34
Presentation first quarter 2014 Goodtech ASA, 14 May 2014

Presentation first quarter 2014 Q1 2014.pdf · • MSEK 25,6 contract for power transformation and distribution station for Älvsjö plant for Fortum Distribution in Stockholm •

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Presentation first quarter 2014 Q1 2014.pdf · • MSEK 25,6 contract for power transformation and distribution station for Älvsjö plant for Fortum Distribution in Stockholm •

Presentation first quarter 2014

Goodtech ASA, 14 May 2014

Page 2: Presentation first quarter 2014 Q1 2014.pdf · • MSEK 25,6 contract for power transformation and distribution station for Älvsjö plant for Fortum Distribution in Stockholm •

Agenda

HighlightsFinancial reviewOrder bookGoodtech – in briefOutlook

2

Page 3: Presentation first quarter 2014 Q1 2014.pdf · • MSEK 25,6 contract for power transformation and distribution station for Älvsjö plant for Fortum Distribution in Stockholm •

Highlights, first quarter 2014

Turnover of MNOK 558,4 in Q1 2014 compared with MNOK 575,6 as in Q1 2013. Acceptable due to lower activity in our project portfolio in Q1.

EBITDA of MNOK 8,2 in Q1 2014, compared with MNOK 22 in Q1 2013.

Weaker EBITDA than planned due to postponed and lower progress in some larger project and temporarily lower activities in our markets.

Positive progress in Solutions business unit.

Order backlog of MNOK 1.243 at the end of Q1, compared with MNOK 1.306 at the end of 2013.

Positive outlook in our markets

3

Page 4: Presentation first quarter 2014 Q1 2014.pdf · • MSEK 25,6 contract for power transformation and distribution station for Älvsjö plant for Fortum Distribution in Stockholm •

Highlights, first quarter 2014

All business units focus on optimizing their operations

• Project operations• Strategic Market and Sale• Cost control• Human resources, continue training activities

Continue with action plan in Solutions to improve earnings. EBITDA loss in previous quarters turned to profit in Q1. Environment turnover increased with 24,3% in Q1 compared to Q1 2013. Infra and Products – weak performance in the quarterInstallation and testing of Energy Recovery System ongoing.

4

Page 5: Presentation first quarter 2014 Q1 2014.pdf · • MSEK 25,6 contract for power transformation and distribution station for Älvsjö plant for Fortum Distribution in Stockholm •

Highlights, first quarter 2014, Market

Order backlog continue on a high level, MNOK 1.243.

Some of the contracts in Q1: • MNOK 40 Contract for delivery biogas treatment

plant to Tønsberg - Vestfold Biogass (not in orderstock)

• MNOK 35 Contract for delivery of control systems and panels to Hydro Aluminum, Karmøy Plant.

• MSEK 25,8 LKAB, Power and installation, Svappavaara

• MSEK 12 NCC, Power and installation contract

• MSEK 11,6 Jämtnät AB, power contract

• MSEK 7,8 Scania, production line solution

5

Page 6: Presentation first quarter 2014 Q1 2014.pdf · • MSEK 25,6 contract for power transformation and distribution station for Älvsjö plant for Fortum Distribution in Stockholm •

Highlights, first quarter 2014, Market

Significant contracts won after Q1• MSEK 25,6 contract for power

transformation and distribution station for Älvsjö plant for Fortum Distribution in Stockholm

• Renewal of frame agreement for Integrated Operations(IO) with Statoil

• Delivery of Manufacturing Execution System (MES) to Hydal, Raufoss

High level activities in the market. Promising outlook.

6

Page 7: Presentation first quarter 2014 Q1 2014.pdf · • MSEK 25,6 contract for power transformation and distribution station for Älvsjö plant for Fortum Distribution in Stockholm •

Financial Review

7

Page 8: Presentation first quarter 2014 Q1 2014.pdf · • MSEK 25,6 contract for power transformation and distribution station for Älvsjö plant for Fortum Distribution in Stockholm •

Main figures

8

(NOK 1.000) Q1 14 Q1 13 2013Revenues 558 401 575 572 2 433 776Product expenses 245 914 280 390 1 197 535Salary expenses 235 074 215 308 905 011Other operating expenses 69 166 57 870 245 012

EBITDA 8 247 22 005 86 218

EBITDA % 1,5 % 3,8 % 3,5 %Depreciation 6 488 5 756 24 021Non recurring items 0 0 3 087

EBIT 1 759 16 249 59 110Net financial items -1 897 -893 -8 406Share of Profit from Associated comp. 0 0 3 917

Profit before taxes -138 15 356 54 621

Taxes -617 3 478 13 132

Net result from continuing operations 480 11 879 41 489

Net result 480 11 879 41 489

Attributable to:

Ow ners of the parent 311 11 623 41 171

Non-controlling interests 169 255 318

Sum 480 11 879 41 489Earnings per share from continuing operations 0,01 0,37 1,28Deluted earnings per share 0,01 0,37 1,28

Page 9: Presentation first quarter 2014 Q1 2014.pdf · • MSEK 25,6 contract for power transformation and distribution station for Älvsjö plant for Fortum Distribution in Stockholm •

Quarterly revenues and earnings - historical

9

 ‐

 100

 200

 300

 400

 500

 600

 700

MNOK 

Revenues

 ‐

 5

 10

 15

 20

 25

 30

MNOK 

EBITDA

Page 10: Presentation first quarter 2014 Q1 2014.pdf · • MSEK 25,6 contract for power transformation and distribution station for Älvsjö plant for Fortum Distribution in Stockholm •

Financial highlights – Balance sheet

10

NOK million 31.03.14 31.03.13 31.12.13Fixed tangible assets 73,3 47,1 67,5 Intangible assets 696,9 664,6 696,8 Total fixed assets 770,3 711,7 764,2 Cash 17,3 20,5 33,4 Other current assets 699,1 630,6 739,2 Total current assets 716,4 651,1 772,6 Total assets 1 486,7 1 362,8 1 536,8

- - - Total equity 713,9 716,2 725,2 Non-current borrow ings 109,7 50,4 118,3 Other non-current liabilities 12,9 14,9 11,5 Total non-current liabilities 122,6 65,3 129,9 Current borrow ings 88,5 26,5 77,2 Other current liabilities 561,7 554,8 604,6 Total current liabilites 650,2 581,3 681,8

Total equity and liabilities 1 486,7 1 362,8 1 536,8 - - -

Net cash and borrow ings 180,9 56,4 162,2 , , ,

Equity Ratio (%) 48,0 % 52,6 % 47,2 %Net Gearing (%) 25,3 % 7,9 % 22,4 %Liquidity Ratio 1,1 1,1 1,1

Definitions:Net Gearing (%): Net interest Bearing Debt/Total equityLiquidity Ratio : Current Assets/Current Liabilities

Page 11: Presentation first quarter 2014 Q1 2014.pdf · • MSEK 25,6 contract for power transformation and distribution station for Älvsjö plant for Fortum Distribution in Stockholm •

Financial highlights – Cash flow

11

NOK 1.000 Q1 14 Q1 13 2013Cash f low from operations -2 771 5 026 -8 734Cash f low from investments **) -19 877 1 799 -39 187Cash f low from financials -7 001 -71 108 -86 788Net changes in cash from period -29 650 -64 284 -134 709Net Cash funds at beginning of period -45 886 82 857 82 857Effects of exchange rate f luctuation on cash held 2 321 1 887 5 965Net Cash funds at end of period *) -73 215 20 460 -45 886

*) Consisting ofCash and cash equivalents - balance sheet 17 276 20 460 33 365Overdraft facility -90 491 0 -79 251Net Cash funds at end of period -73 215 20 461 -45 886Undraw n credit facilities amounts to MNOK 106,0 at the end of Q1

**) Includes investment in Energy Recovery Pilot

Page 12: Presentation first quarter 2014 Q1 2014.pdf · • MSEK 25,6 contract for power transformation and distribution station for Älvsjö plant for Fortum Distribution in Stockholm •

Cash flow from operations and EBITDA

12

Development in Cash flow from operations and EBITDA on 12 months rolling basis

Page 13: Presentation first quarter 2014 Q1 2014.pdf · • MSEK 25,6 contract for power transformation and distribution station for Älvsjö plant for Fortum Distribution in Stockholm •

Employees per business area

13

 ‐

 200

 400

 600

 800

 1 000

 1 200

 1 400

 1 600

 1 800

Projects & Services Infra Solutions Environment Products Admin

Total no. of employees by 31.03.2014: 1.467

Page 14: Presentation first quarter 2014 Q1 2014.pdf · • MSEK 25,6 contract for power transformation and distribution station for Älvsjö plant for Fortum Distribution in Stockholm •

Order backlog

14

 ‐

 200

 400

 600

 800

 1 000

 1 200

 1 400

MNOK 

Projects & Services Infra Solutions Environment Products

Page 15: Presentation first quarter 2014 Q1 2014.pdf · • MSEK 25,6 contract for power transformation and distribution station for Älvsjö plant for Fortum Distribution in Stockholm •

Business areas – figures and facts

15

EnvironmentSolutionsInfraProjects & Services Products

Page 16: Presentation first quarter 2014 Q1 2014.pdf · • MSEK 25,6 contract for power transformation and distribution station for Älvsjö plant for Fortum Distribution in Stockholm •

Business unit: Projects & Services (P&S)

Highlights• P&S business unit has performed well in the quarter.

Some projects postponed in start-up and finalization phase

• Turnover on same level as Q1 2013. • EBITDA lower than Q1 2013. Focus on activities for

improving profitability going forward • Order backlog stable compared to end of 2013 and

increased compared to Q1 2013.• Won several contracts confirming our position as one of

the leading suppliers, LKAB, Statoil, Hydro, Fortum.• Strategic focusing in our business

16

NOK 1.000 Q1 14 Q1 13 2013Revenue 377 159 380 255 1 576 982EBITDA 13 558 20 770 79 800EBITDA margin % 3,6 % 5,5 % 5,1 %Order backlog 814 804 606 998 813 476No. of employees 1 149 1 128 1 162

 ‐

 50

 100

 150

 200

 250

 300

 350

 400

 450

MNOK 

Revenues

 (5)

 ‐

 5

 10

 15

 20

 25

 30

MNOK 

EBITDA

Page 17: Presentation first quarter 2014 Q1 2014.pdf · • MSEK 25,6 contract for power transformation and distribution station for Älvsjö plant for Fortum Distribution in Stockholm •

Business unit: Infra

Highlights• Turnover 25% lower than Q1 2013.• Low activity in the larger projects in Q1 gives low

utilization of workforce and low progress in the projects. Activity will vary from quarter to quarter.

• Negative EBITDA as consequence of turnover reduction. • Order backlog is still on a high level.• Market look promising in the longer perspective, both in

Sweden and Norway.• Won first smaller contract in Norway after Q1

17

NOK 1.000 Q1 14 Q1 13 2013Revenue 44 542 59 414 294 412EBITDA -1 440 813 10 621EBITDA margin % -3,2 % 1,4 % 3,6 %Order backlog 259 254 404 858 285 736No. of employees 64 62 66

0

10

20

30

40

50

60

70

80

90

100

MNOK 

Revenues

‐2

‐1

0

1

2

3

4

5

6

7

MNOK 

EBITDA

Page 18: Presentation first quarter 2014 Q1 2014.pdf · • MSEK 25,6 contract for power transformation and distribution station for Älvsjö plant for Fortum Distribution in Stockholm •

Business unit: Solutions

18

Highlights• Turnover in Q1 on same level as in Q1 2013• Improvement plan in Solutions gives positive effects on

EBITDA. Improvement work will continue • Order backlog on acceptable level. • Large prospect portfolio. Focus on strategic sale and

market.

NOK 1.000 Q1 14 Q1 13 2013Revenue 52 183 58 280 199 301EBITDA 69 -1 974 -10 282EBITDA margin % 0,1 % -3,4 % -5,2 %Order backlog 65 258 63 304 73 184No. of employees 130 141 133

 ‐

 10

 20

 30

 40

 50

 60

 70

 80

MNOK 

Revenues

 (6)

 (5)

 (4)

 (3)

 (2)

 (1)

 ‐

 1

 2

 3

 4

 5

MNOK 

EBITDA

Page 19: Presentation first quarter 2014 Q1 2014.pdf · • MSEK 25,6 contract for power transformation and distribution station for Älvsjö plant for Fortum Distribution in Stockholm •

Business unit: Environment

19

Highlights• Significant turnover increase in Q1 2014 compared to Q1 2013.

• High level of project activity in Q1

• EBITDA in Q1 on typical Q1 level. However loss in one project had negative effect on margin

• Order backlog is varying. Backlog is on acceptable level taken into account contracts included in order backlog after Q1.

• Won MNOK 40 Contract for delivery biogas treatment plant toTønsberg - Vestfold Biogass

• Activity in the Norwegian SBR / Biovac® market has increased in 2014, both in the Norwegian and especially in the Swedish market.

• Market survey confirms positive market expectations for 2014

 ‐

 10

 20

 30

 40

 50

 60

 70

 80

 90

MNOK 

Revenues

 (2)

 (1)

 ‐

 1

 2

 3

 4

 5

 6

 7

MNOK 

EBITDA

NOK 1.000 Q1 14 Q1 13 2013Revenue 73 803 59 393 296 566EBITDA 1 332 1 556 8 016EBITDA margin % 1,8 % 2,6 % 2,7 %Order backlog 98 859 165 384 129 835No. of employees 79 74 78

Page 20: Presentation first quarter 2014 Q1 2014.pdf · • MSEK 25,6 contract for power transformation and distribution station for Älvsjö plant for Fortum Distribution in Stockholm •

Business unit: Products

Highlights• Weak turnover in Q1 compared with Q1 2013 mainly due

to a temporal weak market for Products in beginning of 2014.

• New sales personnel in end 2013 and in beginning of 2014. Increased sales activities in the quarter.

• EBITDA is weak due to low turnover and increased investment in salesforce.

• Increased number of prospects and leads in the period.

• P&S contract for Norsk Hydro will also give large sales volume for Products.

• Market outlook is positive

20

NOK 1.000 Q1 14 Q1 13 2013Revenue 19 912 27 009 92 716EBITDA -791 2 978 7 092EBITDA margin % -4,0 % 11,0 % 7,6 %Order backlog 4 327 11 167 4 235No. of employees 26 23 24

 ‐

 5

 10

 15

 20

 25

 30

MNOK 

Revenues

 (1)

 ‐

 1

 2

 3

 4

MNOK 

EBITDA

Page 21: Presentation first quarter 2014 Q1 2014.pdf · • MSEK 25,6 contract for power transformation and distribution station for Älvsjö plant for Fortum Distribution in Stockholm •

” Goodtech shall be the leading supplier of automation, electrical, process, industrial engineering, and environmental solutions in the

Nordic region.”

Goodtech – in brief

21

Page 22: Presentation first quarter 2014 Q1 2014.pdf · • MSEK 25,6 contract for power transformation and distribution station for Älvsjö plant for Fortum Distribution in Stockholm •

A considerable technology group - background

22

1913

Norsk ElektriskKabelfabrikk A/S

founded

1993

New name: GoodtechBusiness idea:

Environmental tech

2006

Includes automation and material handling into the business idea

El & Industrimontage AB founded 1994

El & Industrimontage Svenska ABand Goodtech ASA merge into

the ”New” Goodtech

2010

MNOK

YEAR

Turnover increased from MNOK 130 in 2005 to MNOK 2.434 in 2013

TURNOVER

2013

Page 23: Presentation first quarter 2014 Q1 2014.pdf · • MSEK 25,6 contract for power transformation and distribution station for Älvsjö plant for Fortum Distribution in Stockholm •

Goodtech in brief

Approx 1.500 employees, with a revenueof NOK 2,4 billion

Strong local presence with almost40 offices in Sweden, Norway and Åland

Headoffice in Oslo and listedon Oslo Stock Exchange

Sweden

Approx 1.150 employees

27 offices, from Kiruna in the north to Malmö in south

Norway

Approx 290 employees

10 offices, with headoffice in Oslo

Åland

Approx 40 employees

Office in Mariehamn

23

Page 24: Presentation first quarter 2014 Q1 2014.pdf · • MSEK 25,6 contract for power transformation and distribution station for Älvsjö plant for Fortum Distribution in Stockholm •

24

Market drivers

Upgrade of infrastructure and energy systems

Increased efficiencyand competitive ability

within the industry

Society’s need for more environmental friendly solutions, products and

projects

Page 25: Presentation first quarter 2014 Q1 2014.pdf · • MSEK 25,6 contract for power transformation and distribution station for Älvsjö plant for Fortum Distribution in Stockholm •

Organisation

Goodtech is organised into five business areas• Projects & Services• Infra • Solutions• Environment• Products

25

EnvironmentSolutionsInfraProjects & Services Products

Page 26: Presentation first quarter 2014 Q1 2014.pdf · • MSEK 25,6 contract for power transformation and distribution station for Älvsjö plant for Fortum Distribution in Stockholm •

Solid service and product portfolio

Automation Industry technology

InstallationPower technology

Environment technology

26

• Innovative technologies and solutions

• Turn-key projects

• Broad specter of services and competence

Page 27: Presentation first quarter 2014 Q1 2014.pdf · • MSEK 25,6 contract for power transformation and distribution station for Älvsjö plant for Fortum Distribution in Stockholm •

Market segments

Industry

Infrastructure

Energy and heating

Oil and gas

Building and public sector

Water & sanitation and biogas

27

Page 28: Presentation first quarter 2014 Q1 2014.pdf · • MSEK 25,6 contract for power transformation and distribution station for Älvsjö plant for Fortum Distribution in Stockholm •

Highlights – Technology development

Technology agreement with Dubal for Energy Recovery signed. Investment in pilot. • Installation and start up of test in

progress.• Technology has high potential

when successfully testedDedicated technology development activities in Solutions• Technology is platform for winning

contracts

Develop technology and standardized solutions to stimulate to repeat business in all business units

28

Page 29: Presentation first quarter 2014 Q1 2014.pdf · • MSEK 25,6 contract for power transformation and distribution station for Älvsjö plant for Fortum Distribution in Stockholm •

Commercial and financial risks for Goodtech

Commercial and market risk • Market for Industry projects and solutions – some risk• Market for Infrastructure projects and solutions – some risk

Financial risks • In general small currency exposure• In general small risk for contract cancellation• In general small risk for loss on receivables • In general some risk related to projects

Turn-key projects and deliveries • Some risk related to project execution

• Various complexity, size and duration of projects• Shortage of Project Managers

• Reducing risk:• MQSP (Method, Quality, Safety and Procurement) department

focus on training, improvement of methods and quality • Training Project managers and employments ongoing

Technology and product development• Some risk related to technical issues and market positioning

29

Page 30: Presentation first quarter 2014 Q1 2014.pdf · • MSEK 25,6 contract for power transformation and distribution station for Älvsjö plant for Fortum Distribution in Stockholm •

30

Outlook 2014

Page 31: Presentation first quarter 2014 Q1 2014.pdf · • MSEK 25,6 contract for power transformation and distribution station for Älvsjö plant for Fortum Distribution in Stockholm •

Expect continuous upgrade and large investments within infrastructure,energy and oil & gas In general, promising markets for Goodtechs services, solutions and products– basis for organic growth The uncertainty in some markets due to uncertainty in the global economyseems to decrease. However still unpredictable

Brief market analysis:• Power and Energy market• Infrastructure, railway/subway• Industry, mines• Industry, manufacturing• Industry, paper• Oil & Gas Industry• Environment• Public buildings

Outlook - Market

31

Page 32: Presentation first quarter 2014 Q1 2014.pdf · • MSEK 25,6 contract for power transformation and distribution station for Älvsjö plant for Fortum Distribution in Stockholm •

Summary / Outlook 2014

Growth strategy • Organic growth in business areas where

Goodtech has strong position and positive market expectations

• Expect strong market drivers within some market segments which is basis for three separate strategic initiatives

• Energy / Power• Oil & Gas• Aquaculture

• Improve and maintain strong margins

32

Page 33: Presentation first quarter 2014 Q1 2014.pdf · • MSEK 25,6 contract for power transformation and distribution station for Älvsjö plant for Fortum Distribution in Stockholm •

Summary / Outlook 2014

In 2014 Goodtech shall buildstronger positions• Continue to build the Goodtech brand• Use customer focus and well established

market position to increase business • Use of own product technology

and technical competence• Open for non-organic growth

within certain areas, consolidationpossibilities in the market

Maintain active dividend policy

33

Page 34: Presentation first quarter 2014 Q1 2014.pdf · • MSEK 25,6 contract for power transformation and distribution station for Älvsjö plant for Fortum Distribution in Stockholm •

The Goodtech way

A better world through the integration of sustainable solutions