1 1 Farid M. Berry Vice President & Project Director Sargent & Lundy LLC April 8, 2014 Role of the OWNER’S ENGINEER Technical Meeting on Becoming a Knowledgeable Customer Obninsk and Novovoronezh, Russian Federation

President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified

Embed Size (px)

Citation preview

Page 1: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified

11

Farid M. BerryVice President & Project Director

Sargent & Lundy LLCApril 8, 2014

Role of the OWNER’S ENGINEER

Technical Meeting on Becoming a Knowledgeable Customer

Obninsk and Novovoronezh, Russian Federation

Page 2: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified

22

• Sargent & Lundy

• Owner’s Engineer

– Why Owner’s Engineer?

– Owners Engineer Roles/Tasks

• Selecting an Owners Engineer

• Summary

Page 3: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified

33

• 122 years of leading global power industry experience

• Headquartered in Chicago, USA

• Exclusive focus on power industry

• Nuclear Quality Assurance Program

– Topical Report which has been reviewed and accepted by the USNRC.

• ISO 9001:2008 Certified Quality System

• 2,600+ staff members

• Ranked in top 5 AE’s Globally in Power by Engineering News-Record.

ProfileProfile

Page 4: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified

44

• Over 600 clients– 150 fossil power clients– 120 nuclear power clients– 40 power delivery service clients– 340 consulting clients

Client BaseClient Base

Page 5: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified

55

Areas of Expertise Include:Areas of Expertise Include:-- Project Concept Development

-- Preliminary Financial Evaluation/Capital Cost Estimating-- Site Selection, Feasibility studies

-- Transmission Impact Studies-- Environmental Evaluation

-- Licensing, Permitting, and Document Preparation-- Detailed Design/EPC Implementation

-- Procurement/Quality Control -- Construction Management/Oversight

-- Preparation and System Startup Testing-- Operations & Maintenance Consulting

Page 6: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified

66

OwnerOwner’’s Engineers Engineer

Owner's Engineer is a term given to an independent Owner's Engineer is a term given to an independent party representative of the party representative of the OWNEROWNER of a of a constructionconstructionor or engineeringengineering project. project.

Page 7: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified

77

New Nuclear Plant TimelineNew Nuclear Plant TimelineGreenfield SiteGreenfield Site

Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8

Feasibility Studies/ Technology Assessment

Select EPC/Technology Contractor

Construction License Issued

Fuel Load

COD

Reactor, Simulator order

Year 9 Year 10

EPC Negotiations LWA Granted

EPC Site Mobilization

Preliminary Rx Technology Selection

Final Site Selection

Licensing

Startup &

Testing

Construction

Training

Page 8: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified

88

Why OwnerWhy Owner’’s Engineer?s Engineer?

• Owner’s engineer support the owner in a successful planning, oversight, execution and implementation of the project from inception through commissioning.

• Owner’s engineer ensures deliverables are in-line with owner’s expectations.

• Owner’s engineer, involved from project inception can help with defining the project size, location, technology selection, contracting strategy, scope, DOR/interfaces, and schedule.

• Owner’s engineer can reduce a project’s overall project cost(capital, operation and maintenance) and project risk

• Design optimization that reduce the owner’s lifecycle costs.

Page 9: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified

99

Why OwnerWhy Owner’’s Engineer? (continued)s Engineer? (continued)• Owner benefits from having a dedicated engineering advisor who is familiar

with all aspects of the project and will help the owner identify opportunities that may otherwise be overlooked while avoiding or minimizing risks.

» Preparation and/or review of equipment procurement specifications and ensure suppliers are in compliance with all contract requirements.

» Support development of configuration management control that captures the plant design basis.

» Develop of the training program and capacity building» Support plant commissioning process (system turnover, start-up tests,

punch lists, performance testing, etc…).» Preparing integrated project schedules.» Preparing technical commercial requirement.» Support with the licensing process, permitting and environmental

processes» Support with EPC contract documents and negotiations, including RFP

(request for proposal) and evaluations.» Provide design when necessary, overall project management, contract

administration, and construction oversight.

Page 10: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified

1010

OwnerOwner’’s Engineer Roles/Taskss Engineer Roles/Tasks• Site Selection• Technology Assessment/Selection• Licensing support• Engineering, Procurement, Construction (EPC) Commercial

Technical Requirements and Bid Assistance• Division Of Responsibilities (DOR)• Contract negotiations support• Develop overall project execution plan • Develop an integrated master project schedule• Identify and quantify project risks and develop a risk mitigation

plan

Page 11: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified

1111

OwnerOwner’’s Engineer Roles/Taskss Engineer Roles/Tasks(continued)(continued)

• Develop design for site specific activities and owners assigned activities• Develop & update project cost estimate

• EPC experience• Maturity of Design• Regulatory Environment• Procurement

• Review EPC contractor’s procedures and related documents• Perform audits on behalf of the Owner• Represent Owner in EPC contractor’s procurement activities

Page 12: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified

1212

OwnerOwner’’s Engineer Roles/Taskss Engineer Roles/Tasks(continued)(continued)

• Perform design reviews on behalf of the Owner of vendor documents (e.g., drawings, calculations, specifications, constructor/vendor document submittals, etc…)

• Support Owner with reviewing EPC contractor costs, schedule, andprogress

• Support the owner with plant testing and startup

• Provide construction support: oversight, engineering, licensing,procurement and commissioning.

• Support design activities/interface with operating units

• Independent engineer evaluation

• Training

• Miscellaneous support (Knowledge transfer, etc…)

Page 13: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified

1313

Technology AssessmentTechnology Assessment• Suitability for available sites• Amount of power needed • Reliability / Availability• Costs

– Capital– O&M

• Risks associated with each technology– Technical (First-of-Kind issues)

» Passive vs, active– Licensing– Schedule

Page 14: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified

1414

Technology Assessment (continued)Technology Assessment (continued)• No reliance on AC power for safety systems• Reduced reliance on operator actions• Large margin to safety limits

• Fewer Active components - less capital / O&M Costs• Modular construction

• Better predictability of cost and schedule• Etc…

Page 15: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified

1515

LicensingLicensing• IAEA General Guidance for the Licensing Process

– Pre-Construction SAR (PCSAR)– Pre-Operation SAR (POSAR)– Station SAR (SSAR)

• US NRC (10 CFR 50 and 52)– 10 CFR 52- Single process

» Early Site Permit (ESP)• Approval to secure one or more sites for future use

» Combined Construction and Operating License (COL)• ITAAC unchartered

– 10 CFR 50- Two step process» Separate construction and operating license

• OE support: License application, RAI’s, Analysis, etc…

Page 16: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified

1616

0

100

200

300

400

500

600

700

# of RAIs

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22Chapter

New Technology RAI Review Experience

Page 17: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified

1717

EPC Commercial Technical RequirementsEPC Commercial Technical Requirements

Page 18: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified

1818

EPC Commercial Technical Requirements EPC Commercial Technical Requirements OverviewOverview

• Relationship to EPC Contract

– Will be a Supplement to EPC contract

– Includes technical requirements

» Owners requirements

» Country local and regional requirements

» Industry Lessons Learned

» Regulatory requirements

Page 19: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified

1919

• Goal = Issue Commercial Technical Requirements that delivers a State of the Art Plant to the owner

– Emphasis on nuclear industry Lessons Learned to date

» 60 year design life

» Industry requirements (EUR/URD)

» Specific operating experience

» INPO/WANO operating experience

» S&L design experience

– Specify critical design and procurement requirements

EPC Commercial Technical Requirements EPC Commercial Technical Requirements Overview (ContOverview (Cont’’d)d)

Page 20: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified

2020

– Adds value relative to requirements affecting:» Plant operations

» Reliability

» Availability

» Maintenance

» ISI/IST

» ALARA

» Design philosophy

» Design margin

» Construction and transition from construction to operation

» Outage optimization

EPC Commercial Technical Requirements EPC Commercial Technical Requirements Overview (ContOverview (Cont’’d)d)

Page 21: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified

2121

• EPC Commercial Technical Structure– Parallels US NRC NUREG-0800 (Standard Review Plans)– Additional sections added for:

» Regulatory (Country specific)» Cooling Media» Site Infrastructure - Barge Facility, Haul Road, etc…» Initial Site Development» Final Site Development » Fukushima Impact/Requirements» Misc. Sections

EPC Commercial Technical Requirements EPC Commercial Technical Requirements Overview (ContOverview (Cont’’d)d)

Page 22: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified

2222

Design Departures

EPC CommercialTechnical

Requirements

EPC CommercialEPC CommercialTechnical Technical

RequirementsRequirements

Lessons Learned from the 1970s and

1980s on LWRs

Industry Codes, Standards, Regulatory

Industry Experience, EUR,

URD, EPRI, WANO, INPO,

etc..

S&L Nuclear New Build Design, etc.

Project Specific Details

Technology Design

Licensing Requirements,

Local and Regional

Requirements

QA/QC Requirements

Inputs to EPC Commercial Technical Inputs to EPC Commercial Technical RequirementsRequirements Operating

Experience

Page 23: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified

2323

CONTENTS of the

EPC Commercial Technical Requirements Document

Technical Requirements (ContTechnical Requirements (Cont’’d)d)

Page 24: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified

2424

1. General Plant Description and Design Philosophy2. Site Characteristics 3. Design of Systems, Structures, and Components4. Reactor5. Reactor Coolant System and Connected Systems6. Engineered Safety Features7. Instrumentation and Controls8. Electrical Systems and Equipment9. Auxiliary Systems10. Steam and Power Conversion

Technical Requirements (ContTechnical Requirements (Cont’’d)d)

Page 25: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified

2525

11. General Radwaste Protection

12. Radiation Protection

13. Conduct of Operations

14. Initial Test Program

15. Accident Analysis

16. Technical Specification

17. Quality Assurance

18. Human Factors Engineering

Technical Requirements (ContTechnical Requirements (Cont’’d)d)

Page 26: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified

2626

19. Severe Accidents

20. Cooling media and Related Facilities

21. Site Infrastructure- Barge Facility, Haul Road, etc…

22. Initial Site Development

23. Final Site Development

24. Unit 1 Transition from Construction to Operation

25. Items Critical to Quality

Technical Requirements (ContTechnical Requirements (Cont’’d)d)

Page 27: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified

2727

26. Construction Oversight, Construction Optimization Including Construction Command Center

27. Procurement Plan, Requirements and Oversight

28. Risk Analysis and Mitigation

29. Fukushima Impact/Requirements– Hazards (Flooding and Seismic)

– Mitigating Strategies for Beyond Design Basis Events

– Etc…

30. Training and Training Facilities

Technical Requirements (ContTechnical Requirements (Cont’’d)d)

Page 28: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified

2828

Division of ResponsibilitiesDivision of Responsibilities

Page 29: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified

2929

DORDOR Site Infrastructure

Power Block

Licensing

Permitting

Security

Fire Protection

Etc…

Page 30: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified

3030

Quality Assurance/Vendor OversightQuality Assurance/Vendor Oversight

Page 31: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified

3131

Quality Assurance/ Vendor OversightQuality Assurance/ Vendor Oversight Quality Assurance/Quality Control

– Develop and Implement QA/QC Program for an independent assessment of the effectiveness of programs and processes related to design, procurement, construction, maintenance and operationactivities, as well as the effectiveness of human performance inimplementing program and process requirements

– Objective:

» Ensure that the programs and processes deliver high quality project work. This should account for safety culture, including the establishment of a safety-conscious work environment, QA, industrial safety, radiological safety and problem identification and resolution

Page 32: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified

3232

Quality Assurance/ Vendor OversightQuality Assurance/ Vendor Oversight Quality Assurance/Quality Control Approach

– QA/QC is integrated in design, construction and procurement

– Utilize Commercial Grade Dedication requirements

» Technical requirements

» Quality requirements

» Acceptance Method

– Verify each level of the procurement chain - audit suppliers often

– Establish an inspection frequency and scope

– Emphasize QA and technical requirements through performance-based inspections

Page 33: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified

3333

Quality Assurance/ Vendor OversightQuality Assurance/ Vendor Oversight

Quality Assurance/Quality Control Approach (continued)– Assess effective implementation of manufacturing and fabrication

processes to provide assurance of product quality

– Establish and maintain document control and records management systems early

– Establish a corrective action program

– Emphasize root cause analysis and/or extent of condition as required to ensure that any proposed corrective action addressesthe underlying QA performance drivers

Page 34: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified

3434

Quality Assurance/ Vendor OversightQuality Assurance/ Vendor Oversight Quality Assurance/Quality Control Approach (continued)

– Inspection and test process verifies that the completed project meets specified design basis attributes, including performance features and characteristic

– Historical records of calibrations, audits, testing, maintenance, certifications, etc… need to be maintained as part of the permanent plant records

– Ensure installed material/components meet intended function and operability requirements

– Oversight and inspections of suppliers’ facilities

Page 35: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified

3535

Quality Assurance/ Vendor OversightQuality Assurance/ Vendor Oversight Quality Assurance/Quality Control Approach (continued)

– Counterfeit material can compromise safety related components/systems/structures

» Establish a process to quickly identify counterfeit material• Qualified suppliers

• Oversight and inspections of supplier facilities

• Proper material documentation and traceability

• Material that cannot be traced back to the original source should be considered suspect

• Corrective action program

Page 36: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified

3636

Prevention, Detection, CorrectionPrevention, Detection, CorrectionPROCUREMENT PROCESSEARLY LATER

PREVENT DETECT CORRECT

Page 37: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified

3737

Manufacturing OversightManufacturing Oversight• Develop a Manufacturing Quality Oversight Plan for successful

overview of equipment and component fabrication

Page 38: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified

3838

Manufacturing Oversight Manufacturing Oversight -- Witness Point Trip Witness Point Trip ObservationsObservations

• Equipment calibration documentation acceptable?

• Work control documentation maintained current?

• Procedure requirements correctly reflected in work control documents?

• Heat analysis documents material specification compliance?

• Shop quality control reviews completed as required?

• Impact of risks that can occur during the test:

– Example, Seismic event-Had no effect on operations but no procedure in place to mitigate

Page 39: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified

3939

Integrated Project ScheduleIntegrated Project Schedule

Page 40: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified

4040

Master BaselineSchedule

ProjectSchedule

SubprojectTrainingSchedule

OE Activities Schedule

Start-upDesignSchedule

ProcurementSchedule

SubprojectOwner

Schedule

ConstSchedule

18 MonthPre-ConstSchedule

Owners ActivitiesSchedule

DevelopTraining Program

ImplementTraining

TestingSchedule

Page 41: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified

4141

Level I: Project Summary ScheduleLevel I: Project Summary Schedule

Level III: Publication / Control Level ScheduleLevel III: Publication / Control Level Schedule

Level IV: Supporting DetailsLevel IV: Supporting DetailsSchedule fragments or Schedule fragments or Deliverable listings, quantityDeliverable listings, quantitydata, etc..data, etc..

Level II: Management SummaryLevel II: Management Summary

Level 0: Project Milestone SummaryLevel 0: Project Milestone Summary

Page 42: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified

4242

Integrated Project ScheduleIntegrated Project Schedule--Output Output (Continued)(Continued)

– Around the clock critical path/near critical path to optimize the schedule

» Critical path

» Near critical path

– Parallel activities and resource management

» Parallel paths with manpower and equipment

» Use the largest of the large equipment/modules to optimize tasks

– Contingency planning

Page 43: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified

4343

Training Activities/PlansTraining Activities/Plans

Page 44: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified

4444

Training Activities/PlansTraining Activities/Plans• Training Planning Activities

1. Training Plans » QA» Construction» Technical» Security» Operation» Etc…

2. Training Material Development» Systems, Maintenance, Construction, Radiation Protection,

Engineering, etc…3. Training Implementation

Page 45: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified

4545

Selecting an OwnerSelecting an Owner’’s Engineer?s Engineer?• Prior experience:

» Design (NI, TI and BOP)

» Licensing (IAEA Guidelines, Regulatory Authority, etc…)

» Procurement

» Quality

» NSSS (Technology Vendor) experience

» Operation

» Oversight

» Project Management

Page 46: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified

4646

SummarySummary Planning through operationDevelop and Monitor an integrated plan that captures information and data for:

» Planning (Site selection, technology selection, Material reservation, etc…)

» Design (Systems, foundations, structures, component/Material specification, etc…)

» Procurement (Technical specifications, Material selection and management, etc…)

» Construction (Construction execution, oversight, Material availability, etc…)

• Recent material issue at a construction site “Cable was not available, they used a bigger size cable”??

» Start-up (Training, testing, Material replacement/repair, fuel load, etc…)

» Operation (Maintenance & Material management, outages, etc…)

Page 47: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified

4747

Summary Summary (continued)(continued) Strategies for SUCCESS

» GET INVOLVED

» Qualified Owners Engineer

» EPC commercial technical requirement

» Integrated DOR

» Integrated project schedule/plan

» Knowledge transfer (Design Basis)

Page 48: President Project Director Sargent Lundy LLC · PDF fileVice President & Project Director Sargent & Lundy LLC ... -- Preliminary Financial Evaluation/Capital Cost ... meets specified

4848

Thank YouFarid M Berry@ sargentlundy.com

Sargent & Lundy LLC55 E. Monroe

Chicago, Il USA 60603630-821-7323