4D Visualizations – Not just a pretty picture
Presented by: Roseann Schmid, P.E.Vico Innocenti, P.E.
4D Visualizations – Not just a pretty picture
COURSE OBJECTIVEDemonstrate the benefits of 4D visualization through a series of case studies
4D Visualizations – Not just a pretty picture
WHAT ARE 4D VISUALIZATIONS
4D visualizations merge project-specific traffic analyses, virtual 3D environments, and proposed geometric designs to enhance project delivery.
4D Visualizations – Not just a pretty picture
Vissim Traffic Model• Vehicular, pedestrian, bicycle data • Signal timing / phasing• Roadway geometry• VISSIM traffic analysis• Calibrate & validate
3D Environment• CAD drawings/dtms• Survey data• Contours• Drape aerials
Add 3D Elements (buildings, bridges, signs, trees)• Build models and apply textures• Import from Sketchup, 3D Studio Max, Revit
BUILDING THE MODELS
Merge into Interactive
Model
4D Visualizations – Not just a pretty picture
• Optimize design / value engineering• Evaluate construction staging impacts• Present aesthetic alternatives• Public education and buy-in• Alternatives evaluation• Depict multi-modal operations• Demonstrate impacts to adjacent properties• Expedited project approval process
USES OF 4D VISUALIZATION
4D Visualizations – Not just a pretty picture
Diverging Diamond Interchange• Public education of new travel patterns
CASE STUDY
4D Visualizations – Not just a pretty picture
Syracuse Transit Center• Bus circulation• Impacts to street network• New travel patterns
CASE STUDY
4D Visualizations – Not just a pretty picture
North Main Street Cultural Connector • Demonstrated roundabout operations• Depicted impacts to adjacent properties
CASE STUDY
4D Visualizations – Not just a pretty picture
Route 17/I-81 Interchange Reconstruction• Demonstrated final interchange configuration• Optimized design / value engineering• Presented aesthetic alternatives• Obtained contractor input on construction staging• Evaluated construction staging impacts
CASE STUDY
Eliminate Mygatt St. Off-Ramp
Construct new partial interchange and mainline bridge
Replace river bridges on new alignment to the south of existing bridges
Replace bridge over Chenango St.
Reconstruct Front St. Off Ramp
Reconstruct Bridge over Mygatt St.
Infill a portion of the viaduct
Move merge/diverge and weave section off curve
Construct partial diamond interchange
4D Visualizations – Not just a pretty picture
Route 17/I-81 Interchange Reconstruction• Presented aesthetic alternatives
CASE STUDY
4D Visualizations – Not just a pretty picture
Route 17/I-81 Interchange Reconstruction• Obtained contractor input on construction staging
Insert
CASE STUDY
4D Visualizations – Not just a pretty picture
Route 17/I-81 Interchange ReconstructionInsert
CASE STUDY
4D Visualizations – Not just a pretty picture
World Trade Center• Alternatives evaluation• Multi-modal
CASE STUDY
4D Visualizations – Not just a pretty picture
Route 198/ScajaquadaExpressway• Public education of expressway
downgrade• Facilitate approval by FHWA
CASE STUDY
4D Visualizations – Not just a pretty picture
John Daly Boulevard• New roadway• Demonstrated new traffic operations• Facilitated project approval
CASE STUDY
4D Visualizations – Not just a pretty picture
• A picture is worth a thousand words• Easily understood by a non-technical audience• Dynamic and interactive• Visualize impacts and alternatives• Depict actual traffic operations• Build credibility as a result of extensive model