15
EJECUCION % de Avance % de Avance respecto respecto al PIM Anual a la inversión viable Ene Feb Mar Abr May Jun Jul Ago Set Oct Nov Dic 2011 2,600,000 0 0.0% 0.0% 2012 2,418,301 64,500 2.7% 0.1% 21,000 10,500 7,500 25,500 2013 26,134,270 21,500 8.2% 0.0% 7,500 3,000 11,000 2009 79,804 79,804 100.0% 0.4% 79,804 2010 187,676 187,676 100.0% 0.9% 1,468 186,208 2011 0 0 0.0% 0.0% 2012 1,877,395 114,600 6.1% 0.5% 70,600 44,000 2013 25,757,455 4,857,569 18.9% 22.9% 351,318 3,047,342 298,150 400,410 492,944 167,605 0 99,800 2011 220,665 219,038 99.3% 0.6% 23,831 43,924 72,431 10,461 12,217 28,374 8,000 19,800 2012 0 0 0.0% 0.0% 2013 23,311,169 54,985 0.2% 0.2% 5,225 4,125 8,335 6,742 6,806 6,614 10,007 7,131 0 2009 552,215 795 0.1% 0.0% 795 2010 9,640,327 569,469 5.9% 1.6% 164,995 164,995 219,993 19,486 2011 16,089,846 7,106,236 44.2% 19.5% 3,203,152 3,190,068 333,556 299,802 79,658 2012 9,611,468 287,077 3.0% 0.8% 86,400 8,000 90,107 77,007 4,000 4,000 9,563 8,000 2013 12,212,545 24,203,547 198.2% 66.5% 5,657,321 0 1,152,934 4,158,625 752,377 4,547,044 7,935,246 2012 0 0 0.0% 0.0% 2013 11,182,349 0 0.0% 0.0% 2011 300,000 139,400 46.5% 0.8% 8,000 131,400 2012 202,518 199,311 98.4% 1.2% 102,200 87,111 10,000 2013 9,784,000 31,875 0.3% 0.2% 0 29,150 0 0 0 0 0 0 2,725 2012 326,663 326,623 100.0% 3.3% 97,987 97,987 130,649 2013 9,042,576 6,942,580 76.8% 70.1% 1,666,059 195,782 1,039,004 1,483,015 1,569,487 981,478 7,755 2012 5,896,815 1,080,040 18.3% 18.6% 4,500 4,500 1,071,040 2013 7,965,463 4,320,551 54.2% 74.5% 222,099 1,316,094 40,526 546,773 1,202,810 992,249 0 2010 2,551,091 2,491,438 97.7% 268,796 143,631 181,469 137,757 134,772 143,205 342,847 156,747 142,836 158,659 142,767 537,952 2011 2,918,217 2,774,368 95.1% 266,695 151,261 221,508 146,286 142,927 139,104 225,635 140,242 127,457 122,568 188,081 902,604 2012 2,873,338 2,510,304 87.4% 218,673 164,526 177,068 150,150 154,617 176,995 246,341 144,898 184,736 161,449 185,029 545,822 2013 7,740,500 2,004,750 25.9% 281,957 162,602 165,695 197,350 249,167 163,577 401,733 249,098 133,571 2012 0 0 0.0% 0.0% 2013 6,643,195 4,358,754 65.6% 74.8% 1,270,728 1,097,601 513,311 544,335 932,779 0 2012 8,000 8,000 100.0% 0.2% 8,000 2013 6,114,538 180,084 2.9% 3.8% 0 0 180,084 11 167862 2159992 REHABILITACION DEL SISTEMA DE DRENAJE SUPERFICIAL EXISTENTE EN LOS DISTRITOS DE HUMAY, INDEPENDENCIA, SAN CLEMENTE, TUPAC AMARU INCA, SAN ANDRES Y PISCO, PROVINCIA DE PISCO Y EL CARMEN PROVINCIA DE CHINCHA, REGION ICA. (petacc). 4,798,457.00 PETACC 10 94723 2163595 MEJORAMIENTO DE LA CARRETERA PARA LA INTEGRACION DE LOS CC.PP. DE LOS DISTRITOS DE SANTIAGO, PACHACUTEC Y TATE DE LA PROVINCIA DE ICA. 5,831,098.00 EN EJECUCION 9 S/C (*) 2000270 GESTION DE PROYECTOS. (Petacc). -- PETACC 8 43493 2041190 CONSTRUCCION DEL RELLENO SANITARIO PARA LA PROVINCIA DE ICA. 5,798,381.00 OBRA CULMINADA 7 43019 2150293 MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE E INSTALACION DEL SISTEMA DE ALCANTARILLADO EN EL CENTRO POBLADO SAN MARTIN DE PORRES Y ANEXOS DEL DISTRITO Y PROVINCIA DE ICA. 9,904,429.00 EN EJECUCION 6 63638 2078310 IRRIGACION LISCAY SAN JUAN DE YANAC- CHINCHA. (Petacc). 16,976,730.00 PETACC 5 152836 2160648 MEJORAMIENTO DE LA CARRETERA DEPARTAMENTAL IC 113, TRAMO: DV PANAMERICANA SUR (KM 421)- SINCCACHI, DISTRITO DE EL INGENIO- NASCA. 15,767,697.00 OBRA EN PROCESO DE SELECCIÓN 4 104598 2091554 FORTALECIMIENTO DE LA CAPACIDAD RESOLUTIVA DE LOS SERVICIOS DE SALUD DEL HOSPITAL SAN JOSE DE CHINCHA-DIRESA-ICA. (Bonos Soberanos). 36,385,792.00 EN EJECUCION 3 101558 2113116 SISTEMA DE RIEGO LA ACHIRANA. (Petacc). 34,493,733.00 PETACC MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE TRATAMIENTO DE AGUAS RESIDUALES DE LA PLANTA CACHICHE- CIUDAD DE ICA. 55,259,815 EXPEDIENTE TECNICO PARA PROCESO DE SELECCIÓN 2 96490 2094540 AMPLIACION, MEJORAMIENTO Y EQUIPAMIENTO DE LA INFRAESTRUCTURA EN EL HOSPITAL DE APOYO DE NASCA. 21,208,039.00 OBRA POR INICIAR EJECUCION MENSUALIZADA ESTADO DE PIP TOTAL (S/.) (**) SNIP DGPP 1 142852 2131992 PRESUPUESTO ACUMULADO DE PROYECTOS AL III TRIMESTRE DEL 2013 Ejecutora Item Código Denominación Monto de la Viabilidad Años PIM

PRESUPUESTO ACUMULADO DE PROYECTOS AL III TRIMESTRE … · pip total (s/.) (**) snip dgpp ... construccion del puente carrozable y obras complementarias en el sector aja-ciudad de

Embed Size (px)

Citation preview

Page 1: PRESUPUESTO ACUMULADO DE PROYECTOS AL III TRIMESTRE … · pip total (s/.) (**) snip dgpp ... construccion del puente carrozable y obras complementarias en el sector aja-ciudad de

EJECUCION% de

Avance

% de

Avance

respecto respecto

al PIM

Anual

a la

inversión

viable Ene Feb Mar Abr May Jun Jul Ago Set Oct Nov Dic

2011 2,600,000 0 0.0% 0.0%

2012 2,418,301 64,500 2.7% 0.1% 21,000 10,500 7,500 25,500

2013 26,134,270 21,500 8.2% 0.0% 7,500 3,000 11,000

2009 79,804 79,804 100.0% 0.4% 79,804

2010 187,676 187,676 100.0% 0.9% 1,468 186,208

2011 0 0 0.0% 0.0%

2012 1,877,395 114,600 6.1% 0.5% 70,600 44,000

2013 25,757,455 4,857,569 18.9% 22.9% 351,318 3,047,342 298,150 400,410 492,944 167,605 0 99,800

2011 220,665 219,038 99.3% 0.6% 23,831 43,924 72,431 10,461 12,217 28,374 8,000 19,800

2012 0 0 0.0% 0.0%

2013 23,311,169 54,985 0.2% 0.2% 5,225 4,125 8,335 6,742 6,806 6,614 10,007 7,131 0

2009 552,215 795 0.1% 0.0% 795

2010 9,640,327 569,469 5.9% 1.6% 164,995 164,995 219,993 19,486

2011 16,089,846 7,106,236 44.2% 19.5% 3,203,152 3,190,068 333,556 299,802 79,658

2012 9,611,468 287,077 3.0% 0.8% 86,400 8,000 90,107 77,007 4,000 4,000 9,563 8,000

2013 12,212,545 24,203,547 198.2% 66.5% 5,657,321 0 1,152,934 4,158,625 752,377 4,547,044 7,935,246

2012 0 0 0.0% 0.0%

2013 11,182,349 0 0.0% 0.0%

2011 300,000 139,400 46.5% 0.8% 8,000 131,400

2012 202,518 199,311 98.4% 1.2% 102,200 87,111 10,000

2013 9,784,000 31,875 0.3% 0.2% 0 29,150 0 0 0 0 0 0 2,725

2012 326,663 326,623 100.0% 3.3% 97,987 97,987 130,649

2013 9,042,576 6,942,580 76.8% 70.1% 1,666,059 195,782 1,039,004 1,483,015 1,569,487 981,478 7,755

2012 5,896,815 1,080,040 18.3% 18.6% 4,500 4,500 1,071,040

2013 7,965,463 4,320,551 54.2% 74.5% 222,099 1,316,094 40,526 546,773 1,202,810 992,249 0

2010 2,551,091 2,491,438 97.7% 268,796 143,631 181,469 137,757 134,772 143,205 342,847 156,747 142,836 158,659 142,767 537,952

2011 2,918,217 2,774,368 95.1% 266,695 151,261 221,508 146,286 142,927 139,104 225,635 140,242 127,457 122,568 188,081 902,604

2012 2,873,338 2,510,304 87.4% 218,673 164,526 177,068 150,150 154,617 176,995 246,341 144,898 184,736 161,449 185,029 545,822

2013 7,740,500 2,004,750 25.9% 281,957 162,602 165,695 197,350 249,167 163,577 401,733 249,098 133,571

2012 0 0 0.0% 0.0%

2013 6,643,195 4,358,754 65.6% 74.8% 1,270,728 1,097,601 513,311 544,335 932,779 0

2012 8,000 8,000 100.0% 0.2% 8,000

2013 6,114,538 180,084 2.9% 3.8% 0 0 180,084

11 167862 2159992

REHABILITACION DEL SISTEMA DE

DRENAJE SUPERFICIAL EXISTENTE EN

LOS DISTRITOS DE HUMAY,

INDEPENDENCIA, SAN CLEMENTE,

TUPAC AMARU INCA, SAN ANDRES Y

PISCO, PROVINCIA DE PISCO Y EL

CARMEN PROVINCIA DE CHINCHA,

REGION ICA.

(petacc).

4,798,457.00 PETACC

10 94723 2163595

MEJORAMIENTO DE LA CARRETERA

PARA LA INTEGRACION DE LOS CC.PP.

DE LOS DISTRITOS DE SANTIAGO,

PACHACUTEC Y TATE DE LA PROVINCIA

DE ICA.

5,831,098.00 EN EJECUCION

9 S/C (*) 2000270GESTION DE PROYECTOS.

(Petacc). -- PETACC

8 43493 2041190CONSTRUCCION DEL RELLENO

SANITARIO PARA LA PROVINCIA DE ICA.5,798,381.00

OBRA

CULMINADA

7 43019 2150293

MEJORAMIENTO DEL SISTEMA DE AGUA

POTABLE E INSTALACION DEL SISTEMA

DE ALCANTARILLADO EN EL CENTRO

POBLADO SAN MARTIN DE PORRES Y

ANEXOS DEL DISTRITO Y PROVINCIA DE

ICA.

9,904,429.00 EN EJECUCION

6 63638 2078310

IRRIGACION LISCAY SAN JUAN DE YANAC-

CHINCHA.

(Petacc).

16,976,730.00 PETACC

5 152836 2160648

MEJORAMIENTO DE LA CARRETERA

DEPARTAMENTAL IC 113, TRAMO: DV

PANAMERICANA SUR (KM 421)-

SINCCACHI, DISTRITO DE EL INGENIO-

NASCA.

15,767,697.00

OBRA EN

PROCESO DE

SELECCIÓN

4 104598 2091554

FORTALECIMIENTO DE LA CAPACIDAD

RESOLUTIVA DE LOS SERVICIOS DE

SALUD DEL HOSPITAL SAN JOSE DE

CHINCHA-DIRESA-ICA.

(Bonos Soberanos).

36,385,792.00 EN EJECUCION

3 101558 2113116SISTEMA DE RIEGO LA ACHIRANA.

(Petacc).34,493,733.00 PETACC

MEJORAMIENTO Y AMPLIACION DEL

SISTEMA DE TRATAMIENTO DE AGUAS

RESIDUALES DE LA PLANTA CACHICHE-

CIUDAD DE ICA.

55,259,815

EXPEDIENTE

TECNICO PARA

PROCESO DE

SELECCIÓN

2 96490 2094540

AMPLIACION, MEJORAMIENTO Y

EQUIPAMIENTO DE LA

INFRAESTRUCTURA EN EL HOSPITAL DE

APOYO DE NASCA.

21,208,039.00OBRA POR

INICIAR

EJECUCION MENSUALIZADA ESTADO DE

PIPTOTAL (S/.)

(**)

SNIP DGPP

GOBIERNO

REGIONAL

DE ICA

1 142852 2131992

PRESUPUESTO ACUMULADO DE PROYECTOS AL III TRIMESTRE DEL 2013

Ejecutora Item

Código

DenominaciónMonto de la

ViabilidadAños PIM

Page 2: PRESUPUESTO ACUMULADO DE PROYECTOS AL III TRIMESTRE … · pip total (s/.) (**) snip dgpp ... construccion del puente carrozable y obras complementarias en el sector aja-ciudad de

EJECUCION% de

Avance

% de

Avance

respecto respecto

al PIM

Anual

a la

inversión

viable Ene Feb Mar Abr May Jun Jul Ago Set Oct Nov Dic

EJECUCION MENSUALIZADA ESTADO DE

PIPTOTAL (S/.)

(**)

SNIP DGPP

PRESUPUESTO ACUMULADO DE PROYECTOS AL III TRIMESTRE DEL 2013

Ejecutora Item

Código

DenominaciónMonto de la

ViabilidadAños PIM

2010 1,050,262 879,835 83.8% 397,538 34,150 28,350 25,000 27,350 346,592 3,520 7,120 10,215

2011 1,390,040 308,422 22.2% 3,600 24,000 32,256 26,009 38,751 20,009 83,763 80,034

2012 1,277,864 550,540 43.1% 110,108 220,216 220,216

2013 6,000,000 1,156,761 19.3% 103,540 163,386 22,834 54,285 212,155 210,517 162,954 227,090

2009 1,500,000 427,402 28.5% 1.1% 427,402

2010 14,537,541 1,006,723 6.9% 2.7% 568,000 284,000 148,600 6,123

2011 39,781,349 25,843,637 65.0% 69.2% 3,753,479 3,638,478 2,498,575 2,772,789 4,110,196 2,349,473 1,540,377 2,688,783 2,491,487

2012 13,484,177 4,528,739 33.6% 12.1% 881,338 1,059,364 643,974 8,106 478,837 350,478 448,648 3,500 7,500 646,994

2013 6,000,000 1,113,516 18.6% 3.0% 79,046 3,500 117754 296299 7000 0 602,917 7,000

2012 5,515,213 10,000 0.2% 0.2% 10,000

2013 5,713,279 5,523,729 96.7% 122.2% 1,094,601 1,901,503 1,343,287 635,803 26,624 521,911

2012 3,808,711 144,546 3.8% 3.2% 43364 43,364 57,818

2013 5,654,210 4,602,575 81.4% 101.8% 1,027,195 1,101,481 550,184 676,070 607,233 377,503 146,797 116,112

2012 4,526,476 879,307 19.4% 879,307

2013 4,985,613 4,275,577 85.8% 1,397,113 1,132,635 581,800 768,848 240,357 154,824

2009 456,000 71,667 15.7% 1.8% 551 138 70,978

2010 0 0 0.0% 0.0%

2011 0 0 0.0% 0.0%

2012 4,954,031 913,631 18.4% 22.3% 996 912,635

2013 4,919,031 2,497,087 50.8% 61.0% 1,825,269 138,388 0 132,185 0 383,492 15,007 2,746

2,011 151,216 0 0.0% 0.0%

2,012 351,001 154,330 44.0% 4.6% 45,360 105,840 3,130

2,013 4,127,194 0 0.0% 0.0%

2010 0 0 0.0% 0.0%

2011 0 0 0.0% 0.0%

2012 10,900 0 0.0% 0.0%

2013 3,986,522 520,538 13.1% 21.5% 520,538

2010 5,380 5,379 100.0% 0.0% 4,944 435

2011 0 0 0.0% 0.0%

2012 0 0 0.0% 0.0%

2013 2,329,972 117,422 5.0% 0.2% 10,415 3,570 13,970 44,065 13,970 19,610 4,719 7,103

2011 114,680 0 0.0% 0.0%

2012 114,680 34,404 30.0% 1.0% 34,404

2013 3,362,466 6,700 0.2% 0.2% 4,000 1,700 1,000

21 182824 2148053

MEJORAMIENTO DE CARRETERA IC-105;

DV PANAMERICANA SUR KM 303-PROG

13+000 SECTOR LOMA LODULLADO-

DISTRITO DE ICA-PROVINCIA DE ICA-

DEPARTAMENTO DE ICA.

3,477,146.00

EXPEDIENTE

TECNICO

OBSERVADO

20 12462 2031222

CONSTRUCCION DE POZAS DE

REGULACION Y CONTROL DE AVENIDAS

DEL RIO ICA.

(Petacc).

61804405 PETACC

19 141205 2163990

MEJORAMIENTO E INSTALACION DEL

SISTEMA DE AGUA POTABLE Y DESAGUE

DEL C.P. SAN JOSE, DISTRITO EL CARMEN-

CHINCHA-ICA.

2,416,266.00

OBRA PARA

PROCESO DE

SELECCIÓN

18 147407 2115900

MEJORAMIENTO DE CARRETERA

VECINAL RUTA IC-576, TRAMO

PROGRESIVA 21+500 A LA PROGRESIVA

60+501.956, DISTRITO DE TIBILLO-

PALPA.

3,357,001.00 EN EJECUCION

17 78892 2078063

CONSTRUCCION DEL PUENTE

CARROZABLE Y OBRAS

COMPLEMENTARIAS EN EL SECTOR AJA-

CIUDAD DE NASCA.

4,090,488.00OBRA

PARALIZADA

16

FICHA

TECNICA

PIP DE

EMERGE

NCIA

S/C (*)

2154690

REHABILITACIÓN DE EMISOR, COLECTOR

PRINCIPAL DE LA AV. LOS MAESTROS,

EMISOR Y COLECTOR SECUNDARIO DE

PROLONGACIÓN AYABACA DEL

DISTRITO, PROVINCIA Y

DEPARTAMENTO DE ICA AFECTADOS

POR EL SISMO DEL 30 DE ENERO DEL

2012.

--OBRA

CULMINADA

15 48363 2148596

MEJORAMIENTO Y CONSTRUCCION DEL

SISTEMA DE AGUA POTABLE Y

ALCANTARILLADO DE LOS PUEBLOS

JOVENES SEÑOR DE LUREN Y ANEXOS

COLINDANTES DEL DISTRITO DE

SUBTANJALLA-ICA.

4,521,513.00 EN EJECUCION

14 175959 2161496

CONSTRUCCION DEFENSAS RIBEREÑAS

M. I. RIO INGENIO SECT. SAN PABLO-EL

INGENIO-NAZCA, RIO MATAGENTE M. D.

SECT. RONCEROS BAJO-EL CARMEN, RIO

CHICO M. I. SECT. CANYAR-CHINCHA

BAJA, TAMBO DE MORA M. D. Y CRUZ

VERDE M. I. -TAMBO DE MORA-

CHINCHA-REGION ICA.

4,518,425.00OBRA

CULMINADA

13 83948 2094097

MEJORAMIENTO Y AMPLIACION DE LOS

SISTEMAS DE AGUA POTABLE Y

ALCANTARILLADO DE NASCA Y VISTA

ALEGRE.

37,372,306.00OBRA

PARALIZADA

12 S/C (*) 001-813ESTUDIOS DE PRE-INVERSION.

(Sede Central).-- EN EJECUCION

GOBIERNO

REGIONAL

DE ICA

Page 3: PRESUPUESTO ACUMULADO DE PROYECTOS AL III TRIMESTRE … · pip total (s/.) (**) snip dgpp ... construccion del puente carrozable y obras complementarias en el sector aja-ciudad de

EJECUCION% de

Avance

% de

Avance

respecto respecto

al PIM

Anual

a la

inversión

viable Ene Feb Mar Abr May Jun Jul Ago Set Oct Nov Dic

EJECUCION MENSUALIZADA ESTADO DE

PIPTOTAL (S/.)

(**)

SNIP DGPP

PRESUPUESTO ACUMULADO DE PROYECTOS AL III TRIMESTRE DEL 2013

Ejecutora Item

Código

DenominaciónMonto de la

ViabilidadAños PIM

2012 4,708,479 1,403,878 29.8% 34.0% 877,800 10,489 4,531 511,058

2013 3,251,441 2,573,702 79.2% 62.2% 203,884 2,000 1,987 700,258 935,357 448,882 281,334

2010 1,815,101 1,699,383 93.6% 127,178 77,837 69,320 128,592 51,881 36,502 62,970 116,899 109,788 151,387 121,650 645,379

2011 5,016,682 4,921,522 98.1% 75,210 62,476 222,524 113,124 97,705 112,737 72,926 107,702 214,326 347,193 1,359,709 2,135,890

2012 2,831,046 2,220,669 78.4% 82,037 125,239 117,040 169,983 149,842 52,233 144,013 232,042 209,395 193,761 34,895 710,189

2013 3,285,008 2,567,354 78.2% 78,828 96,438 364,377 134,098 118,991 140,877 675,148 445,209 513,388

2012 10,218,344 7,745,220 75.8% 77.6% 1,738,858 3,946,223 390,991 359,806 581,198 6,800 721,344

2013 2,564,756 1,573,290 61.3% 15.8% 595,560 37,883 661,160 278,687

25 152354 2157122

CONSTRUCCION DE TROCHA

CARROZABLEDESDE PUENTE LAMBRAS

AL CENTRO POBLADO DE TAMBULLA EN

EL DISTRITO DE SAN PEDRO DE

HUACARPANA PROVINCIA DE CHINCHA-

ICA.

2,581,056.00 2013 2,988,813 1,754,583 58.7% 68.0% 8,462 483,696 403,323 19,341 733,639 106,122 EN EJECUCION

26 S/C (*) 2022788

GESTION DEL PROGRAMA Y OTROS -

PROGRAMA DE CAMINOS

DEPARTAMENTALES.

(A cargo de la Dirección Regional de

Transportes y Comunicaciones (DRTyC

Ica).

(Provias)

2013 3,269,101 157,557 4.8% 157,557

DIRECCION

REGIONAL

TRANSPORTES

2012 54,000 54,000 100.0% 2.2% 54,000

2013 2,453,755 2,129,213 86.8% 85.7% 116,503 935,653 352,840 714,510 4,247 0 0 5,460

2011 54,441 54,440 100.0% 2.0% 16,332 38,108

2012 3,056,992 800,012 26.2% 30.1% 1,095 996 797,921

2013 2,115,572 2,092,442 98.9% 78.6% 479,501 570,846 457,560 251,368 326,167 0 7,000 0

2012 3,948,472 2,349,679 59.5% 62.9% 430,543 452,589 368,315 177,142 183,994 737,096

2013 2,063,484 24,849 1.2% 0.7% 2,498 0 22,351 0

30 78602 2111849

INSTALACIONES DE SISTEMA DE AGUA

POTABLE PARA LA COMUNIDAD

CAMPESINA SAN ANDRES DE

QUILCANTO Y SAN NICOLAS DE PULPO-

YAUCA DEL ROSARIO-ICA.

1,462,318.00 2013 1,813,262 1,182,870 65.2% 80.9% 319,121 862,662 1,087 EN EJECUCION

2011 27,040 16,223 60.0% 1.4% 16,223

2012 1,046,727 10,816 1.0% 0.9% 10,816

2013 1,542,057 1,327,983 86.1% 111.3% 223,093 176,769 445,205 380,139 102,777 0 0

31 165371 2132728

CONSTRUCCION DE INFRAESTRUCTURA

Y EQUIPAMIENTO PARA LA FORMACION

PROFESIONAL DE LAS ESPECIALIDADES

DE MECANICA AUTOMOTRIZ Y DE

PRODUCCION EN EL INSTITUTO

SUPERIOR TECNOLOGICO CATALINA

1,192,701.00OBRA

CULMINADA

29 135513 2116356

MEJORAMIENTO DE LA

INFRAESTRUCTURA TECNICO-

PRODUCTIVO Y EQUIPAMIENTO DEL

INSTITUTO SUPERIOR TECNOLOGICO

PALPA, DISTRITO DE RIO GRANDE,

PROVINCIA DE PALPA-ICA.

3,736,788.00OBRA

CULMINADA

28 157122 2132916

MEJORAMIENTO Y REHABILITACION DE

VIA VECINAL VILLA PERIODISTA I -

SANTA ROSA DE CACHICHE - VILLA

PERIODISTA II ENLACE A CAMINO DE

HUACACHINA , PROVINCIA DE ICA - ICA.

2,661,725.00OBRA

CULMINADA

27 150806 2115880

MEJORAMIENTO DE LA CARRETERA DE

ACCESO DESDE EL C.P. OCUCAJE-C.P.

BARRIO NUEVO-C.P LA CAPILLA,

DISTRITO DE OCUCAJE, PROVINCIA DE

ICA.

2,484,461.00OBRA

CULMINADA

24 102556 2113225

MEJORAMIENTO DE LA CARRETERA DE

ACCESO AL VALLE LAS TRANCAS, TRAMO

Dv. PANAMERICANA SUR Km 463-

SANTA LUISA-DISTRITO DE VISTA

ALEGRE-NASCA.

9,987,256.00OBRA

CULMINADA

23 S/C (*) 2000351OPERACION Y MANTENIMIENTO.

(Petacc).-- PETACC

22 152550 2121113

CONSTRUCCION DE PISTAS Y VEREDAS

EN EL AA.HH ACOMAYO ZONA B, TUPAC

AMARU, PP.JJ ANDRES AVELINO

CACERES Y ASOCIACION DE VIVIENDA EL

SAUCE, DISTRITO DE PARCONA-ICA-ICA.

4,134,942.00OBRA

CULMINADA

GOBIERNO

REGIONAL

DE ICA

Page 4: PRESUPUESTO ACUMULADO DE PROYECTOS AL III TRIMESTRE … · pip total (s/.) (**) snip dgpp ... construccion del puente carrozable y obras complementarias en el sector aja-ciudad de

EJECUCION% de

Avance

% de

Avance

respecto respecto

al PIM

Anual

a la

inversión

viable Ene Feb Mar Abr May Jun Jul Ago Set Oct Nov Dic

EJECUCION MENSUALIZADA ESTADO DE

PIPTOTAL (S/.)

(**)

SNIP DGPP

PRESUPUESTO ACUMULADO DE PROYECTOS AL III TRIMESTRE DEL 2013

Ejecutora Item

Código

DenominaciónMonto de la

ViabilidadAños PIM

32 132655 2110876

MEJORAMIENTO DE LAS EDIFICACIONES

INTERNAS, EXTERNA E

IMPLEMENTACION DE SERVICIOS,

COMUNICACIONES, SEGURIDAD Y

ORNATO DE LA SEDE CENTRAL DEL

GOBIERNO REGIONAL DE ICA.

1,197,334.47 2013 1,383,299 56,256 4.1% 4.7% 0 56,256 0 EN EJECUCION

33 145334 2163989

INSTALACION DEL SISTEMA DE DESAGUE

DEL C.P. SAN REGIS, DISTRITO DE EL

CARMEN-CHINCHA-ICA.

796,843.00 2013 1,099,141 1,066,768 97.1% 133.9% 15,635 689,229 174,624 120,818 66,462OBRA

CULMINADA

2012 1,160,236 787,438 67.9% 57.8% 13,800 10,350 10,350 312,000 440,938

2013 1,084,129 873,762 80.6% 64.2% 232,433 123,023 143,036 149,049 10,266 215,955 0

2011 54,590 54,589 100.0% 16,377 7,315 30,897

2012 2,226,570 1,148,976 51.6% 1,148,976

2013 1,078,595 606,756 56.3% 162,062 111,499 186,090 147,105

2009 45,000 1,908 4.2% 0.0% 1,908

2010 139,500 98,000 70.3% 1.6% 42,592 55,408

1011 0 0 0.0% 0.0%

2012 6,269,598 4,839,827 77.2% 80.1% 1,072,571 2,150,749 513,610 481,340 621,557

2013 1,376,710 507,429 36.9% 8.4% 117,206 181,029 62,790 74,434 0 53,832 8,270 9,868

2010 2,869,558 193,559 6.7% 7.3% 53,700 134,800 284 3,922 853

2011 2,597,503 2,146,072 82.6% 80.7% 461,762 923,524 229,176 117,469 219,937 19,184 72,681 2,500 2,834 84,094 12,911

2012 2,250,928 1,093,526 48.6% 41.1% 5,360 5,390 8,190 7,200 3,010 4,800 2,400 7,000 1,050,176

2013 958,329 323,788 33.8% 12.2% 45,237 37,852 71,110 79,168 77,691 12,730 0

2009 111,400 106,045 95.2% 1.9% 98,000 1,045 7,000

2010 0 0 0.0% 0.0%

2011 3,896,953 3,562,933 91.4% 65.2% 1,000 1,130,157 2,431,776

2012 3,424,377 3,084,768 90.1% 56.4% 85,530 4,936 50,101 53,556 179,089 51,828 648,981 1,062,348 685,466 262,933

2013 943,370 876,939 93.0% 16.0% 671,057 9,733 102,720 93,429

2012 2,829,136 1,806,179 63.8% 76.0% 5,260 1,870 75,487 263,180 312,003 646,789 495,593 5,997

2013 887,988 707,642 79.7% 29.8% 4,650 0 702,992

2010 129,527 129,527 100.0% 6.7% 38,858 90,669

2011 0 0 0.0% 0.0%

2012 2,324,917 1,294,482 55.7% 67.3% 5,000 390,058 673,455 5,000 6,449 214,520

2013 823,785 735,759 89.3% 38.3% 191,722 228,470 138,683 102,280 3,157 71,447

2012 1,482,384 623,424 42.1% 52.0% 52,419 62,474 508,531

2013 765,162 469,128 61.3% 39.2% 169,385 184,606 13,290 84,410 7,737 0 9,700

41 132967 2131175

SUSTITUCION, AMPLIACION Y

EQUIPAMIENTO DE LA

INFRAESTRUCTURA EDUCATIVA EN EL

CETPRO SR DE LUREN-DISTRITO DE

VISTA ALEGRE-NASCA-ICA.

1,198,281.73OBRA

CULMINADA

40 112254 2094596

CONSTRUCCION DE PUENTE VEHICULAR

EN UCUCHIMPANA KM 37 + 500 RUTA I-

C 108 EMP PE 1S RIO GRANDE - PALPA -

ICA.

1,923,240.00 EN EJECUCION

39 136042 2127890

MEJORAMIENTO DEL SISTEMA DE AGUA

POTABLE Y CONSTRUCCION DEL

SISTEMA DE ALCANTARILLADO EN LOS

CENTROS POBLADOS DEL DISTRITO DE

HUANCANO, PROVINCIA DE PISCO - ICA.

2,377,728.00 EN EJECUCION

38 101616 2092499

SISTEMA DE RIEGO MACACONA-

QUILLOAY.

(Petacc).

5,464,628.00 PETACC

37 112324 2094595

CONSTRUCCION DE PUENTE VEHICULAR

EN HUARACCO KM 22+000 RUTA I-C 108

EMP PE 1S RIO GRANDE - PALPA - ICA.

2,659,672.00OBRA

PARALIZADA

36 31196 2092086

MEJORAMIENTO DE LA

INFRAESTRUCTURA Y EQUIPAMIENTO

EN EL CENTRO DE SALUD LA TINGUIÑA-

ICA.

6,045,380.00 EN EJECUCION

35FICHA

FORSUR2117126

RECONSTRUCCION Y EQUIPAMIENTO

DEL RESERVORIO DE AGUA DEL SECTOR

EL ALTO COMATRANA DEL DISTRITO,

PROVINCIA Y DEPARTAMENTO DE ICA,

AFECTADO POR EL SISMO DEL 15 DE

AGOSTO DEL 2007.

OBRA

PARALIZADA

34 165218 2148597

MEJORAMIENTO DE INFRAESTRUCTURA

EDUCATIVA Y EQUIPAMIENTO EN DOS

NIVELES EN LA I.E.Nº22446 ISAAC

MONTALVAN NIVEL INICIAL Y PRIMARIA

MENORES, DISTRITO DE

INDEPENDENCIA-PISCO.

1,361,811.00OBRA

CULMINADA

GOBIERNO

REGIONAL

DE ICA

Page 5: PRESUPUESTO ACUMULADO DE PROYECTOS AL III TRIMESTRE … · pip total (s/.) (**) snip dgpp ... construccion del puente carrozable y obras complementarias en el sector aja-ciudad de

EJECUCION% de

Avance

% de

Avance

respecto respecto

al PIM

Anual

a la

inversión

viable Ene Feb Mar Abr May Jun Jul Ago Set Oct Nov Dic

EJECUCION MENSUALIZADA ESTADO DE

PIPTOTAL (S/.)

(**)

SNIP DGPP

PRESUPUESTO ACUMULADO DE PROYECTOS AL III TRIMESTRE DEL 2013

Ejecutora Item

Código

DenominaciónMonto de la

ViabilidadAños PIM

2011 3,085,460 80,729 2.6% 2.8% 10,759 69,970

2012 3,154,266 2,537,225 80.4% 89.5% 559,901 324,459 293,367 769,253 172,132 340,726 17,160 35,480 5,000 19,747

2013 669,816 80,300 12.0% 2.8% 48,800 31,500

43 145336 2163992

INSTALACION DEL SISTEMA DE DESAGUE

DEL C.P. EL GUAYABO, DISTRITO DE EL

CARMEN-CHINCHA-ICA.

1,003,583.00 2013 659,956 335,581 50.8% 33.4% 206,399 128,775 0 0 407OBRA

PARALIZADA

2011 1,173,905 583,492 49.7% 24.2% 3,000 3,000 1,500 482,671 93,321

2012 2,446,530 1,932,729 79.0% 80.2% 860,773 245,248 15,370 207,992 252,813 350,533

2013 601,902 341,428 56.7% 14.2% 340,626 802

2010 10,750 10,750 100.0% 0.9% 10,750

2011 0 0 0.0% 0.0%

2012 1,236,123 674,493 54.6% 58.1% 2,672 236,281 435,540

2013 551,445 137,694 25.0% 11.9% 123,732 0 0 13,962

2009 1,976,117 1,500 0.1% 0.1% 1,500

2010 50,000 0 0.0% 0.0%

2011 3,089,073 40,234 1.3% 2.0% 40,234

2012 2,892,447 2,477,506 85.7% 125.4% 3,801 1,566,746 5,591 188,928 9,465 387,211 315,764

2013 520,803 260,058 49.9% 13.2% 242,192 17,866 0 0 0 0 0 0

2012 1,211,403 753,727 62.2% 65.0% 462 183,496 442,458 100,732 21,138 5,441

2013 516,741 0 0.0% 0.0%

2010 107,630 64,578 60.0% 0.3% 32,289 32,289

2011 1,842,937 42,944 2.3% 0.2% 42,944

2012 13,576,823 262,774 1.9% 1.4% 13,470 21,180 228,124

2013 19,531,783 5,850,054 30.0% 30.9% 145,654 5,686,900 7,000 3,500 7,000

49 125735 2143207

RECONSTRUCCION Y EQUIPAMIENTO I.E.

Nº143, ZONA NUEVA, DISTRITO DE

PARCONA-ICA-ICA.

526,761.24 2013 492,214 486,513 98.8% 92.4% 319,061 10,292 157,160OBRA

CULMINADA

2012 506,934 91,687 18.1% 17.8% 91,687

2013 415,247 381,087 91.8% 73.8% 155,550 213,537 12,000 0 0

2010 351,554 350,693 99.8% 25,861 10,140 8,740 5,143 135,809 135,000 30,000

2011 1,426,500 779,999 54.7% 20,000 18,000 53,462 82,915 605,622

2012 860,160 854,033 99.3% 28,499 28,650 110,268 144,453 92,355 103,807 63,324 13,889 43,099 163,925 33,966 27,798

2013 1,304,250 528,992 40.6% 110,000 165,000 58,992 195,000

2012 1,688,650 1,277,821 75.7% 99.1% 242,511 290,756 463,204 156,772 68,711 29,425 6,705 19,737

2013 392,925 7,224 1.8% 0.6% 7,224

53 175557 2227598

CONSTRUCCION Y EQUIPAMIENTO DE

PUESTO DE SALUD PAMPA BLANCA EN

EL DISTRITO DE RIO GRANDE,

PROVINCIA DE PALPA-ICA.

298,629.41 2013 377,599 0 0.0% 0.0% EN EJECUCION

2012 8,889 8,889 100.0% 8,889

2013 375,836 0 0.0%

54

FICHA

FORSUR

S/C (*)

2154728

2154728: RECONSTRUCCION,

REHABILITACION Y MEJORAMIENTO

POSTA MEDICA PNP-PISCO-

DEPARTAMENTO ICA, PROVINCIA DE

PISCO, DISTRITO DE PISCO.

EXPEDIENTE

TECNICO

APROBADO

52 81004 2110497

FORTALECIMIENTO DE LA ATENCION Y

MANEJO INTEGRAL DE PACIENTES CON

TUBERCULOSIS EN EL HOSPITAL

REGIONAL DE ICA-DIRESA ICA.

(Convenio Care Perú).

1,289,574.00OBRA

CULMINADA

51 S/C (*) 002-1139ESTUDIOS DE PRE-INVERSION.

(Petacc).PETACC

50 174984 2161495

MEJORAMIENTO DE LA

INFRAESTRUCTURA DEPORTIVA EN LA

I.E. Nº22401 MARIA REICHE NEUMANN,

DISTRITO DE NASCA Y DEPARTAMENTO

DE ICA.

516,311.00OBRA

CULMINADA

48 125735 2114169

MEJORAMIENTO DE LOS SERVICIOS DE

PREVENCION DE LA COMISION DE

DELITOS Y FALTAS EN LA JURISDICCION

DE LA DIRECCION TERRITORIAL DE

POLICIA DE ICA.

18,955,772.00OBRA

CULMINADA

47 150635 2116994

MEJORAMIENTO DEL SISTEMA DE AGUA

POTABLE Y ALCANTARILLADO DEL CC.PP

SAN TADEO-HUMAY-PISCO.

1,160,056.16OBRA

PARALIZADA

46 58627 2087349

CONSTRUCCION Y MEJORAMIENTO DE

LA INFRAESTRUCTURA EDUCATIVA EN

LA I.E. JOSEFINA MEJIA DE BOCANEGRA -

NASCA - ICA.

1,976,117.00OBRA

CULMINADA

45 134712 2131176

SUSTITUCION, AMPLIACION Y

EQUIPAMIENTO DE LA

INFRAESTRUCTURA EDUCATIVA EN EL

CETPRO CAJUCA-NASCA-ICA.

1,161,642.99OBRA

PARALIZADA

44 54823 2094593

CONSTRUCCION DE MINIPRESAS

LARGASHJA - CHUYA DISTRITO DE

CHAVÍN.

2,411,140.00OBRA

CULMINADA

42 144161 2113082

MEJORAMIENTO DE INFRAESTRUCTURA

EDUCATIVA Y EQUIPAMIENTO EN DOS

NIVELES EN LA I.E INDEPENDENCIA

NIVEL SECUNDARIO MENORES,

DISTRITO DE INDEPENDENCIA - PISCO.

2,835,592.00OBRA

CULMINADA

GOBIERNO

REGIONAL

DE ICA

Page 6: PRESUPUESTO ACUMULADO DE PROYECTOS AL III TRIMESTRE … · pip total (s/.) (**) snip dgpp ... construccion del puente carrozable y obras complementarias en el sector aja-ciudad de

EJECUCION% de

Avance

% de

Avance

respecto respecto

al PIM

Anual

a la

inversión

viable Ene Feb Mar Abr May Jun Jul Ago Set Oct Nov Dic

EJECUCION MENSUALIZADA ESTADO DE

PIPTOTAL (S/.)

(**)

SNIP DGPP

PRESUPUESTO ACUMULADO DE PROYECTOS AL III TRIMESTRE DEL 2013

Ejecutora Item

Código

DenominaciónMonto de la

ViabilidadAños PIM

2009 331,920 77,097 23.2% 1.8% 77,097

2010 0 0 0.0% 0.0%

2011 51,400 51,398 100.0% 1.2% 51,398

2012 4,180,844 3,839,898 91.8% 91.1% 262,645 959,504 424,850 397,856 441,527 490,147 459,020 404,349

2013 340,947 12,772 3.7% 0.3% 12,772

2012 2,274,702 1,801,587 79.2% 77.5% 2,672 1,205,397 593,518

2013 316,454 286,799 90.6% 12.3% 272,092 3,750 0 0 10,957

2012 413,139 127,543 30.9% 42.6% 3,570 3,570 120,403

2013 284,783 282,117 99.1% 94.2% 284,361 0 0 -2,244

2012 6,103,280 5,822,362 95.4% 111.4% 1,038,717 1,329,779 697,076 614,746 579,133 413,816 247,381 350,680 551,034

2013 325,918 262,823 80.6% 5.0% 2,000 47,815 61,820 0 109,332 41,856

2012 230,480 10,657 4.6% 4.3% 10,557 100

2013 258,173 0 0.0% 0.0%

2010 5,165,000 3,861,044 74.8% 65.4% 5,672 4,883 1,070,928 2,779,561

2011 1,564,815 1,248,721 79.8% 21.2% 1,237,629 9,947 1,060 85

2012 0 0 0.0% 0.0%

2013 251,895 251,895 100.0% 4.3% 235,021 16,874

61 225575 2173509

MEJORAMIENTO, SUSTITUCION Y

EQUIPAMIENTO DE LA

INFRAESTRUCTURA EDUCATIVA

POLIDOCENTE AL AÑO 2010, EN LA

PROVINCIA DE PISCO.

9,934,268.00 2013 245,412 0 0.0% 0.0%

EXPEDIENTE

TECNICO PARA

PROCESO DE

SELECCIÓN

2012 398,111 153,328 38.5% 53.1% 1,308 4,685 147,335

2013 244,744 243,522 99.5% 84.4% 243,741 -219

63 112995 2115649

FORTALECIMIENTO DE LA CAPACIDAD

RESOLUTIVA Y REFERENCIA DE

PACIENTES EN SITUACION DE

EMERGENCIA EN EL CENTRO DE SALUD

CLAS SAN ISIDRO - DISTRITO DE PUEBLO

NUEVO - CHINCHA.

180,680.00 2013 234,950 182,714 77.8% 101.1% 182,714OBRA

CULMINADA

2010 1,227,584 402,511 32.8% 29.4% 379,169 1,206 16,321 5,815

2011 353,759 0 0.0% 0.0%

2012 232,437 0 0.0% 0.0%

2013 232,437 0 0.0% 0.0%

64 24606 2087372

CONSTRUCCION DE TROCHA

CARROZABLE SAN PEDRO DE

HUACARPANA-SANLORENZO EN LA

PROVINCIA DE CHINCHA-ICA.

1,368,309.00OBRA

CULMINADA

62 135246 2162335

REHABILITACION DE DIQUE EN EL RIO

GRANDE, PARA REDUCIR LA

VULNERABILIDAD DEL SECTOR CHILLO,

MARGEN DERECHA, DISTRITO LLIPATA,

PROVINCIA PALPA-REGION ICA.

(Petacc).

288,485.40 PETACC

60 139456 2109937

CONSTRUCCION DE PISTAS Y VEREDAS

EN LA EXPANSION SUR DEL, DISTRITO DE

PARCONA - ICA - ICA.

5,900,582.00OBRA

CULMINADA

59 139752 2113628

CONSTRUCCION DE MODULO DE WAWA

WASI COMUNAL EN EL SECTOR I DEL P.V

DAMNIFICADOS DEL FENOMENO DEL

NIÑO DEL DISTRITO DE SUBTANJALLA-

ICA

250,462.07 EN EJECUCION

58 138887 2126257

MEJORAMIENTO DE LA

INFRAESTRUCTURA Y EQUIPAMIENTO

DE LA I.E VICTOR MANUEL MAURTUA

DE PARCONA, DISTRITO DE PARCONA-

ICA-ICA.

5,228,213.00OBRA

CULMINADA

57 133787 2162336

REHABILITACION DE DIQUE EN EL RIO

GRANDE, PARA REDUCIR LA

VULNERABILIDAD DEL SECTOR FLORITA

ACEQUION, MARGEN DERECHA,

DISTRITO RIO GRANDE, PROVINCIA

PALPA-REGION ICA.

(Petacc).

299,376.56 PETACC

56 187439 2152406

MEJORAMIENTO DE CARRETERA

DEPARTAMENTAL IC-107 TRAMO Dv

PANAMERICANA SUR Km 307-

PROGRESIVA 3+200 PONTON LA

ACHIRANA DISTRITO LOS AQUIJES-

PROVINCIA DE ICA-DEPARTAMENTO DE

ICA.

2,323,591.00OBRA

CULMINADA

55 68869 2086775

CONSTRUCCION DE LINEA DE

CONDUCCION RESERVORIO ELEVADO Y

LINEA DE ADUCCION EN EL DISTRITO DE

SAN ANDRES-PISCO.

4,213,533.00OBRA

CULMINADA

GOBIERNO

REGIONAL

DE ICA

Page 7: PRESUPUESTO ACUMULADO DE PROYECTOS AL III TRIMESTRE … · pip total (s/.) (**) snip dgpp ... construccion del puente carrozable y obras complementarias en el sector aja-ciudad de

EJECUCION% de

Avance

% de

Avance

respecto respecto

al PIM

Anual

a la

inversión

viable Ene Feb Mar Abr May Jun Jul Ago Set Oct Nov Dic

EJECUCION MENSUALIZADA ESTADO DE

PIPTOTAL (S/.)

(**)

SNIP DGPP

PRESUPUESTO ACUMULADO DE PROYECTOS AL III TRIMESTRE DEL 2013

Ejecutora Item

Código

DenominaciónMonto de la

ViabilidadAños PIM

65 226122 2167028

MEJORAMIENTO, SUSTITUCION Y

EQUIPAMIENTO DE LA

INFRAESTRUCTURA EDUCATIVA

POLIDOCENTE AL AÑO 2010, EN LA

PROVINCIA DE ICA.

7,070,218.00 2013 228,266 0 0.0% 0.0%

EXPEDIENTE

TECNICO EN

FORMULACION

2012 497,783 190,417 38.3% 64.0% 10,000 180,417

2013 225,253 220,667 98.0% 74.2% 222,819 0 0 -2,152

2012 2,139,272 1,916,108 89.6% 124.4% 10,000 397,854 1,508,254

2013 223,164.00 202,363 90.7% 13.1% 117,131 46,059 35,828 548 0 0 2,797

68 186229 2159993

CREACION, MEJORAMIENTO E

IMPLEMENTACION DE LA

INFRAESTRUCTURA DEPORTIVA DE

BASQUETBOL Y VOLEIBOL EN LAS

INSTITUCIONES EDUCATIVAS DE LA

PROVINCIA DE ICA, PALPA, NASCA,

PISCO, CHINCHA-REGION ICA.

6,964,455.00 2013 236,843 80,853 34.1% 1.2% 66,853 3,500 0 10,500

EXPEDIENTE

TECNICO

APROBADO

2012 227,761 10,557 4.6% 4.3% 10,557

2013 220,799 212,923 96.4% 86.0% 95,077 104,071 13,775

2009 90,300 86,227 95.5% 2.0% 46,000 26,000 14,227

2010 3,423 3,423 100.0% 0.1% 2,773 650

2011 4,877,305 4,821,177 98.8% 111.8% 9,470 942,514 264,235 3,604,958

2012 815,777 689,513 84.5% 16.0% 82,105 42,453 11,711 131,521 29,278 73,752 308,693 10,000

2013 220,000 210,527 95.7% 4.9% 210,527

2009 207,600 177,539 85.5% 12.8% 1,200 2,502 9,450 7,110 9,364 10,486 7,233 6,400 8,395 13,402 86,363 15,634

2010 230,035 119,547 52.0% 8.6% 12,860 6,495 1,350 1,954 8,063 35,811 53,014

2011 254,000 190,136 74.9% 13.7% 1,542 22,371 17,105 21,929 14,904 28,582 83,703

2012 400,000 173,523 43.4% 12.5% 1,080 3,866 1,499 255 31,442 3,555 46,931 1,258 6,069 34,476 43,092

2013 350,817 87,312 24.9% 6.3% 13,500 0 0 25,597 43,029 5,186

72 131987 2164046

FORTALECIMIENTO DE LA CAPACIDAD

RESOLUTIVA DEL PUESTO DE SALUD DE

BELLAVISTA SAN PEDRO DE

HUACARPANA-CHINCHA-ICA.

244,725.28 2013 219,882 162,100 73.7% 66.2% 159,135 0 2,965 0OBRA

CULMINADA

2012 216,509 10,775 5.0% 4.4% 10,542 233

2013 207,156 191,525 92.5% 79.0% 54,039 69,835 43,722 23,929

2009 872,279 715 0.1% 0.0% 715

2010 3,466,340 114,701 3.3% 2.6% 33,551 78,286 2,864

2011 3,752,236 819,950 21.9% 18.7% 350,404 361,121 3,460 9,217 67,723 28,025

2012 886,146 451,011 50.9% 10.3% 784 2,015 133,453 111,874 202,885

2013 199,981 149,767 74.9% 3.4% 66,600 83,094 73

74 71824 2088551

FORTALECIMIENTO DE LA CAPACIDAD

RESOLUTIVA DEL CENTRO DE SALUD

ALTO LARAN - MICRORED PUEBLO

NUEVO- RED PISCO DE LA DIRESA ICA.

4,384,826.00 EN EJECUCION

73 139677 2113622

CONSTRUCCION DE MODULO DE WAWA

WASI COMUNAL EN A.H MICAELA

BASTIDAS DEL DISTRITO DE PARCONA-

ICA

242,428.69OBRA

CULMINADA

71 59186 2057958

FORTALECIMIENTO DE LAS

CAPACIDADES OPERATIVAS Y TECNICAS

PARA LA DEMARCACION TERRITORIAL

DE LA REGION ICA.

1,390,310.00

EXPEDIENTE

TECNICO

OBSERVADO

70 101572 2092500SISTEMA DE RIEGO AMARA SANTA ANA.

(Petacc).4,312,915.00 PETACC

69 139768 2113623

CONSTRUCCION DE MODULO DE WAWA

WASI COMUNAL EN SECTOR SEBASTIAN

BARRANCA DEL DISTRITO DE SANTIAGO-

ICA.

247,556.75OBRA

CULMINADA

67 127501 2158202

CONSTRUCCION DE DEFENSAS

RIBEREÑAS CON FINES DE REDUCIR LA

VULNERABILIDAD DE LOS CANALES DE

CONDUCCION DE CAUCATO Y FIGUEROA-

EL PUEBLO EN AMBAS MARGENES DEL

RIO PISCO, DISTRITO DE SAN CLEMENTE

Y CERCADO, PROVINCIA DE PISCO-

REGION ICA.

(Petacc).

1,539,859.00 PETACC

66 136700 2114738

CONSTRUCCION DE DEFENSAS

RIBEREÑAS CON ENROCADO EN LA

MARGEN DERECHA DEL RIO PISCO,

SECTOR FRANCIA BAJA, DISTRITO DE

SAN CLEMENTE, PROVINCIA DE PISCO,

REGION ICA.

(Petacc).

297,488.00 PETACC

GOBIERNO

REGIONAL

DE ICA

Page 8: PRESUPUESTO ACUMULADO DE PROYECTOS AL III TRIMESTRE … · pip total (s/.) (**) snip dgpp ... construccion del puente carrozable y obras complementarias en el sector aja-ciudad de

EJECUCION% de

Avance

% de

Avance

respecto respecto

al PIM

Anual

a la

inversión

viable Ene Feb Mar Abr May Jun Jul Ago Set Oct Nov Dic

EJECUCION MENSUALIZADA ESTADO DE

PIPTOTAL (S/.)

(**)

SNIP DGPP

PRESUPUESTO ACUMULADO DE PROYECTOS AL III TRIMESTRE DEL 2013

Ejecutora Item

Código

DenominaciónMonto de la

ViabilidadAños PIM

75 228416 2232188

MEJORAMIENTO, SUSTITUCION Y

EQUIPAMIENTO DE LA

INFRAESTRUCTURA EDUCATIVA

POLIDOCENTE AL AÑO 2010, EN LA

PROVINCIA DE PALPA.

3,943,192.00 2013 183,500 0 0.0% 0.0%

EXPEDIENTE

TECNICO EN

FORMULACION

76 43386 2057745

SUSTITUCION, AMPLIACION Y

EQUIPAMIENTO DE LA

INFRAESTRUCTURA EDUCATIVA DE LA

INSTITUCION EDUCATIVA MARGARITA

SANTA ANA DE BENAVIDES-ICA.

1,666,139.00 2013 172,397 172,396 100.0% 10.3% 172,396OBRA

CULMINADA

2012 2,720,665 2,529,236 93.0% 102.4% 490,644 426,469 2,240 490,180 841,130 5,250 5,250 268,073

2013 171,459 155,533 90.7% 6.3% 14,848 109,594 31,091

2011 810,095 161,427 19.9% 20.6% 161,427

2012 839,595 618,217 73.6% 78.8% 292,522 323,601 907 1,187

2013 166,938 0 0.0% 0.0%

79 225132 2173510

MEJORAMIENTO, SUSTITUCION Y

EQUIPAMIENTO DE LA

INFRAESTRUCTURA EDUCATIVA

POLIDOCENTE AL AÑO 2010, EN LA

PROVINCIA DE CHINCHA.

6,725,041.00 2013 157,202 0 0.0% 0.0%

EXPEDIENTE

TECNICO EN

FORMULACION

80 142731 2113073

CONSTRUCCION Y EQUIPAMIENTO DEL

NUEVO LOCAL INSTITUCIONAL DE LA

SEDE CENTRAL DE LA UNIDAD DE

GESTION EDUCATIVA LOCAL DE NASCA,

PROVINCIA DE NASCA-ICA.

3,156,042.00 2013 156,042 0 0.0% 0.0%

EXPEDIENTE

TECNICO

APROBADO

2012 377,590 197,763 52.4% 1,664 76,500 3,500 116,099

2013 153,959 47,263 30.7% 6,875 1,487 0 38,901 0

2011 1,195,920 90,527 7.6% 8.4% 90,527

2012 1,344,591 1,057,371 78.6% 97.9% 4,044 287,739 281,508 109,119 170,281 104,070 10,530 10,469 12,239 67,372

2013 147,512 192,393 130.4% 17.8% 0 146,670 45,723

2012 228,249 103,094 45.2% 42.4% 10,557 92,537

2013 137,387 115,937 84.4% 47.7% 7,000 108,937

84 216621 2161178

2161178: REHABILITACION POST

DESASTRE DE LOS SERVICIOS

EDUCATIVOS DE LA I. E. JOSE SEBASTIAN

BARRANCA, DISTRITO DE SANTIAGO-ICA-

ICA.

4,974,261.00 2013 150,939 56,832 37.7% 1.1% 40,332 13,500 3,000 0

EXPEDIENTE

TECNICO

OBSERVADO

83 139743 2113624

CONSTRUCCION DE MODULO DE WAWA

WASI COMUNAL EN LA ASOCIACION

VIRGEN DEL ROSARIO DEL DISTRITO DE

LOS AQUIJES-ICA.

243,284.34OBRA

CULMINADA

82 176534 2133866

CONSTRUCCION DE AMBIENTES

ADMINISTRATIVOS EN LA SEDE CENTRAL

DEL GOBIERNO REGIONAL DE ICA.

1,080,001.00OBRA

CULMINADA

81 S/C (*) 2154694

REHABILITACION DEL PUENTE

COLGANTE MIRAFLORES, AFECTADO

POR LAS INTENSAS LLUVIAS EN EL

CENTRO POBLADO PANTAYCO, EN EL

KM 36.5 DE LA VIA LOS LIBERTADORES

WARI, DISTRITO DE HUMAY, PROVINCIA

DE PISCO, DEPARTAMENTO DE ICA.

OBRA

CULMINADA

78 129853 2110023

INSTALACION DE REDES SECUNDARIAS Y

CONEXIONES DOMICILIARIAS DE

ALCANTARILLADO EN EL AA.HH VISTA

ALEGRE DEL CC.PP URBANO TUPAC

AMARU-PISCO.

784,925.83OBRA

CULMINADA

77 146388 2126563

MEJORAMIENTO DE VIA A NIVEL DE

ASFALTO EN CALIENTE PARA LA

INTEGRACIÓN DE LOS CC.PP PRIMAVERA

PARIÑA GRANDE, CAMINO CHICO LAS

SILVAS , Y PUEBLO NUEVO DEL DISTRITO

DE PUEBLO NUEVO - ICA.

2,468,856.00OBRA

CULMINADA

GOBIERNO

REGIONAL

DE ICA

Page 9: PRESUPUESTO ACUMULADO DE PROYECTOS AL III TRIMESTRE … · pip total (s/.) (**) snip dgpp ... construccion del puente carrozable y obras complementarias en el sector aja-ciudad de

EJECUCION% de

Avance

% de

Avance

respecto respecto

al PIM

Anual

a la

inversión

viable Ene Feb Mar Abr May Jun Jul Ago Set Oct Nov Dic

EJECUCION MENSUALIZADA ESTADO DE

PIPTOTAL (S/.)

(**)

SNIP DGPP

PRESUPUESTO ACUMULADO DE PROYECTOS AL III TRIMESTRE DEL 2013

Ejecutora Item

Código

DenominaciónMonto de la

ViabilidadAños PIM

2010 3,583,724 237,000 6.6% 4.4% 71,100 94,800 71,100

2011 5,684,462 5,119,579 90.1% 95.0% 600,000 892,443 481,187 464,830 969,332 511,542 526,955 428,488 244,802

2012 571,112 273,273 47.8% 5.1% 83,046 61,420 1,000 1,000 2,000 124,807

2013 130,718 0 0.0% 0.0%

86 209687 2231665

MEJORAMIENTO DEL SERVICIO

EDUCATIVO CON INFRAESTRUCTURA DE

PROTECCION SOLAR EN LAS I.E. DE LA

PROVINCIA DE CHINCHA, REGION ICA.

3,749,729.00 2013 124,179 0 0.0% 0.0%

EXPEDIENTE

TECNICO EN

PROCESO DE

SELECCIÓN

2012 1,337,185 1,238,166 92.6% 106.1% 6,231 401,493 245,256 227,098 15,168 240,315 102,605

2013 121,705 22,669 18.6% 1.9% 9,693 12,976

88 S/C (*) 300-816ESTUDIOS DE PRE-INVERSION-REGION

ICA-EDUCACION.2013 117,453 0 0.0% 0 0 0

DIRECCION

REGIONAL

EDUCACION

89 209703 2231666

MEJORAMIENTO DEL SERVICIO

EDUCATIVO CON INFRAESTRUCTURA DE

PROTECCION SOLAR EN LAS I.E. DE LA

PROVINCIA DE ICA, REGION ICA.

3,996,197.00 2013 130,733 0 0.0% 0.0%

EXPEDIENTE

TECNICO EN

PROCESO DE

SELECCIÓN

2012 49,210 24,605 50.0% 0.9% 9,842 14,763

2013 104,022 32,105 30.9% 1.2% 4,000 3,000 500 0 0 24,605

2010 3,486,442 1,754,364 50.3% 38.3% 1,754,364

2011 2,841,872 2,650,645 93.3% 57.8% 134,237 293,564 234,392 402,318 473,066 134,957 306,840 1,056 670,215

2012 191,228 36,795 19.2% 0.8% 1,783 13,078 17,585 4,349

2013 102,526 0 0.0% 0.0%

92 209695 2231667

MEJORAMIENTO DEL SERVICIO

EDUCATIVO CON INFRAESTRUCTURA DE

PROTECCION SOLAR EN LAS I.E. DE LA

PROVINCIA DE PISCO, REGION ICA.

3,041,557.00 2013 102,048 0 0.0% 0.0%

EXPEDIENTE

TECNICO EN

PROCESO DE

SELECCIÓN

2011 1,024,164 428,539 41.8% 43.3% 138,000 290,539

2012 721,088 665,015 92.2% 67.2% 1,265 591,753 15,931 4,235 51,831

2013 97,083 45,538 46.9% 4.6% 40,339 5,199 0 0

94 218440 2163132

MEJORAMIENTO Y AMPLIACION DE LA

GESTION INTEGRAL DE RESIDUOS

SOLIDOS MUNICIPALES EN EL DISTRITO

DE INGENIO, DISTRITO DE EL INGENIO-

NAZCA-ICA.

2,507,629.00 2013 107,772 65,603 60.9% 2.6% 56,563 3,500 3,500 2,040

EXPEDIENTE

TECNICO EN

FORMULACION

95 209719 2165500

MEJORAMIENTO DEL SERVICIO

EDUCATIVO CON INFRAESTRUCTURA DE

PROTECCION SOLAR EN LAS I.E. DE LA

PROVINCIA DE NASCA, REGION ICA.

2,804,078.00 2013 94,627 0 0.0% 0.0%

EXPEDIENTE

TECNICO

PROCESO DE

SELECCIÓN

96 56943 2163471

MANEJO INTEGRAL CON ENFASIS EN LA

REFORESTACION DE LA PARTE ALTA DEL

DISTRITO DE CHAVIN-CHINCHA.

2,558,632.00 2013 88,996 0 0.0% 0.0%

EXPEDIENTE

TECNICO

OBSERVADO

93 148536 2111902

MEJORAMIENTO Y EQUIPAMIENTO DE

INFRAESTRUCTURA DEPORTIVA Y

RECREATIVA EN EL CC.PP URBANO RIO

GRANDE, SECTOR MIRAFLORES,

DISTRITO DE RIO GRANDE- PALPA-ICA.

988,934.20OBRA

CULMINADA

91 146382 2111197

CONSTRUCCION DE PISTAS Y VEREDAS

EN LAS CALLES PRINCIPALES DEL

CENTRO POBLADO SAN CLEMENTE

GRUPO 2, DISTRITO DE SAN CLEMENTE -

PISCO - ICA

4,584,361.00OBRA

CULMINADA

90 187942 2156624

CREACION E IMPLEMENTACION DEL

CENTRO DE EVALUACION PARA EL

OTORGAMIENTO DE LICENCIAS DE

CONDUCIR EN LA REIGION ICA.

2,698,022.00

EXPEDIENTE

TECNICO

APROBADO

87 132257 2111196

MEJORAMIENTO DEL SERVICIO

EDUCATIVO EN LA I.E 22498 FAUSTINO

ROSAS BARBOZA DEL CENTRO POBLADO

TOMA DE LEON DEL DISTRITO DE

INDEPENDENCIA-PISCO-ICA.

1,166,784.92OBRA

CULMINADA

85 88649 2094601

CONSTRUCCION DE UN COLISEO

DEPORTIVO Y UN GIMNASIO PARA EL

DESARROLLO FISICO DE LOS ALUMNOS

DE LA INSTITUCION EDUCATIVA SAN

LUIS GONZAGA DE ICA EN LA CIUDAD DE

ICA PROVINCIA Y DEPARTAMENTO DE

ICA.

5,389,371.00OBRA

CULMINADA

GOBIERNO

REGIONAL

DE ICA

Page 10: PRESUPUESTO ACUMULADO DE PROYECTOS AL III TRIMESTRE … · pip total (s/.) (**) snip dgpp ... construccion del puente carrozable y obras complementarias en el sector aja-ciudad de

EJECUCION% de

Avance

% de

Avance

respecto respecto

al PIM

Anual

a la

inversión

viable Ene Feb Mar Abr May Jun Jul Ago Set Oct Nov Dic

EJECUCION MENSUALIZADA ESTADO DE

PIPTOTAL (S/.)

(**)

SNIP DGPP

PRESUPUESTO ACUMULADO DE PROYECTOS AL III TRIMESTRE DEL 2013

Ejecutora Item

Código

DenominaciónMonto de la

ViabilidadAños PIM

97 234252 2230612

MEJORAMIENTO DE LA PRODUCCION Y

COMERCIALIZACION DE PALTA,

MEDIANTE LA TRANSFERENCIA DE

TECNOLOGIA A LOS PEQUEÑOS

PRODUCTORES, EN ARTICULACION CON

LOS GOBIERNOS LOCALES, DE LAS

PROVINCIAS DE PISCO Y CHINCHA DE LA

REGION ICA.

4228380 2013 87,798 0 0.0% 0.0%

EXPEDIENTE

TECNICO EN

PROCESO DE

SELECCIÓN

98 147212 2163472

MEJORAMIENTO DE CANAL DE

IRRIGACION PAMPA DE ÑOCO EN EL

SECTOR RURAL EN LOS DISTRITOS DE

CHINCHA ALTA, PUEBLO NUEVO Y

GROCIO PRADO EN LA PROVINCIA DE

CHINCHA-REGION ICA.

4,881,491.00 2013 85,602 0 0.0% 0.0%

EXPEDIENTE

TECNICO PARA

PROCESO DE

SELECCIÓN

99 170345 2160205

CONSTRUCCION DE DEFENSA

MARITIMA, SECTOR CRUZ VERDE,

DISTRITO DE TAMBO DE MORA,

PROVINCIA DE CHINCHA, REGION ICA.

3,232,447.00 2013 87,650 62,405 71.2% 1.9% 16,830 42,075 3,500 0 0

EXPEDIENTE

TECNICO EN

REVISION

2011 327,332 327,332 100.0% 2.8% 327,332

2012 12,627,741 12,301,367 97.4% 106.0% 6,780,588 258 237,206 1,819,170 982,054 943,603 1,538,488

2013 79,536 71,875 90.4% 0.6% 0 71,875 0

101 228444 2232187

2232187: MEJORAMIENTO,

SUSTITUCION Y EQUIPAMIENTO DE LA

INFRAESTRUCTURA EDUCATIVA

POLIDOCENTE AL AÑO 2010, EN LA

PROVINCIA DE NASCA.

2,204,808.00 2013 78,500 0 0.0% 0.0%

EXPEDIENTE

TECNICO EN

FORMULACION

2012 59,132 29,566 50.0% 0.9% 14,783 14,783

2013 77,132 10,000 13.0% 0.3% 7,000 3,000 0

2010 136,493 277 0.2% 277

2011 180,895 117,090 64.7% 8,676 5,465 10,715 11,680 8,100 15,722 53,732 3,000

2012 101,516 59,138 58.3% 40,551 534 18,053

2013 70,837 17,836 25.2% 17,836

2011 20,000 20,000 100.0% 0.6% 20,000

2012 0 0 0.0% 0.0%

2013 68,400 8,200 12.0% 0.2% 3,500 1,300 0 3,400 0

105 235083 2177933

2177933: AMPLIACION Y

MEJORAMIENTO DE LOS SERVICIOS DE

AGUA POTABLE Y ALCANTARILLADO EN

LOS CCPP. LOS JUAREZ, LOS PINOS Y

ZONAS ADYACENTES A LA VICTORIA-ICA-

ICA-ICA.

1042592.16 2013 59,437 3,861 6.5% 0.4% 3,861

EXPEDIENTE

TECNICO EN

FORMULACION

106 209705 2165499

2165499: MEJORAMIENTO DEL

SERVICIO EDUCATIVO CON

INFRAESTRUCTURA DE PROTECCION

SOLAR EN LAS I.E. DE LA PROVINCIA DE

PALPA, REGION ICA.

1,536,545.00 2013 55,017 0 0.0% 0.0%

EXPEDIENTE

TECNICO EN

FORMULACION

104 140422 2130148

2130148: DESARROLLO DE

CAPACIDADES PARA EL ORDENAMIENTO

TERRITORIAL EN LA REGION ICA.

3,539,629.00

EXPEDIENTE

TECNICO

APROBADO

103

FICHA

FORSUR

S/C (*)

2113870

2113870: RECONSTRUCCION DE

INFRAESTRUCTURA EDUCATIVA Y

EQUIPAMIENTO EN LA INSTITUCION

EDUCATIVA Nº 22346 SAN MARTIN DE

PORRES, CASERIO CASA BLANCA,

DISTRITO DE SANTIAGO, PROVINCIA DE

ICA, AFECTADA POR EL TERREMOTO DEL

15 DE AGOSTO DEL 2007.

OBRA

CULMINADA

102 101512 2105752

2105752: MEJORAMIENTO DEL

SERVICIO EDUCATIVO EN EL INSTITUTO

SUPERIOR TECNOLOGICO PUBLICO LUIS

FELIPE DE LAS CASAS EN EL DISTRITO DE

MARCONA-NASCA-ICA.

3,390,295.00

EXPEDIENTE

TECNICO EN

OBSERVADO

100 112338 2129698

2129698: MEJORAMIENTO A NIVEL DE

ASFALTADO DE LA CARRETERA PONTON

LA ACHIRANA-LOS AQUIJES-SANTUARIO

DE YAUCA DEL ROSARIO, EN LA

PROVINCIA DE ICA.

11,602,641.00OBRA

CULMINADA

GOBIERNO

REGIONAL

DE ICA

Page 11: PRESUPUESTO ACUMULADO DE PROYECTOS AL III TRIMESTRE … · pip total (s/.) (**) snip dgpp ... construccion del puente carrozable y obras complementarias en el sector aja-ciudad de

EJECUCION% de

Avance

% de

Avance

respecto respecto

al PIM

Anual

a la

inversión

viable Ene Feb Mar Abr May Jun Jul Ago Set Oct Nov Dic

EJECUCION MENSUALIZADA ESTADO DE

PIPTOTAL (S/.)

(**)

SNIP DGPP

PRESUPUESTO ACUMULADO DE PROYECTOS AL III TRIMESTRE DEL 2013

Ejecutora Item

Código

DenominaciónMonto de la

ViabilidadAños PIM

2012 403,912 351,685 87.1% 119.3% 10,000 341,685

2013 52,227 46,652 89.3% 15.8% 49,270 -2,618

2011 69,988 20,996 30.0% 0.3% 20,996

2012 48,992 38,493 78.6% 0.6% 17,497 20,996

2013 50,299 11,600 23.1% 0.2% 5,200 3,900 2,500

2012 302,523 252,993 83.6% 98.8% 8,300 49,371 112,449 82,873

2013 49,450 22,298 45.1% 8.7% 3,950 17,329 1,019

2012 221,284 173,210 78.3% 101.1% 28,323 27,746 32,780 27,117 57,244

2013 48,074 1,376 2.9% 0.8% 1,376

2010 481,361 450 0.1% 450

2011 548,850 511,395 93.2% 171,481 187,115 23,101 3,894 36,408 2,701 86,695

2012 26,510 333 1.3% 333

2013 43,855 25,041 57.1% 16,899 8,142 0

2012 409,702 367,317 89.7% 123.7% 367,317

2013 41,572 38,926 93.6% 13.1% 40,612 545 -2,231

2010 18,593 18,593 100.0% 1.6% 7,437 11,156

2011 0 0 0.0% 0.0%

2012 10,500 0 0.0% 0.0%

2013 40,500 14,000 34.6% 1.2% 3,500 0 10,500 0

114 165292 2162333

2162333: CONSTRUCCION DE DEFENSAS

RIBEREÑAS SECTORES CHIQUERILLO, RIO

GRANDE, PALLASCA, MONTESIERPE, SAN

IGNACIO, FRANCIA Y LA CUCHILLA,

PISCO EN LA REGION ICA.

(Petacc).

4,273,497.00 2013 40,000 39,500 98.8% 0.9% 39,500 0 0 0 PETACC

113 125026 2092988

2092988: RECONSTRUCCION E

IMPLEMENTACION DE LA SEDE

INSTITUCIONAL DE LA DIRECCION

REGIONAL DE PRODUCCION ICA EN LA

CIUDAD DE PISCO.

1,171,252.22OBRA POR

INICIAR

112 133778 2162337

2162337: REHABILITACION DEL DIQUE

EN EL RIO GRANDE, PARA REDUCIR LA

VULNERABILIDAD DEL SECTOR PERNIL

ALTO, MARGEN DERECHA, DISTRITO RIO

GRANDE, PROVINCIA DE PALPA-REGION

ICA.

(Petacc).

296,885.46 PETACC

111

FICHA

FORSUR

S/C (*)

2113867

2113867: RECONSTRUCCION DE

INFRAESTRUCTURA EDUCATIVA Y

EQUIPAMIENTO EN LA INSTITUCION

EDUCATIVA ADELA LENGUA CALDERON,

LA VENTA BAJA, DISTRITO DE

SANTIAGO, PROVINCIA DE ICA,

AFECTADA POR EL TERREMOTO DEL 15

DE AGOSTO DEL 2007.

OBRA

CULMINADA

110 151143 2122382

CONSTRUCCION DEL CERCO

PERIMETRICO Y SERVICIOS HIGIENICOS

DE LA I.E. Nº 22374 CAMINO DE REYES

DEL DISTRITO DE SAN JUAN BAUTISTA-

ICA-ICA.

171,377.83OBRA

CULMINADA

109 139761 2113625

2113625: CONSTRUCCION DE MODULO

DE WAWA WASI COMUNAL EN EL

SECTOR LOS SAUCES DEL DISTRITO DE LA

TINGUIÑA-PROVINCIA DE ICA-

DEPARTAMENTO DE ICA.

256,067.51OBRA

CULMINADA

108 72653 2111396

2111396: CONSTRUCCION Y

EQUIPAMIENTO DEL NUEVO LOCAL

INSTITUCIONAL DE LA SEDE CENTRAL DE

LA DIRECCION REGIONAL DE

EDUCACION ICA.

6,890,640.00

EXPEDIENTE

TECNICO EN

OBSERVADO

107 136230 2114654

2114654: CONSTRUCCION DE DEFENSAS

RIBEREÑAS CON FINES DE PROTECCION

DE LA TOMA DEL CANAL DE

CONDUCCION Y DRENAJE DOS PALMAS

EN LA MARGEN DERECHA DEL RIO PISCO

SECTOR DOS PALMAS, DISTRITO DE

INDEPENDENCIA, PROVINCIA DE PISCO,

REGION ICA.

(Petacc).

294,708.03 PETACC

GOBIERNO

REGIONAL

DE ICA

Page 12: PRESUPUESTO ACUMULADO DE PROYECTOS AL III TRIMESTRE … · pip total (s/.) (**) snip dgpp ... construccion del puente carrozable y obras complementarias en el sector aja-ciudad de

EJECUCION% de

Avance

% de

Avance

respecto respecto

al PIM

Anual

a la

inversión

viable Ene Feb Mar Abr May Jun Jul Ago Set Oct Nov Dic

EJECUCION MENSUALIZADA ESTADO DE

PIPTOTAL (S/.)

(**)

SNIP DGPP

PRESUPUESTO ACUMULADO DE PROYECTOS AL III TRIMESTRE DEL 2013

Ejecutora Item

Código

DenominaciónMonto de la

ViabilidadAños PIM

115 137297 2160206

2160206: MEJORAMIENTO DE LA

INFRAESTRUCTURA Y EQUIPAMIENTO

EN EL CETPRO JULIO C. TELLO DEL

DISTRITO DE ICA, PROVINCIA DE ICA,

REGION ICA

914,775.50 2013 45,680 45,680 100.0% 5.0% 38,680 0 3,500 3,500OBRA POR

INICIAR

2010 1,575,369 15,000 1.0% 15,000

2011 2,175,553 669,424 30.8% 35,000 10,775 623,649

2012 1,471,131 1,378,248 93.7% 16,183 421,971 415,107 425,788 4,322 43,690 2,000 49,187

2013 34,370 0 0.0%

2012 252,391 223,586 88.6% 91.9% 10,542 280 74,958 137,806

2013 30,249 8,506 28.1% 3.5% 4,000 2,000 1,877 629

2012 3,787,528 3,753,603 99.1% 99.6% 690,245 361,420 291,240 546,262 549,560 569,954 744,922

2013 29,610 23,814 80.4% 0.6% 23,059 0 755

2012 523,423 499,028 95.3% 98.9% 254,993 244,035

2013 27,990 8,610 30.8% 1.7% 0 8,610 0

2010 437,394 25,000 5.7% 7,500 17,500

2011 597,454 399,710 66.9% 399,710

2012 208,873 87,870 42.1% 66,308 1,188 10,390 9,984

2013 26,280 20,480 77.9% 20,480

121 128677 2162711

2162711: CONSTRUCCION DE DEFENSAS

RIBEREÑAS EN LOS SECTORES DE SAN

JUAN Y CABILDO EN LA MARGEN

DERECHA DEL RIO GRANDE, DISTRITO DE

CHANGUILLO, PROVINCIA DE NASCA,

REGION ICA.

(Petacc).

1,565,377.00 2013 25,000 25,000 100.0% 1.6% 25,000 PETACC

2010 25,288 186 0.7% 186

2011 28,414 16,132 56.8% 2,867 3,588 9,677

2012 26,012 11,983 46.1% 3,311 7,270 1,402

2013 24,459 10,361 42.4% 396 6,336 0 0 3,629

2010 40,590 237 0.6% 237

2011 51,910 43,736 84.3% 3,470 6,498 3,736 8,668 16,996 4,368

2012 26,391 2,179 8.3% 2,179

2013 24,212 8,065 33.3% 7,042 1,023 0 0

123

FICHA

FORSUR

S/C (*)

2113866

2113866: RECONSTRUCCION DE

INFRAESTRUCTURA EDUCATIVA Y

EQUIPAMIENTO EN LA INSTITUCION

EDUCATIVA Nº 22348 SANTIAGO

BARRIOS TORREALVA, CASERIO SAN

FELIPE, DISTRITO DE OCUCAJE,

PROVINCIA DE ICA, AFECTADA POR EL

TERREMOTO DEL 15 DE AGOSTO DEL

2007.

OBRA

CULMINADA

122

FICHA

FORSUR

S/C (*)

2113869

2113869: RECONSTRUCCION DE

INFRAESTRUCTURA EDUCATIVA Y

EQUIPAMIENTO EN LA INSTITUCION

EDUCATIVA Nº 22352, CASERIO LOS

FLORES, LA VENTA ALTA, DISTRITO DE

SANTIAGO, PROVINCIA DE ICA,

AFECTADA POR EL TERREMOTO DEL 15

DE AGOSTO DEL 2007-(SAGRADO

CORAZON)

OBRA

CULMINADA

120

FICHA

FORSUR

S/C (*)

2113685

2113685: RECONSTRUCCIÓN Y

EQUIPAMIENTO DE LA INSTITUCIÓN

EDUCATIVA Nº 188 "ANGELITOS DEL

DIVINO NIÑO" - HUMAY - PISCO- ICA.

(Forsur).

OBRA

CULMINADA

119 218433 2158290

2158290: INSTALACION PROVISIONAL

DE LOS SERVICIOS DE EDUCACION

INICIAL DE LA I.E. Nº014 MERCEDES

DIBOS DE CAMINO DISTRITO DE ICA,

PROVINCIA DE ICA, DEPARTAMENTO DE

ICA.

504,476.36OBRA

CULMINADA

118 128366 2111667

MEJORAMIENTO DE LA PLAZA DE

ARMAS DEL DISTRITO DE PACHACUTEC-

ICA.

3,767,334.00OBRA

CULMINADA

117 139696 2113626

CONSTRUCCION DE MODULO DE WAWA

WASI COMUNAL EN EL CERCADO DEL

DISTRITO DE SUBTANJALLA-ICA

243,293.06OBRA

CULMINADA

116

FICHA

FORSU

R

S/C (*)

2113683

2113683 RECONSTRUCCIÓN,

REHABILITACIÓN Y EQUIPAMIENTO DE

LA INFRAESTRUCTURA EN LA IE JULIO C.

TELLO.

(Forsur).

OBRA

CULMINADA

GOBIERNO

REGIONAL

DE ICA

Page 13: PRESUPUESTO ACUMULADO DE PROYECTOS AL III TRIMESTRE … · pip total (s/.) (**) snip dgpp ... construccion del puente carrozable y obras complementarias en el sector aja-ciudad de

EJECUCION% de

Avance

% de

Avance

respecto respecto

al PIM

Anual

a la

inversión

viable Ene Feb Mar Abr May Jun Jul Ago Set Oct Nov Dic

EJECUCION MENSUALIZADA ESTADO DE

PIPTOTAL (S/.)

(**)

SNIP DGPP

PRESUPUESTO ACUMULADO DE PROYECTOS AL III TRIMESTRE DEL 2013

Ejecutora Item

Código

DenominaciónMonto de la

ViabilidadAños PIM

2011 586,385 513,424 87.6% 41.8% 513,424

2012 751,562 687,262 91.4% 55.9% 7,509 191,630 257,692 151,285 78,995 151

2013 24,141 0 0.0% 0.0%

2012 122,450 98,421 80.4% 85.6% 62,758 31,203 4,460

2013 23,530 0 0.0% 0.0%

2012 1,186,486 1,135,755 95.7% 95.4% 417,836 236,591 481,328

2013 22,924 0 0.0% 0.0%

2009 2,900,306 32,874 1.1% 32,874

2010 3,014,071 2,125,844 70.5% 886 180 565,340 537,280 490,051 532,107

2011 783,590 635,312 81.1% 172,228 236,221 5,857 171,025 6,983 2,727 4,725 29,676 5,870

2012 318,207 295,564 92.9% 295,564

2013 22,643 22,642 100.0% 22,642

2010 107,571 499 0.5% 499

2011 180,861 168,526 93.2% 9,349 6,872 16,951 7,523 84,244 29,558 14,029

2012 28,321 16,820 59.4% 7,819 7,833 1,168

2013 21,931 7,024 32.0% 6,740 0 0 284

129 123932 2163549

2163549: CONSTRUCCION DE DEFENSAS

RIBEREÑAS EN AMBAS MARGENES DEL

RIO ICA PARA ASEGURAR EL SERVICIO

DE AGUA DE RIEGO, EN LOS SECTORES

AMARA Y SANTA ANA, DISTRITO DE

OCUCAJE, PROVINCIA Y REGION ICA.

(Petacc).

744,445.00 2013 20,000 20,000 100.0% 2.7% 20,000 PETACC

2012 10,000 10,000 100.0% 4.0% 10,000

2013 20,000 20,000 100.0% 7.9% 20,000

2012 10,000 10,000 100.0% 3.4% 10,000

2013 20,000 20,000 100.0% 6.8% 20,000

2012 265,490 251,470 94.7% 90.2% 10,542 378 46,262 80,285 114,003

2013 14,860 3,374 22.7% 1.2% 2,310 1,064

132 139756 2113627

CONSTRUCCION DE MODULO DE WAWA

WASI COMUNAL EN C.P SAN JOSE DE

LOS MOLINOS DEL DISTRITO DE SAN

JOSE DE LOS MOLINOS-ICA.

278,808.23OBRA

CULMINADA

131 132348 2162994

2162994: REHABILITACION DEL DIQUE

EN EL RIO PISCO, CON FINES DE

REDUCIR LA VULNERABILIDAD DEL

SECTOR NUÑEZ CANCHARI-CASALLA-M.

I, DISTRITO DE TUPAC AMARU INCA,

PROVINCIA DE PISCO, REGION ICA.

(Petacc).

293,827.97 PETACC

130 132321 2162747

2162747: REHABILITACION DE DIQUE EN

EL RIO PISCO CON FINES DE REDUCIR LA

VULNERABILIDAD DEL SECTOR

BERNALES-M. IZQUIERDA, DISTRITO DE

HUMAY, PROVINCIA DE PISCO, REGION

ICA.

(Petacc).

252428.9 PETACC

128

FICHA

FORSUR

S/C (*)

2113868

2113868: RECONSTRUCCION DE

INFRAESTRUCTURA EDUCATIVA Y

EQUIPAMIENTO EN LA INSTITUCION

EDUCATIVA Nº 22732, CP SANTA

DOMINGUITA, DISTRITO DE SANTIAGO,

PROVINCIA DE ICA, AFECTADA POR EL

TERREMOTO DEL 15 DE AGOSTO DEL

2007.

OBRA

CULMINADA

127FICHA

FORSUR2090181

RECONSTRUCCION DE LA COMISARIA

PNP CHINCHA ALTA - CHINCHA - ICA,

AFECTADO POR EL SISMO DEL 15 DE

AGOSTO DEL 2007.

(Forsur).

OBRA

CULMINADA

126 137111 2111439

2111439: CONSTRUCCION DE PISTAS Y

VEREDAS EN EL CENTRO POBLADO

PAMPANO, DISTRITO DE HUANCANO-

PISCO.

1,190,456.54OBRA

CULMINADA

125 147677 2116133

AMPLIACION DE REDES DE

DISTRIBUCION PRIMARIA EN 22,9 KV

PARA ELECTRIFICAR LOS C.P. SANTA

MONICA, SANTA CRUZ DE VILLACURI I Y

II ETAPA Y VIRGEN DEL ROSARIO DEL C.P

SANTA CRUZ DE VILLACURI DEL

DISTRITO DE SALAS-ICA-ICA

115,011.08OBRA

CULMINADA

124 90884 2112492

2112492: REHABILITACION DEL CAMINO

VECINAL DV PANAMERICANA SUR Km

381+500 PUEBLO NUEVO - EL CARMEN -

ALTO LARAN - LOCARI - ORONGO -

SOTELO.

1,228,442.00OBRA

CULMINADA

GOBIERNO

REGIONAL

DE ICA

Page 14: PRESUPUESTO ACUMULADO DE PROYECTOS AL III TRIMESTRE … · pip total (s/.) (**) snip dgpp ... construccion del puente carrozable y obras complementarias en el sector aja-ciudad de

EJECUCION% de

Avance

% de

Avance

respecto respecto

al PIM

Anual

a la

inversión

viable Ene Feb Mar Abr May Jun Jul Ago Set Oct Nov Dic

EJECUCION MENSUALIZADA ESTADO DE

PIPTOTAL (S/.)

(**)

SNIP DGPP

PRESUPUESTO ACUMULADO DE PROYECTOS AL III TRIMESTRE DEL 2013

Ejecutora Item

Código

DenominaciónMonto de la

ViabilidadAños PIM

133 148903 2163470

2163470: MEJORAMIENTO DEL

SERVICIO EDUCATIVO EN LA I.E. 22290

C.P. EL GUAYABO, DEPARTAMENTO ICA,

PROVINCIA CHINCHA, DISTRITO

SUNAMPE.

627,239.00 2013 21,816 3,000 13.8% 0.5% 3,000

EXPEDIENTE

TECNICO EN

FORMULACION

2010 380,247 4,200 1.1% 4,200

2011 648,055 534,050 82.4% 9,800 194,487 22,216 118,056 10,063 148,350 31,078

2012 21,198 10,398 49.1% 4,728 5,670

2013 10,580 10,580 100.0% 10,580

135 223187 2229809

2229809: MEJORAMIENTO Y

AMPLIACION DEL SERVICIO DE

COMERCIALIZACION DE PRODUCTOS DE

PRIMERA NECESIDAD DEL MERCADO DE

ABASTO MUNICIPAL, DISTRITO DE

PUEBLO NUEVO-CHINCHA-ICA.

9,986,423.00 2013 10,500 0 0.0% 0.0%

OBRA PARA

PROCESO DE

SELECCIÓN

2012 1,211,173 1,178,198 97.3% 102.3% 235,142 594,290 348,766

2013 9,437 9,436 100.0% 0.8% 9,436

2012 26,275 26,275 100.0% 3.4% 10,510 15,765

2013 7,883 0 0.0% 0.0%

2012 423,349 399,881 94.5% 70.6% 49,900 91,198 235,615 3,020 20,148

2013 6,175 1,771 28.7% 0.3% 1,771

2012 828,060 822,860 99.4% 98.5% 366,284 225,280 120,176 108,025 3,095

2013 5,200 0 0.0% 0.0%

2011 378,888 258,348 68.2% 91.5% 258,348

2012 116,725 110,181 94.4% 39.0% 99,164 8,326 2,691

2013 3,861 0 0.0% 0.0%

2012 10,900 10,900 100.0% 1.3% 0 0 10,900

2013 10,500 10,500 100.0% 1.2% 0 0 10,500

2159892: MEJORAMIENTO DE LA

CALIDAD EDUCATIVA DE LA I.E. Nº91 EN

EL AA.HH. SEÑOR DE LUREN III ETAPA,

DISTRITO, PROVINCIA Y

DEPARTAMENTO DE ICA.

2159892172208 853,425.00

140 155401 2131991

2131991: SUSTITUCION DE LA LINEA DE

ABASTECIMIENTO DE AGUA POTABLE Y

AMPLIACION DE REDES DE

DISTRIBUCION DE AGUA POTABLE AL

CC.PP LA VICTORIA-LOS JUAREZ,

DISTRITO DE ICA.

282,277.02OBRA

CULMINADA

139 147690 2117929

AMPLIACION DE REDES DE

DISTRIBUCION SECUNDARIA Y

ALUMBRADO PUBLICO PARA

ELECTRIFICAR LOS C.P. SANTA MONICA,

SANTA CRUZ DE VILLACURI I Y II ETAPA Y

VIRGEN DEL ROSARIO DEL C.P SANTA

CRUZ DE VILLACURI DEL DISTRITO DE

SALAS - ICA-ICA

835,054.70OBRA

CULMINADA

138 149196 2133478

CONSTRUCCION DE ALAMEDA

TURISTICA DEL ANEXO DE HUARACCO-

DISTRITO RIO GRANDE, PROVINCIA DE

PALPA-ICA.

566,368.00OBRA

CULMINADA

137 188630 2150903

2150903: MEJORAMIENTO DEL SISTEMA

DE COMUNICACIÓN PARA LA

PREVENCION Y ATENCION DE LAS

EMERGENCIAS DEL GOBIERNO

REGIONAL DE ICA.

775,104.00

EXPEDIENTE

TECNICO

APROBADO

136 143136 2115792

CONSTRUCCION DE PISTAS Y VEREDAS

DE CONCRETO EN LAS PRINCIPALES

CALLES DEL DISTRITO DE SAN PEDRO DE

HUACARPANA-CHINCHA.

1,152,135.49OBRA

CULMINADA

134

FICHA

FORSUR

S/C (*)

2113688

2113688 RECONSTRUCCIÓN DE

AMBIENTES Y ADQUISICIÓN DE

EQUIPAMIENTO BIÓMEDICO BÁSICO

DEL PUESTO DE SALUD CONDORILLO

ALTO DEL DISTRITO DE CHINCHA ALTA,

PROVINCIA DE CHINCHA, DPTO DE ICA,

AFECTADOS POR EL SISMO DEL 15 DE

AGOSTO DEL 2007.

(FORSUR).

OBRA

CULMINADA

GOBIERNO

REGIONAL

DE ICA

Page 15: PRESUPUESTO ACUMULADO DE PROYECTOS AL III TRIMESTRE … · pip total (s/.) (**) snip dgpp ... construccion del puente carrozable y obras complementarias en el sector aja-ciudad de

EJECUCION% de

Avance

% de

Avance

respecto respecto

al PIM

Anual

a la

inversión

viable Ene Feb Mar Abr May Jun Jul Ago Set Oct Nov Dic

EJECUCION MENSUALIZADA ESTADO DE

PIPTOTAL (S/.)

(**)

SNIP DGPP

PRESUPUESTO ACUMULADO DE PROYECTOS AL III TRIMESTRE DEL 2013

Ejecutora Item

Código

DenominaciónMonto de la

ViabilidadAños PIM

2011 1,247,840 663,043 53.1% 46.9% 663,043

2012 717,332 662,753 92.4% 46.9% 11,142 349,439 50,833 1,064 6,936 238,880 4,459

2013 2,350 2,350 100.0% 0.2% 2,350

2010 20,318 165 0.8% 165

2011 20,153 12,727 63.2% 4,666 2,614 3,328 2,119

2012 8,926 858 9.6% 858

2013 1,919 419 21.8% 0 0 419

2011 993,588 969,020 97.5% 89.8% 435,680 94,941 96,087 61,127 74,940 190,450 -335 16,130

2012 24,567 4,304 17.5% 0.4% 4,304

2013 1,584 1,584 100.0% 0.1% 1,584

144

2. Si el monto de inversión total con el que fue declarado viable el PIP es > a S/.3 millones de N/S y < o igual a S/.6millones de N/S, la modificación no deberá incrementarlo en mas de 30% respecto de lo declarado viable.

(*) S/C Sin Código - Proyectos que no pasaron por el SNIP

Nota: (**)

De acuerdo al Artículo Nº27 respecto a las Modificaciones de un PIP durante la fase de Inversión, señala:

1. si el monto de inversión total con el que fue declarado viable el PIP es < o igual a S/.3 millones de N/S, la modificación no deberá incrementarlo en mas de 40% respecto de o

3. Si el monto de inversión total con el que fue declarado viable el PIP es > a S/.6 millones de N/S, la modificación no deberá incrementarlo en mas de 20% respecto de lo declarado viable.

144 132459 2113629

2113629: MEJORAMIENTO DE LA

CAPACIDAD RESOLUTIVA PARA LA

OFERTA DE SERVICIOS DEL PUESTO DE

SALUD BERNALES, DISTRITO DE HUMAY-

PISCO-ICA.

1,079,634.97OBRA

CULMINADA

143

FICHA

FORSUR

S/C (*)

2113865

2113865: RECONSTRUCCION DE

INFRAESTRUCTURA EDUCATIVA Y

EQUIPAMIENTO EN LA INSTITUCION

EDUCATIVA INICIAL Nº 080, CASERIO

SAN JOSE DE PINILLA DISTRITO DE

OCUCAJE, PROVINCIA DE ICA, AFECTADA

POR EL TERREMOTO DEL 15 DE AGOSTO

DEL 2007.

OBRA

CULMINADA

142 113837 2113226

2113226: REHABILITACION Y

MEJORAMIENTO DE LAS REDES DE

AGUA POTABLE Y ALCANTARILLADO DEL

CENTRO POBLADO DE SAN IDELFONSO

LA TINGUIÑA-ICA.

1,413,911.00OBRA

CULMINADA

GOBIERNO

REGIONAL

DE ICA