1
Tunneling technologies
for construction of underpass
beneath railway or road intersection
in Japan
Yukinori KOYAMA
Purpose of construction of underpass
beneath railway or road intersection
Decrease of (1) Traffic jam
(2) Traffic accidents
(3) Carbon dioxide emission
2
Replacing Manners to two-level crossing
(1)Overpass (2) Underpass
Overpass → the worse of a town view
→ long approach section
to the crossing
(in the case of road over railway)
Most selection : Underpass manner
Requirement for construction method
of underpass
(1) shallow level of formation of underpass
→ rectangular tunnel section
→ small thickness of overburden
(2) little disturbance of operation of railway
→ most construction methods
= tunneling methods
3
Tunneling methods for construction
of underpass in Japan
1.Box section tunnel structure jacking methods
(1) Front Jacking Method
(2) R & C Method
(3) SFT Method
(4) ESA Method
2. Structure elements jacking methods constructing through girder type tunnel
(1) URT Method
(2) PCR Method
3. Structure elements jacking methods constructing rigid frame box section
tunnel
(1) URT Method (Pre-stress)
(2) HEP & JES Method
4.EPB shield tunneling methods
(1) Harmonica Method
(2) URUP Method
Tunneling methods for construction
of underpass in Japan
1.Box section tunnel structure jacking methods
(1) Front Jacking Method
(2) R & C Method
(3) SFT Method
(4) ESA Method
2. Structure elements jacking methods constructing through girder type tunnel
(1) URT Method
(2) PCR Method
3. Structure elements jacking methods constructing rigid frame box section
tunnel
(1) URT Method (Pre-stress)
(2) HEP & JES Method
4.EPB shield tunneling methods
(1) Harmonica Method
(2) URUP Method
4
Tunneling methods for construction
of underpass in Japan
1.Box section tunnel structure jacking methods
(1) Front Jacking Method
(2) R & C Method
(3) SFT Method
(4) ESA Method
2. Structure elements jacking methods constructing through girder type tunnel
(1) URT Method
(2) PCR Method
3. Structure elements jacking methods constructing rigid frame box section
tunnel
(1) URT Method (Pre-stress)
(2) HEP & JES Method
4.EPB shield tunneling methods
(1) Harmonica Method
(2) URUP Method (Underpass Technical Association)
FRONT JACKING Method
(Underpass Technical Association)
1.Pipes jacking for ground stability
2.Boring holes and excavating pilot tunnels
3.Producting RC box structures
4.Preparating traction of box structures
Traction jack
Hood
Pipe roof
5
FRONT JACKING Method
(Underpass Technical Association)
5.Excavating ground at tunnel face
6.Pulling No.1 box structure by traction jacks
7.Pulling No.2 box structure by traction jacks
8.Docking two box structures
9.Casting concrete in space between two box structures
Tunneling methods for construction
of underpass in Japan
1.Box section tunnel structure jacking methods
(1) Front Jacking Method
(2) R & C Method
(3) SFT Method
(4) ESA Method
2. Structure elements jacking methods constructing through girder type tunnel
(1) URT Method
(2) PCR Method
3. Structure elements jacking methods constructing rigid frame box section
tunnel
(1) URT Method (Pre-stress)
(2) HEP & JES Method
4.EPB shield tunneling methods
(1) Harmonica Method
(2) URUP Method
6
Tunneling methods for construction
of underpass in Japan
1.Box section tunnel structure jacking methods
(1) Front Jacking Method
(2) R & C Method
(3) SFT Method
(4) ESA Method
2. Structure elements jacking methods constructing through girder type tunnel
(1) URT Method
(2) PCR Method
3. Structure elements jacking methods constructing rigid frame box section
tunnel
(1) URT Method (Pre-stress)
(2) HEP & JES Method
4.EPB shield tunneling methods
(1) Harmonica Method
(2) URUP Method
Endless Self Advancing Method
ESA Method
(Underpass Technical Association)
Driving jack Anchor device for
PC steel wire PC steel wire Traction jack
No.1
box
No.2
box
No.3
box
Hood
7
Tunneling methods for construction
of underpass in Japan
1.Box section tunnel structure jacking methods
(1) Front Jacking Method
(2) R & C Method
(3) SFT Method
(4) ESA Method
2. Structure elements jacking methods constructing through girder type tunnel
(1) URT Method
(2) PCR Method
3. Structure elements jacking methods constructing rigid frame box section
tunnel
(1) URT Method (Pre-stress)
(2) HEP & JES Method
4.EPB shield tunneling methods
(1) Harmonica Method
(2) URUP Method
Tunneling methods for construction
of underpass in Japan
1.Box section tunnel structure jacking methods
(1) Front Jacking Method
(2) R & C Method
(3) SFT Method
(4) ESA Method
2. Structure elements jacking methods constructing through girder type tunnel
(1) URT Method
(2) PCR Method
3. Structure elements jacking methods constructing rigid frame box section
tunnel
(1) URT Method (Pre-stress)
(2) HEP & JES Method
4.EPB shield tunneling methods
(1) Harmonica Method
(2) URUP Method
Under Railway Tunneling Method
(URT Association)
8
URT Method (Through girder)
(URT Association) (URT Association)
URT Method (Through girder)
9
URT Method (Through girder)
(URT Association)
1.Jacking structure elements
2.Casting concrete in elements
3.Producting main through girders
4.Excavating
Tunneling methods for construction
of underpass in Japan
1.Box section tunnel structure jacking methods
(1) Front Jacking Method
(2) R & C Method
(3) SFT Method
(4) ESA Method
2. Structure elements jacking methods constructing through girder type tunnel
(1) URT Method
(2) PCR Method
3. Structure elements jacking methods constructing rigid frame box section
tunnel
(1) URT Method (Pre-stress)
(2) HEP & JES Method
4.EPB shield tunneling methods
(1) Harmonica Method
(2) URUP Method
Pre-stressed Concrete Roof Method
10
PCR Method (Through girder)
(URT Association)
Tunneling methods for construction
of underpass in Japan
1.Box section tunnel structure jacking methods
(1) Front Jacking Method
(2) R & C Method
(3) SFT Method
(4) ESA Method
2. Structure elements jacking methods constructing through girder type tunnel
(1) URT Method
(2) PCR Method
3. Structure elements jacking methods constructing rigid frame box section
tunnel
(1) URT Method (Pre-stress)
(2) HEP & JES Method
4.EPB shield tunneling methods
(1) Harmonica Method
(2) URUP Method
11
Tunneling methods for construction
of underpass in Japan
1.Box section tunnel structure jacking methods
(1) Front Jacking Method
(2) R & C Method
(3) SFT Method
(4) ESA Method
2. Structure elements jacking methods constructing through girder type tunnel
(1) URT Method
(2) PCR Method
3. Structure elements jacking methods constructing rigid frame box section
tunnel
(1) URT Method (Pre-stress)
(2) HEP & JES Method
4.EPB shield tunneling methods
(1) Harmonica Method
(2) URUP Method
Roof and Culvert Method
(Underpass Technical Association)
Box-shaped
pipe roof
Friction cut plate
Hood Front Jacks
R & C Method
(Underpass Technical Association)
1.Pipes(box section) jacking for ground stability
Friction cut plate
Pipe (box section)
2.Producting RC box structures
3.Preparating thrust of box structures
12
R & C Method
(Underpass Technical Association)
4. Excavating ground at tunnel face
5.Pushing No.1 box structure with pipes by thrust
6.Removing pipes in arriving shaft
Removing pipes
7.Finshing excavation and push
8.Sealing joint
Tunneling methods for construction
of underpass in Japan
1.Box section tunnel structure jacking methods
(1) Front Jacking Method
(2) R & C Method
(3) SFT Method
(4) ESA Method
2. Structure elements jacking methods constructing through girder type tunnel
(1) URT Method
(2) PCR Method
3. Structure elements jacking methods constructing rigid frame box section
tunnel
(1) URT Method (Pre-stress)
(2) HEP & JES Method
4.EPB shield tunneling methods
(1) Harmonica Method
(2) URUP Method
13
Element of upper slab
Element of side wall
Element of lower slab
PC steel wire Element for
pre-stressing
operation
URT Method (Pre-stress)
(URT Association)
Tunneling methods for construction
of underpass in Japan
1.Box section tunnel structure jacking methods
(1) Front Jacking Method
(2) R & C Method
(3) SFT Method
(4) ESA Method
2. Structure elements jacking methods constructing through girder type tunnel
(1) URT Method
(2) PCR Method
3. Structure elements jacking methods constructing rigid frame box section
tunnel
(1) URT Method (Pre-stress )
(2) HEP & JES Method
4.EPB shield tunneling methods
(1) Harmonica Method
(2) URUP Method
14
Tunneling methods for construction
of underpass in Japan
1.Box section tunnel structure jacking methods
(1) Front Jacking Method
(2) R & C Method
(3) SFT Method
(4) ESA Method
2. Structure elements jacking methods constructing through girder type tunnel
(1) URT Method
(2) PCR Method
3. Structure elements jacking methods constructing rigid frame box section
tunnel
(1) URT Method (Pre-stress)
(2) HEP & JES Method
4.EPB shield tunneling methods
(1) Harmonica Method
(2) URUP Method
High Speed Element Pull Method
and Jointed Element Structure
(JR East Structure)
(JR East Consultants Company)
HEP & JES Method
(JR East Consultants Company)
Joint of JES
HEP mothod
15
HEP & JES Method
(JR East Consultants Company)
Shaft excavating
1)Shaft excavating 2)Horizontal boring
Tunneling methods for construction
of underpass in Japan
1.Box section tunnel structure jacking methods
(1) Front Jacking Method
(2) R & C Method
(3) SFT Method
(4) ESA Method
2. Structure elements jacking methods constructing through girder type tunnel
(1) URT Method
(2) PCR Method
3. Structure elements jacking methods constructing rigid frame box section
tunnel
(1) URT Method (Pre-stress)
(2) HEP & JES Method
4.EPB shield tunneling methods
(1) Harmonica Method
(2) URUP Method
16
Tunneling methods for construction
of underpass in Japan
1.Box section tunnel structure jacking methods
(1) Front Jacking Method
(2) R & C Method
(3) SFT Method
(4) ESA Method
2. Structure elements jacking methods constructing through girder type tunnel
(1) URT Method
(2) PCR Method
3. Structure elements jacking methods constructing rigid frame box section
tunnel
(1) URT Method (Pre-stress)
(2) HEP & JES Method
4.EPB shield tunneling methods
(1) Harmonica Method
(2) URUP Method
Simple and Face-less Method Construction Tunnel
(Underpass Technical Association)
Box-shaped
pipe roof
Friction
cut plate
Soil
Tunnel structure Earth retaining wall
SFT Method
(Underpass Technical Association)
1.Pipes(box section) jacking for ground stability
2.Producting RC box structures
3.Pushing No.1 box structure with pipes and soil by thrust
4.Excavating soil and removing pipes in arriving shaft
Friction cut plate
17
SFT Method
(Underpass Technical Association)
5.Producting No.2 box structure
6.Pushing No.1 and No.2 box structure with pipes and soil by thrust
7.Excavating soil and removing pipes in arriving shaft
8.Finshing excavation and push
9.Sealing joint
Tunneling methods for construction
of underpass in Japan
1.Box section tunnel structure jacking methods
(1) Front Jacking Method
(2) R & C Method
(3) SFT Method
(4) ESA Method
2. Structure elements jacking methods constructing through girder type tunnel
(1) URT Method
(2) PCR Method
3. Structure elements jacking methods constructing rigid frame box section
tunnel
(1) URT Method (Pre-stress)
(2) HEP & JES Method
4.EPB shield tunneling methods
(1) Harmonica Method
(2) URUP Method
18
Tunneling methods for construction
of underpass in Japan
1.Box section tunnel structure jacking methods
(1) Front Jacking Method
(2) R & C Method
(3) SFT Method
(4) ESA Method
2. Structure elements jacking methods constructing through girder type tunnel
(1) URT Method
(2) PCR Method
3. Structure elements jacking methods constructing rigid frame box section
tunnel
(1) URT Method (Pre-stress)
(2) HEP & JES Method
4.EPB shield tunneling methods
(1) Harmonica Method
(2) URUP Method
Tunneling methods for construction
of underpass in Japan
1.Box section tunnel structure jacking methods
(1) Front Jacking Method
(2) R & C Method
(3) SFT Method
(4) ESA Method
2. Structure elements jacking methods constructing through girder type tunnel
(1) URT Method
(2) PCR Method
3. Structure elements jacking methods constructing rigid frame box section
tunnel
(1) URT Method (Pre-stress)
(2) HEP & JES Method
4.EPB shield tunneling methods
(1) Harmonica Method
(2) URUP Method
19
Harmonica Method
(Taisei Corp.)
Harmonica Method
(Taisei Corp.)
20
Tunneling methods for construction
of underpass in Japan
1.Box section tunnel structure jacking methods
(1) Front Jacking Method
(2) R & C Method
(3) SFT Method
(4) ESA Method
2. Structure elements jacking methods constructing through girder type tunnel
(1) URT Method
(2) PCR Method
3. Structure elements jacking methods constructing rigid frame box section
tunnel
(1) URT Method (Pre-stress)
(2) HEP & JES Method
4.EPB shield tunneling methods
(1) Harmonica Method
(2) URUP Method
Tunneling methods for construction
of underpass in Japan
1.Box section tunnel structure jacking methods
(1) Front Jacking Method
(2) R & C Method
(3) SFT Method
(4) ESA Method
2. Structure elements jacking methods constructing through girder type tunnel
(1) URT Method
(2) PCR Method
3. Structure elements jacking methods constructing rigid frame box section
tunnel
(1) URT Method (Pre-stress)
(2) HEP & JES Method
4.EPB shield tunneling methods
(1) Harmonica Method
(2) URUP Method Ultra Rapid Under Pass Method
21
Arrival at
ground level Intersection
Side cutter
Launch from
ground level
Tunneling in
small depth
URUP Method
(Obayashi Corp.)
Thank you for your kind attention