……… S.p.APRESENTATION
ENGINEERING – CONTRACTING
A real expertise…for efficient industrial plants
2
The Company
Italia S.p.A.
160 home-office personnel
130 personnel in outsourcing
45 men in site Construction Management
Man-hours capacity in E & P, over 500.000/year
3
Company organization
Purchasing
Expediting
Inspection
Shipping
Equipment & Packages
Civil / Structural
Piping
Electrical
Instrumentation
Finance
HR
IT
Office Services
Process
Technology
Commissioning / Start-up
Process Engineering Engineering Procurement Services Construction Management
Project Management
& Control
Commercial QA/QC HSE Staff
President
Director of Operations
Sales & Marketing
Proposals
Estimating
4
Company capabilities
…..Italia has proper skills and tools to engineer and construct
efficient plants in Oil, Gas, Petrochemicals,
Energy and Environmental fields
Qualified manpower can perform:
Process & Feasibilities Studies
Licensors Selection & PDP Endorsement
Basic & FEED
Detail Engineering & Procurement activities
Construction & Start-up
5
Manpower distribution & tools
Manpower Distribution:
Management and staff: 5%
Project management and control: 15%
Engineering departments: 55%
Procurement services: 10%
Site construction management: 15%
Company Tools:
All engineering IT tools
Smart plant design stations
6
Company tools: Software Systems
Admin. & Finance
JDE
Smart Plant Suite
….. Operations
Project Control
Engineering
Human Resources
Materials Documents
PUMA
TRACS
VDCSMEDOC
Caesar II
VEP
EPO Hysys
Primavera
Tresy
VPRM
Microsoft Project
7
Company tools: Software Systems
Project Control - Planning & Control
MEDOC/VDCSDATABASE
ENGINEERINGACTIVITIES
VPRM DATABASE
PROCUREMENTACTIVITIES
CONTROL
PLANNING
C
O
N
T
R
O
L
P
L
A
N
N
I
N
G
CONTROL
PLANNING
[DATES/ HOURS]
[DATES/
HOURS/PROGRESS]
[DATES]
[DATES]
[QTY/
HOURS]
PRIMAVERA PROJECT PLANNER
[QTY/
HOURS/
PROGRESS]
JOB CARDS(SPREAD SHEETS)
CONSTRUCTION/COMMISSIONING
ACTIVITIES
8
Company tools: Software Systems
Require(MR’s)
Define(eqpt list, MTO’s)
Enquire(RFQ’s+bids)
Purchase(PO’s)
Expedite(IRN’s)
Ship(PL’s, shipmts)
Store(feasib., vouchers)
Lifecycle of materials in VPRM
9
Company tools: Smart Plant Platform
3D PDS: 3D Plant Design System
SPPID: Smart Plant P&ID
SPEL: Smart Plant Electrical
SPI: Smart Plant Instrumentation
10
Company tools: Smart Plant Design Platform
3D PDS - 3D Plant Design System
PDS is a comprehensive, intelligent computer-aided engineering
application for plant design, construction, and operations.
It helps in delivering the best design in the most efficient way, and
reducing the total plant installed cost
Three-dimensional modeling helps designers creating a better and
clash-free design
Dynamic walkthroughs allow operations and maintenance
personnel to interactively view the
plant before it is constructed
Interference checking reduces or eliminates field rework
Accurate material take-offs cut costs
11
Company tools: Smart Plant Design Platform
SPPID - Smart Plant P&ID
SPPID is an engineering solution that allows the creation of
“intelligent” P&IDs, by assigning design and operating process
conditions to pipelines, equipments, instruments and control
facilities
SPPID allows authomatical extraction of documents as
Equipment List, Line List, Valve List and Tie-in List
12
Company tools: Smart Plant Design Platform
SPEL - Smart Plant Electrical
SPEL is a highly fexible tool that handles large amount of
electric power system data
SPEL has comprehensive equipment datasheet templates,
schedule templates, single-line diagrams and customizable
default libraries
SPEL allows creation of datasheet of all electrical equipment,
SLDs, schematic diagrams, PCC & MCC load list, cable sizing &
termination details, cable schedules
SPEL automatically creates graphical reports based on data
provided
SPEL automatically generates MTOs for all electrical equipment
13
Company tools: Smart Plant Design Platform
SPI - Smart Plant Instrumentation
SPI is a window-based program that mantains all aspects of
instrument engineering data, using dedicated modules sharing a
common database
SPI has a complete database for all instruments
SPI allows creation of instrument index, instrument specification
sheets, calculation and sizing of control valves, instrument wiring
diagrams, loop diagrams, hook-ups
14
Most recent projects completed and on-going
ITALY:
New MHC
LOCATION:
SAUDI ARABIA:
PAP Project
Material Handling Project
Gypsum Stacking Project
LOCATION : ……
ITALY:
Cogeneration unit
LOCATION:
15
Projects under execution
TYPE OF
CONTRACTPROGRESS PLANT VALUE COUNTRY
PHOSPHORIC
ACID PLANTEPC (LSTK) 62 % 650 MMUSD Saudi Arabia
PHOSPHATE
ROCK, KAOLIN &
SILICA
MATERIAL
HANDLING
EPCM
Services19 % 71 MMUSD Saudi Arabia
GYPSUM
STACKING
SYSTEM
EPCM
Services15 % 140 MMUSD Saudi Arabia
COGENERATION
UNIT
Feasibility
Study,
Basic & Cost
Estimate
70 % 6.0 MMEUR Italy
16
Phosphoric Acid Plant (PAP)
17
Customer
Ma’aden exploration programs outlined mine promising deposit
areas in the region of Al Jalamid (Northern Region of KSA)
The phosphate rock will be transported by rail after treatment
(beneficiation) to a fertilizer complex at Ras Az Zawr on the
East cost, for conversion into Diammonium Phosphate fertilizer
(for export)
18
Site location
Al Jawf
Hail
Buraidah Hofuf
Riyadh
Dammam
Jubail
Az Zabirah
Al Jalamid
Jeddah
Ras Az Zawr
Mineral City
Al Qurayyat
Planned area 82 Sq. Km
(approx.)
New Railway Line
Future Railway Line Existing Railway Line
19
Chemical complex
Overall site, 4 main plants at Ras Az Zawr:
The Sulphuric Acid Plant (SAP) will receive solid sulphur (rocks)
and convert it into H2SO4
The Phosphoric Acid Plant (PAP) will receive H2SO4 and phosphate
rock and convert it into 48% H3PO4
The Ammonia Plant will receive, in parallel, natural gas and convert
it into NH3
The Diammonium Phosphate Plant (DAP) will receive ammonia
and 48% H3PO4 and convert it into granular Diammonium Phosphate
for export
20
Litwin Involvement:
• A Capture Team was created in early January 2006 to gather the rightcompetencies:
» …… Italia for Project Management
» High Tech Solutions Inc. (HTS) for process services
» ……. as Consortium Partner for erection/ construction works
» ……. KSA was started-up to manage local aspects
• ……. was awarded with the Contract on July 2006:» Phase 1, pre basic for 4.8 MUS$ LS
» Phase 2 with profit LS and draft Terms & Conditions
• Phase 1 from 1st August 2006 to end May 2007:» Open Book Estimate
» Cost saving exercise to cut costs (3 months)
• Phase 2 started on 1st June 2007:» Job started with Letter of Intent
» Contract finalized a month later
21
Project description:
Largest phosphoric acid plant worldwide
Project value and capacity:
US$ 525 Millions
Production output:
1.5 Mtons/year Fertilizer Grade Phosphoric Acid
Client: Ma’aden
Award date: 19th July 2006
Time schedule: 36 months
Type of contract: LSTK EPC
Engineering Man-hours: 550.000 mh
22
Project Description
Single Stage Hemi-Hydrate Process (YARA Licensor)
1. Plant Capacity
a. Reaction and Filtration
PAP consists of three identical production units
Each Unit has been designed to produce 1460 MTPD 100% P2O5
b. Concentration
Four identical concentration lines
Each line has a capacity of 1460 MTPD with produced acid
concentration 48% P2O5
23
Project Description (cont.)Single Stage Hemi-Hydrate Process (YARA Licensor)
2. Plant Details
The PAP Plant consists of the following unit operation Systems:
Kaolin / Silica
Phosphate Handling
Reaction and Slurry cooling
Filtration
Scrubbing
Acid concentration
40% and 48% Acid Product Storages
Cooling Towers
HH Gypsum Disposal
3. Other Sections
The Other Sections of the Plant include Facilities, such as Control
Room, Administration Building, Laboratory, Electrical Substations
24
PAP plot plan
Train 1 Train 3Train 2
2. Concentration Section
1. Reaction & Filtration Section
3. Cooling Water 4. Electrical Sub. & Buildings
25
3-D Plant modelling 1
26
3-D Plant modelling 2