Upload
votu
View
218
Download
2
Embed Size (px)
Citation preview
3
vosgesvosgesPrincipalPrincipal site : site :
TORRI DI QUARTESOLOTORRI DI QUARTESOLOVICENZA VICENZA -- ITALYITALY
FilialsFilials in in SuisseSuisse -- UnitedUnited StatesStatesSaudiSaudi Arabia Arabia
4
IONIC ACCELERATORS IONIC ACCELERATORS BYBY
NATURAL PERMANENT NATURAL PERMANENT MAGNETSMAGNETS
NEW ARANEW ARA
5
THE PRODUCT
The ionic acceleratorsNEW ARA
radically solves numerousdrawbackws and dams caused
by deposits and incrustations ofcalcium carbonate in appliances
and pipes.
6
THE PRODUCT
The ionic acceleratorsNEW ARA
patented in over 150 countries in the world are
a qualified water conditionerfor all kind of water.
7
THE PRODUCT
Once installedNEW ARA
doesn’t need electricalconnection, no need of
maintenance or operationalexpenses and remains
operative several years.It’s guaranteed as law
regulations say.
23
U S E
They’re ideal for houses, acquariums, acqueducts, snow
guns, paper mills, laundries, pasteurizers, swimming pools,
sprinkler evaporator towers, coffee machines ecc. and wherever there’s
need of using chemical productsunhealthy both for men and for
environment.
24
U S E
The ionic acceleratorsNEW ARA are present and
perfectly functioning in thousands of applications and are availables in several sizes
covering all requirements.
Up to 2” are threaded.From 2” to 28” are flanged.
25
PRINCIPLE OF OPERATING
The principle of operatingapplied by VOSGES for
NEW ARA ionic acceleratorin simple and sofisticated
at the same time.It’s based on the forced flow of water through a high intensitymagnetic field (10.000 Gauss).
26
PRINCIPLE OF OPERATING
This magnetic field doesn’t derive from electric
connections but fromNATURAL PERMANENT
MAGNETS and so the power doesn’t decay with the
passing of time.
27
FROM CALCIUM CARBONATE TO ARAGONITE
In this way, the calcium, insteadof making deposits and solidify
in pipes, is trasformed in a softening precipitated called
ARAGONITE.It’s similar to talc remains in
suspension, preventing the formation of scale.
28
FROM CALCIUM CARBONATE TO ARAGONITE
NEW ARA
Determines the progressive dissolvence of preexisting
formations of calcarous scale.
29
MAINTENANCE
Thank to its particular solidityand resistance
NEW ARAOnce installed, doesn’t needmaintenance or operational
expenses.
31
SATISFACTION OF THE CLIENT
• He has bought a very good qualityproduct.
• He has a direct service by the seller.
• Not to think aboutthe maintenanceof the product.
Quality product
No need to buy other times the product.
Direct service.
32
COSTS ANALYSIS
The economic advantages forthe client can be resumed : • Total elimination of chemical
products for water mitigation.• Reduction up to 50% of soaps
and by-products.• No expenses for electric energy.
33
SAVING (in €)
0%10%20%30%40%50%60%70%80%90%
100%
electricconsumption
soaps chemicalproducts
saving
consumption
34
STRONG POINTS OF THE NEW ARA
• No need of electrical connection.
• Natural permanent magnets.
• Product guaranteed for life.
35
ADVANTAGES
• It’s bought once in life.• No other can be compared as
considering reliability, efficiency and result.
• It’s delivered directly by ourdeputies who will give all the instructions for the assemblyad the successive utilization.
36
THE BIGGEST ADVANTAGE IS …....
The idea is based upon the fact that the product will beused 24 hours a day for 365 days a year without really
perceive it.
37
REFERENCES NEW ARA
AIRPORT of Roma Fiumicino(hot water circuit)AGENCY RIGONI in Vicenza(condominium water)AGIP in Roma(cooling circuit)AMAG in Padova(heating system in Bassanelloswimming-pool)ARSENAL M.M. in La Spezia(water in local cafeteria)
38
REFERENCES NEW ARA
ARSENAL M.M. in La Spezia(cruiser Ardito - water treatment)ARSENAL M.M. in La Spezia(training-ship A. Vespucci - water treat. ASPIV in Venezia(fountain water)DAIRY PALUMBO in L'Aquila(water and vapor treatment)DAIRY POMELLA in Frosinone(water and vapor treatment)
39
REFERENCES NEW ARA
CEMENT FACTORY AUGUSTA in Siracusa(water for cooling compressors)CINECITTA' in Roma(sanitary water treatment)TOWN HALL in Bressanone - BZ(water treatment)TOWN HALL in Lusia - RO(fountain water)
40
REFERENCES NEW ARA
TOWN HALL in Sommacampagna - VR(sanitary water treatment)DAGNINI in Bologna(vapor treatment) DALMINE in Livorno(rinse tank)FININVEST - Direct. Centre Milano 2(sanitary water treatment)
41
REFERENCES NEW ARA
GREEN GARDEN SPORTING CLUB in Mestre - VE(sanitary water treatment)ILVA in Genova(plant of rigeneration of refrigeratedH2SO4)LA TRIVENETA in Brendola - VI(cooling water treatment)OREAL in Torino(plant of raising refrigerated H2O)
42
REFERENCES NEW ARA
SAFFA in Frosinone(void pumps)SARIS in Trento(water treatment)ELEMENTARY SCHOOL M. PACKER in Bressanone - BZ(water treatment)SIPEM in Enna(vapor hot water treatment)VIDEOCOLOR in Frosinone(sprinkler cooling towers)