Sheet1ItemDescripcinUnd.MetradoPrecio (S/.)Parcial (S/.)001PAVIMENTACION26,151,034.63001.01OBRAS PRELIMINARES635,731.47001.01.01ALQUILER DE ALMACENMES18.0012,000.00216,000.00001.01.02REUBICACION DE POSTES DE TELEFONOund10.00363.283,632.80001.01.03ELIMINACION DE ARBOLpza400.0065.6726,268.00001.01.04REUBICACION DE POSTES DE LUZund50.00426.7521,337.50001.01.05DESMONTAJE DE ALCANTARILLAS TUBULARESund6.001,237.497,424.94001.01.06DEMOLICION DE PAVIMENTO FLEXIBLE C/EQUIPO E=0.075mm211,700.0011.67136,539.00001.01.07DEMOLICION PAVIMENTO RIGIDO C/EQ.(LOSA DE CONCRETO) E=0.20Mm23,227.6625.0080,691.50001.01.08DEMOLICION DE VEREDA DE CONCRETO C/EQUIPO E=0.10Mm23,329.0417.5058,258.20001.01.09DEMOLICION DE CANALETAS/ALCANTARILLAS EXISTENTESm31,438.5357.9483,348.43001.01.10REMOCION DE ESTRUCTURAS EXISTENTEund185.0012.062,231.10001.02TRABAJOS PRELIMINARES761,133.01001.02.01CARTEL DE IDENTIFICACION DE LA OBRA 5.60 x 3.60 Mund3.00848.392,545.17001.02.02LIMPIEZA DE TERRENO MANUALm2159,494.940.80127,595.95001.02.03TRAZO, NIVELES Y REPLANTEO DURANTE EL PROCESO CONSTRUCTIVOm2159,494.943.58570,991.89001.02.04MOVILIZACION Y DESMOVILIZACION DE EQUIPOSGLB1.0060,000.0060,000.00001.03MOVIMIENTO DE TIERRAS7,047,113.41001.03.01EXCAVACION HASTA SUB RASANTE MAT. SUELTO C/TRACTORm361,519.4810.69657,643.24001.03.02EXCAVACION HASTA SUB RASANTE R.S. S/EXPL. TRACTORm329,620.4915.68464,449.28001.03.03RELLENO COMPACTADO CON MATERIAL PROPIO C/EQUIPO (EN PISTAS R=250 M3/DIA)m323,069.8025.59590,356.18001.03.04RELLENO COMPACTADO CON MATERIAL PRESTAMO R=300 M3/DIA EN PISTASm323,069.80117.372,707,702.43001.03.05CONFORMACION Y COMPACTACION SUB RASANTE C/MOTONIVELADORA 125 HPm2159,494.945.07808,639.35001.03.06ELIMINACION DE EXCEDENTES C/VOLQ. 15 M3 D=10 KMm394,753.6719.191,818,322.93001.04PAVIMENTOS15,113,531.92001.04.01BASE DE 0.20 M.m2113,924.9622.772,594,071.34001.04.02ENCOFRADO Y DESENCOFRADO METALICO P/LOSA DE CONCRETOm239,873.7458.312,325,037.78001.04.03PAVIMENTO DE CONCRETO F'C= 245 KG/CM2 E=0.20Mm2113,924.9678.428,933,995.36001.04.04ACERO CORRUGADO (BASTONES EN JUNTAS)kg23,366.746.75157,725.50001.04.05ACERO LISO (BASTONES EN JUNTAS) - TRANVERSALESkg165,819.846.651,102,701.94001.05JUNTAS2,503,720.52001.05.01RELLENO DE JUNTAS DE PAVIMENTACION E=6 MMML13,999.6823.70331,792.42001.05.02RELLENO DE JUNTAS DE PAVIMENTACION E=12 MMML30,290.2231.83964,137.70001.05.03RELLENO DE JUNTAS DE PAVIMENTACION E=20 MMML25,453.9647.451,207,790.40001.06PLAN DE DESVIOS DE TRAFICO44,604.30001.06.01TRANQUERA DE MADERA 1.20X1.10M P/DESVIO DE TRANSPORTEund16.0081.461,303.36001.06.02SEALIZACION NOCTURNA POR TRAMOSUND16.00171.742,747.84001.06.03HABILITACION DE VIAS AUXILIARES EN LA EJECUCIONKM5.404,546.8724,553.10001.06.04CONSTRUCCION DE CRUCES DE CANAL PROVISIONALund32.00500.0016,000.00001.07PLAN DE SEGURIDAD DE OBRA15,600.00001.07.01BOTIQUIN DE PRIMEROS AUXILIOSund18.00450.008,100.00001.07.02EXTINTORES DE 6 Kg.und18.00150.002,700.00001.07.03CINTA DE SEGURIDAD EN OBRArll60.0080.004,800.00001.08CONTROL DE CALIDAD DE OBRA29,600.00001.08.01DISEO DE MEZCLA DE CONCRETOGLB10.00450.004,500.00001.08.02ANALISIS FISICO QUIMICO DE LOS AGREGADOSund10.00350.003,500.00001.08.03ANALISIS QUIMICO DEL AGUA USADO PARA EL CONCRETOund5.00720.003,600.00001.08.04PRUEBAS DE COMPACTACION-DENSIDAD DE CAMPOund50.00220.0011,000.00001.08.05PRUEBAS DE CALIDAD DEL CONCRETO(RESISTENCIA A LA COMPRESION)und100.0070.007,000.00002OBRAS DE DRENAJE8,064,926.72002.01TRABAJOS PRELIMINARES44,081.28002.01.01NIVELACION, TRAZADO Y REPLANTEO C/EQUIPOm215,096.332.9244,081.28002.02MOVIMIENTO DE TIERRAS507,402.49002.02.01EXCAVACION PARA ALCANTARILLAS C/EQUIPO PESADOM3833.429.127,600.79002.02.02EXCAVACION PARA CANALETAS CON EQUIPO PESADOM315,096.339.12137,678.53002.02.03ELIMINACION DE EXCEDENTES C/VOLQ. 15M3 D=10 KMm318,870.4119.19362,123.17002.03OBRAS DE CONCRETO SIMPLE307,506.99002.03.01SOLADO 4" MEZCLA 1:12 CEMENTO - ARENAm213,870.4122.17307,506.99002.04CONCRETO ARMADO - CANALETAS6,964,414.99002.04.01CONCRETO F'C= 175 KG/CM2- LOSA/FONDO Y PAREDESM35,577.53326.151,819,111.41002.04.02CONCRETO F'C= 210 KG/CM2 EN TECHOS / TAPASM32,028.19349.84709,541.99002.04.03ENCOFRADO Y DESENCOFRADO DE CANALETASM250,704.8627.421,390,327.26002.04.04ACERO DE REFUERZO F'Y=4200 KG/CM2kg500,066.855.872,935,392.41002.04.05WATER STOP NEOPRENE 6" EN CANALETASM3,459.3531.81110,041.92002.05ALCANTARILLAS241,520.97002.05.01CONCRETO F'C= 175 KG/CM2- LOSA/FONDOM379.49326.1525,925.66002.05.02CONCRETO F'C= 175 KG/CM2 EN MUROSm396.37329.8931,791.50002.05.03CONCRETO F'C= 210 KG/CM2 EN LOSA SUPERIORM374.52349.8426,070.08002.05.04ENCOFRADO Y DESENCOFRADO DE MUROM2640.6727.4217,567.17002.05.05ACERO DE REFUERZO F'Y=4200 KG/CM2kg23,878.465.87140,166.56003MUROS DE CONTENCION8,668,839.59003.01TRABAJOS PRELIMINARES24,374.31003.01.01NIVELACION, TRAZADO Y REPLANTEO C/EQUIPOm27,640.853.1924,374.31003.02MOVIMIENTO DE TIERRAS3,924,361.54003.02.01EXCAVACION PARA MUROS DE CONTENCION C/ EQUIPO PESADO T.S.m324,973.249.92247,734.54003.02.02EXCAVACION PARA MUROS DE CONTENCION C/EQUIPO PESADO R.S.m324,316.0517.59427,719.32003.02.03EXCAVACION PARA MUROS DE CONTENCION C/EQUIPO PESADO R.F.m324,644.6528.40699,908.06003.02.04RELLENO COMPACTADO MATERIAL PROPIO - CIMIENTO DE MUROm380,214.2319.311,548,936.78003.02.05ELIMINACION DE EXCEDENTES C/VOLQ. 15M3 D=10 KMm348,546.7420.601,000,062.84003.03OBRAS DE CONCRETO SIMPLE174,822.65003.03.01SOLADO 4" MEZCLA 1:12 CEMENTO-ARENAm27,640.8522.88174,822.65003.04OBRAS DE CONCRETO ARMADO4,545,281.09003.04.01CONCRETO F'C=210 KG/CM2 EN MURO CONTENCIONm36,327.50351.002,220,952.50003.04.02ENCOFRADO Y DESENCOFRADO CARAVISTA MURO DE CONTENCIONm224,585.3832.58800,991.68003.04.03ACERO DE REFUERZO FY=4200 KG/CM2kg256,023.015.951,523,336.91004INSTALACIONES ELECTRICAS Y ELECTROMECANICAS1,077,436.95004.01TRABAJOS PRELIMINARES DE OBRAS CIVILES-ELECTRICAS78,210.65004.01.01EXCAVACION DE ZANJAS C/EQUIPOm31,324.809.1212,082.18004.01.02EXCAVACION POZO PARA POSTE 5.00m 0.30m x 0.30m x 0.50mm314.8142.95636.09004.01.03EXCAVACION POZO PARA POSTE 13.00mm31.2542.9553.69004.01.04EXCAVACION C/EQUIPO DE POZO PARA PUESTA A TIERRA DE 2.40m, DIAMETRO 0.80m a 1.00mm3693.669.816,804.80004.01.05RELLENO COMPACTADO CON MATERIAL PROPIO C/EQUIPO (EN PISTAS R=250 M3/DIA)m31,104.0025.5928,251.36004.01.06ELIMINACION MATERIAL EXCEDENTE C/VOLQ. 15M3 D=10 KMm3264.9625.116,653.15004.01.07COLOCACION CAMA ARENAm3220.80107.4723,729.38004.02SUMINISTRO E INSTALACION POSTES292,443.61004.02.01SUMINISTRO E INSTALACION POSTES ORNAMENTALES DE 5Mund329.00660.55217,320.95004.02.02SUMINISTRO E INSTALACION ARMADO ESPECIAL P/FAROLA DOS BRAZOSund329.00207.7468,346.46004.02.03SUMINISTRO E INSTALACION DE POSTE C.A.C. 13/300und5.001,355.246,776.20004.03SUMINISTRO E INSTALACION DE CONDUCTORES ELECTRICOS100,617.40004.03.01SUMINISTRO E INSTALACION CONDUCTOR NYY 1-3x10mm2+1x10mm2m7,150.0012.7591,162.50004.03.02SUMINISTRO E INSTALACION CONDUCTOR NYY 1-2x4mm2+1x4mm2m910.0010.399,454.90004.04SUMINISTRO E INSTALACION EQUIPOS ALUMBRADO135,197.92004.04.01SUMINISTRO E INSTALACION ALUMBRADO PUBLICO TIPO ESFERICA HPC-Eund329.00403.13132,629.77004.04.02SUMINISTRO E INSTALACION DE REFLECTORES DE 250 Wund5.00513.632,568.15004.05SUMINISTRO E INSTALACION PUESTA TIERRA187,897.12004.05.01SUMINSITRO E INSTALACION PUESTA TIERRA 2.40m VARILLA DE COBREund368.00510.59187,897.12004.06OTROS283,070.25004.06.01PROTECCION DE CABLE ELECTRICO NYY DE BAJA TENSION SUBTERRANEOm8,060.0034.86280,971.60004.06.02SUMINISTRO E INSTALACION ARMADO ESPECIAL P/REFLECTORund5.00219.151,095.75004.06.03PRUEBA DE AISLAMIENTO DE CONDUCTORESda30.0033.431,002.90005VEREDAS,SARDINELES Y MARTILLOS8,594,671.28005.01TRABAJOS PRELIMINARES2,875.33005.01.01NIVELACION, TRAZADO Y REPLANTEO C/EQUIPOm21,956.011.472,875.33005.02MOVIMIENTO DE TIERRAS2,336,047.45005.02.01EXCAVACION MANUAL PARA SARDINELESM33,030.9842.95130,180.59005.02.02EXCAVACION MANUAL PARA UA DE CONCRETOm350,817.0342.952,182,591.44005.02.03RELLENO COMPACTADO CON MATERIAL PROPIO C/EQUIPO LIVIANOm3293.4079.3323,275.42005.03MARTILLO1,809,228.94005.03.01BASE GRANULAR PARA VEREDAS Y MARTILLOS E=0.10Mm224,206.9714.04339,865.86005.03.02CONFORMACION DE SUB RASANTE PARA VEREDASm224,206.977.90191,235.06005.03.03CONCRETO F'C=175 KG/CM2 BRUADO EN VEREDAS Y MARTILLO E=0.15m.m224,206.9752.801,278,128.02005.04VARIOS - CONCRETO ARMADO4,272,689.56005.04.01TAPAS DE CONCRETO PARA INSPECCION Y LIMPIEZA fc=210 kg/cm2m31,839.50335.24616,673.98005.04.02UA DE CONCRETO F'C= 210 KG/CM2 EN LOSAm33,431.38355.281,219,100.69005.04.03CONCRETO F'C= 175 KG/CM2- SARDINELESM32,020.65325.34657,398.27005.04.04ENCOFRADO Y DESENCOFRADO DE SARDINELESM226,942.0627.42738,751.29005.04.05ACERO DE REFUERZO F'Y=4200 KG/CM2 -SARDINELESkg78,131.965.87458,634.61005.04.06REJILLA METALICA CON MARCO 0.55x0.80und1,990.00226.42450,575.80005.04.07WATER STOP EN OBRAS DE ARTEm4,179.0031.48131,554.92005.05CONEXIONES DOMIICILIARAS173,830.00005.05.01RECONEXION DOMICILIARIA DE AGUA POTABLEund250.00317.6679,415.00005.05.02RECONEXION DOMICILIARIA DE DESAGUEund250.00377.6694,415.00006JARDINERIA343,804.38006.01SEMBRADO DE GRASm220,450.786.35129,862.45006.02PLANTADO ARBOL FICUSund2,312.0041.0995,000.08006.03COLOCACION DE HUMUS ORGANICOm32,045.0858.16118,941.85007PUENTES PEATONALES3,760,981.83007.01OBRAS PRELIMINARES3,734.39007.01.01NIVELACION, TRAZADO Y REPLANTEO C/EQUIPOm22,540.401.473,734.39007.02MOVIMIENTO DE TIERRAS33,026.05007.02.01EXCAVACION C/EQUIPO PARA ZAPATAS MATERIAL SEMIROCOSOm31,001.649.129,134.96007.02.02RELLENO CON MATERIAL PROPIO EXTRAIDOm3527.5423.7312,518.52007.02.03ELIMINACION MATERIAL EXCEDENTE C/VOLQ. 15M3 D=10 KMm3592.6319.1911,372.57007.03CONCRETO SIMPLE34,691.94007.03.01SOLADO 4" MEZCLA 1:12 CEMENTO-ARENAm2539.5222.2011,977.34007.03.02PISO CEMENTO FROTACHADO E=4" MEZCLA 1:4m2707.6232.1022,714.60007.04CONCRETO ARMADO1,403,436.56007.04.01ZAPATAS173,595.28007.04.01.01CONCRETO EN ZAPATAS F'C= 210 KG/CM2m3351.86361.31127,130.54007.04.01.02ACERO DE REFUERZO FY=4200 KG/CM2kg7,809.205.9546,464.74007.04.02MUROS DE CONCRETO ARMADO828,755.19007.04.02.01CONCRETO F'C=210 kG/CM2 EN MUROS DE CONCRETO ARMADOm3608.06370.84225,492.97007.04.02.02ENCOFRADO Y DESENCOFRADO NORMAL MUROS CONCRETO ARMADOm23,269.7648.45158,419.87007.04.02.03ACERO DE REFUERZO FY=4200 KG/CM2kg74,763.425.95444,842.35007.04.03VIGAS71,550.93007.04.03.01CONCRETO EN VIGAS F'C=210 KG/CM2m323.17393.169,109.52007.04.03.02ENCOFRADO Y DESENCOFRADO NORMAL EN VIGASm2178.2047.708,500.14007.04.03.03ACERO DE REFUERZO FY=4200 KG/CM2kg9,065.765.9553,941.27007.04.04RAMPAS DE ACCESO329,535.16007.04.04.01CONCRETO EN RAMPAS DE ACCESO F'C=210 KG/CM2m3333.42381.91127,336.43007.04.04.02ENCOFRADO Y DESENCOFRADO NORMAL RAMPA DE ACCESOm22,083.8844.8093,357.82007.04.04.03ACERO DE REFUERZO FY=4200 KG/CM2kg18,292.595.95108,840.91007.05SUPERESTRUCTURA LOSA-VIGA PRINCIPAL-VIGA DIAFRAGMA1,166,895.87007.05.01CONCRETO ARMADO78,140.89007.05.01.01CONCRETO EN LOSAS MACIZAS F'C=210 KG/CM2m374.63381.2828,454.93007.05.01.02ENCOFRADO Y DESENCOFRADO NORMAL LOSA MACIZAm2513.1444.8022,988.67007.05.01.03ACERO DE REFUERZO FY=4200 KG/CM2kg4,486.945.9526,697.29007.05.02FABRICACION ESTRUCTURAS METALICAS333,017.59007.05.02.01FABRICACION DE VIGAS METALICASkg28,449.608.77249,502.99007.05.02.02MONTAJE Y LANZAMIENTO DE ESTRUCTURAS METALICASton28.452,700.0076,815.00007.05.02.03PINTURA EN ESTRUCTURAS METALICASund6.001,116.606,699.60007.05.03ESTRUCTURAS DE PROTECCION46,152.69007.05.03.01PLANCHA DE POLICARBONATOm2884.4952.1846,152.69007.05.04REVOQUES ENLUCIDOS Y MOLDURAS709,584.70007.05.04.01TARRAJEO PRIMARIO RAYADO CON CEMENTO - ARENAm25,588.5016.6492,992.64007.05.04.02ENCHAPE CON PIEDRA LAJA EN MUROS E=1CMm24,349.5168.65298,593.86007.05.04.03ENCHAPE CON PIEDRA LAJA EN RAMPAS E=1CMm22,066.7779.15163,584.85007.05.04.04ENCHAPE CON PIEDRA LAJA EN CIELORRASOSm21,600.4796.48154,413.35007.06ACCESORIOS414,811.03007.06.01APARATOS DE APOYO MOVILund6.002,403.9614,423.76007.06.02APARATOS DE APOYO FIJOund6.002,415.7214,494.32007.06.03JUNTAS DE DILATACIONm54.00613.0133,102.54007.06.04BARANDAS INC. COLOCACIONm1,252.60277.78347,947.23007.06.05DRENAJE PLUVIAL EN LOSA TUBOS PVC SAP D=3"m296.4016.344,843.18007.07PAVIMENTO DE PARADEROS216,003.71007.07.01BASE GRANULAR e=200 mmm21,680.0023.2839,110.40007.07.02ENCOFRADO Y DESENCOFRADO LOSA DE CONCRETOm21,680.0024.0540,404.00007.07.03CONCRETO F'C= 210 KG/CM2 E=0.20M P/PARADEROSm21,680.0079.79134,047.20007.07.04ACERO CORRUGADO (BASTONES EN JUNTAS)kg376.755.872,211.52007.07.05ACERO LISO (BASTONES EN JUNTAS) - TRANVERSALESkg35.756.45230.59007.08VARIOS488,382.28007.08.01ACABADO DE SUPERFICIE DE CONCRETOm21,610.00113.03181,978.30007.08.02LETRERO DE "ALTURA LIBRE" EN EL PUENTEund6.00252.451,514.70007.08.03LETRERO DE "PARADERO"und120.00268.5032,220.00007.08.04PINTURA SEPARADORA DE TRANSITOm300.0013.243,972.00007.08.05SEGURIDAD VIALGLB6.0022,081.51132,489.06007.08.06DESVIO DE TRANSITOGLB6.0012,373.6074,241.60007.08.07EQUIPAMENTO DE PARADEROSGLB1.0061,966.6261,966.62008RAMPAS DE ACCESO CON DESNIVELES304,565.54008.01OBRAS PRELIMINARES306.15008.01.01TRAZO, NIVELES Y REPLANTEO EN EL PROCESO CONSTRUCTIVOm2233.701.31306.15008.02MOVIMIENTO DE TIERRAS1,357.62008.02.01EXCAVACION C/EQUIPO PARA ZAPATAS MATERIAL SEMIROCOSOm341.169.12375.38008.02.02RELLENO EN EXCAVACIONES REMANENTESm323.6021.23501.03008.02.03ELIMINACION MATERIAL EXCEDENTE C/VOLQ. 15M3 D=10 KMm318.7925.61481.21008.03CONCRETO SIMPLE6,798.01008.03.01SOLADO 4" MEZCLA 1:12 CEMENTO-ARENAm218.7935.91674.75008.03.02PISO CEMENTO FROTACHADO E=4" MEZCLA 1:4m2110.1955.576,123.26008.04CONCRETO ARMADO89,162.80008.04.01ZAPATAS7,372.29008.04.01.01CONCRETO EN ZAPATAS F'C= 210 KG/CM2m315.38355.245,463.59008.04.01.02ACERO DE REFUERZO FY=4200 KG/CM2kg320.795.951,908.70008.04.02COLUMNAS12,383.02008.04.02.01CONCRETO EN COLUMNAS F'C=210 KG/CM2m311.19391.694,383.01008.04.02.02ENCOFRADO Y DESENCOFRADO NORMAL DE COLUMNASm257.4430.651,760.54008.04.02.03ACERO DE REFUERZO FY=4200 KG/CM2kg1,048.655.956,239.47008.04.03VIGAS11,162.53008.04.03.01CONCRETO EN VIGAS F'C=210 KG/CM2m32.48396.09982.30008.04.03.02ENCOFRADO Y DESENCOFRADO NORMAL EN VIGASm235.6433.391,190.02008.04.03.03ACERO DE REFUERZO FY=4200 KG/CM2kg1,510.965.958,990.21008.04.04LOSA MACIZA58,244.96008.04.04.01CONCRETO EN LOSAS MACIZAS F'C=210 KG/CM2m355.57402.9422,391.38008.04.04.02ENCOFRADO Y DESENCOFRADO NORMAL LOSA MACIZAm2333.4231.4410,482.72008.04.04.03ACERO DE REFUERZO FY=4200 KG/CM2kg4,264.015.9525,370.86008.05CARPINTERIA METALICA129,436.59008.05.01BARANDAS INC. COLOCACIONm391.39330.71129,436.59008.06REVOQUES ENLUCIDOS Y MOLDURAS77,504.37008.06.01TARRAJEO PRIMARIO RAYADO CON CEMENTO - ARENAm2348.6623.968,353.89008.06.02ENCHAPE CON PIEDRA LAJA EN MUROS E=1CMm2113.7268.657,806.88008.06.03ENCHAPE CON PIEDRA LAJA EN RAMPAS E=1CMm2372.0279.1529,445.38008.06.04ENCHAPE CON PIEDRA LAJA EN CIELORRASOSm2330.6296.4831,898.22009SEMAFORIZACIONES2,179,970.76009.01OBRAS PRELIMINARES54,495.87009.01.01MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MAQUINARIASGLB1.005,768.175,768.17009.01.02MANTENIMIENTO DE TRANSITO SEALIZACIONGLB1.0028,841.6028,841.60009.01.03TRAZO, NIVELES Y REPLANTEO EN EL PROCESO CONSTRUCTIVOm2756.001.31990.36009.01.04OFICINAS ALMACENES VESTUARIOS PROVISIONALESGLB1.005,412.145,412.14009.01.05ALQUILER DE SSHH PROVICIONALES , AGUA DESAGUE LUZ TELEFONOmes3.00620.501,861.50009.01.06DEMOLICION Y ELIMINACION DE BASES DE CONCRETO EXISTENTES INC RESANE DE PISOund1.79330.57591.72009.01.07TRANSPORTE DE ELEMENTOS RETIRADOS A ALMACENGLB1.0011,030.3811,030.38009.02MOVIMIENTO DE TIERRAS12,425.83009.02.01CORTE CON DISCO EN VEREDA DE CONCRETO E=4-6"m79.806.63529.07009.02.02DEMOLICION DE VEREDAS DE 0.10 mm213.5738.81526.65009.02.03EXCAVACION PARA CIMIENTOS ZAPATAS EN TERRENO NORMALm358.2842.952,503.13009.02.04CARGUIO Y ELIMINACION DE DESMONTEm374.55118.948,866.98009.03OBRAS DE CONCRETO ARMADO46,322.43009.03.01ESTRUCTURA METALICA DE ZAPATA PARA SEMIPORTICO O BANDERAund20.00325.346,506.80009.03.02ESTRUCTURA METALICA DE ZAPATA PARA PEDESTALund60.00314.4118,864.60009.03.03CONCRETO PREMEZCLADO PARA ZAPATA F'C=175 KG/CM2 PARA PEDESTALm317.28313.145,411.06009.03.04CONCRETO PREMEZCLADO PARA ZAPATA F'C=210 KG/CM2 PARA SEMIPORTICOm320.00417.448,348.80009.03.05ENCOFRADO DE ZAPATASm2195.2036.847,191.17009.04ESTRUCTURAS DE FIERRO459,038.32009.04.01SEMIPORTICOund42.009,398.79394,749.18009.04.02PEDESTAL CON 01 SEMAFORO VEHICULARund1.002,902.712,902.71009.04.03PEDESTAL CON 01 SEMAFORO PEATONALund21.002,749.4557,738.45009.04.04PEDESTAL - PARA CONTROLADOR DE TRAFICOund1.003,647.983,647.98009.05TRASLADO E INSTALACION DE ESTRUCTURAS31,122.76009.05.01INSTALACION DE SEMIPORTICO O BANDERAS (INCLUYE TRANSPORTE)und42.00607.8725,530.54009.05.02INSTALACION DE PEDESTAL O SOPORTE DE CONTROL (INCLUYE TRANSPORTE)und23.00243.145,592.22009.06SEMAFOROS A LED'S189,014.10009.06.01AEREO VEHICULAR DE 1C-3L CON LEDund20.002,861.0357,220.60009.06.02PEDESTAL VEHICULAR DE 1C-3L CON LEDund10.002,861.0328,610.30009.06.03ADOSADO PEATONAL DE 1C - 2L CON LEDund10.001,516.5115,165.10009.06.04PEDESTAL PEATONAL DE 1C - 2L CON LEDund50.001,516.5175,825.50009.06.05AEREO CONTADOR CUENTA REGRESIVA , CON LEDund20.00609.6312,192.60009.07CABLES (SUMINISTRO E INSTALACION)121,082.60009.07.01CABLE DE CONTROL (4xN 16 AWG)m1,000.0016.9416,940.00009.07.02CABLE DE CONTROL (3xN 16 AWG)m1,000.0015.1815,180.00009.07.03CABLE DE ACOMETIDA (2 x N 12 AWG)m500.0016.948,470.00009.07.04CABLE ELECTRICO (1 x 6 mm -TW)m500.0013.536,765.00009.07.05CABLE DE COMUNICACION FIBRA OPTICA 12 HILOS MONOMODOm1,090.0067.6473,727.60009.08CAMARAS DE TRAFICO202,822.43009.08.01CAMARA DE TRAFICO EN POSTE PASTORALund15.0012,839.53192,592.95009.08.02CAMARA DE TRAFICO EN ESTRUCTURA SEMAFORICAund1.0010,229.4810,229.48009.09CANALIZACION (EXCAVACION Y RESANE)237,910.54009.09.01EN PISTA DE CONCRETO, DUCTO DE 1 VIAm260.00244.1963,489.40009.09.02EN VEREDA, DUCTO DE UNA VIAm910.34191.60174,421.14009.10CAJAS DE PASO (EXCAVACION Y RESANE)6,771.48009.10.01TIPO CE -2und12.00564.296,771.48009.11CONTROL DE TRAFICO (SUMINISTRO E INSTALACION)775,837.60009.11.01CONTROL DE TRAFICO INTELIGENTE, 8 GRUPOS C/ SINCRONIZACIONund20.0038,791.88775,837.60009.12SUMINISTRO DE EE.EE. (CON MURETE)17,683.20009.12.01OPCION TARIFARIA BT - 6und20.00884.1617,683.20009.13POZO A TIERRA (SUMINISTRO E INSTALACION)25,443.60009.13.01KIT DE POZO DE TIERRA CON VARILLA DE COBRE DE 5/8"und20.001,272.1825,443.60010SEALIZACION843,467.65010.01SEALES REGLAMENTARIAS (0.60m x 0.90m )und187.001,781.20333,084.40010.02SEALES PREVENTIVAS (0.60m x 0.60m)und79.00786.5262,135.08010.03SEALES INFORMATIVAS (0.45m x 0.40m )und98.00318.0431,167.92010.04PINTADO DE LINEAS ANCHO=0.075 mm3,261.002.839,228.63010.05PINTADO DE PAVIMENTOS (SIMBOLOS Y LETRAS)m2873.3043.8038,250.54010.06PINTADO DE SARDINELESm21,108.0017.51369,601.08011PLAN MANEJO AMBIENTAL534,199.54011.01CONSIDERACIONES AMBIENTALES16,738.52011.01.01SUPERVISION AMBIENTAL16,738.52011.01.01.01APLICACION DE NORMAS AMBIENTALESund5.00287.501,437.50011.01.01.02SEGUIMIENTO AMBIENTALund5.001,632.008,160.00011.01.01.03COORDINACION INTERINSTITUCIONALund6.001,190.177,141.02011.02MEDIDAS DE PREVENCION33,688.52011.02.01EDUCACION AMBIENTAL33,688.52011.02.01.01CAPACITACIONES EN TEMAS AMBIENTALES20,956.88011.02.01.01.01CAPACIDAD A LA COMUNIDAD BENEFICIARIAund12.001,082.7412,992.88011.02.01.01.02CAPACITACION AL PERSONAL DE LA OBRAund8.00995.507,964.00011.02.01.02MEDIOS DE CONCIENTIZACION12,731.64011.02.01.02.01CHARLAS DE CONCIENTIZACION AL PERSONAL DE LA OBRAund8.001,094.508,756.00011.02.01.02.02MURAL AMBIENTALund4.00431.411,725.64011.02.01.02.03BOLETINESund500.004.502,250.00011.03MEDIDAS DE CONTROL483,772.50011.03.01BOTADEROS DE DISPOSICION FINAL483,772.50011.03.01.01LIMPIEZA Y REPLANTEO PRELIMINARm27,500.004.3932,925.00011.03.01.02EXCAVACION DE ZANJAS H=1.00Mm37,500.0042.95322,125.00011.03.01.03RELLENO COMPACTADO CON ARCILLA IMPERMEABILIZANTEm32,250.0057.21128,722.50012SANEAMIENTO FISICO LEGAL DE INMUEBLES100,000.00012.01SANEAMIENTO FISICO LEGAL INMUEBLESGLB1.00100,000.00100,000.00013INSTALACION SISTEMA RIEGO TECNIFICADO AREAS VERDES3,596,314.37013.01MOVIMIENTO DE TIERRAS1,110,715.56013.01.01EXCAVACION C/EQUIPO EN TERRENO SEMIROCOSO P/TUB. D=2"-3"m8,190.4610.4985,917.93013.01.02EXCAVACION C/EQUIPO EN TERRENO SUELTO P/TUB. D=2"-3"m6,955.909.2164,063.84013.01.03EXCAVACION C/EQUIPO EN TERRENO SUELTO P/TUB. D=4"m18.6011.52214.27013.01.04REFINE Y NIV. DE ZANJAS T.SEMIROCA P/TUB. D=2"-3"m8,190.462.5821,131.39013.01.05REFINE Y NIV. DE ZANJAS T.NORMAL P/TUB. D=2"-3"m6,955.901.8412,798.86013.01.06REFINE Y NIV. DE ZANJAS T.NORMAL P/TUB. D=4"m18.601.9836.83013.01.07RELLENO COMPAC.ZANJA T.N. P/TUB. HASTA 1.00m D=2"-3"m8,190.4611.1891,569.34013.01.08RELLENO COMPAC. ZANJA T.S.R. P/TUB. HASTA 1.00m D=2"-3"m6,955.9011.1877,766.96013.01.09RELLENO COMPAC. ZANJA T.S.R. P/TUB. HASTA 1.00m D=4"m18.6011.18207.95013.01.10CAMA DE APOYO PARA TUBERIASm15,164.964.8974,156.65013.01.11SUMINISTRO TIERRA CHACRA JARDIN P/TUB. HASTA 1.00m D=2"-3"m20,450.7833.39682,851.54013.02CONSTRUCCION DE CASA ELECTROBOMBA PARA CAPTACION26,760.14013.02.01TRABAJOS PRELIMINARES153.50013.02.01.01LIMPIEZA DE TERRENO MANUALm225.003.2280.50013.02.01.02NIVELACION, TRAZADO Y REPLANTEO C/EQUIPOm225.002.9273.00013.02.02MOVIMIENTO DE TIERRAS2,671.37013.02.02.01EXCAVACION ZANJAS PARA ZAPATAS MATERIAL SEMIROCOSOm316.99128.842,188.99013.02.02.02RELLENO EN EXCAVACIONES REMANENTESm318.8621.64408.13013.02.02.03ELIMINACIOND E MATERIAL EXCEDENTEm323.573.1574.25013.02.03OBRAS DE CONCRETO ARMADO23,935.27013.02.03.01ZAPATAS5,436.65013.02.03.01.01CONCRETO EN ZAPATAS F'C= 210 KG/CM2m33.46303.921,051.56013.02.03.01.02ACERO DE REFUERZO FY=4200 KG/CM2kg736.995.954,385.09013.02.03.02COLUMNAS2,300.66013.02.03.02.01CONCRETO EN COLUMNAS F'C=210 KG/CM2m31.28402.12514.71013.02.03.02.02ENCOFRADO Y DESENCOFRADO NORMAL DE COLUMNASm214.2830.65437.68013.02.03.02.03ACERO DE REFUERZO FY=4200 KG/CM2kg226.605.951,348.27013.02.03.03VIGAS1,834.49013.02.03.03.01CONCRETO EN VIGAS F'C=210 KG/CM2m30.93402.12373.97013.02.03.03.02ENCOFRADO Y DESENCOFRADO NORMAL EN VIGASm211.0633.39369.29013.02.03.03.03ACERO DE REFUERZO FY=4200 KG/CM2kg183.405.951,091.23013.02.03.04PLACAS DE CONCRETO ARMADO12,575.28013.02.03.04.01CONCRETO EN PLACAS F'C=210 KG/CM2m39.80402.943,948.81013.02.03.04.02ENCOFRADO Y DESENCOFRADO NORMAL EN PLACASm2112.8639.254,429.76013.02.03.04.03ACERO DE REFUERZO FY=4200 KG/CM2kg705.335.954,196.71013.02.03.05LOSA DE CONCRETO ARMADO1,788.19013.02.03.05.01CONCRETO EN LOSA F'C=210 KG/CM2m31.78402.94717.23013.02.03.05.02ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAm216.6539.25653.51013.02.03.05.03ACERO DE REFUERZO FY=4200 KG/CM2kg70.165.95417.45013.03ELECTROBOMBA20,000.00013.03.01ELECTROBOMBAund1.0020,000.0020,000.00013.04SISTEMA ELECTRICO223,452.31013.04.01TRANSFORMADOR Y CAJA ELECTRICAund1.0018,002.8318,002.83013.04.02POZO CONEXION A TIERRA EN SISTEMA EQUIPO BOMBEO ALUMBRADO TOMACORRIENTEund1.001,784.071,784.07013.04.03PRUEBA HIDRAULICA203,665.41013.04.03.01PRUEBA HIDRAULICA+DESINFECCION TUBERIAm15,164.9610.75163,023.32013.04.03.02PRUEBA HIDRAULICA+ESCORRENTIA TUBOm15,164.962.6840,642.09013.05MODULO DE HIDRANTES Y ASPERSORES54,855.18013.05.01HIDRANTE54,855.18013.05.01.01CONCRETO ARMADO54,855.18013.05.01.01.01CONCRETO F'C=175 KG/CM2m372.01357.6125,751.50013.05.01.01.02ACERO DE REFUERZO FY=4200 KG/CM2kg1,045.975.956,223.52013.05.01.01.03ENCOFRADO Y DESENCOFRADO NORMALm2182.8830.365,552.24013.05.01.01.04TARRAJEO MEZCLA 1:3mes259.4066.8017,327.92013.06ASPERSORES1,297,192.05013.06.01ASPERSORESund3,465.00374.371,297,192.05013.07VARIOS863,339.13013.07.01VALVULA COMPUERTA 2" y 4"und127.001,020.49129,602.23013.07.02CODO PVC PARA RED AGUA 2"und100.00124.1612,416.00013.07.03YEE METALICO 4"x2"und1.00406.82406.82013.07.04TUBERIA PVC 4"und2.0093.51187.02013.07.05TUBERIA PVC 2"und7,036.3451.78364,341.69013.07.06TUBERIA PVC 1 1/2"und6,504.4026.23170,610.41013.07.07REDUCCION PVC PARA RED AGUA POTABLE 2" A 1 1/2"und628.00295.82185,774.96