PRES Shuttle Operations

Embed Size (px)

Citation preview

  • 7/30/2019 PRES Shuttle Operations

    1/47

    Kennedy Space Center

    Shuttle Operations Team

    New Employee Orientation Training

    KLASS

  • 7/30/2019 PRES Shuttle Operations

    2/47

    KSC Home to Shuttle

    Space Shuttles Call Kennedy Space Center Home

    http://www-pao.ksc.nasa.gov/kscpao/videos/metafiles/ksc_112304_shuttle_home.ram
  • 7/30/2019 PRES Shuttle Operations

    3/47

    Be familiar with other Shuttle operations:

    Ferry Flight Operations

    and Constraints

    Guppy Operations

    NASA Marine Operations

    Understand Shuttle launch operations

    and launch-related requests

    Todays Objectives

  • 7/30/2019 PRES Shuttle Operations

    4/47

    KSC Operations

    Guppy Flights

    Pad OperationsSegment Moves

    Rollover (OPF - VAB)

    Rollout/back (VAB - Pad)

    Ships

    SRB Recovery

    ET Barge Operations

    Payload Lift

    RSS Retract

    Tanking

    Crew Ingress

    Launch--User Constraints

    Landing

    RTLS

    End of Mission

    Ferry Flight

    Post Landing Operations

    Mate / Demate

    Roll

  • 7/30/2019 PRES Shuttle Operations

    5/47

    Guppy Flights

  • 7/30/2019 PRES Shuttle Operations

    6/47

    Solid Rocket Booster Segment Arrival

  • 7/30/2019 PRES Shuttle Operations

    7/47

    SRB Segment Move Constraints:

    (1-hour forecast) LTG within 5NM

    Forecast LTG within 5 NM > 25%

    Wind > 34 Kts steady-state, peak 52 Kts

    Solid Rocket Booster Segment Move

  • 7/30/2019 PRES Shuttle Operations

    8/47

    ET Barge Operations Concerns:

    Seas > 8 ft - Possible damage to ET barge

    Wind forecast > 15 Kts for barge transfer from

    Port Canaveral to KSC via Banana River

    External Tank Barge Ops

  • 7/30/2019 PRES Shuttle Operations

    9/47

    ET Barge Ops

  • 7/30/2019 PRES Shuttle Operations

    10/47

    Stack ET in VAB

  • 7/30/2019 PRES Shuttle Operations

    11/47

    Transport Constraints:

    Pad Wind > 34 Kts sustained

    LTG within 5NM

    Payload Transport and Lifting Ops

  • 7/30/2019 PRES Shuttle Operations

    12/47

    Lift Constraints:

    Pad Wind > 17 Kts steady-state, Peak 26 kts @ 60

    level

    LTG within 5NM

    Payload Lift Ops

  • 7/30/2019 PRES Shuttle Operations

    13/47

    Rollover Constraints:

    (2 - hour forecast)

    LTG within 5NM

    Temp < 36F

    Any Precip

    On transporter: Wind > 30 Kts Peak On landing gear: Wind > 42 P 64 Kts

    Rollover

    R ll /R llb k

  • 7/30/2019 PRES Shuttle Operations

    14/47

    Rollout/back Constraints:

    (12 - hour forecast) LTG within 20 NM

    Forecast LTG within 20NM > 10%

    Wind 40 P 60Kts

    Rollout /Rollback

    R ll t / R llb k

  • 7/30/2019 PRES Shuttle Operations

    15/47

    Rollout / Rollback

    P d O ti

  • 7/30/2019 PRES Shuttle Operations

    16/47

    Pad Ops Constraints:Generally

    (Shuttle not necessarily on pad)

    LTG within 5NM

    Wind>17Kts (many thresholds)

    Heavy Precipitation

    Hail--any Cold Temperatures

    Severe Weather

    Weather Constraints covered by

    45 WS wx warnings/advisories

    Pad Operations

    H i

  • 7/30/2019 PRES Shuttle Operations

    17/47

    Hurricanes

    Rollback!

  • 7/30/2019 PRES Shuttle Operations

    18/47

    Rollback!

    Pre Launch Ops

  • 7/30/2019 PRES Shuttle Operations

    19/47

    Pre-Launch Ops

    Crew Ingress TCDT

  • 7/30/2019 PRES Shuttle Operations

    20/47

    Terminal Countdown Demonstration Test

    Crew Ingress TCDT

    Barge Move

  • 7/30/2019 PRES Shuttle Operations

    21/47

    Barge Move

    SRB Recovery Ships

  • 7/30/2019 PRES Shuttle Operations

    22/47

    Depart ~24 Hours Before Launch

    SRB Recovery Ships

    Rotating Service Structure Retract

  • 7/30/2019 PRES Shuttle Operations

    23/47

    RSS Retract Constraints (1 hr forecast):

    Pad wind > 40 kts steady-state @ 60' level

    LTG within 5NM

    Forecast LTG within 5NM > 20%

    Heavy Rain (worker safety issue)

    Potential Severe Wx or any hail

    Orbiter exposed--Orbiter, tiles, or ET could be

    damaged

    Rotating Service Structure Retract

    Tanking

  • 7/30/2019 PRES Shuttle Operations

    24/47

    Tanking Constraints:Pad Wind > 42 Kts @ 60 level

    LTG within 5NM

    24 hr average temp < 41F

    Tanking

    Patrick AFB Forecaster

  • 7/30/2019 PRES Shuttle Operations

    25/47

    Provides weather support to rescue aircrews supporting Shuttle launch

    Patrick AFB Forecaster

    Crew Ingress

  • 7/30/2019 PRES Shuttle Operations

    26/47

    Launch

    Crew Ingress Constraints

    No Ltg within 5NM

    g

    NASA T-38

  • 7/30/2019 PRES Shuttle Operations

    27/47

    Monitors Padand SLF

    ~L - 3:00

    Shuttle Training Aircraft

  • 7/30/2019 PRES Shuttle Operations

    28/47

    ~L - 1:40

    g

    Ice Team

  • 7/30/2019 PRES Shuttle Operations

    29/47

    Ice on ET

    L-3, 2, 1 Day Forecasts (LWO)

    Ice Team performs inspection of ET after

    tanking

    Shuttle Ceiling Constraints

  • 7/30/2019 PRES Shuttle Operations

    30/47

    5,000 ft

    4,000 ft

    6,000 ft

    8,000 ft

    7,000 ft

    RTLS (SLF)

    < 500 ft

    Thick

    > 500 ft

    Thick

    Launch (PAD)GO

    Conditional

    NO GO

    Shuttle Precipitation Rule

  • 7/30/2019 PRES Shuttle Operations

    31/47

    DO NOT launch if precipitation

    (visible rain, virga, or minimum

    discernible weather radar echo)exists in the flight path.

    OK

    Shuttle Temperature Rules

  • 7/30/2019 PRES Shuttle Operations

    32/47

    VALUES IN TABLE ARE RELATIVE HUMIDITY IN %

    Key:

    Green - i.e., no violation

    Conditional - i.e., Green or Red depending upon relative humidity

    Red - i.e., violation of minimum air temp criteria

    48 47 46 45 44 43 42 41 40 39 38 37 36

    0 to 1 2 3 4

    5-7 8-14

    Ambient Air Temp, Deg F

    Sustained

    Wind Speed

    (Kts)

    Shuttle Pad Wind Constraints

  • 7/30/2019 PRES Shuttle Operations

    33/47

    DO NOT launch if peak winds exceed wind criteria listed in

    NSTS 16007

    Criteria determined by SSMEs:

    - One or More Block II SSMEs

    vs.

    Three Non-Block II SSMEs

    - Pad Peak Wind Speed range: 24 - 34 knots,

    depending upon wind direction

    Launch!

  • 7/30/2019 PRES Shuttle Operations

    34/47

    SRB Recovery Ops

  • 7/30/2019 PRES Shuttle Operations

    35/47

    SRB Recovery Concerns

    Seas > 10 ft

    (@ 10 ft seas recovery forces crew into

    survival mode)

    Steady-state wind forecast > 26 Kts(higher probability of booster damage upon

    impact)

    SRB Recovery

    SRB Recovery Ops

    http://localhost/var/www/apps/conversion/tmp/scratch_10//p423fp2/45ws/TRAINING/(4)http://localhost/var/www/apps/conversion/tmp/scratch_10//p423fp2/45ws/TRAINING/(4)
  • 7/30/2019 PRES Shuttle Operations

    36/47

    External Tank

  • 7/30/2019 PRES Shuttle Operations

    37/47

    Not recovered

    On-Orbit

  • 7/30/2019 PRES Shuttle Operations

    38/47

    SMG provides daily forecasts for KSC, EDW, NOR

    Landing

  • 7/30/2019 PRES Shuttle Operations

    39/47

    SMG=Spaceflight Meteorology Group

    FD = Flight Director

    TD = Touch down

    hrs = hours

    LWO = Launch Weather Officer

    SMG provides continuous Wx

    updates until landing

    45 WS LWO supports SMG and

    provides LD updates for post-landing preparation

    Post Flight Ops

  • 7/30/2019 PRES Shuttle Operations

    40/47

    Post-Flight Processing Constraints:

    (1 hour desired lead time)

    Lightning within 5NM

    Surface winds > 40 P 60 Kts

    Hail, Any Size

    Any precip

    Ferry Flight Ops

  • 7/30/2019 PRES Shuttle Operations

    41/47

    This Could Be You!!

  • 7/30/2019 PRES Shuttle Operations

    42/47

    Mate / Demate Ops

  • 7/30/2019 PRES Shuttle Operations

    43/47

    Pathfinder

  • 7/30/2019 PRES Shuttle Operations

    44/47

    Here we go again!

  • 7/30/2019 PRES Shuttle Operations

    45/47

    Rolling shuttle in after landing while rolling out the next mission!

    Terminology/Acronyms

  • 7/30/2019 PRES Shuttle Operations

    46/47

    Flight Director

    Touch Down

    Hours

    Launch Weather Officer

    Space Flight Meteorology Group at

    Johnson Space Center in Houston, Tex

    Edwards

    Air Force Base

    Space Station Processing Facility

    Rotation Processing & Surge Facility

    FD -

    TD -

    HRS -

    LWO -

    SMG -

    EDW-

    AFB-

    SSPF -

    RPSF -

    Terminology Acronyms

  • 7/30/2019 PRES Shuttle Operations

    47/47

    Space Meteorology GroupAuxiliary Power Unit

    Nautical Miles

    LightingWeather

    National Hurricane Center

    Orbiter Weather Protection

    SMG -APU -

    NM -

    LTG-

    WX-

    NHC -

    OWP -