8
presented to presented to Transportation Advisory Commission Transportation Advisory Commission presented by presented by Michael Jollon, FCDOT Michael Jollon, FCDOT May 4, 2010 May 4, 2010 Fairfax County TDM Proffer Study Project Update

Presented to Transportation Advisory Commission presented by Michael Jollon, FCDOT May 4, 2010 Fairfax County TDM Proffer Study Project Update

Embed Size (px)

Citation preview

Page 1: Presented to Transportation Advisory Commission presented by Michael Jollon, FCDOT May 4, 2010 Fairfax County TDM Proffer Study Project Update

presented topresented to

Transportation Advisory CommissionTransportation Advisory Commission

presented bypresented by

Michael Jollon, FCDOTMichael Jollon, FCDOT

May 4, 2010May 4, 2010

Fairfax County TDM Proffer Study Project Update

Page 2: Presented to Transportation Advisory Commission presented by Michael Jollon, FCDOT May 4, 2010 Fairfax County TDM Proffer Study Project Update

2

Agenda

TDM Manual

Trip Reductions

Parking Requirements

Next Steps

Questions/Discussion

Page 3: Presented to Transportation Advisory Commission presented by Michael Jollon, FCDOT May 4, 2010 Fairfax County TDM Proffer Study Project Update

3

TDM Manual

Triggers Sec. 527 Review

100 veh./hr. residential or 250 veh./hour commercial

Establishing Trip Reduction Goals Urban Accessibility Assessment Transit Assessment

Proffer Commitments Budget Strategies Monitoring Remedies/Penalties

Page 4: Presented to Transportation Advisory Commission presented by Michael Jollon, FCDOT May 4, 2010 Fairfax County TDM Proffer Study Project Update

4

Trip Reductions

Transit mode

TDM programs

Bike/Walk modes

Internal Capture

Page 5: Presented to Transportation Advisory Commission presented by Michael Jollon, FCDOT May 4, 2010 Fairfax County TDM Proffer Study Project Update

5

Recommended Vehicle Trip Reduction Goals: Office Developments

Level of Transit Level of Transit ServiceService HighHigh ModerateModerate LowLow

Urban Accessibility High Low High Low High Low

% Reduction from ITE

Baseline 25% 20%

With TDM

35-45% 25-35%

Page 6: Presented to Transportation Advisory Commission presented by Michael Jollon, FCDOT May 4, 2010 Fairfax County TDM Proffer Study Project Update

6

Parking

TOD Areas Maximums

Minimums

Page 7: Presented to Transportation Advisory Commission presented by Michael Jollon, FCDOT May 4, 2010 Fairfax County TDM Proffer Study Project Update

7

Parking Recommendations TODs/Transit Station Areas - Maximums

Maximum Requirements, Spaces/Unit or Spaces/1,000 sq. ft.

UseUseCurrent Current

MinimumMinimumZone A Zone A ––

<1,000’ from Metro<1,000’ from Metro

Zone B – Zone B – 1,000-2,000’ from 1,000-2,000’ from

MetroMetro

Single-Family Detached

2.0 2.0 2.5 2.5

Townhouses 2.75 2.75 2.2 2.5

Multifamily 1.6 1.6 1.3 – 1.9 1.4 – 2.0

Office 2.6-3.62.6-3.6 2.5 – 3.0 2.9 – 3.4

Retail 5.0-6.05.0-6.0 5.0 5.6

Note: These parking ratios recommended 7/09—may be updated.

Page 8: Presented to Transportation Advisory Commission presented by Michael Jollon, FCDOT May 4, 2010 Fairfax County TDM Proffer Study Project Update

8

Next Steps

Finalize TDM Manual

Finalize other study products (including a Summary of Findings and Recommendations)

Public Workshop

Prepare draft amendments for Comprehensive Plan, Zoning Ordinance, and/or Public Facilities Manual

Approval by Planning Board and Board of Supervisors