CITY OF MUSTANG
April 21, 2015
Comprehensive City-WideWater Distribution Model
WDB ENGINEERING
PRESENTATION FOR:
Project Objective
Existing Conditions
Intro to Hydraulic Model
Model Development
Model Analysis
Recommendations
Q & A
PRESENTATION OVERVIEW
WDB ENGINEERING
Operation and Maintenance
Economic Development & Planning
Water Quantity and Quality
City-Wide Fire Flow
Capital Improvement Planning
PROJECT OBJECTIVE
WDB ENGINEERING
Water Sources
Water Distribution
Water Pumping
Water Storage
EXISTING CONDITIONS
WDB ENGINEERING
Eleven (11)
Groundwater
Wells
Two (2) OKC
Connections
EXISTING CONDITIONSWater Sources
WDB
ENGINEERING
SW 104th
SW 119th
SW 134th
Over 116 miles of waterlines & 7000 meters
EXISTING CONDITIONSWater Distribution
Four (4) water booster stations:
EXISTING CONDITIONSWater Pumping
Clear Springs
Four (4) water booster stations:
EXISTING CONDITIONSWater Pumping
59th Street
Four (4) water booster stations:
EXISTING CONDITIONSWater Pumping
74th Booster
Four (4) water booster stations:
EXISTING CONDITIONSWater Pumping
Rockwell
Three (3) Water Storage Tanks:
EXISTING CONDITIONSWater Storage
Clear Springs
Three (3) Water Storage Tanks:
EXISTING CONDITIONSWater Storage
Mustang
Three (3) Water Storage Tanks:
EXISTING CONDITIONSWater Storage
County Line
EXISTING CONDITIONSSystem Model
WDB ENGINEERING
Dynamic Movement of Water
Pressure System
Complex GIS Based Software
Steady-State Simulation
Extended State Simulation
Creating Demand Patterns
INTRODUCTION TO HYDRAULIC MODELING
WDB ENGINEERING
Existing Conditions and Mapping
Distribution System - Data
Distribution System - Operations
Water Demands
Model Calibration
MODEL DEVELOPMENT
WDB ENGINEERING
1. Existing Water Distribution System
2. County Line Tank
3. New Ground Storage at Rockwell
4. 16-inch Waterline along SH 152
5. 2045 Water Distribution System
MODEL ANALYSISScenarios
WDB ENGINEERING
Critical
Short Term
Long Term
RECOMMENDATIONS
WDB ENGINEERING
Flow Meters
VFDs
SCADA
Well Field Waterlines
RECOMMENDATIONS
Critical
WDB ENGINEERING
County Line Tank
New Storage Tank at
Rockwell Booster Station
Extend 16” Waterline West
Upgrade/Construct New
Water Lines
AMR
WDB ENGINEERING
RECOMMENDATIONS
Short Term
Asset Management
Update City Ordinances
Encourage Water
Conservation
WDB ENGINEERING
RECOMMENDATIONS
Short Term
Construct New Elevated
Water Tower at Clear Springs
Site
Explore Additional / New
Water Sources
WDB ENGINEERING
RECOMMENDATIONS
Long Term
QUESTION
&
ANSWER
WDB ENGINEERING