33
Presentation of the UNEP/GEF project “UNCCD PRAIS” Performance Review and Assessment of the Implementation System (PRAIS) - Enabling a paradigm shift on monitoring and assessment within the UNCCD

Presentation of the UNEP/GEF project “UNCCD PRAIS”

  • Upload
    gloria

  • View
    48

  • Download
    0

Embed Size (px)

DESCRIPTION

Presentation of the UNEP/GEF project “UNCCD PRAIS”. Performance Review and Assessment of the Implementation System (PRAIS) - Enabling a paradigm shift on monitoring and assessment within the UNCCD. Project presentation. Quick recap of the project Components 1, 2, 3 and related work plan - PowerPoint PPT Presentation

Citation preview

Page 1: Presentation of the UNEP/GEF project “UNCCD PRAIS”

Presentation of the UNEP/GEF project “UNCCD PRAIS”

Performance Review and Assessment of the Implementation System (PRAIS) - Enabling a paradigm shift on monitoring and assessment within the UNCCD

Page 2: Presentation of the UNEP/GEF project “UNCCD PRAIS”

Project presentation

1. Quick recap of the project2. Components 1, 2, 3 and related work

plan 3. Implementation arrangements4. Questions and comments

Page 3: Presentation of the UNEP/GEF project “UNCCD PRAIS”

The Project – Quick detailsFull title: Enabling paradigm shift on monitoring and

assessment within the UNCCDShort title: UNCCD 4th national reporting (4NR) project

Client: UNEP DGEF and UNCCD Secretariat (on behalf of Affected Country Parties)

Executing Agency: UNEP-WCMC with regional partners

Project value: US$2.5 million with $5 million co-financing leveraged through the UNCCD Secretariat, Global Mechanism, European Commission, donors and Parties at national level

Start date: January/February 2010 | End date: June 2011

Page 4: Presentation of the UNEP/GEF project “UNCCD PRAIS”

The Project - Objectives• Immediate:

– To undertake a scientifically rigorous and credible assessment of the performance of the implementation of the UNCCD at the national, sub-regional, regional and global levels, and

– To build/strengthen capacity and knowledge management systems for subsequent assessments.

• Long-term: – To identify priority areas for investment to

enhance implementation of UNCCD.

Page 5: Presentation of the UNEP/GEF project “UNCCD PRAIS”

The Project – Components

1: Review of indicators, and formulation of guidelines and reporting formats

2: Assessment of current baseline, synthesis and preparation of reports  at all levels

3: Knowledge Management System, M&E and Dissemination

Page 6: Presentation of the UNEP/GEF project “UNCCD PRAIS”

Simple KeySimple Key

1: Methods2: Assessment

3: Knowledge management

Page 7: Presentation of the UNEP/GEF project “UNCCD PRAIS”

Component 1Component 1Review of indicators, and formulation of national, sub-regional guidelines and reporting formats

Page 8: Presentation of the UNEP/GEF project “UNCCD PRAIS”

Component 1 – Result & Outputs• Result: Parties capacity built by providing clear and

consistent guidelines for reporting on the implementation of the Strategy are available to country Parties

• Outputs: 1: Sets of harmonized indicators 2: Finalized Guidelines for assessment 3: Contribution to the production of a glossary and a

guide for implementing performance indicators  4: Finalized Format/template for preparation of 4th

National reports  5: Training modules and guidelines for data collection for

baseline assessment 6: Training in use of guidelines format/template for 4th

National Reports, through sub-regional workshops

1: Methods

Page 9: Presentation of the UNEP/GEF project “UNCCD PRAIS”

Component 1 - ActivitiesComponent 1 - Activities1.1: Review the sets of harmonized indicators1.2: Finalization of Guidelines for assessment of

baseline and best practices1.3: Production of a glossary and a guide1.4: Finalize format/template, develop training modules

and guidelines for data collection for baseline assessment and for the preparation of 4th National reports.

1.5: Training modules and guidelines for data collection for baseline assessment, development of guidelines or instructions for the use of Relevant Activity Codes (RACS) and Rio Markers.

1.6: Training in use of guidelines format/template for 4th National Reports, through sub-regional workshops

1: Methods

Page 10: Presentation of the UNEP/GEF project “UNCCD PRAIS”

Timeframe

•YR2: Revision based on lessons

Mar AprDec Jan Feb

Project preparation

Engagement of NFPs and RCs

Preparation of reporting tools and PRAIS portal

Training of RCs

Page 11: Presentation of the UNEP/GEF project “UNCCD PRAIS”

Component 2Component 2Assessment of current baseline, Synthesis and preparation of reports at national, sub-regional, regional and global levels

Page 12: Presentation of the UNEP/GEF project “UNCCD PRAIS”

Component 2 – Results

•2.1: Credible and verifiable information of current baseline performance situation for future planning of investments and actions

•2.2: A credible and widely accepted understanding of current state of implementation of UNCCD

2: Assessment

Page 13: Presentation of the UNEP/GEF project “UNCCD PRAIS”

Component 2 - Outputs

• 2.1: A comprehensive monitoring and assessment system for the UNCCD that will clarify among others the institutional set up needed in order to effectively engage in future periodic monitoring and assessment of performance (every 2 years) and impacts (every 4 years).

• 2.2: Indicators-based reports of baseline situations at all levels

• 2.3: 4th National reports; Synthesis reports on sub-regional, regional and global assessment of UNCCD implementation under the guidance of UNCCD Secretariat

2: Assessment

Page 14: Presentation of the UNEP/GEF project “UNCCD PRAIS”

Component 2 - Activities• 2.1: Establishment of a comprehensive monitoring and

assessment system for the UNCCD that will clarify among others the institutional set up needed in order to effectively engage in future periodic monitoring and assessment of performance.

• 2.2: Technical assistance to Parties in conducting Performance Indicators-based baseline situations assessment ▫ Technical assistance in the preparation of standard financial

annexes and programme and project sheets.

• 2.3: Synthesis reports on sub-regional, regional and global assessment of UNCCD implementation under the guidance of UNCCD Secretariat (based on 4th National reports).

2: Assessment

Page 15: Presentation of the UNEP/GEF project “UNCCD PRAIS”

Approach

•Agreement with Reference Centres▫Training of National Focal Points▫Technical “help desk” for countries▫Support for preparation of synthesis

reports

•YR2: review institutional arrangements, long-term capacity needs

Page 16: Presentation of the UNEP/GEF project “UNCCD PRAIS”

Timeframe

Page 17: Presentation of the UNEP/GEF project “UNCCD PRAIS”

Component 3Knowledge Management System, M&E and Dissemination

Page 18: Presentation of the UNEP/GEF project “UNCCD PRAIS”

Component 3 – Result

•3: Capacities of affected country Parties to assess performance of national action programmes (NAPs) as a mean to combating DLDD and of UNCCD implementation are enhanced.

3: Knowledge management

Page 19: Presentation of the UNEP/GEF project “UNCCD PRAIS”

Component 3 - Outputs•3.1: Comprehensive capacity building

framework for reporting UNCCD implementation

•3.2: PRAIS portal developed and utilized at national or sub-regional level for storage and retrieval of information on baseline data, indicators, reporting guidelines and tools, best practices, and lessons learned.

•3.3: Appropriate framework for assessing and reporting of performance and impact developed

3: Knowledge management

Page 20: Presentation of the UNEP/GEF project “UNCCD PRAIS”

Component 3 - Activities• 3.1: Comprehensive capacity building framework for

reporting UNCCD implementation  • 3.2: Development of Portal with entry points at all

levels for storage and retrieval of information on baseline data, indicators, reporting guidelines and tools, best practices, and any additional information countries would like to publish ▫ Due consideration of pertinent COP decisions relating to

knowledge management tools▫ Build on and link to relevant systems that already exist,

such as FIELD.

• 3.3: Development of appropriate framework for assessing and reporting of performance

3: Knowledge management

Page 21: Presentation of the UNEP/GEF project “UNCCD PRAIS”

Graphical User Input [GUI] (Forms and

Interactive help to post the national reports)

Assessment and reporting guidelines

Tracking Tools and Utilities e.g. FIELD

UNCCD + GM Knowledge interoperable

bases

Databases + case studies + publications +

articles + scientific findings and facts

[Account Services]Electronic Forums +

Blogs + Feeds + CST Correspondent + News

letters

Rio Conventions + Library + DPI + GEO Services + Research

Institutes + Universities + Global Model UN +

FAO + CSO

Synergies and Outreach

Search Engines + Media + Campaigns + Printed / CD / DVD Material + E-Forums +

Social Networking +

KM Portal for UNCCD

Reporting

Hosting and Maintainence

Cloud Based Computing Center

Database Server + Web Server + Cluster

Computing Servers + Portal Services

Prepared [email protected] 24-09

Reporting Portal

Hosting Services (UNCCD, ICT + UNHQ)

UNCCD

KNOWLEDGE MANAGEMENTPORTAL

UNCCD

UNCCD OVERALL KNOWLEDGE MANAGEMENT

PORTAL SIGNATURES

Page 22: Presentation of the UNEP/GEF project “UNCCD PRAIS”

PRAIS portal

Urgent•Input form for national reports •Best practice input form•Documents•Discussion fora

Long-term?•Tracking-tools

3: Knowledge management

Page 23: Presentation of the UNEP/GEF project “UNCCD PRAIS”

Approach

•Portal coordinated with UNCCD Knowledge Management Portal, GM FIELD system

•Development of “pilot” system•CD-ROMS, offline tools as alternative for

materials, reporting

•YR2: Looking at additional capacity needs, lessons from usage

Page 24: Presentation of the UNEP/GEF project “UNCCD PRAIS”

4NR Timeframe

Demo for training; de-bugging, security, usage policies, etc

Page 25: Presentation of the UNEP/GEF project “UNCCD PRAIS”

Project GovernanceInstitutional and Implementation Arrangements

Page 26: Presentation of the UNEP/GEF project “UNCCD PRAIS”

Project Organisational Chart

Project Steering Committee

UNEP (IA), UNCCD Secretariat, representatives from 5 regional annexes, GM, Donors, Partners in implementation

Technical advisory group WCMC, RCS, UNCCD SECRETARIAT Guides technical implementation of the project and coordination Advises SC and PM

EA: UNEP-WCMC • - Project coordinator (PM) reports to SC and TAG

• - Project Management Unit

Coordination ToT for regions, oversight Knowledge management

Reporting on project

UNCCD Secretariat Institutional mandate for reporting process, coordination, etc.

Guidance to the process through TAG

In-kind support

Coordination with developed country parties, NMed region

Regional Coordination

Mechanisms Regional and sub-regional Reference Centres

Regional activities, coordination with RCMs in their respective regions

Country Parties Client and beneficiaries

Africa Asia LAC CEE Resources flow and technical advisory function per Annex

Page 27: Presentation of the UNEP/GEF project “UNCCD PRAIS”

Regional and Sub-Regional Reference Centres (RCs)• 15 Regional and Sub-Regional Reference Centres jointly

identified by UNCCD Secretariat and UNEP-WCMC in consultation with the GM and UNEP/DGEF.

• The RCs are specialized institutions in the sub-region/region with recognized mandate in SLM and which have a recognized experience of UNCCD implementation.

• These centers are expected to continue to play a major role in the reporting process beyond the 2010 pilot exercise. They should have some mechanisms which retain and share institutional knowledge, including of the assessment and reporting process.

• In cooperation with UNEP-WCMC, they will be responsible for the execution of the activities at regional level, providing front-line support for up to 140 eligible Affected Country Parties. As such, they will play a crucial role for the successful implementation of the project at regional and national level.

Page 28: Presentation of the UNEP/GEF project “UNCCD PRAIS”

Reference Centres – Indicative List• OSS (Observatoire du Sahara et du Sahel)• ARC/CILSS (Agrhymet Regional Center - Permanent Interstate

Committee for Drought Control in the Sahel)• COMIFAC (Commission for the forests of Central Africa)  • ICPAC/IGAD (Climate Prediction and Application Centre - Inter

Governmental Authority on Development)• SPREP (South Pacific Regional Environment Programme)• ACSAD (Arab Center for the Studies of Arid Zones and Dry Lands)• CACILM Secretariat (Central Asian Countries Initiative for Land

Management)• ICRISAT (International Crops Research Institute for the Semi-Arid

Tropics)• FAO/ROAP (Food and Agriculture Organization – Regional Office for Asia

and the Pacific)• CATIE (Tropical Agronomic Center of research and education)• ECLAC (Economic Commission for Latin America and the Caribbean)• IICA (Inter-American Institute for Cooperation on Agriculture)• CEHI (Caribbean Environmental Health Institute)• JRC (Joint Research Center of the European Commission)• DRFN (Desert Research Foundation of Namibia)

Page 29: Presentation of the UNEP/GEF project “UNCCD PRAIS”

Reference Centres – Specific Objectives

▫To serve as the direct interlocutor of the UNEP-WCMC as the Executing Agency of the project in the regions;

▫To ensure, in collaboration with UNCCD Regional Coordination Mechanisms and Regional Coordination Mechanisms(RCMs), the coordination of activities of the UNCCD 4NR project in the regions;

▫To facilitate activities and technically backstop countries within the regions in the UNCCD 4th national reporting;

Page 30: Presentation of the UNEP/GEF project “UNCCD PRAIS”

Reference Centres – Specific Objectives (cont’d)

▫ To support UNCCD Secretariat via UNEP-WCMC in elaboration of the regional synthesis of the 4th National Report;

▫ To mobilize and collaborate with other technical institutions in the region in the technical backstopping of Parties in the process of the 4th National reporting;

▫ To maintain the agreed harmonized standards for UNCCD 4th National Reporting within the regional implementation Annexes of the Convention.

Page 31: Presentation of the UNEP/GEF project “UNCCD PRAIS”

National UNCCD Focal Points (NFPs)

• At the national level, the project activities will be managed by the UNCCD

National Focal Points within the respective National Executing Agency (NEA).

• The NFPs will bear overall responsibility for the execution of the project

activities and report to a National Project Steering Committee (N.B. this function

could be the UNCCD National Coordinating Body or other suitable multi-stakeholder

committee).

• They will act as national representative, facilitating inter-agency coordination

and guide the execution of the project in each country.

• The NEAs will implement the project in collaboration with other national,

provincial and local government agencies, NGOs, private sector and local

communities.

• Each NEA will receive international technical assistance through the UNEP-

WCMC and Regional Reference Centres.

Page 32: Presentation of the UNEP/GEF project “UNCCD PRAIS”

National UNCCD Focal Points – cont’d• Country parties with the support of the

UNCCD and GM Secretariats and the respective RCs will prepare the 4th National Reports based on the new reporting tools (templates, guidelines, glossary, best practices, standard financial annex and programme/project sheets).

• NFPs will receive training from the RCs on the new reporting tools and on the utilization of the new PRAIS Portal.

• The RCs, in addition to deliver the training for the NFPs, will provide on-going technical backstopping from the reporting process.

Page 33: Presentation of the UNEP/GEF project “UNCCD PRAIS”