ....................................................................................................... 18

Using the other SMART Scaffolder products ........................................................................................ 20

Model IT ............................................................................................................................................ 20

Schedule IT ........................................................................................................................................ 20

Check IT TG20:13 .............................................................................................................................. 20

Report IT............................................................................................................................................ 20

Quote IT ............................................................................................................................................ 20

BIM Toolbox ...................................................................................................................................... 20

Feedback ............................................................................................................................................... 21

Page 3: Price IT - Scaffolding design and estimating software - SMART … · 2016-11-15 · Price IT user guide 3 ... The Price IT project browser helps you to organise your scaffolding items

Price IT user guide

1 Copyright 2016 © Computer and Design Services Limited

Introduction

Thank you for choosing CADS SMART Scaffolder.

SMART Scaffolder Price IT is a detailed, customisable, fast and powerful way to price large or small scaffolding projects.

SMART Scaffolder Price IT helps you to quickly and easily create a cost breakdown and price for your scaffolding project. Once a scaffold is created, all of the details are carried through to the pricing screens automatically.

The Item Pricing report lets you change the way a single scaffolding item is priced.

The Project Pricing report is a quick way to view and change the way all of the scaffolding items are priced.

Page 4: Price IT - Scaffolding design and estimating software - SMART … · 2016-11-15 · Price IT user guide 3 ... The Price IT project browser helps you to organise your scaffolding items

Price IT user guide

2 Copyright 2016 © Computer and Design Services Limited

Create a new project

If you have the network version of SMART Scaffolder, when you first launch the application you will see the Welcome Screen.

You can also open this screen by pressing the File menu button and selecting the New option.

New Enterprise Server Project (Recommended) New Project

Use this option if you want to create a project which can be easily shared with others on your network.

Use this option if the server is not available, or if you are testing.

A contract number will be reserved on the server for your project, and it will be visible to others on your network.

A contract number will be chosen for you, but it is not reserved on the server.

You are given a chance to select the Customer Address and Site Address for this new project. It is recommended that you enter the Customer Address now, if you know it. This will appear on the quotation (if you have Quote IT). If you know the Site Address please enter it now as well. This will be used for pricing transport, and for the TG20 check (if you have Price IT or Check IT TG20:13).

Finally, press Create Project to create the project file.

Please read the Getting Started Guide which will help you customise SMART Scaffolder before continuing to read this guide.

Page 5: Price IT - Scaffolding design and estimating software - SMART … · 2016-11-15 · Price IT user guide 3 ... The Price IT project browser helps you to organise your scaffolding items

Price IT user guide

3 Copyright 2016 © Computer and Design Services Limited

Setting up your project

The Price IT project browser helps you to organise your scaffolding items into a single project, enabling you to price for multiple sets of scaffolding or multiple sites.

The project browser starts with one item in the project, ready to create your first report.

If you wish you can enter a contract number and a description for the project, which will appear in the title areas of your drawings or printed reports. You can also change the name of the item from ‘Item 1’ to any name of your choosing. You can optionally set a project status here as well.

If you want to add another item to the project, select the Click to add a new item option. Alternatively, you can press the Ctrl and Insert keys at the same time. This will add a new blank item to the project and activate it; you can tell which item is active because its border is highlighted in the project browser.

If you want to create a new scaffolding item that is similar to another one, for example to show a variation or to scaffold around a similar building, you can hover the mouse pointer over a thumbnail to display the context-sensitive options:

If you make a mistake while using the project browser you can press the Undo button at the top of the screen.

Click here to copy this item.

Click here to remove this item from the project.

Page 6: Price IT - Scaffolding design and estimating software - SMART … · 2016-11-15 · Price IT user guide 3 ... The Price IT project browser helps you to organise your scaffolding items

Price IT user guide

4 Copyright 2016 © Computer and Design Services Limited

If you are working with a larger project you can scroll the display to see different items, or you can resize the project browser to see more items at the same time.

This makes it easy to reorganise your project if you want to; just click and hold the left mouse button over an item, then move the mouse to reorder the items:

You can move the project browser by dragging its title bar; for example if you prefer to see your items in a horizontal list:

You can also hide the project browser if you want more space for report editing. Just click the X button at the top corner of the browser to minimise the browser and click on the Project button to restore it. Finally, you can click on the Pin button to lock the project browser into place.

Page 7: Price IT - Scaffolding design and estimating software - SMART … · 2016-11-15 · Price IT user guide 3 ... The Price IT project browser helps you to organise your scaffolding items

Price IT user guide

5 Copyright 2016 © Computer and Design Services Limited

Calculating a price for the item

You can calculate the price for the current item using the Item Breakdown report.

When you first open the Price IT tab, this is the report which will be shown. If you have used the Price IT tab previously, the Project Pricing report may be shown instead. In this case, to access a detailed price breakdown for the current scaffold item, choose the Preview Item Pricing button.

The calculated price breakdown is presented as an intelligent, editable report.

Page 8: Price IT - Scaffolding design and estimating software - SMART … · 2016-11-15 · Price IT user guide 3 ... The Price IT project browser helps you to organise your scaffolding items

Price IT user guide

6 Copyright 2016 © Computer and Design Services Limited

Sections of the report

The report is divided in the following sections:

The Header

The Labour section

Output Pay: The cost of the labour to erect, dismantle and adapt the scaffold; plus other expenses such as the carrying of materials.

Additional Costs: Labour expenses such as the cost of travel and wage-on costs.

The Other section: Other costs such as design.

The Materials section

Material Hire: The cost to hire materials.

Contract Expenses: Expenses such as the cost of transporting materials.

Material Purchase: The cost of purchasing materials.

The Overheads section: The cost of labour and material overheads, e.g. administrative costs.

The Margins section: The profit margin and other forms of contingency / profit for the job, excluding an optional customer discount.

Tendered Prices: The quantity, tax and other factors affecting the final price are calculated and shown here.

Check rates: You can check these to make sure that your price is not unusually high or low.

Page 9: Price IT - Scaffolding design and estimating software - SMART … · 2016-11-15 · Price IT user guide 3 ... The Price IT project browser helps you to organise your scaffolding items

Price IT user guide

7 Copyright 2016 © Computer and Design Services Limited

Changing values

Any of the figures presented in the shaded columns of the report can be modified to suit the circumstances of the job.

There are two types of editable box:

Normal

The text on a blue shaded background represents values you can change. These values can be changed to suit the job, but they cannot be saved for future projects.

Settings

The text on a green shaded background represents settings. These values can be used for the current item only, or alternatively, they can be saved and used for future projects and other items in this project.

Changing a setting

For example, the labour rate could be changed for a particular scaffold that can be erected more easily, or with more difficulty than normal:

Saving a setting

When you change a setting, there are 3 ways to save it, which means that it is used for other scaffold items of the same type:

1. Click the advice panel. This appears at the top of the page.

Example

The example scaffold has 34.77 metres of lift run.

Any of the shaded values can be edited, so change the metres of lift run from 34.77 to 35.

The new value is highlighted red, to show that it has been modified. Now, we can change the pricing method to feet, without our 35 value changing:

The first change, in the blue box, can only affect this scaffold, but we could save the second change (in the green box), so that all of our independent scaffolds are priced by “ft of lift run”.

Page 10: Price IT - Scaffolding design and estimating software - SMART … · 2016-11-15 · Price IT user guide 3 ... The Price IT project browser helps you to organise your scaffolding items

Price IT user guide

8 Copyright 2016 © Computer and Design Services Limited

2. Click the “Use these settings for all Project Items” button (in the ribbon).

3. Click the ‘P’ floating button. Hold the mouse over the setting you just changed. A ‘P’ button appears:

All other items of the same type will now use this setting. In the example above, all independent scaffolds would now be priced in feet of lift run.

Multiple Scaffolds

Some settings are repeated if there are multiple scaffolds in the item. When you save a setting, only the first value will be used for that scaffold type’s setting.

Saving to My Rates / Shared Rates

All of these settings can be stored in a special folder called “My Rates”. If you are connected to an Enterprise Server, the special folder is called “Shared Rates” and is shared by everyone on your network.

From the ribbon, you can use, save or delete from My Rates / Server Rates:

Why can’t I save these settings?

It is only possible to save settings once they have been used for all items in the Project. If the Save to My Rates button is missing, try pressing the Use these Settings for all Project Items button:

Here, only the first value (“imperial squares”) will be saved for independent scaffolds.

Pressing to save this value will change the other independent to match.

Page 11: Price IT - Scaffolding design and estimating software - SMART … · 2016-11-15 · Price IT user guide 3 ... The Price IT project browser helps you to organise your scaffolding items

Price IT user guide

9 Copyright 2016 © Computer and Design Services Limited

Setting up multiple rate sets

You can save multiple rates which can be used to generate prices for different customers, or even price using different methods (for example Banded and non-banded).

Create a ‘Set-Up’ Project

The best method for setting rates, using either Model IT or Schedule IT, is to create one of every different scaffold type. For example: independent, birdcage, staircase etc.

Then add every type of add-on that you use. For example, add hop-ups, bridges, safety lamps, sheeting, brick guards, cantilever brackets, etc.

Once this has been done, switch to Price IT, and edit the rates to reflect your company pricing.

Now save your rates. We recommend that you name your saved rate set as a relevant name rather than just overwriting the “Standard” rate set.

To do this, select Save to My Rates (or Save to Shared Rates).

Now from the pull-down menu, type in the name of your new rate.

Finally, press Save.

Page 12: Price IT - Scaffolding design and estimating software - SMART … · 2016-11-15 · Price IT user guide 3 ... The Price IT project browser helps you to organise your scaffolding items

Price IT user guide

10 Copyright 2016 © Computer and Design Services Limited

Setting up banded rates

You can set up banded rates. This allows you to have a different rate for different heights of the scaffold.

The best method for setting these up are similar to the previous section.

First, using either Model IT or Schedule IT, generate one of every different scaffold type. For example independent, birdcage, staircase etc.

This time though, you need to make the scaffolds larger than the maximum height that you will price to. For instance, if you are going to price to 20 lifts then the scaffold might be 41 metres high.

Now under Labour Options, select Use Banded Pricing

You will see that the bands are now displayed in the price.

Page 13: Price IT - Scaffolding design and estimating software - SMART … · 2016-11-15 · Price IT user guide 3 ... The Price IT project browser helps you to organise your scaffolding items

Price IT user guide

11 Copyright 2016 © Computer and Design Services Limited

To set the bands, simply type in the heights required.

Now a rate can simply be assigned to each band.

Page 14: Price IT - Scaffolding design and estimating software - SMART … · 2016-11-15 · Price IT user guide 3 ... The Price IT project browser helps you to organise your scaffolding items

Price IT user guide

12 Copyright 2016 © Computer and Design Services Limited

This can also be done for ties, board movements and netting/sheeting.

Once the Bands and Rates are set, apply the project settings by pressing Use these Settings for all Project Items.

Then save back to your rates. To do this, select Save to My Rates (or Save to Shared Rates).

Now from the pull-down menu, type in the name of your new rate and press Save.

From now on when these rates are used, Price IT will price the band according to the height of the scaffold. So for instance, if only 6 lifts are required, only the relevant bands are shown.

Page 15: Price IT - Scaffolding design and estimating software - SMART … · 2016-11-15 · Price IT user guide 3 ... The Price IT project browser helps you to organise your scaffolding items

Price IT user guide

13 Copyright 2016 © Computer and Design Services Limited

Calculate a price for the project

You can also calculate the price for the whole project using the Project Summary report.

When you first open the Price IT tab, the item pricing report is shown instead. To access the project summary report, press the Show Project Summary button.

You can edit the most common price settings for the whole project from here.

Sections of the report

The report is divided up in to the following sections:

Project Items The Header

The All Items row: Use this row to set a single value for all items (all rows).

Page 16: Price IT - Scaffolding design and estimating software - SMART … · 2016-11-15 · Price IT user guide 3 ... The Price IT project browser helps you to organise your scaffolding items

Price IT user guide

14 Copyright 2016 © Computer and Design Services Limited

Changing values

Click on any box in the table and change the value. This will change it on the Item Pricing report for that item as well. This will normally change the final price.

Changing multiple items at once

You can easily set a single value to be used by every item in the project. Just click in the All Items row. Before you select it, the All Items row has the following text: “Use this row to change for all items”.

Type your new value and leave the box by clicking anywhere else. Your value will now be used for every row in the table.

Changing the columns shown on the project pricing report

You can change the columns shown on this report using the Choose Visible Columns drop-down menu.

Simply select the columns you want to see.

Page 17: Price IT - Scaffolding design and estimating software - SMART … · 2016-11-15 · Price IT user guide 3 ... The Price IT project browser helps you to organise your scaffolding items

Price IT user guide

15 Copyright 2016 © Computer and Design Services Limited

Printing the pricing reports

A new toolbar is displayed while previewing either of the reports:

Feature Description

Warning Log This icon appears if any errors, warnings, or information messages apply to the calculated materials for any item.

For example, a message may be raised to inform you if tube-and-fitting bracing is required to accommodate a bay length for which a standard bracing component is not available.

Print Preview Press this to close the print preview and return to editing.

Print Prints the report, providing options to select the required printer and paper options.

Quick Print Prints the report to the default printer.

Page Setup Allows you to choose the paper size, margins, and orientation: portrait or landscape.

Navigation Provides options to move back and forth through the pages of the report.

Zoom Zooms the report to allow you to see it in detail or to view multiple pages.

Page Colour Allows you to specify the background colour to use while printing, for example if your company uses a coloured background on its stationery.

Watermark Allows you to add a text or image watermark to the report. You might use this to show your company logo on the reports.

Export to Allows you to export the report to an Adobe PDF, Microsoft Word document or Microsoft Excel spreadsheet.

Email as Allows you to create an email with the drawings or material list attached as an Adobe PDF, Microsoft Word, or Microsoft Excel file.

To close the preview and return, just press the Print Preview button again.

Note that the Project Pricing Report print preview is a pie chart with fixed, set columns. Showing or hiding columns does not change the columns shown on the printable report.

Page 18: Price IT - Scaffolding design and estimating software - SMART … · 2016-11-15 · Price IT user guide 3 ... The Price IT project browser helps you to organise your scaffolding items

Price IT user guide

16 Copyright 2016 © Computer and Design Services Limited

Set labour options

It is possible to change the way that labour is priced. To do this, select the Labour Options menu:

Set material options

It is possible to change the way that materials are priced. To do this, select the Material Options menu:

Price by Material List

This gives a detailed set of prices based on your pricing settings for every component.

Set the labour to be priced as a flat rate (currency) or as hours of work, multiplied by the Labour Cost (per hour).

Included pricing lines for: Placing boards Moving boards Fixing ties

Separate lifts which have been set as working or unboarded, from those set as structural when pricing the labour to erect the scaffolding.

Set the Labour Cost (per hour), which is used when the Price Labour in Hours option is set.

Page 19: Price IT - Scaffolding design and estimating software - SMART … · 2016-11-15 · Price IT user guide 3 ... The Price IT project browser helps you to organise your scaffolding items

Price IT user guide

17 Copyright 2016 © Computer and Design Services Limited

While this option is set, the final button, Open Material Pricing Configuration is available, jumping to the view where each component’s pricing settings are selected.

Price as % of Labour

Price the materials based on a simple percentage of the labour.

No Material Cost

Materials are not priced separately. They are included in the labour calculations.

Set transport options

It is possible to change the way that transport is priced. To do this, select the Transport Options menu:

My Depot (Yard) Address

Use this option to set the location of your yard. This location will be used to calculate the distance and time to travel to a site.

Site Address

Use this option to set the location of the site. This location will be used to calculate the distance and time to travel to or from your yard.

Calculate Travel Distance and Time

Forces the distance and time to be recalculated immediately. This requires an internet connection.

Page 20: Price IT - Scaffolding design and estimating software - SMART … · 2016-11-15 · Price IT user guide 3 ... The Price IT project browser helps you to organise your scaffolding items

Price IT user guide

18 Copyright 2016 © Computer and Design Services Limited

Labour pricing methods explained

For each scaffold type, the following labour pricing rates are available, and appear in the Labour section of the item pricing report:

Method Description

m of lift run The sum of the Length each lift, in metres.

ft of lift run As above, but measured in feet.

imperial squares The Length x Height (to the top lift) measured in 100’ x 100’ squares.

fittings The number of fittings (clamps) in the scaffold from the material list.

standards The number of standard positions x the number of lifts.

m2 of scaffold The Length x Height (to the top lift) measured in 1m x 1m squares.

ft2 of scaffold As above, but measured in 1’ x 1’ squares.

m of tube The length of all tubular components in the material list, measured in metres.

ft of tube As above, but measured in feet.

components The number of components for that scaffold in the material list.

kgs of material The total weight of components for that scaffold in the material list, measured in kilograms.

lbs of material As above, but measured in pounds.

This method is not recommended for scaffolds where the Width is an important, changing factor, such as birdcages.

This method is not recommended for scaffolds where the Width is an important, changing factor, such as birdcages.

This method is not recommended for scaffolds where the Width is an important, changing factor, such as birdcages.

Page 21: Price IT - Scaffolding design and estimating software - SMART … · 2016-11-15 · Price IT user guide 3 ... The Price IT project browser helps you to organise your scaffolding items

Price IT user guide

19 Copyright 2016 © Computer and Design Services Limited

tonnes of material As above, but measured in (metric) tonnes.

tons of material As above, but measured in (imperial) tons.

m2 of lift area The total plan area of every bay on every lift, whether boarded or unboarded, measured in 1m x 1m squares.

ft2 of lift area As above, but measured in 1’ x 1’ squares.

cubic metres The total volume of the scaffold, measured in 1m x 1m x 1m cubes.

cubic feet As above, but measured in 1’ x 1’ x 1’ cubes.

rising metres The Height measured from the ground to the top of the highest guardrail, measured in metres.

rising feet As above, but measured in feet.

component minutes The sum total of the Labour Time associated with each component of the scaffold. (This can be set through the Configuration.)

This method is not recommended for scaffolds where the Width or Length are important, changing factors, such as independents and birdcages.

Page 22: Price IT - Scaffolding design and estimating software - SMART … · 2016-11-15 · Price IT user guide 3 ... The Price IT project browser helps you to organise your scaffolding items

Price IT user guide

20 Copyright 2016 © Computer and Design Services Limited

Using the other SMART Scaffolder products

The best way to use the SMART Scaffolder products is to use them together. Every product is designed to enhance the rest of the suite.

SMART Scaffolder Price IT can be used with the rest of the SMART Scaffolder products:

Model IT

SMART Scaffolder Model IT is a powerful 3D modelling tool. Use it to create scaffolds to exactly meet your project-specific needs. These 3D models also have automatic material calculations which are used in the materials section of the item pricing report.

Schedule IT

As a rapid way of creating large, multi-scaffold projects, Schedule IT can be used to rapidly create projects which Price IT can use for the pricing reports.

Check IT TG20:13

Create your project of scaffolds in Schedule IT or Model IT, then immediately jump to Check IT TG20:13 to load the scaffolds, choose your site location and print a TG20:13 summary report.

Report IT

Check and customise the material lists for your project, which are used by the materials section of the item pricing reports. You can also produce technical drawings, using the drawings reports.

Quote IT

Generate quotations for the project. Details of the items and pricing within the project are automatically shown in the customisable quotations.

BIM Toolbox

Create scaffolds more quickly, using information from an existing model, or export data from SMART Scaffolder to be used in other design software.

For more information about the other SMART Scaffolder products, please refer to their user guides, which were also supplied with your SMART Scaffolder DVD.

Page 23: Price IT - Scaffolding design and estimating software - SMART … · 2016-11-15 · Price IT user guide 3 ... The Price IT project browser helps you to organise your scaffolding items

Price IT user guide

21 Copyright 2016 © Computer and Design Services Limited

Feedback

Thank you for choosing CADS SMART Scaffolder.

We are always striving to improve the product so please contact us with your feedback. We are always keen to hear new ideas and if you experience any problems with the software we want to hear about them so that they can be resolved.

You can contact us via:

Our website support centre at www.smartscaffolder.com/support.html;

Email on [email protected];

Telephone on +44 (0)1202 603733 from Monday to Friday between 09:30 and 17:00.