Mineral Deposit Modelling in Surpac
Surpac Modelling- Exploration Drilling- Mineral Deposit as Block Model- Open Pit
Surface & U/G Mine Planning
Modelling in Surpac- Mineral Deposit- Open Pit- Underground Headings
Waste Rock Dump Designing
Dump Design
Site Selection
Open-pit size and Location, Topography, Surface and Grounwater,
Rehabilitation
Mining Factors
Mine Production Schedule,
Waste Quantity,
Transportation Method
Environmental
FactorsPotential
ARD, Drainage Handling,
Reclamation Requirement
s
Political and Social Considerati
onsGovernmental Regulations
and Standards,
Nature Preservation
Stability Issues
Foundation and Waste
Material Geotechnical Parameters,
Slope Stability Analyses
Material PropertiesSwell Factor, Compaction
Degree, Angle of Repose
Stable and Unstable Dump
Tailings Cycle at MinesMining
Processing Washing, Grinding, Flotation
Concentrated Ore Tailings
Usage as Backfilling
Storage in Impoundment
Solids Settle in Bottom
Water Collection
Used in Dust Suppression
Mining Cost Estimation Model
Mining Equipment Costs
Capital Costs (CapEx) Operating Costs (OpEx)
Overhau
l
Parts
Labour
Maintenance
Parts
Labour
Fuel/
Power
Lubricants
Tyres
Wear
Parts
Estimated Mine Operating Costs
Overhaul Parts4%
Overhaul Labour
5%Maintenance
Parts8%
Maintenance Labour
8%
Fuel/Power46%
Lubricant10%
Tyres19%
Sources
http://www.imagebroker.com/view-fullscreen/975692
http://www.techsoft3d.com/industries/mining-and-geosciences/