Mineral Deposit Modelling in Surpac Surpac Modelling - Exploration Drilling - Mineral Deposit as Block Model - Open Pit

Presentation for Linkedin

Embed Size (px)

Citation preview

Page 1: Presentation for Linkedin

Mineral Deposit Modelling in Surpac

Surpac Modelling- Exploration Drilling- Mineral Deposit as Block Model- Open Pit

Page 2: Presentation for Linkedin

Surface & U/G Mine Planning

Modelling in Surpac- Mineral Deposit- Open Pit- Underground Headings

Page 3: Presentation for Linkedin

Waste Rock Dump Designing

Dump Design

Site Selection

Open-pit size and Location, Topography, Surface and Grounwater,

Rehabilitation

Mining Factors

Mine Production Schedule,

Waste Quantity,

Transportation Method

Environmental

FactorsPotential

ARD, Drainage Handling,

Reclamation Requirement

s

Political and Social Considerati

onsGovernmental Regulations

and Standards,

Nature Preservation

Stability Issues

Foundation and Waste

Material Geotechnical Parameters,

Slope Stability Analyses

Material PropertiesSwell Factor, Compaction

Degree, Angle of Repose

Page 4: Presentation for Linkedin

Stable and Unstable Dump

Page 5: Presentation for Linkedin

Tailings Cycle at MinesMining

Processing Washing, Grinding, Flotation

Concentrated Ore Tailings

Usage as Backfilling

Storage in Impoundment

Solids Settle in Bottom

Water Collection

Used in Dust Suppression

Page 6: Presentation for Linkedin

Mining Cost Estimation Model

Mining Equipment Costs

Capital Costs (CapEx) Operating Costs (OpEx)

Overhau

l

Parts

Labour

Maintenance

Parts

Labour

Fuel/

Power

Lubricants

Tyres

Wear

Parts

Page 7: Presentation for Linkedin

Estimated Mine Operating Costs

Overhaul Parts4%

Overhaul Labour

5%Maintenance

Parts8%

Maintenance Labour

8%

Fuel/Power46%

Lubricant10%

Tyres19%

Page 8: Presentation for Linkedin

Sources