Page 1: Presented by: Shri Kennedy Lamare Programme Manager, FFDA NONGSTOIÑ & MAWSHYNRUT C&RD BLOCK FIELD VERIFICATION ON SCHEMES IMPLEMENTED UNDER MEGHALAYA STATE

Presented by: Shri Kennedy LamareProgramme Manager, FFDA

NONGSTOIÑ & MAWSHYNRUT C&RD BLOCK

FIELD VERIFICATION ON SCHEMES IMPLEMENTED UNDER MEGHALAYA STATE AQUACULTURE MISSION THROUGH SPA (2011-12)

Page 2: Presented by: Shri Kennedy Lamare Programme Manager, FFDA NONGSTOIÑ & MAWSHYNRUT C&RD BLOCK FIELD VERIFICATION ON SCHEMES IMPLEMENTED UNDER MEGHALAYA STATE

Area of the pond 0.1 Ha

Actual area constructed

0.15 Ha

Crest width >1.5M

Bottom width < 3 M

Slope 1:1

Depth < 1 M

Overflow canal 2-4 inch

Drain pipe 8 inch

Percentage of completion

100%

Shri Kederson Rengrin, Umdang

Page 3: Presented by: Shri Kennedy Lamare Programme Manager, FFDA NONGSTOIÑ & MAWSHYNRUT C&RD BLOCK FIELD VERIFICATION ON SCHEMES IMPLEMENTED UNDER MEGHALAYA STATE

Area of the pond 0.1 Ha

Actual area constructed

0.1 Ha

Crest width 1-1.5 M

Bottom width < 3 M

Slope 1:1

Depth 1.5 M

Overflow pipe 2-4 inch

Drain pipe 4-6 inch

Percentage of completion

100%

Shri Makarius Amora, Riangba

Page 4: Presented by: Shri Kennedy Lamare Programme Manager, FFDA NONGSTOIÑ & MAWSHYNRUT C&RD BLOCK FIELD VERIFICATION ON SCHEMES IMPLEMENTED UNDER MEGHALAYA STATE

Area of the pond 0.1 Ha

Actual area constructed

0.12 Ha

Crest width < 1 M

Bottom width 3-5 M

Slope 1:1

Depth 1.5 M

Overflow pipe 2-4 inch

Drain pipe 4-6 inch

Percentage of completion

100%

Shri Kyrmenlang Rasher, Riangwar

Page 5: Presented by: Shri Kennedy Lamare Programme Manager, FFDA NONGSTOIÑ & MAWSHYNRUT C&RD BLOCK FIELD VERIFICATION ON SCHEMES IMPLEMENTED UNDER MEGHALAYA STATE

Area of the pond 0.1 Ha

Actual area constructed

0.1 Ha

Crest width 1-1.5 M

Bottom width < 3 M

Slope 1:1

Depth 1.5 M

Overflow pipe 4-5 inch

Drain pipe 4-6 inch

Percentage of completion

100%

Smt. Martina Nongsiej, Nongprut

Page 6: Presented by: Shri Kennedy Lamare Programme Manager, FFDA NONGSTOIÑ & MAWSHYNRUT C&RD BLOCK FIELD VERIFICATION ON SCHEMES IMPLEMENTED UNDER MEGHALAYA STATE

Area of the pond 0.1 Ha

Actual area constructed

0.11 Ha

Crest width 1-1.5 M

Bottom width 3-5 M

Slope 1:1

Depth 1.5 M

Overflow pipe 4-5 inch

Drain pipe 4-6 inch

Percentage of completion

100%

Smt. Kronti Marngar, Rimardon

Page 7: Presented by: Shri Kennedy Lamare Programme Manager, FFDA NONGSTOIÑ & MAWSHYNRUT C&RD BLOCK FIELD VERIFICATION ON SCHEMES IMPLEMENTED UNDER MEGHALAYA STATE

Area of the pond 0.1 Ha

Actual area constructed

0.2 Ha

Crest width 1-1.5 M

Bottom width 3-5 M

Slope 1:1

Depth 1.5 M

Overflow pipe 1 no.

Drain pipe 1 no.

Percentage of completion

100%

Smt. Krispina K. Snar, Nongjri

Page 8: Presented by: Shri Kennedy Lamare Programme Manager, FFDA NONGSTOIÑ & MAWSHYNRUT C&RD BLOCK FIELD VERIFICATION ON SCHEMES IMPLEMENTED UNDER MEGHALAYA STATE

Area of the pond 0.1 Ha

Actual area constructed

0.12 Ha

Crest width 1-1.5 M

Bottom width 3-5 M

Slope 2:1

Depth 1.5 M

Overflow pipe 2-4 inch

Drain pipe 4-6 inch

Percentage of completion

100%

Smt. Markaret Iawren, Mawthawphet

Page 9: Presented by: Shri Kennedy Lamare Programme Manager, FFDA NONGSTOIÑ & MAWSHYNRUT C&RD BLOCK FIELD VERIFICATION ON SCHEMES IMPLEMENTED UNDER MEGHALAYA STATE

Area of the pond 0.1 Ha

Actual area constructed

0.1 Ha

Crest width 1-1.5 M

Bottom width < 3 M

Slope 2:1

Depth 1-1.5 M

Overflow pipe 4-5 inch

Drain pipe 4-6 inch

Percentage of completion

100%

Shri Doloris Iawren, Sangriang

Page 10: Presented by: Shri Kennedy Lamare Programme Manager, FFDA NONGSTOIÑ & MAWSHYNRUT C&RD BLOCK FIELD VERIFICATION ON SCHEMES IMPLEMENTED UNDER MEGHALAYA STATE

Area of the pond 0.1 Ha

Actual area constructed

0.13 Ha

Crest width 1-1.5 M

Bottom width 3-5 M

Slope 2:1

Depth 1-1.5 M

Overflow pipe > 5 inch

Drain pipe 4-6 inch

Percentage of completion

100%

Smt. Kristina Wanniang, Sangriang

Page 11: Presented by: Shri Kennedy Lamare Programme Manager, FFDA NONGSTOIÑ & MAWSHYNRUT C&RD BLOCK FIELD VERIFICATION ON SCHEMES IMPLEMENTED UNDER MEGHALAYA STATE

Area of the pond 0.1 Ha

Actual area constructed

0.2 Ha

Crest width 1.5 M

Bottom width 3-5 M

Slope 1:1

Depth > 1.5 M

Overflow pipe 2-4 inch

Drain pipe 4-6 inch

Percentage of completion

100%

Smt. Banrishisha Wanniang, Sangriang

Page 12: Presented by: Shri Kennedy Lamare Programme Manager, FFDA NONGSTOIÑ & MAWSHYNRUT C&RD BLOCK FIELD VERIFICATION ON SCHEMES IMPLEMENTED UNDER MEGHALAYA STATE