47
NRF Business Plan: 2010/11 - 2012/13 Presentation to Parliamentary Portfolio Committee 12 MAY 2010 Dr Albert van Jaarsveld Reach for the stars Reach for the stars

Presentation to Parliamentary Portfolio Committeepmg-assets.s3-website-eu-west-1.amazonaws.com/docs/100512nrf-edit.pdf · • The NRF allocates resources to attain strategic goals

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Presentation to Parliamentary Portfolio Committeepmg-assets.s3-website-eu-west-1.amazonaws.com/docs/100512nrf-edit.pdf · • The NRF allocates resources to attain strategic goals

NRF Business Plan: 2010/11 - 2012/13

Presentation to Parliamentary Portfolio

Committee

12 MAY 2010

Dr Albert van JaarsveldReach for the starsReach for the stars

Page 2: Presentation to Parliamentary Portfolio Committeepmg-assets.s3-website-eu-west-1.amazonaws.com/docs/100512nrf-edit.pdf · • The NRF allocates resources to attain strategic goals

Contents

1. Strategic context and structure2. Alignment with DST3. Contributions by division:

i. RISAii. SAASTAiii. National Facilities

4. Financial perspective5. KPI’s

Page 3: Presentation to Parliamentary Portfolio Committeepmg-assets.s3-website-eu-west-1.amazonaws.com/docs/100512nrf-edit.pdf · • The NRF allocates resources to attain strategic goals

Promote and support research

throughfunding, human resource development

and the

provision of the necessary research facilities

in order tofacilitate the creation of knowledge, innovation and development in all fields of science and technology, including indigenous knowledge

and thereby tocontribute to the improvement of the quality of life

of all the people of the Republic

1. Strategic context NRF MANDATE - NRF ACT

Presenter
Presentation Notes
Reminder: Annual report based on performance against 2006/07 Business Plan
Page 4: Presentation to Parliamentary Portfolio Committeepmg-assets.s3-website-eu-west-1.amazonaws.com/docs/100512nrf-edit.pdf · • The NRF allocates resources to attain strategic goals
Presenter
Presentation Notes
The point of this presentation should be on telling PPC what we (NRF): has achieved during 2006/07 – brag about successes have we met our targets – if not what are we doing to correct?
Page 5: Presentation to Parliamentary Portfolio Committeepmg-assets.s3-website-eu-west-1.amazonaws.com/docs/100512nrf-edit.pdf · • The NRF allocates resources to attain strategic goals

Relationship between Vision, Mission and Strategic Imperatives

Page 6: Presentation to Parliamentary Portfolio Committeepmg-assets.s3-website-eu-west-1.amazonaws.com/docs/100512nrf-edit.pdf · • The NRF allocates resources to attain strategic goals

NRF Core competencies

• Leading-edge grant management systems• World-class research evaluation and benchmarking

practices• Science and technology management experience • State-of-the-art research platforms• Specialised research capacity at the National

Research Facilities • Strategic information accumulation and

dissemination capability• Capacity to catalyse local and international science

cooperation, networks and partnerships; and • Science advancement expertise and platforms.

Page 7: Presentation to Parliamentary Portfolio Committeepmg-assets.s3-website-eu-west-1.amazonaws.com/docs/100512nrf-edit.pdf · • The NRF allocates resources to attain strategic goals

Code of conduct, ethics and values

• Passion for excellence

• World-class service

• Integrity

• Respect

• People-centred

• Accountability

Presenter
Presentation Notes
The NRF subscribes to the following values:
Page 8: Presentation to Parliamentary Portfolio Committeepmg-assets.s3-website-eu-west-1.amazonaws.com/docs/100512nrf-edit.pdf · • The NRF allocates resources to attain strategic goals

Organisational structure

NRF Board

NRF President

Corporate Secretary

ICT

Finance

Governance

New Business Development

Human Resources

Legal Services

Corporate Communication

GMSA

Int Rel & Col

KME

HICD

ARI

KFD

Disciplinary based Research Fellows

iThemba LABS

HartRAO/MeerKat

SAAO

HMO

SAIAB

NZG

SAASTA

Finance & Business Systems Human Resources and Stakeholder relationships

Vice-President: Research & Innovation Support & Advancement (RISA)

SKA Project

SANAP?

SAEON

Vice-President: Research Infrastructure & National Research Facilities

Presenter
Presentation Notes
KME: KNOWLEDGE MANAGEMENT AND EVALUATION GMSA: Grant Management and Systems Administration HICD: Human and Institutional Capacity Development ARI: Applied Research and Innovation KFD: Knowledge Fields Development NiTheP:National Institute for Theoretical Physics SAEON:South African Environmental Observation Network SAAO:South African Astronomical Observatory HartRAO: Hartebeesthoek Radio Astronomy Observatory HMO: Hermanus Magnetic Observatory iThemba LABS:iThemba Laboratory for Accelerator Based Sciences NZG: National Zoological Gardens SAIAB: SOUTH AFRICAN INSTITUTE FOR AQUATIC BIODIVERSITY
Page 9: Presentation to Parliamentary Portfolio Committeepmg-assets.s3-website-eu-west-1.amazonaws.com/docs/100512nrf-edit.pdf · • The NRF allocates resources to attain strategic goals

NRF investment principles

• Funding awarded after competitive processes• Investments are subject to rigorous peer review• Balance between strategy-driven vs demand-pull

investment (disciplinary) • The NRF allocates resources to attain strategic

goals and for efficient service delivery• The PhD is regarded as a critical systems driver• The NRF promotes rotation of expertise between

itself and other entities in the NSI• Principles of fairness, transparency and

accountability apply to all investment processes• Transformation is considered and rewarded at all

times

Presenter
Presentation Notes
The NRF formulated eight principles to guide its investment and business approach across the range of its interventions, functions, facilities and programmes:
Page 10: Presentation to Parliamentary Portfolio Committeepmg-assets.s3-website-eu-west-1.amazonaws.com/docs/100512nrf-edit.pdf · • The NRF allocates resources to attain strategic goals

2. Alignment with R&D Strategy (2002)

• Areas where SA has geographic advantage– Astronomy– Palaeontology– Marine Biology– Antarctic research– Indigenous knowledge systems (knowledge advantage)

• Key technology missions– Advanced manufacturing– Biotechnology,– ICT and poverty alleviation,– Nanotechnology.

• Grand challenges (Innovation plan)

Page 11: Presentation to Parliamentary Portfolio Committeepmg-assets.s3-website-eu-west-1.amazonaws.com/docs/100512nrf-edit.pdf · • The NRF allocates resources to attain strategic goals

Mapping of strategic goals

10 Year Innovation Plan’s Strategic Goals NRF’s

Strategic Goals Develop South Africa’s knowledge-

generation capacityPromote internationally competitive

research as basis for a knowledge economy

Position South Africa as a strategic international research, development and innovation (RDI) partner and destination

Position NRF as a world-class evaluation and grant-making agency

Develop appropriate human capital for RDI Grow a representative science and technology workforce in South Africa

Build world-class RDI infrastructure Provide cutting-edge research, technology and innovation platforms

Develop the innovation capacity of the science system and thereby contribute to

socio-economic development

Contribute to a vibrant national system of innovation.

South Africa as a Science Destination –

beyond 2010[Knowledge economy, human capital, infrastructure, science tourism, etc.]

Presenter
Presentation Notes
DST’s goals come from the 10 year Innovation Plan
Page 12: Presentation to Parliamentary Portfolio Committeepmg-assets.s3-website-eu-west-1.amazonaws.com/docs/100512nrf-edit.pdf · • The NRF allocates resources to attain strategic goals

Investment in Grand challenges and Areas of geographic advantage

DST strategic goals

17.06

35.19

14.44

0.644.71

0.82 0.582.41

8.51 8.45

2.383.07

0.00

5.0010.00

15.00

20.00

25.0030.00

35.00

40.00

Farm

er to

Pha

rma:

Life

sci

ence

san

d H

ealth

Exp

andi

ng th

e lim

its o

f spa

cesc

ienc

e an

d te

chno

logy

In s

earc

h of

ene

rgy

secu

rity

Sci

ence

and

tech

nolo

gy in

resp

onse

to g

loba

l cha

nge

Hum

an a

nd S

ocia

l dyn

amic

s

Hum

an c

apita

l dev

elop

men

t

Inst

itutio

nal e

nviro

nmen

ts fo

rkn

owle

dge

prod

uctio

n

Ast

rono

my

Hum

an p

aleo

ntol

ogy

Bio

dive

rsity

Ant

arct

ic R

esea

rch

Indi

geno

us k

now

ledg

e

Perc

enta

ge(%

)

NRF Investment

Grand challenges Geographic advantage

Page 13: Presentation to Parliamentary Portfolio Committeepmg-assets.s3-website-eu-west-1.amazonaws.com/docs/100512nrf-edit.pdf · • The NRF allocates resources to attain strategic goals

Additional instruments

NRF manages the following initiatives that address the R&D strategy and the Grand Challenges:

Centres of excellenceResearch chairs Research Facilities Flagship programmesResearch programmes funded through contractsResearch programmes funded through NRF core grant

31% of university academics have a doctoral degree

Presenter
Presentation Notes
NRF has derived mechanisms to address the DST’s Grand Challenges, and these are the establishments of:
Page 14: Presentation to Parliamentary Portfolio Committeepmg-assets.s3-website-eu-west-1.amazonaws.com/docs/100512nrf-edit.pdf · • The NRF allocates resources to attain strategic goals

3. Divisional contributions – RISA INVESTMENT AREAS: 2010/11

Investment area R’000 %Established researchers (SARChI, Incentive funding for rated researchers, Competitive Support for Rated and Unrated Researchers, Grant-holder linked bursaries)

280 075 25

Human capital development (Thuthuka; research niche areas; free-

standing support for postgraduate students) 132 452 12

Strategic knowledge fields (many varied opportunities; and CoE) 212 410 19

Applied and Industrial Research and Innovation (including THRIP) 155 531 14Strategic platforms (equipment; nano-science flagship projects and programmes directed by the NRF) 135 906 12International initiatives (including bilateral and binational

agreements) 108 675 10

Community engagement research 1 100 0.1Focus area programmes (existing commitments that are being phased out) 79 061 7

Total 1 105 210 100

75% Contract vs

25% Core funding

Presenter
Presentation Notes
SOURCES OF FUNDING: MTEF & CONTRACTS
Page 15: Presentation to Parliamentary Portfolio Committeepmg-assets.s3-website-eu-west-1.amazonaws.com/docs/100512nrf-edit.pdf · • The NRF allocates resources to attain strategic goals

Grant-holder linked bursary values (minimum)

Final year undergraduate (F-t) R 8 000 pa (R 20 000)Honours / BTech (Full-time) R15 000 pa (R 30 000)Masters degree (Full-time) R30 000 pa (R 70 000)Masters degree (Part-time) R10 000 pa (R 20 000) Doctoral degree (Full-time) R45 000 pa (R 120 000)Doctoral degree (Part-time) R12 000 pa (R 30 000)Postdoctoral (pro rata per month) R80 000 pa (R 180 000)Staff development bursary R25 000 pa (R 50 000)

• NRF’s bursary values have been constant since the F/Y 2007/08

• Bursary values too low – requires an injection of approx. R 300 m in the core grant to adjust values and grow student numbers

Presenter
Presentation Notes
Bursary values too low – requires an injection of approx. R 300m in the core grant
Page 16: Presentation to Parliamentary Portfolio Committeepmg-assets.s3-website-eu-west-1.amazonaws.com/docs/100512nrf-edit.pdf · • The NRF allocates resources to attain strategic goals

Student funding options

• NRF Studentships– Grant-holder linked (~ 66 %)– Free standing scholarships (~ 33 %)– Stated intention to reverse ratio (increase free-standing

scholarships) • Transformation management

– Target driven (Free-standing vs Grant-holder linked)– 80 % black, 15 % rest of Africa, 5 % International– Needs based approaches (~ 33 % Free-standing)– Black student retention (family commitments)

• System influence (only 15 % of all registered PhD’s)- Statistic influenced by the poor national PhD completion rates

Page 17: Presentation to Parliamentary Portfolio Committeepmg-assets.s3-website-eu-west-1.amazonaws.com/docs/100512nrf-edit.pdf · • The NRF allocates resources to attain strategic goals

NRF Impact on Human Resource Development

2007 2008 2009

Level Number SpentR 000

Number SpentR 000

Number SpentR 000

Final year

170 937 195 1 613 286 2 168

Honours 1 504 28 176 1 271 41 456 1 699 36 587

Masters 2 693 63 296 2 657 81 929 2 376 77 308

Doctoral 1 556 65 563 1 500 75 348 1 384 69 462

Postdoc 295 22 744 260 26 972 302 34 207

Total 6 218 180 717 5 883 227 317 6 047 219 731

All sources of income and all funding programmes

Page 18: Presentation to Parliamentary Portfolio Committeepmg-assets.s3-website-eu-west-1.amazonaws.com/docs/100512nrf-edit.pdf · • The NRF allocates resources to attain strategic goals

NRF impact on the NSI

NRF funding levels in 2008

Scholarship levelbased on 2008 data

Total NRFAwards

Students Funded by NRFIn First Year

ApplicationsReceived by NRF

Total NationalStudent Registration

StudentsSupported byNRF as % ofNational

Honours 1,271 1,271 4,237 66,917 2%

Master's degree 2,657 1,329 4,428 41,711 6%

Doctoral degree inSA 1,500 600 2,000 9,994 15%

Total 5,428 3,200 10,665 118,622 5%

NRF Student Support Equity ProfileScholarship level 2008 2009

HonoursBlack 66% 73%

Woman 55% 59%

Master’s Black 36% 53%

Woman 51% 53%

DoctoralBlack 36% 51%

Woman 50% 51% 302519% female707581% male20127% black808893% white

200419991994Graduates (PhD)

302519% female707581% male20127% black808893% white

200419991994Graduates (PhD)NRF Supported PhD equity profile

Page 19: Presentation to Parliamentary Portfolio Committeepmg-assets.s3-website-eu-west-1.amazonaws.com/docs/100512nrf-edit.pdf · • The NRF allocates resources to attain strategic goals

Selection criteria

• Scientific quality– Marks– Publications, Conference proceedings

• Capacity of HEI to support chosen research– Different HEI in case of postdoctoral

• Demographics– Race– Gender– Disability– Nationality

• Timing– Not more than 5 years after last degree

• Discipline (in some funding programmes)– Scarce skills focus

Page 20: Presentation to Parliamentary Portfolio Committeepmg-assets.s3-website-eu-west-1.amazonaws.com/docs/100512nrf-edit.pdf · • The NRF allocates resources to attain strategic goals

Bursary adjustments 2010

2010 (DST intervention)

• Injection of additional R52,7 million to increase bursary values• To address uptake • Assist needy students

Free standing and grant holder linked bursaries• Honours R15 000 pa - R 20 000 pa• Masters degree R30 000 pa - R 40 000 pa• Doctoral degree R45 000 pa - R 60 000 pa

• Needy students – less than R 300 000/ annum household income– R 10 000 bursary top-up

Page 21: Presentation to Parliamentary Portfolio Committeepmg-assets.s3-website-eu-west-1.amazonaws.com/docs/100512nrf-edit.pdf · • The NRF allocates resources to attain strategic goals

RISA programmes and activities

a. Knowledge Fields Development: • Facilitate the creation of new knowledge and research capacity• Developing new fields of knowledge and associated research capacity• Mechanisms: Centres of excellence; special programmes (SANAP,

SABI-R3 m)

• Budget 2010/11: MTEF = R175 m, CF = R54 m, Total = R229 m

b. Applied Research and Innovation:• Supports research with innovation and social beneficiation by

addressing issues related to sustainability, housing, good governance, community health, poverty alleviation, food security and community security

• Funded solely through sector specific departmental budgets (e.g. Agriculture; Local government etc.)

• Mechanisms: THRIP-like programmes

• Budget 2010/11: MTEF = R2 m, CF = R173 m, Total = R175 m

Presenter
Presentation Notes
This section provides a short overview of the programmes offered by RISA in support of the NRF strategic goals. Data comes from Great Plains extracted by GM. MTEF 9ncludes core and ringfenced.
Page 22: Presentation to Parliamentary Portfolio Committeepmg-assets.s3-website-eu-west-1.amazonaws.com/docs/100512nrf-edit.pdf · • The NRF allocates resources to attain strategic goals

RISA programmes and activities (cont.)

c. Human and Institutional Capacity Development:• Develop individual researcher’s capacity

– Incentive programme– The South African PhD Project – Thuthuka– Rating track programme (Career awards)– SARChI

• Develop institution’s research capacity– RNAs

• Develop strategic platforms to support research: HR – TEM

• Budget 2010/11: MTEF = R141 m, CF = R372 m, Total = R513 m

d. International Relations and Cooperation:• NRF is responsible for the development of the Science and Technology

Agreements Fund (STAF) • Agency to agency support of international research collaboration

• Budget 2010/11: MTEF = R76 m, CF = R23 m, Total = R99 m

Presenter
Presentation Notes
The South African PhD Project : The primary activities of the South African PhD Project are: The Development of a ‘One-stop-shop’ clearinghouse comprising of an interactive website or portal for visitors, mainly students, academics, employers and funders, to provide them with information, among other things; Human Capacity Programme: The Human Capacity Programme focuses on supporting the establishment of a highly skilled human resource base in South Africa through various sub-programmes; Institutional Capacity Programme: The Institutional Capacity Programme hosts a number of sub-programmes with the mandate of advancing the transformation agenda of equity and redress. Research Chairs and Rating Incentive Funding: The Research Chair initiative is a key intervention to address the scientific leadership development needs in the universities and is forging new public-private partnerships for in order to give South African universities and industry a competitive edge.
Page 23: Presentation to Parliamentary Portfolio Committeepmg-assets.s3-website-eu-west-1.amazonaws.com/docs/100512nrf-edit.pdf · • The NRF allocates resources to attain strategic goals

RISA programmes and activities (cont.)

e. Knowledge Management and Evaluation Directorate:• Implementation and custodianship of knowledge management

processes within NRF but also in the wider NSI context (PhD thesis database, journal access?)

• Rating system• Conduct programme / disciplinary reviews

• Budget 2010/11: MTEF = R18 m, CF = R1 m, Total = R19 m

f. Grants Management and Systems Administration (GMSA):• Implements grant management in partnership with and on behalf of

the funding directorates of RISA

• Budget for 2010/11: NA

Presenter
Presentation Notes
Red Flag: There has been a decrease in budget over time, although emphasis on international relations by DST
Page 24: Presentation to Parliamentary Portfolio Committeepmg-assets.s3-website-eu-west-1.amazonaws.com/docs/100512nrf-edit.pdf · • The NRF allocates resources to attain strategic goals

RISA grant awards

0

200

400

600

800

1000

1200

1400

Awarded Expensed Awarded Expensed Awarded Expensed Awarded Year todate

expense

Budget

2006/07 2007/08 2008/09 2009/10 2010/11

Mill

ions

MTEFContractTotal

Page 25: Presentation to Parliamentary Portfolio Committeepmg-assets.s3-website-eu-west-1.amazonaws.com/docs/100512nrf-edit.pdf · • The NRF allocates resources to attain strategic goals

RISA Challenges

• Achieving an optimal balance between core and contract funding – Increase bursary values substantially– Increase funding for fundamental disciplinary research (core grant)

• Ensuring an appropriate mix of fundamental and directed research (disciplinary vs strategic)

• Strengthening the peer review and rating system as requested by HESA

• Optimising the Scarce Skills Development Fund (DoHET)• Improve management and administration of bi-national and

bilateral agreements • Strengthening the Strategic Platforms Collaboration

Programme

Presenter
Presentation Notes
RISA faces the above stated challenges over the medium term:
Page 26: Presentation to Parliamentary Portfolio Committeepmg-assets.s3-website-eu-west-1.amazonaws.com/docs/100512nrf-edit.pdf · • The NRF allocates resources to attain strategic goals

3. Divisional contributions - SAASTA FOCUS AND INFRASTRUCTURE

• Science education• Science communication• Science awareness platforms

Presenter
Presentation Notes
The objective of SAASTA is to increase public awareness of and the human resource capacity for science. SAASTA achieves its objective by exposing people to the wonders of science and engaging with them about the relevance of SET in their everyday lives. SAASTA pursues its goals through:Science education – developing curriculum support and materials for educators and learners, mainly in mathematics and science and exposing learners to career opportunities in SET; Science communication – providing relevant information about South Africa’s SET achievements through science and media events, a variety of innovative communication tools and science communication capacity building; and Science awareness platforms – providing multi-user science advancement platforms in collaboration with the National Research Facilities, a network of science centres, higher education institutions, Science Councils and international networks.
Page 27: Presentation to Parliamentary Portfolio Committeepmg-assets.s3-website-eu-west-1.amazonaws.com/docs/100512nrf-edit.pdf · • The NRF allocates resources to attain strategic goals

Financial Perspective: SAASTA

0

10

20

30

40

50

60

70

80

Expenditure Projection Budget

2008/09 2009/10 2010/11

Mill

ions

MTEFContractTotal

Presenter
Presentation Notes
Data comes from Table 5 BP
Page 28: Presentation to Parliamentary Portfolio Committeepmg-assets.s3-website-eu-west-1.amazonaws.com/docs/100512nrf-edit.pdf · • The NRF allocates resources to attain strategic goals

SAASTA Infrastructure

• Johannesburg Observatory: SAASTA is currently exploring refurbishing this

site to accommodate a multifaceted interactive Science Park

with a specific focus on astronomy

and engineering• Didacta

building:

Retain or consolidate with Jhb Observatory?• National Zoological Gardens’

Life Sciences

Centre: New plans to further develop this centre

Page 29: Presentation to Parliamentary Portfolio Committeepmg-assets.s3-website-eu-west-1.amazonaws.com/docs/100512nrf-edit.pdf · • The NRF allocates resources to attain strategic goals

Important Challenges

Future of the Johannesburg Observatory site

“Should this be a flagship national site from where Science Advancement is both driven and coordinated?”

Page 30: Presentation to Parliamentary Portfolio Committeepmg-assets.s3-website-eu-west-1.amazonaws.com/docs/100512nrf-edit.pdf · • The NRF allocates resources to attain strategic goals

3. Divisional contributions – National Facilities SOUTH AFRICAN ASTRONOMICAL OBSERVATORY [SAAO)

• SAAO’s has been entrusted with the responsibility for optical, infrared astronomy and astrophysics research

• SAAO operates SALT on behalf of a globally distributed, 12-member consortium for which SAAO is the leading organisation

• Budget: MTEF = R30 m, CF = R20 m, Total = R50 m• Challenges: Repair, refurbishment of ageing infrastructure• SALT operations levy – maintaining shareholding for SA astronomy

Increasing demand from other African countries for participation in, and support in terms of astronomy

Presenter
Presentation Notes
SAAO, the facility entrusted with the responsibility for optical, infrared astronomy and astrophysics research, has its headquarters located in Observatory, Cape Town. Central to the functioning of the SAAO is the Southern African Large Telescope (SALT), its primary research tool, which is located 370km away, outside Sutherland in the Northern Cape.
Page 31: Presentation to Parliamentary Portfolio Committeepmg-assets.s3-website-eu-west-1.amazonaws.com/docs/100512nrf-edit.pdf · • The NRF allocates resources to attain strategic goals

HARTEBEESTHOEK RADIO ASTRONOMY OBSERVATORY (HartRAO)

• The 26 m diameter radio telescope that is used for research in radio astronomy, astrometry and geodesy is central to the operations and functioning of the HartRAO

• HartRAO also takes charge of other radio telescopes• Budget: MTEF = R19 m, CF = R3 m, Total = R22 m• Challenges: Maintaining HartRAO competitiveness while becoming

involved in KAT-7 and MeerKAT• Upgrade radio-astronomy systems and instruments

Presenter
Presentation Notes
Central to the operations and functioning of the HartRAO is the 26 m diameter radio telescope that is used for research in radio astronomy, astrometry and geodesy. The radio telescope is multi-purpose, as it can be used as an independent instrument and as part of global radio telescope arrays using the Very Long Baseline Interferometry (VLBI) technique.
Page 32: Presentation to Parliamentary Portfolio Committeepmg-assets.s3-website-eu-west-1.amazonaws.com/docs/100512nrf-edit.pdf · • The NRF allocates resources to attain strategic goals

MeerKAT SQUARE KILOMETRE ARRAY (SKA)

• SKA is envisaged to be the largest, powerful pathfinder telescope in the world• Budget: MTEF = R14 m, CF = R455 m, Total = R469 m• Challenges: The SKA SA project is still severely under-resourced from an HR

perspective, given the task of delivering the MeerKAT 80 dish array. These positions will be filled by the beginning of the 2011 financial year. The challenge is the shortage of engineering skills within the country and the issue of staff retention given the skill sets of current staff members.

• No real operations budget for MeerKAT in place

Presenter
Presentation Notes
MeerKAT Precursor KAT 7 sees Fringes: 10 December 2009 The South African MeerKAT Project reached a major milestone on 3 December 2009 when interference fringes were seen between two of the dishes which have now been constructed on the MeerKAT site. This milestone was reached ahead of schedule - it was originally scheduled for 18 December 2009. This is a major achievement for the MeerKAT team.
Page 33: Presentation to Parliamentary Portfolio Committeepmg-assets.s3-website-eu-west-1.amazonaws.com/docs/100512nrf-edit.pdf · • The NRF allocates resources to attain strategic goals

HERMANUS MAGNETIC OBSERVATORY (HMO)

• The HMO functions as an active participant in the worldwide network of magnetic observatories (INTERMAGNET) which monitor and model variations of the Earth’s magnetic field

• House important and unique tools and instruments (magnetometers, HF radars and VLF receivers, GPS network in Southern Africa)

• Strategic importance to the SANDF and aviation sector • Budget: MTEF = R9 m, CF = R14 m, Total= R23 m• Challenges:

– Budgetary constraints that hinder operational excellence of the facility– Critical scarce skills vested in few individuals – Inadequate students’ accommodation limiting the increase in student intake– Positioning with the advent of SANSA

Page 34: Presentation to Parliamentary Portfolio Committeepmg-assets.s3-website-eu-west-1.amazonaws.com/docs/100512nrf-edit.pdf · • The NRF allocates resources to attain strategic goals

SOUTH AFRICAN INSTITUTE FOR AQUATIC BIODIVERSITY (SAIAB)

• The SAIAB’s research scope spans aquatic biodiversity from genes to ecosystems

• Disciplines include systematics and taxonomy; phylogenetics and phylogeography; ecology; physical and biological oceanography; marine palaeo-climates; remote sensing; coastal biodiversity; conservation planning; environmental education; and deepwater biodiversity

• Budget: MTEF = R11 m, CF = R13 m, Total = R24 m• Challenges: Ensuring that ACEP II research programme is successful, as it

operates on a model that is novel for the South African marine research community

Page 35: Presentation to Parliamentary Portfolio Committeepmg-assets.s3-website-eu-west-1.amazonaws.com/docs/100512nrf-edit.pdf · • The NRF allocates resources to attain strategic goals

SOUTH AFRICAN ENVIRONMENTAL OBSERVATION NETWORK (SAEON)

• SAEON draws on research competencies in hydrology, water quality, eco- physiology, soil sciences, conservation biology, botany, zoology, marine sciences, limnology, climatology and meteorology, fresh water ecology, human ecology, environmental information systems, palaeo-ecology, biogeography, pollution and environmental modelling.

• Budget: MTEF = R17 m, CF = R5 m, Total = R22 m• Challenges: Resourcing and managing the implementation phase of the SAEON

information management system; and inactive formal relationships/agreements• Status of facility declaration outstanding

Page 36: Presentation to Parliamentary Portfolio Committeepmg-assets.s3-website-eu-west-1.amazonaws.com/docs/100512nrf-edit.pdf · • The NRF allocates resources to attain strategic goals

NATIONAL ZOOLOGICAL GARDENS OF SOUTH AFRICA (NZG)

• The NZG represents a Science Advancement platform that enhances and augments knowledge, particularly knowledge related to conservation.

• Furthermore, the research component provides the basis for the development of the next generation of biodiversity conservation and conservation medicine scientists that will generate new knowledge required for managing wildlife biodiversity and its conservation.

• Budget: MTEF = R47 m, C and other F = R40 m, Total = R87 m• Challenges: Decaying physical infrastructure that poses challenges for the

management of health & safety• Unsustainable business models

Page 37: Presentation to Parliamentary Portfolio Committeepmg-assets.s3-website-eu-west-1.amazonaws.com/docs/100512nrf-edit.pdf · • The NRF allocates resources to attain strategic goals

iTHEMBA LABORATORY FOR ACCELERATOR BASED SCIENCES (iThemba LABS)

• iThemba LABS brings together scientists working in the physical, medical and biological sciences through the provision of a unique suite of facilities and infrastructure for modern research, advanced education, the treatment of cancers, and the production of unique radioisotopes

• Budget: MTEF = R122 m, CF = R61 m, Total = R183 m• Challenges: Equipment upgrades required• Skills retention and replacement• Electricity costs

Gauteng: Incomplete refurbishment of facility due to insufficient funding

Page 38: Presentation to Parliamentary Portfolio Committeepmg-assets.s3-website-eu-west-1.amazonaws.com/docs/100512nrf-edit.pdf · • The NRF allocates resources to attain strategic goals

Important Challenges

Maintain and re-establish global competitiveness

• ACTUAL: R37 m invested into infrastructure (2 years)• REQUIRED: R200 m per annum for 3 years* • Facility baseline funding (eroded to 60% of target)• Salary to operations ratios are non-sustainable

Recapitalisation

of the National Facilities

* Excluding SKA

Presenter
Presentation Notes
KPI, p14 – 15, Table 19 - 20
Page 39: Presentation to Parliamentary Portfolio Committeepmg-assets.s3-website-eu-west-1.amazonaws.com/docs/100512nrf-edit.pdf · • The NRF allocates resources to attain strategic goals

4. NRF Financial perspective NRF growth strategy

0

5001,000

1,5002,000

2,5003,000

3,5004,000

4,500

2007

/0820

08/09

2009

/10

2010

/1120

11/12

2012

/1320

13/14

2014

/15

Year

Fund

ing

(RM

)

Core & RingContractsTotalGrowth

A

B

Presenter
Presentation Notes
Figure 8 above indicates the budgetary growth required up till 2014/15. The New Business Development (NBD) to diversify new NRF funding streams Secure R1, 343m per annum in addition to the MTEF projections NBD sources its funding from government, industry, and private individuals This growth is required to realise the objectives of the NRF Strategic Plan, Vision 2015.
Page 40: Presentation to Parliamentary Portfolio Committeepmg-assets.s3-website-eu-west-1.amazonaws.com/docs/100512nrf-edit.pdf · • The NRF allocates resources to attain strategic goals

NRF growth strategy

• Increased DST contribution is pivotal• Diversification of NRF funding streams

– Other government departments – Industry– International partners (leveraging)– Private donors

This growth strategy is required to realise the objectives of the NRF Strategic Plan, Vision 2015.

Page 41: Presentation to Parliamentary Portfolio Committeepmg-assets.s3-website-eu-west-1.amazonaws.com/docs/100512nrf-edit.pdf · • The NRF allocates resources to attain strategic goals

NRF multi-year expenditure (RISA & National Facilities)

NRF'S MULTI-YEAR EXPENDITURE

EXPENSES/FINANCIAL YEARS

R'00

0 SALARIES RUNNING COSTSGRANTS & BURSARIES

SALARIES 272,147 292,901 350,665 393,196

RUNNING COSTS 276,165 286,667 357,752 386,793

GRANTS &BURSARIES

905,675 1,121,810 1,050,867 1,060,085

2007/08 2008/09 2009/10 2010/2011

FINANCIAL YEAR 2007/08 2008/09 2009/10 2010/2011

GRANT & BURSARIES % of TOTAL 62.3 65.9 59.7 57.6

TOTAL EXPENDITURE (R'000) 1,453,987 1,701,378 1,759,284 1,840,074

Page 42: Presentation to Parliamentary Portfolio Committeepmg-assets.s3-website-eu-west-1.amazonaws.com/docs/100512nrf-edit.pdf · • The NRF allocates resources to attain strategic goals

Cost structure Agency vs. National Facilities

0%10%20%30%40%50%60%70%80%90%

100%

Cost Structure: Agency Function (RISA)

Opex/Total 12% 9%

Salaries/Total 8% 7%

Grants/Total 79% 84%

RISA Actual 2010 RISA Budget 2011

0%

20%

40%

60%

80%

100%

Cost Structure: National Facilities (NF)

Shared Services 24% 23%

Research Platform 76% 77%

NF Actual 2010 NF Budget 2011

Page 43: Presentation to Parliamentary Portfolio Committeepmg-assets.s3-website-eu-west-1.amazonaws.com/docs/100512nrf-edit.pdf · • The NRF allocates resources to attain strategic goals

MTEF growth

NRF MTEF Allocation Trend vs CPIX (%)

4.60

% 6.50

%

11.3

9%

10.0

0%

6.00

%

14.4

%

11.9

%

7.5%

4.3%

-0.6

%

13.9

%

5.5%

2.8%

6.7%

4.3%

-2.00%

0.00%

2.00%

4.00%

6.00%

8.00%

10.00%

12.00%

14.00%

16.00%

2006/07 2007/08 2008/09 2009/10 2010/11

Year

% M

ovem

ent

% MTEF Movement

Baseline

CPIX

Below CPIX adjustments →

pressure on operations and continued sustainability

Presenter
Presentation Notes
The NRF receives its resources annually from the DST after a Medium-Term Expenditure Framework (MTEF) submission for science and technology to the National Treasury.
Page 44: Presentation to Parliamentary Portfolio Committeepmg-assets.s3-website-eu-west-1.amazonaws.com/docs/100512nrf-edit.pdf · • The NRF allocates resources to attain strategic goals

Impact of forced efficiency savings (MTEF budget cuts]

11

22

005

10152025

R' M

illio

n

2010/11 2011/12 2012/13

Year

Break-even (after forced efficiency savings)

-11 -22-67

-80-60

-40

-20

0

R' m

illio

n

2010/11 2011/12 2012/13

Year

Cumulative Deficit (with embedded savings)

Assumptions:• Salary bill movement

limited to 6%

• Operating costs increase

limited to 2%

Page 45: Presentation to Parliamentary Portfolio Committeepmg-assets.s3-website-eu-west-1.amazonaws.com/docs/100512nrf-edit.pdf · • The NRF allocates resources to attain strategic goals

Forced efficiency savings (MTEF budget cuts]

• Corrective measures implemented from 2010/11 to allow break-even by 2012/13

• Dealing with R120 m budget cuts over 3 years

– Embedded efficiencies in 3 year budget = R53 m– Further savings required = R67 m

• Freeze vacancies / Staff rationalisation (R10m)• Reduce running costs + Downsize National Facilities (R57m)• Grant budget impact (zero increase on core grants)

Page 46: Presentation to Parliamentary Portfolio Committeepmg-assets.s3-website-eu-west-1.amazonaws.com/docs/100512nrf-edit.pdf · • The NRF allocates resources to attain strategic goals

Key performance targets 2010/11-2012-2013

NRF Vision 2015 strategic targets:

Balanced Scorecard Approach (Appendix): – Stakeholder perspective– Financial perspective– Organisational perspective (business processes and

procedures)– Organisational learning and growth perspective, and– Human resources and transformation perspective

Presenter
Presentation Notes
The NRF performance targets are structured according to the Balanced Scorecard perspectives. This is followed by more details on the performance targets of RISA, SAASTA and the National Research Facilities according to the strategic goals of the NRF. SCORECARD APPROACH: