PRESUPUESTO DE OBRAS CIVILES PARA LA CONSTRUCCION DE UN SEDIMENTADOR NV 3900-2 CONTMIN CIA MANO DE OBRA 87,623.17 73,724.81 Dias 60.00 M. OBRA UND CONTMIN CIA PRECIO PARCIAL Capataz tar 3.00 1.00 101.74 18,312.34 6,104.11 Maestro Encofrador tar 3.00 3.00 82.96 14,932.07 14,932.07 Maestro Fierrero tar 3.00 3.00 82.96 14,932.07 14,932.07 Ayudante Oficial tar 6.00 3.00 59.48 21,413.48 10,706.74 Peon tar 6.00 9.00 50.09 18,033.21 27,049.82 21.00 19.00 87,623.17 73,724.81 MATERIALES 58,535.46 53,170.68 CONCRETO UND CANT PRECIO PARCIAL ACEITE PARA MOTOR SAE-30 GLN 2.85 8.00 22.80 22.80 ARENA GRUESA M3 129.22 36.42 4,706.21 4,706.21 CEMENTO PORTLAND TIPO I (42.5KG) BOL 1,976.31 7.66 9.48 15,138.55 18,735.44 GASOLINA 84 OCTANOS GLN 16.72 4.86 81.27 81.27 GRASA(200 GR) UND 1.90 1.71 3.25 3.25 PIEDRA CHANCADA DE 1/2" M3 148.22 45.00 6,670.05 6,670.05 Total m3 190.03 26,622.14 30,219.02 ENCOFRADO UND CANT PRECIO PARCIAL ALAMBRE NEGRO RECOCIDO # 8 KG 103.25 103.25 3.07 2.20 316.97 227.14 CLAVOS PARA MADERA C/C 2"-4" KG 113.57 113.57 3.07 2.20 348.66 249.86 LACA DESMOLDANTE TIPO SIKA LAC GLN 51.62 0.00 46.39 46.39 2,394.79 0.00 MADERA TORNILLO P2 1,388.66 694.33 1.68 1.68 2,332.95 1,166.47 TRIPLAY LUPUNA DE 4'x8'x 9 mm PLN 258.12 129.06 16.07 16.07 4,147.91 2,073.95 Total m2 516.23 9,541.27 3,717.42 ACEROS UND CANT PRECIO PARCIAL ACERO DE REFUERZO FY=4200 GRADO 60 KG 10,087.89 2.08 1.82 21,002.98 18,359.95 ALAMBRE NEGRO RECOCIDO # 16 KG 480.38 2.85 1.82 1,369.07 874.28 9,607.51 22,372.05 19,234.24 EQUIPOS Y HERRAMIENTAS 2,722.67 2,722.67 CONCRETO UND CANT PRECIO PARCIAL HERRAMIENTAS MANUALES %MO 570.09 60.98 347.62 347.62 VIBRADOR DE CONCRETO HM 81.48 7.36 599.43 599.43 MEZCLADORA CONCRETO 9HP HM 81.48 8.93 727.46 727.46 190.03 1,674.50 1,674.50 ENCOFRADO UND CANT PRECIO PARCIAL HERRAMIENTAS MANUALES %MO 1,548.69 13.29 205.88 205.88 516.23 205.88 205.88 ACEROS UND CANT PRECIO PARCIAL HERRAMIENTAS MANUALES %MO 48,037.55 0.99 476.50 476.50 CIZALLA P/CORTE DE FIERRO HM 329.54 1.11 365.79 365.79 9,607.51 842.29 842.29 COSTO DIRECTO DE OBRA US $ 148,881.30 129,618.17 GASTOS GENERALES + UTILIDAD % 56,827.99 49,475.25 COSTO TOTAL DE OBRA - CONTMIN US $ 205,709.29 179,093.42

Presupuesto Obras Civiles Final

Embed Size (px)

DESCRIPTION

pu

Citation preview

Page 1: Presupuesto Obras Civiles Final

PRESUPUESTO DE OBRAS CIVILES PARA LA CONSTRUCCION DE UN SEDIMENTADOR NV 3900-2

CONTMIN CIA VARIACION

MANO DE OBRA 87,623.17 73,724.81 -13,898.36Dias 60.00

M. OBRA UND CONTMIN CIA PRECIO PARCIALCapataz tar 3.00 1.00 101.74 18,312.34 6,104.11Maestro Encofrador tar 3.00 3.00 82.96 14,932.07 14,932.07Maestro Fierrero tar 3.00 3.00 82.96 14,932.07 14,932.07Ayudante Oficial tar 6.00 3.00 59.48 21,413.48 10,706.74Peon tar 6.00 9.00 50.09 18,033.21 27,049.82

21.00 19.00 87,623.17 73,724.81

MATERIALES 58,535.46 53,170.68 -5,364.77

CONCRETO UND CANT PRECIO PARCIALACEITE PARA MOTOR SAE-30 GLN 2.85 8.00 22.80 22.80ARENA GRUESA M3 129.22 36.42 4,706.21 4,706.21CEMENTO PORTLAND TIPO I (42.5KG) BOL 1,976.31 7.66 9.48 15,138.55 18,735.44GASOLINA 84 OCTANOS GLN 16.72 4.86 81.27 81.27GRASA(200 GR) UND 1.90 1.71 3.25 3.25PIEDRA CHANCADA DE 1/2" M3 148.22 45.00 6,670.05 6,670.05Total m3 190.03 26,622.14 30,219.02

ENCOFRADO UND CANT PRECIO PARCIALALAMBRE NEGRO RECOCIDO # 8 KG 103.25 103.25 3.07 2.20 316.97 227.14CLAVOS PARA MADERA C/C 2"-4" KG 113.57 113.57 3.07 2.20 348.66 249.86LACA DESMOLDANTE TIPO SIKA LAC GLN 51.62 0.00 46.39 46.39 2,394.79 0.00MADERA TORNILLO P2 1,388.66 694.33 1.68 1.68 2,332.95 1,166.47TRIPLAY LUPUNA DE 4'x8'x 9 mm PLN 258.12 129.06 16.07 16.07 4,147.91 2,073.95Total m2 516.23 9,541.27 3,717.42

ACEROS UND CANT PRECIO PARCIALACERO DE REFUERZO FY=4200 GRADO 60 KG 10,087.89 2.08 1.82 21,002.98 18,359.95ALAMBRE NEGRO RECOCIDO # 16 KG 480.38 2.85 1.82 1,369.07 874.28

9,607.51 22,372.05 19,234.24

EQUIPOS Y HERRAMIENTAS 2,722.67 2,722.67 0.00

CONCRETO UND CANT PRECIO PARCIALHERRAMIENTAS MANUALES %MO 570.09 60.98 347.62 347.62VIBRADOR DE CONCRETO HM 81.48 7.36 599.43 599.43MEZCLADORA CONCRETO 9HP HM 81.48 8.93 727.46 727.46

190.03 1,674.50 1,674.50

ENCOFRADO UND CANT PRECIO PARCIALHERRAMIENTAS MANUALES %MO 1,548.69 13.29 205.88 205.88

516.23 205.88 205.88

ACEROS UND CANT PRECIO PARCIALHERRAMIENTAS MANUALES %MO 48,037.55 0.99 476.50 476.50CIZALLA P/CORTE DE FIERRO HM 329.54 1.11 365.79 365.79

9,607.51 842.29 842.29

COSTO DIRECTO DE OBRA US $ 148,881.30 129,618.17 -19,263.13GASTOS GENERALES + UTILIDAD % 56,827.99 49,475.25 -7,352.74COSTO TOTAL DE OBRA - CONTMIN US $ 205,709.29 179,093.42 -26,615.87