23
SEISMIC ISOLATION OF PIERS AND WHARVES USING LEAD-RUBBER BEARINGS Bob Harn Senior Project Manager | Jeff Kilborn Project Manager PREVENTION FIRST 2012 October 24, 2012

Prevention First 2012 (10-22-12) - State Lands …slc.ca.gov/About/Prevention_First/2012/Seismic-Seismic.pdf · Puerto de Coronel Chile ... San Diego, CA (2009) ... Microsoft PowerPoint

Embed Size (px)

Citation preview

Page 1: Prevention First 2012 (10-22-12) - State Lands …slc.ca.gov/About/Prevention_First/2012/Seismic-Seismic.pdf · Puerto de Coronel Chile ... San Diego, CA (2009) ... Microsoft PowerPoint

SEISMIC ISOLATION OF PIERS AND WHARVES USING LEAD-RUBBER BEARINGSBob Harn – Senior Project Manager | Jeff Kilborn – Project Manager

PREVENTION FIRST 2012October 24, 2012

Page 2: Prevention First 2012 (10-22-12) - State Lands …slc.ca.gov/About/Prevention_First/2012/Seismic-Seismic.pdf · Puerto de Coronel Chile ... San Diego, CA (2009) ... Microsoft PowerPoint

Presentation Overview

• Principles of seismic isolation

• Principles of lead-rubber bearings (LRBs)

• Applications

• MOT case study

• Broadway Pier retrofit

Page 3: Prevention First 2012 (10-22-12) - State Lands …slc.ca.gov/About/Prevention_First/2012/Seismic-Seismic.pdf · Puerto de Coronel Chile ... San Diego, CA (2009) ... Microsoft PowerPoint

Behavior with and without Seismic Isolation

Without Isolation With Isolation

Foundation

Structure

Isolators

Page 4: Prevention First 2012 (10-22-12) - State Lands …slc.ca.gov/About/Prevention_First/2012/Seismic-Seismic.pdf · Puerto de Coronel Chile ... San Diego, CA (2009) ... Microsoft PowerPoint

Characteristics of a Seismic Isolation System

• Added flexibility increases period of vibration and reduces force response

• Energy dissipation (damping) controls forces and displacements

• Rigidity under service demands

Page 5: Prevention First 2012 (10-22-12) - State Lands …slc.ca.gov/About/Prevention_First/2012/Seismic-Seismic.pdf · Puerto de Coronel Chile ... San Diego, CA (2009) ... Microsoft PowerPoint

Lead Rubber Bearing (LRB)

Lead Core provides initial stiffness with high damping when yielded

Internal Plate

Laminated Rubber provides flexibility and re-centers bearing after earthquake

Rubber Cover

Flange Plate

Page 6: Prevention First 2012 (10-22-12) - State Lands …slc.ca.gov/About/Prevention_First/2012/Seismic-Seismic.pdf · Puerto de Coronel Chile ... San Diego, CA (2009) ... Microsoft PowerPoint

Requirements of Marine Seismic Isolation System

• Every element tested

• Resist desired earthquake undamaged

• Saltwater resistant

Lead-Rubber Bearing

Page 7: Prevention First 2012 (10-22-12) - State Lands …slc.ca.gov/About/Prevention_First/2012/Seismic-Seismic.pdf · Puerto de Coronel Chile ... San Diego, CA (2009) ... Microsoft PowerPoint

LRB Dolphin

• Batter piles are stiff and strong for service loads

• LRBs add flexibility and damping system• LRBs capacity protect the batter piles

Example Pushover Plot Damping vs. Displacement Plot

Page 8: Prevention First 2012 (10-22-12) - State Lands …slc.ca.gov/About/Prevention_First/2012/Seismic-Seismic.pdf · Puerto de Coronel Chile ... San Diego, CA (2009) ... Microsoft PowerPoint

Uses of LRB Dolphins“Seismic Isolation” and “Drift Control”

Bas

e Sh

ear

Period

Drift Control

Seismic Isolation

Page 9: Prevention First 2012 (10-22-12) - State Lands …slc.ca.gov/About/Prevention_First/2012/Seismic-Seismic.pdf · Puerto de Coronel Chile ... San Diego, CA (2009) ... Microsoft PowerPoint

Applications of LRB dolphins

• Retrofit of existing piers• Seismic isolation reduces base shear, protects assets

• Construction below deck

• Minimize need for new piles

• Deep water piers• Drift control reduces displacements, protects assets

• LRB dolphins strengthen pier for non-seismic demands

• Reduces number and size of required plumb piles

Page 10: Prevention First 2012 (10-22-12) - State Lands …slc.ca.gov/About/Prevention_First/2012/Seismic-Seismic.pdf · Puerto de Coronel Chile ... San Diego, CA (2009) ... Microsoft PowerPoint

Previous Applications of Seismic Isolation to Piers

POLA Berth 136 Extension (1994)Sliding Friction Dampers

Puerto de Coronel Chile (2008)

LRB

Page 11: Prevention First 2012 (10-22-12) - State Lands …slc.ca.gov/About/Prevention_First/2012/Seismic-Seismic.pdf · Puerto de Coronel Chile ... San Diego, CA (2009) ... Microsoft PowerPoint

Use of Seismic Isolation on Piers by BergerABAM

• Retrofit of Broadway Pier – San Diego, CA (2009)• Deep water pier (2011)• Deep water pier with large industrial building (2011)

105’

110’

Page 12: Prevention First 2012 (10-22-12) - State Lands …slc.ca.gov/About/Prevention_First/2012/Seismic-Seismic.pdf · Puerto de Coronel Chile ... San Diego, CA (2009) ... Microsoft PowerPoint

MOT Case Study

• Earthquake - MOTEMS POLA CLE• No liquefaction• Target displacement 10 inches

85’

Section

Concrete deck

Pipe piles

60’ x 100’ unloading platform (ULP)

MOT Plan

Page 13: Prevention First 2012 (10-22-12) - State Lands …slc.ca.gov/About/Prevention_First/2012/Seismic-Seismic.pdf · Puerto de Coronel Chile ... San Diego, CA (2009) ... Microsoft PowerPoint

Solution Using 54” Diameter Plumb Piles

54” x 2” wall pipe piles

• Mass = 4700 kips• Displacement = 10 inches• V= 2100 kips• Damping 8%• Steel weight in piles = 2,000,000 lbs• Approx. Cost = $4 million

Section

4’-6” thick deck

Pile Plan

Page 14: Prevention First 2012 (10-22-12) - State Lands …slc.ca.gov/About/Prevention_First/2012/Seismic-Seismic.pdf · Puerto de Coronel Chile ... San Diego, CA (2009) ... Microsoft PowerPoint

Solution Using 36” Piles and LRBs for Drift Control

36” x 0.75” pipe piles plumb and battered (28 total)

• Mass = 3100 kips• Displacement = 9.5 inches• V=1170 kips• 19% damping• Steel weight in piles = 1,100,000 lbs• Approx. Cost = $2.8 million36” thick deck

LRBs

Section

Pile Plan

Page 15: Prevention First 2012 (10-22-12) - State Lands …slc.ca.gov/About/Prevention_First/2012/Seismic-Seismic.pdf · Puerto de Coronel Chile ... San Diego, CA (2009) ... Microsoft PowerPoint

MOT Unloading Platform Case Study Summary

• 54” diameter piles• Thick heavy deck required to fix piles• Less damping – higher force

• $ 4.0 million for unloading platform

• LRBs with 36” diameter piles• Thinner deck – less mass• More damping – less force

• $2.8 million for unloading platform

Page 16: Prevention First 2012 (10-22-12) - State Lands …slc.ca.gov/About/Prevention_First/2012/Seismic-Seismic.pdf · Puerto de Coronel Chile ... San Diego, CA (2009) ... Microsoft PowerPoint

Broadway Pier Seismic Upgrade – San Diego, CA

• Owner - San Diego Unified Port District

• Part of larger Broadway Pavilion project

• Completed in late 2010

• Project Team• BergerABAM• Bermello/Ajamil Partners Inc. • Moffatt&Nichol-Blaylock

Page 17: Prevention First 2012 (10-22-12) - State Lands …slc.ca.gov/About/Prevention_First/2012/Seismic-Seismic.pdf · Puerto de Coronel Chile ... San Diego, CA (2009) ... Microsoft PowerPoint

Broadway Pier Project Overview

• Client wants new building on an aging pier• Pier had seismic deficiencies – did not meet CBC• No permit for new piles• Project completion date fixed• Limited budget

1025’Bulkhead

Plan of Broadway Pier

Proposed Building

Page 18: Prevention First 2012 (10-22-12) - State Lands …slc.ca.gov/About/Prevention_First/2012/Seismic-Seismic.pdf · Puerto de Coronel Chile ... San Diego, CA (2009) ... Microsoft PowerPoint

Seismic Deficiencies

Beach deposits (liquefiable)

• Brittle batter pile connections both directions• Insufficient ductility in plumb piles

Section Through Pier

Page 19: Prevention First 2012 (10-22-12) - State Lands …slc.ca.gov/About/Prevention_First/2012/Seismic-Seismic.pdf · Puerto de Coronel Chile ... San Diego, CA (2009) ... Microsoft PowerPoint

Solution

New Pavilion Building

New seismic isolation bearings on new pile caps supported on the existing piles

• All work done under pier

• No building impact

• Cost $3 million

Page 20: Prevention First 2012 (10-22-12) - State Lands …slc.ca.gov/About/Prevention_First/2012/Seismic-Seismic.pdf · Puerto de Coronel Chile ... San Diego, CA (2009) ... Microsoft PowerPoint

Construction Step 1

• Install falsework• Remove pile cover• Install stage 1 pile cap

• Install falsework• Remove pile cover• Install stage 1 pile cap

Page 21: Prevention First 2012 (10-22-12) - State Lands …slc.ca.gov/About/Prevention_First/2012/Seismic-Seismic.pdf · Puerto de Coronel Chile ... San Diego, CA (2009) ... Microsoft PowerPoint

Construction – Step 2

• Install pipe shoring• Cut-off existing piles• Anchor reinforcement

• Install pipe shoring• Cut-off existing piles• Anchor reinforcement

Page 22: Prevention First 2012 (10-22-12) - State Lands …slc.ca.gov/About/Prevention_First/2012/Seismic-Seismic.pdf · Puerto de Coronel Chile ... San Diego, CA (2009) ... Microsoft PowerPoint

Construction – Step 3

• Complete stage 2 pile cap• Install LRBs• Complete grouting, remove

shores and falsework

• Complete stage 2 pile cap• Install LRBs• Complete grouting, remove

shores and falsework

Page 23: Prevention First 2012 (10-22-12) - State Lands …slc.ca.gov/About/Prevention_First/2012/Seismic-Seismic.pdf · Puerto de Coronel Chile ... San Diego, CA (2009) ... Microsoft PowerPoint

Summary - Applications of Seismic Isolation

• Deep water Piers• Drift control of plumb pile structures

• Reduce base shear to protect assets (buildings, equipment & utilities)

• Retrofit of existing piers• Seismic isolation

• Reduce base shear to protect assets

• Minimize impacts on operations

• Minimize number of new piles

• Questions?