Upload
kathleen-shaw
View
220
Download
1
Tags:
Embed Size (px)
Citation preview
SHOW TELL AND SELL
Presented By
MAC MCGEHEE
President- ENECON Hampton Roads
Disney Magic Worn Shaft Repair
*Note* Groove In Propulsion Shaft
ENECON DurAlloy Applied and Machined In Place
Who Says Welding Is The Only Way To Repair This?
Cable Pass / Stuffing Tubes Repair
*Note* Deteriorated Metal Pipes
Full Encapsulation and Life Extension Repairs Using CeramAlloy System
Staten Island Ferry Boat Window Renewal Project
*Note* Severe Corrosion Damage Around Windows
Metal Exterior Wiring-Piping and Insulation Interior / Conventional Weld Repairs Out
ENECON High-Performance Polymer Composites Save Thousands $$$$
CVN Class AFFF Station Deck Preservation
CVN’s Involved In Project
• USS BUSH CVN-77- Completed• USS ROOSEVELT CVN-71- In Progress• USS TRUMAN CVN-75- Awaiting P.O.• USS FORD CVN-78- In Progress
Titan Dry Dock Ballast System
42 in x 16 ft Manifolds
5 ft x 6 ft Pump
Spool Pieces- Asst. Diameter18 pieces total
Three Coat CeramAlloy System to provide 30+ years protection