SARENS NOTHING TOO HEAVY, NOTHING TOO HIGH

Presentación de PowerPoint - Sarens€¦ · ring and machinery deck ring and machinery deck • 64 steel mats • double rail beam • 40 counterweight containers • room for 8

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Presentación de PowerPoint - Sarens€¦ · ring and machinery deck ring and machinery deck • 64 steel mats • double rail beam • 40 counterweight containers • room for 8

SARENSNOTHING TOO HEAVY, NOTHING TOO HIGH

Page 2: Presentación de PowerPoint - Sarens€¦ · ring and machinery deck ring and machinery deck • 64 steel mats • double rail beam • 40 counterweight containers • room for 8

SGC-140NEXT STEP IN SGC FAMILY

Page 3: Presentación de PowerPoint - Sarens€¦ · ring and machinery deck ring and machinery deck • 64 steel mats • double rail beam • 40 counterweight containers • room for 8

A TRUE GIANT

HOW BIG IS IT?

44M

4000T COUNTERWEIGHT

2820T

LIFTING CAPACITY @ 50M

Page 4: Presentación de PowerPoint - Sarens€¦ · ring and machinery deck ring and machinery deck • 64 steel mats • double rail beam • 40 counterweight containers • room for 8

RING AND MACHINERY DECK

RING AND MACHINERY DECK

• 64 STEEL MATS

• DOUBLE RAIL BEAM

• 40 COUNTERWEIGHT CONTAINERS

• ROOM FOR 8 WINCHES

• 64 FRONT WHEELS, 32 REAR WHEELS

• 6 POWER PACK UNITS, ELECTRICAL

CONTAINER AND OPERATOR CABIN

Page 5: Presentación de PowerPoint - Sarens€¦ · ring and machinery deck ring and machinery deck • 64 steel mats • double rail beam • 40 counterweight containers • room for 8

BOOM AND MAST

BOOM AND MAST

• BOOM 515 TON - 130M

• MAST 250 TON – 60M

• COUNTERWEIGHT STRUT 110 TON – 51M

Page 6: Presentación de PowerPoint - Sarens€¦ · ring and machinery deck ring and machinery deck • 64 steel mats • double rail beam • 40 counterweight containers • room for 8

HOOKBLOCK

SGC-140 HOOKBLOCK

• DOUBLE RAMSHORN

• WEIGHT 102 TON

• 3200 TON SWL

Page 7: Presentación de PowerPoint - Sarens€¦ · ring and machinery deck ring and machinery deck • 64 steel mats • double rail beam • 40 counterweight containers • room for 8

WHY DID WE DESIGN IT?

New demands from our

clients meant we could not

buy new cranes to complete

the projects, so we designed

our own crane, which sets a

new standard for the

industry.

Page 8: Presentación de PowerPoint - Sarens€¦ · ring and machinery deck ring and machinery deck • 64 steel mats • double rail beam • 40 counterweight containers • room for 8

CAPACITY

COMPARISON OF THE CC 8800-1, SGC-120 AND SGC-

140 WITH THE SAME BOOM LENGTH

2820

700

0

500

1000

1500

2000

2500

3000

15 35 55 75 95 115

CC 8800-1

SGC-120

SGC-140

45 %STRONGER

THAN SGC-120

@120M

Page 9: Presentación de PowerPoint - Sarens€¦ · ring and machinery deck ring and machinery deck • 64 steel mats • double rail beam • 40 counterweight containers • room for 8

BOOM CONFIGURATIONS

3 DIFFERENT BOOM CONFIGURATIONS

89 METER 118 METER 130 METER

Page 10: Presentación de PowerPoint - Sarens€¦ · ring and machinery deck ring and machinery deck • 64 steel mats • double rail beam • 40 counterweight containers • room for 8

JIB CONFIGURATIONS

4 DIFFERENT JIB CONFIGURATIONS

• 40,5 METER

• 64,1 METER

• 87,7 METER

• 99,5 METER

130M BOOM + 99,5M JIB

Page 11: Presentación de PowerPoint - Sarens€¦ · ring and machinery deck ring and machinery deck • 64 steel mats • double rail beam • 40 counterweight containers • room for 8

UPGRADES IN THE SGC-140

IMPROVEMENTS

• 4000T EXTRA COUNTERWEIGHT

• REINFORCED BOOM AND MAST

• UPGRADED BOOM HOIST

• IMPROVED WINCHES AND POWER PACK UNITS

• NEW RAIL AND BOGIE DESIGN

Page 12: Presentación de PowerPoint - Sarens€¦ · ring and machinery deck ring and machinery deck • 64 steel mats • double rail beam • 40 counterweight containers • room for 8

BUILDING THE CRANE

FULL ASSEMBLY IN 6 WEEKS

• STEEL MATS AND RAILS ARE

PLACED IN CIRCLE

• BOGIES AND MACHINERY DECK IS

ASSEMBLED ON THE RAIL

• WINCHES AND POWER PACKS ARE

PLACED ON MACHINERY DECK

• MAST IS ERECTED WITH TWO

CRANES, ONE SIDE AT THE TIME

Page 13: Presentación de PowerPoint - Sarens€¦ · ring and machinery deck ring and machinery deck • 64 steel mats • double rail beam • 40 counterweight containers • room for 8

BUILDING THE CRANE

• COUNTERWEIGHT CONTAINERS

ARE STACKED

• BOOM IS CONNECTED TO MAIN

HINGE POINT

• BOOM HOIST WINCHES ARE

CONNECTED

• BOOM IS ERECTED WITH BOOM

HOIST WINCHES

Page 14: Presentación de PowerPoint - Sarens€¦ · ring and machinery deck ring and machinery deck • 64 steel mats • double rail beam • 40 counterweight containers • room for 8

WINCHES

ZOLLERN ZHP 4.36

MAIN HOIST WINCH

• 4 MAIN HOIST WINCHES :

• 40 TONS

• 50MM ROPE

• LENGTH 1300M

• 2 BOOM HOIST WINCHES :

• 40 TONS

• 50MM ROPE

• LENGTH 2100M

• MAX LINE PULL – 600 KN

Page 15: Presentación de PowerPoint - Sarens€¦ · ring and machinery deck ring and machinery deck • 64 steel mats • double rail beam • 40 counterweight containers • room for 8

POWER PACK UNITS (PPU)

POWER PACK UNIT

• SIX POWER PACKS

• TWO ENGINES PER PPU

• 260KW CATERPILLAR ENGINES

• POWER PACK WITH COLD TEMP

PACKAGE

• TIER4 COMPLIANT

• MAX 84 DB(A)

Page 16: Presentación de PowerPoint - Sarens€¦ · ring and machinery deck ring and machinery deck • 64 steel mats • double rail beam • 40 counterweight containers • room for 8

OPERATING CONDITIONS

WIND SPEEDS

• IN-SERVICE 22,4 M/S

• OUT-OF-SERVICE 56 M/S

GROUND PREPARATION :

• MAX. GROUND PRESSURE 25 T/M2

Page 17: Presentación de PowerPoint - Sarens€¦ · ring and machinery deck ring and machinery deck • 64 steel mats • double rail beam • 40 counterweight containers • room for 8

SAFETY

HOIST AND SLEWING CONTROL SYSTEM WITH PERFORMANCE LEVEL E

• FULL REDUNDANCY

• SAFETY PLC

• ONLY HIGHEST QUALITY COMPONENTS

• EN13000 COMPLIANT BUT ALL TEST AT 125% (DYNAMIC & STATIC)

Page 18: Presentación de PowerPoint - Sarens€¦ · ring and machinery deck ring and machinery deck • 64 steel mats • double rail beam • 40 counterweight containers • room for 8

SAFETY

CONTROL SYSTEM

• FULL REDUNDANCY

• SAFETY PLC

• ONLY HIGHEST QUALITY COMPONENTS

HIGHEST PERFORMANCE LEVEL (PLE)

Page 19: Presentación de PowerPoint - Sarens€¦ · ring and machinery deck ring and machinery deck • 64 steel mats • double rail beam • 40 counterweight containers • room for 8

CARL SARENS

TECHNICAL SOLUTIONS & ENGINEERING

DIRECTOR

AUTOWEG 10, 1861 WOLVERTEM - BELGIUM

[email protected]

+32 477 319 322

WWW.SARENS.COM