Presentation of investment projects of Kherson Sea Port

Presentation of investment projects of Kherson Sea Port

Embed Size (px)

Citation preview

Page 1: Presentation of investment projects of Kherson Sea Port

Presentation

of investment projects of

Kherson Sea Port

Page 2: Presentation of investment projects of Kherson Sea Port

Kherson sea port

Characteristic of Port

Project power 4 mln. t

Number of berths 10

Storage space of open type (sqm)

24433

Storage space of indoor type (sqm)

19780

Technical capabilities of vessels’ handling

Length of vessel (m) 230

Draft (m) 7,6

Loading max (thous. tons) 31,2

Page 3: Presentation of investment projects of Kherson Sea Port

Foreign economic relations of Kherson Port develops in three direc-tions: Western Europe, Near East and Africa as well as Southeast Asia.

Kherson Sea Port is an important river and sea transport junction of Ukraine, is among the top of ten Ukrainian ports as per handling of foreign trade and transit cargoes.

Page 4: Presentation of investment projects of Kherson Sea Port

Kherson branch of the state enterprise «Administration of seaports of Ukraine» (Administration of Kherson sea port)

Organization of external raid anchor area to perform marine cargo operations in the area of Tendrov split

• Depth up to 22 m.

• Power - 300 thousd. tons per year

• Ability of acceptance of vessels of «Panamax» type with loading up to 60 thousd. tons.

• Cost of the project - 1.5 million. UAH .

• Implementation period - 1 year.

• Payback period - 1.5 years.

Page 5: Presentation of investment projects of Kherson Sea Port

State enterprise «Kherson commercial sea port»

Construction of additional silos of grain terminal (second step) with a capacity of 12.8 tons on the area of the rear of berths №2,3

• Power - 550.0 thousd. tons per year

• Estimated implementation period: 2 years (2015 - 2016)

• The volume of capital investments - 29 891.0 thousd. UAH.

• The financial sourcing - operator-investor means

• Payback period - 4.1

Page 6: Presentation of investment projects of Kherson Sea Port

Company «Dnipro Cargo Limited»

Modernization of transshipment complex (TC) on the berth No. 6

The range of cargoes: grain of all types and sorts,oilseeds and bean plants.

The amount of investment -1,597.7 thousd. dollars of USA .

Project power - up to 500.0 thousd. tons per year.

Page 7: Presentation of investment projects of Kherson Sea Port

Public Joint Stock Company «Kherson Bakery»

1. Construction of mechanized warehouse of floor grain storage with capacity of 16 thousd. tons (step I) •Project’s cost - 53.2 mln. •Payback period - 3.5 years. •Indicative term of realization of works - 3 years (2014-2016))

2. Construction of mechanized warehouse of floor grain storage with capacity of 20 thousd. tons and reconstruction of quay wall of grain transporting (II-nd and III-rd phases) •Project cost - 3.2 million dollars of USA • Indicative implementation period - 5 years (2016-2020) • Payback period - 4.6 years

3. Construction of elevated type berth along the quay №10 on concession term .•Project cost - 0.92 million dollars of USA • Indicative implementation period - 3 years (2015-2017) • Payback period - 3,26 years

Page 8: Presentation of investment projects of Kherson Sea Port

THANK YOU FOR YOUR ATTENTION