    Adani Group

    Adani Petronet (Dahej) Port Pvt. Ltd

  • 7/30/2019 Presentation- APPPL (Adani Port at Dahej)

    2/10

    Adani Group adds anotherfeather to its cap giving the

    nation a World Class Solid

    Cargo Handling Terminal at

    Dahej for EXIM trade to serve

    central Gujarat, Maharashtra

    and Madhya Pradesh with

    International Standard norms,

    excellent storage facilities, eco-

    Adani Group

    friendly and world class

    technology to meet the needs

    of the nation and the delight of

    the customers with the higheststandards in port services

    APPPL, is a joint venture between

    Adani Group & Petronet LNG

    Limited

  • 7/30/2019 Presentation- APPPL (Adani Port at Dahej)

    3/10

    The Port is located in

    the Gulf of Khambhat,

    (along with three other

    terminals) in Bharuch

    district of Gujarat state

    on the west coast ofNo Port Limits.

    The port is located 45km from Bharuch at

    village Lakhigam

    A 21 deg 44 min 30 sec N,

    72 deg 32 min 20 sec E

    B 21 deg 44 min 30 sec N,

    72 deg 28 min 70 sec E

    C 21 deg 25 min 00 sec N,

    72 deg 28 min 70 sec E

    D 21 deg 25 min 00 sec N,

    72 deg 28 min 5 sec E

  • 7/30/2019 Presentation- APPPL (Adani Port at Dahej)

    4/10

    Dahej is the nearest railway station for APPPL

    connectivity. Dahej is a part of Western

    Railway Network. Indian Railways is converting

    the linkage between the main western railway

    & Dahej into broad gauge system. APPPL will

    bridge the gap between the Port & Dahej Rail

    APPPL : Linkage

    APPPL : Linkage

    Rail Connectivity

    Rail Connectivity

    Yard t roug private rai way networ .

    42 km long four lane highway connects Dahejwith the district headquarter Bharuch which

    lies on the Highway no 8 from Mumbai to

    Ahmedabad. The road network within GIDC

    leading to APPPL is a 6 KM stretch which is 4

    lane concreted road.

    Road Connectivity

    Road Connectivity

  • 7/30/2019 Presentation- APPPL (Adani Port at Dahej)

    5/10

    Port Infrastructure is capable of handling Bulk (dry) , Break Bulk & Project Cargo .

    Round the clock cargo operation (loading & unloading)

    APPPL : Infrastructure

    APPPL : Infrastructure

    Berth Details

    Berth Details

    Length Width Draft Deadweight Displacement

    (mtrs) (mtrs) (mtrs) (MT) (MT)

    North 206 29 14 80000 106600 Operational

    South 221 30.6 12* 80000 106600 Ready **

    Approach road up-to 2.4 km

    North Berth: Mechanized for coal bulk handling

    South Berth: Multi-purpose jetty (break bulk, bulk other than coal, project cargoes)*South Jetty

    ** Awaiting Customs Notification & Statutory Clearance (Mid May 2011)

  • 7/30/2019 Presentation- APPPL (Adani Port at Dahej)

    6/10

    BerthLOA

    (mtrs)

    Beam of

    vessel

    (mtrs)

    Draft

    (mtrs)Displacement

    Mooring

    ArrangementCranes

    North 260 42 14 106600

    4+3+3

    Forward andAft

    2 nos. of liebherr make

    cranes (SWL 65 MTeach in hook mode)

    Vessel Acceptance Criteria

    Vessel Acceptance Criteria

    South 260 42 12 106600

    4+3+3

    Forward and

    Aft

    2 nos. of Gottwald make

    cranes (SWL 65 MT

    each in hook mode) *

    *Will be ready by mid-May 2011North Berth: Effective working length forward end of first hatch to aft end of

    last hatch: 200 meters

    South Berth: Effective working length forward end of first hatch to aft end of

    last hatch: 207 meters

  • 7/30/2019 Presentation- APPPL (Adani Port at Dahej)

    7/10

    Equipments:Equipments:

    APPPL : InfrastructureAPPPL : Infrastructure

    Equipments Length Capacity

    Import Conveyor

    Within Port 3.5 km 5000 TPH

    For evacuation 12 km 4200 PHM

    Silo at Rail yard 4000 TPH

    The bulk handling cargo capacity of the Berths with Mechanized Handling System

    would be around12 MMTPA

    Stacker Reclaimer . 4200 TPH 2500 TPH

    Mobile Harbour Cranes 4 nos. SWL of 65 MT each

    Grabs 4 nos. 42 CBM

  • 7/30/2019 Presentation- APPPL (Adani Port at Dahej)

    8/10

    APPPL : InfrastructureAPPPL : Infrastructure

    1.15 lacs sq. meters open storage

    area available at APPPL for Bulk /

    Break Bulk , Expandable byanother 77000 s . meters

    Storage:Storage:

    Rail Facility :Rail Facility :

    APPPL is presently developing its own dedicated 2.5 kmprivate rail line connecting Dahej Railway Station.

    The silo system at the rail yard for loading rakes is

    connected with the port by a conveyor system

  • 7/30/2019 Presentation- APPPL (Adani Port at Dahej)

    9/10

    Tugs Details

    Two tugs of Japanese make viz., Dolphin - 3 and Dolphin 4

    Bollard Pull-55 tons.

    Twin Engines (NIGATA) and Twin Screw of 2200 BHP with zed

    pillar system giving them all round maneuverability

    Fitted with half FiFi.

  • 7/30/2019 Presentation- APPPL (Adani Port at Dahej)

    10/10

    WIND INFORMATION

    During Monsoon - Apr to Sep During non monsoon - Oct to Mar

    Wind Direction Wind speed Wind Direction Wind speed

    South Westerly 25 kts - 35 kts North Easterly 15 kts 20 kts

    TIDE INFORMATION

    SR. NO TIDES LOW WATER HIGH WATER

    1 Spring tide -0.8 m 10 m

    2 Neap tide 2.2 m 7.5 m