63
Prequalification Document Brimaxx Creative February 2010

Prequalification Document - Brimaxx · PDF filePrOJeCt management Brimaxx internal project management is a carefully planned and organized effort to accomplish a success-ful implementation

Embed Size (px)

Citation preview

Page 1: Prequalification Document - Brimaxx · PDF filePrOJeCt management Brimaxx internal project management is a carefully planned and organized effort to accomplish a success-ful implementation

Prequalification DocumentBrimaxx Creative

February 2010

Page 2: Prequalification Document - Brimaxx · PDF filePrOJeCt management Brimaxx internal project management is a carefully planned and organized effort to accomplish a success-ful implementation

marketing

if the camel circus is coming to town and you paint a sign saying, „Circus is coming to Dubai.“

that’s ADVERTISING.

if you put the sign on the back of a camel and walk it through town,

that’s PROMOTION.

if the camel walks through the Sheikh’s flower bed,

that’s PUBLICITY.

if you can get the Sheikh to laugh about it,

that’s PUBLIC RELATIONS.

and, if you planned the whole thing,

that’s MARKETING!

2Brimaxx Consultancy JLt | Prequalification Document | Brimaxx Creative | Vers. 1.0 | October 2010

Page 3: Prequalification Document - Brimaxx · PDF filePrOJeCt management Brimaxx internal project management is a carefully planned and organized effort to accomplish a success-ful implementation

aBOUt US

established in 2001 in Uae, Brimaxx has come a long way. Over the past view years Brimaxx has gained its reputa-tion by creating effective industrial design solutions for hospitals, hotels, shopping malls, restaurants, universities, sports arenas and high end commercial and residential projects.From comprehensive implementations for five-star luxu-ry resorts to the most prestigious towers, Brimaxx signa-ture can be seen globally at various prime landmarks.

today Brimaxx is also well known as a corporate com-munication specialist. the company is providing from comprehensive marketing and graphic design to archi-tectural services and signage consultancy.

recently Brimaxx Consultants have added hardware con-sultancy to their portfolio. ms. katie tawil , a professional hardware consultant for the last 13 years, is heading this newly established division. She is qualified by “the guild of architectural ironmongery” and is also registered with the Door & Hardware institute, U.S.a.

to facilitate the use of global resources for all clients, Brimaxx maintains associated offices in Berlin and Da-mascus.

3Brimaxx Consultancy JLt | Prequalification Document | Brimaxx Creative | Vers. 1.0 | October 2010

Page 4: Prequalification Document - Brimaxx · PDF filePrOJeCt management Brimaxx internal project management is a carefully planned and organized effort to accomplish a success-ful implementation

PHiLOSOPHy

Our philosophy is straight forward!

there is no “out of the box” design or concept – we cus-tomize solutions according to requirements. We start with proper analysis and try to understand point of view and specific perception of the different user groups. We love to get involved in an early project stage to do proper research prior to beginning the actual concept, design and project implementation process.

Our team consists of graphic designers, industrial design-ers, architects and project managers and which seek to provide integrated solutions matching the project theme and ambience.

Being “pro active” is the Brimaxx team spirit which can be felt through out every project.

4Brimaxx Consultancy JLt | Prequalification Document | Brimaxx Creative | Vers. 1.0 | October 2010

Page 5: Prequalification Document - Brimaxx · PDF filePrOJeCt management Brimaxx internal project management is a carefully planned and organized effort to accomplish a success-ful implementation

PrOJeCt management

Brimaxx internal project management is a carefully planned and organized effort to accomplish a success-ful implementation of our customized solutions. this includes the development of project plans with goals

and objectives, as well as specifications on tasks or how goals will be achieved. We allocate resources from all our departments and associate budgets and timelines for a successful completion.

graphic Design

Production Super-vision

Cost estimation & Controlling

Quality management

tender Packages

Print Specification

Handling of Sub -contractors

Supply mgmt

Planning & administration

Project manager

Project assistant

5Brimaxx Consultancy JLt | Prequalification Document | Brimaxx Creative | Vers. 1.0 | October 2010

Page 6: Prequalification Document - Brimaxx · PDF filePrOJeCt management Brimaxx internal project management is a carefully planned and organized effort to accomplish a success-ful implementation

team memBerS

Christian BerglehnerManaging Director

ralph neumeisterQuality Manager

Hendrik WeberIndustrial Designer

andreas grafGraphic Designer

maryam moravvej CFO

nick armstrongDigital Signage

Carlo SchwaerzlerPM / Design

isabelle CabreraArchitect

mohamed alkokabaniIndustrial Designer

Veselin radovicGraphic Designer

6Brimaxx Consultancy JLt | Prequalification Document | Brimaxx Creative | Vers. 1.0 | October 2010

Page 7: Prequalification Document - Brimaxx · PDF filePrOJeCt management Brimaxx internal project management is a carefully planned and organized effort to accomplish a success-ful implementation

Brimaxx CreatiVe - POrtFOLiO

7Brimaxx Consultancy JLt | Prequalification Document | Brimaxx Creative | Vers. 1.0 | October 2010

Page 8: Prequalification Document - Brimaxx · PDF filePrOJeCt management Brimaxx internal project management is a carefully planned and organized effort to accomplish a success-ful implementation

Brimaxx CreatiVe - POrtFOLiO

8Brimaxx Consultancy JLt | Prequalification Document | Brimaxx Creative | Vers. 1.0 | October 2010

Page 9: Prequalification Document - Brimaxx · PDF filePrOJeCt management Brimaxx internal project management is a carefully planned and organized effort to accomplish a success-ful implementation

Brimaxx CreatiVe - POrtFOLiO

9Brimaxx Consultancy JLt | Prequalification Document | Brimaxx Creative | Vers. 1.0 | October 2010

Page 10: Prequalification Document - Brimaxx · PDF filePrOJeCt management Brimaxx internal project management is a carefully planned and organized effort to accomplish a success-ful implementation

Brimaxx CreatiVe - POrtFOLiO

10Brimaxx Consultancy JLt | Prequalification Document | Brimaxx Creative | Vers. 1.0 | October 2010

Page 11: Prequalification Document - Brimaxx · PDF filePrOJeCt management Brimaxx internal project management is a carefully planned and organized effort to accomplish a success-ful implementation

Brimaxx CreatiVe - POrtFOLiO

11Brimaxx Consultancy JLt | Prequalification Document | Brimaxx Creative | Vers. 1.0 | October 2010

Page 12: Prequalification Document - Brimaxx · PDF filePrOJeCt management Brimaxx internal project management is a carefully planned and organized effort to accomplish a success-ful implementation

Brimaxx CreatiVe - POrtFOLiO

12Brimaxx Consultancy JLt | Prequalification Document | Brimaxx Creative | Vers. 1.0 | October 2010

Page 13: Prequalification Document - Brimaxx · PDF filePrOJeCt management Brimaxx internal project management is a carefully planned and organized effort to accomplish a success-ful implementation

Brimaxx CreatiVe - POrtFOLiO

13Brimaxx Consultancy JLt | Prequalification Document | Brimaxx Creative | Vers. 1.0 | October 2010

Page 14: Prequalification Document - Brimaxx · PDF filePrOJeCt management Brimaxx internal project management is a carefully planned and organized effort to accomplish a success-ful implementation

Brimaxx CreatiVe - POrtFOLiO

14Brimaxx Consultancy JLt | Prequalification Document | Brimaxx Creative | Vers. 1.0 | October 2010

Page 15: Prequalification Document - Brimaxx · PDF filePrOJeCt management Brimaxx internal project management is a carefully planned and organized effort to accomplish a success-ful implementation

Brimaxx CreatiVe - POrtFOLiO

For reservations and more information, please contact 02-6564444, or [email protected]

eleb

rate

the

end

of 2

009

for A

ED 9

99*

New Year’s Eve standard

Coolest Party in Town Come & enjoy an amazing New Year’s eve at Centro Yas Island with DJ Steve Johnston from radio 2 including: Open Buffet Unlimited wine and beer A glass of champagne at midnight 1 night stay Breakfast on New Year’s day

Terms and Conditions

Dinner will be at C Taste restaurant from 7:30pm till 11:30 PMThe package is subject to availabilityAfter midnight all drinks will be chargeableLate check outBreakfast will be served in C Taste restaurant

All prices are subject to 10% service charge and 6 % tourism fee.

New Year’s Eve VIP

Cel

ebra

te th

e en

d of

200

9 fo

r AED

1800

* Enjoy this amazing event with DJ Steve Johnston (Radio 2) at the terrace of Centro Yas Island

From 11.15 PM onwards8 persons maximum per table, facing the poolInclusive of 1 bottle of champagne and 2 bottles of your choiceadditional charge of 300 AED will be applied per person for one night stay at Centro Yas Island

VIP Sofa Lounge

For reservations and more information, please contact 02-6564444, or [email protected]

All prices are subject to 10% service charge and 6 % tourism fee.

New Year’s Eve

Blue Grill steakhouse

Six Course Glamorous set menuAED 318 inclusive of a glass of champagne with the Arabian Pearls Duo live entertainment

Pool PartyEnjoy your New Years Eve at the Yas Rotana Pool with DJ Dave Cleary from radio 2 for 200 AED inclusive of one selected beverage

Y Bar

Famous resident Djs will entertain you all night longEntrance fee of AED 200 from 10:00 pm inclusive of one selected beverage

Choices international cuisine

The Fabulous New Year’s Eve Buffet

AED 298 inclusive of soft drinksAED 398 incllusive of wine and sparkling wine

Pool Party access with entrance fee is included

Rangoli modern Indian cuisine

Fabulous and elegant Five course set menu

AED 258 inclusive of a glass of champagne

Spectacular Seven course set menu

AED 385 inclusive of a glass of champagne

For reservations and more information, please contact 02-6564293, or [email protected] prices are subject to 10% service charge and 6 % tourism fee.

New Year’s Escape

Set menu dinner in Rangoli RestaurantBrunch in Choices on January 1. 2010One night stay in Yas Island Rotana

for only AED 1446

Terms & Conditions:The packages are valid for 2 persons Free access to the Pool, free access to the GymThese packages are subject to availability

New Year’s buffet in Choices RestaurantBrunch in Choices on January 1. 2010One night stay in Yas Island RotanaFree enterance to the pool party

for only AED 1726

Set menu dinner in Blue GrillBrunch in Choices on January 1. 2010One night stay in Yas Island Rotana

for only AED 1566

For reservations and more information, please contact 02-6564293, or [email protected] prices are subject to 10% service charge and 6 % tourism fee.

15Brimaxx Consultancy JLt | Prequalification Document | Brimaxx Creative | Vers. 1.0 | October 2010

Page 16: Prequalification Document - Brimaxx · PDF filePrOJeCt management Brimaxx internal project management is a carefully planned and organized effort to accomplish a success-ful implementation

Brimaxx CreatiVe - POrtFOLiO

All prices are in AED and Subject to 10% service charge and 6% tourism fees All prices are in AED and Subject to 10% service charge and 6% tourism fees

Starters

Crisp potato and cashew nut patties,sweet and sour tamarind dipping sauce

Coriander and carrot salad, caramelized vinegar and garlic sauce

Mustard citrus chutney

Onion bonda, masala chana dal, corn vada

Crisp wafers, chick peas, steamed lentil dumplings

Coated with vermicelli and sesame seeds, coconut chutney

Salads

Green chilli, lime and coriander

Chilli vinaigrette dressing

Lime and pomegranate molasses

Soups

Slightly spiced, garlic and ginger

Crab, shrimp, hammour, coconut milk, ginger, curry leaves

Tandoor

Cinnamon scented chicken tikka, garlic confit

Khatta pyaaz, minted potato chat

Spiced hammour, coriander yoghurt, caramalized spiced lemon

Lemon, garlic and ginger, mint chutney

Cottage cheese, cashew nuts, raisins

Curries

Boneless chicken pieces, tomatoes, fresh cream

Lentils, pumpkin, fresh herbs, mildly spiced sauce

Slow cooked lamb, tomatoes, onions, spinach and cumin

Braised lamb shank, plain yoghurt, saffron, aniseed

Coconut milk, tamarind, onions, turmeric and cumin

Fried with onions, tomatoes, lemon juice and yoghurt

Stir fried with, garam masala, turmeric, chilli,cinnamon and coriander and a lot more

(V) indicates vegetarian dish (V) indicates vegetarian dishAll prices are in AED and Subject to 10% service charge and 6% tourism feesAll prices are in AED and Subject to 10% service charge and 6% tourism fees

StartersStarters

Crisp potato and cashew nut patties,Crisp potato and cashew nut patties,sweet and sour tamarind dipping saucesweet and sour tamarind dipping sauce

Coriander and carrot salad, caramelized vinegar and garlic sauceCoriander and carrot salad, caramelized vinegar and garlic sauce

Mustard citrus chutneyMustard citrus chutney

Onion bonda, masala chana dal, corn vadaOnion bonda, masala chana dal, corn vada

Crisp wafers, chick peas, steamed lentil dumplingsCrisp wafers, chick peas, steamed lentil dumplings

Coated with vermicelli and sesame seeds, coconut chutneyCoated with vermicelli and sesame seeds, coconut chutney

SaladsSalads

Green chilli, lime and corianderGreen chilli, lime and coriander

Chilli vinaigrette dressingChilli vinaigrette dressing

Lime and pomegranate molassesLime and pomegranate molasses

SoupsSoups

Slightly spiced, garlic and gingerSlightly spiced, garlic and ginger

Crab, shrimp, hammour, coconut milk, ginger, curry leavesCrab, shrimp, hammour, coconut milk, ginger, curry leaves

(V) indicates vegetarian dish(V) indicates vegetarian dish

16Brimaxx Consultancy JLt | Prequalification Document | Brimaxx Creative | Vers. 1.0 | October 2010

Page 17: Prequalification Document - Brimaxx · PDF filePrOJeCt management Brimaxx internal project management is a carefully planned and organized effort to accomplish a success-ful implementation

Brimaxx CreatiVe - POrtFOLiO

17Brimaxx Consultancy JLt | Prequalification Document | Brimaxx Creative | Vers. 1.0 | October 2010

Page 18: Prequalification Document - Brimaxx · PDF filePrOJeCt management Brimaxx internal project management is a carefully planned and organized effort to accomplish a success-ful implementation

Brimaxx CreatiVe - POrtFOLiO

18Brimaxx Consultancy JLt | Prequalification Document | Brimaxx Creative | Vers. 1.0 | October 2010

Page 19: Prequalification Document - Brimaxx · PDF filePrOJeCt management Brimaxx internal project management is a carefully planned and organized effort to accomplish a success-ful implementation

Brimaxx CreatiVe - POrtFOLiO

19Brimaxx Consultancy JLt | Prequalification Document | Brimaxx Creative | Vers. 1.0 | October 2010

Page 20: Prequalification Document - Brimaxx · PDF filePrOJeCt management Brimaxx internal project management is a carefully planned and organized effort to accomplish a success-ful implementation

Brimaxx CreatiVe - POrtFOLiO

AR

T O

F C

REA

TIO

ND

esig

ned

By

Muh

anna

d Sh

. Ass

amMuhannad Sh. AssamDESIGN OF LIFE’S ARCHITECTURE

Located in Downtown Abu Dhabi, this 20 storey office building has two of its sides enclosed in a glass façade which at the top tilts towards the city. This subtle movement gives the building an unconventional appearance.

Down Town Office TowerThe Prism

Abu Dhabi, 2004

Dubai, 2005

As the name would suggest, design for this project drew inspiration from the shape of a prism. The structure’s backbone is made up of granite façade through which light shoots out to give it a very rich and contemporary feel. Through the use of dynamic triangular shapes the building denotes a sense of continuous elevation towards the sky.

2019

Muhannad Sh. Assam

Muhannad Sh. Assam believes that one never stops being a student, Inspiration is everywhere and one must keep learning and exploring. This zest for his industry, and life in general, has granted him several successes and ensured him a fulfilling life.

Born as the youngest amongst 8 siblings, into a merchantÍs family in Iraq, Muhannad had a lot of aspirations to make a difference in the way people live. Constant support and encouragement from his family ensured that he fulfilled his goals. From high school onwards, Muhannad had an innate talent for understanding spaces. Always setting the benchmark for his fellow students, he constantly surprised his renowned professors with his passion, talent and dedication.

In 1971, he enrolled in the School of Architecture in Baghdad. He still owes his successes to his professors, like Mohammed Makia, who honed his talent and added fuel to his passion. He trained during his university period at the office of Rafa’t Chaderchi, a distinguished architect with an Agha Khan Award to boast among several others.

In 1977 Muhannad graduated with distinction and right after pursued his postgraduate studies in Design of Specialised Buildings.

In 1980, Muhannad moved to UAE and since then has contributed immensely to the quality and style of life in the Middle East region. He has designed, provided guidance and overseen many projects, that have changed the perception of architecture and the way we live. His contemporary designs have also won him several design competitions. He believes that both form and function complement each other in a progressive instead of a conservative way and his creations are living proof of that.Ha has worked in several offices in the UAE, with his longest duration in Dewan Architects and Engineers (18 years) as Design Director and later as Regional Director and Director of Design. His job profile included overseeing and designing innumerous projects for prestigious and V.V.I.P clients. He was involved in the entire design process from conceptualization to execution.For Muhannad, the most rewarding thing about his career has been watching his buildings over the years and how people react to his created environments. He experiences immense satisfaction when his creation has made an inspirational environment for someone else.

Never ceasing to grow, Muhannad decided it was time to venture out of Dewan and start his own business, thus BEAD. BEAD stands for Bureau of Excellence in Architecture and Design and that is the primary vision of BEAD. He wishes to transform the Architecture Industry in UAE through BEAD. He expects of his team unwavering dedication and immense passion. He leads by example and is constantly inspiring his team to delve into extensive research, create innovative solutions, introduce new materials and have a professional outlook towards the industry as opposed to a commercial one.He hopes that BEAD would eventually link up with Universities that function as research centres, so that BEAD is constantly challenging the norms of Architecture and pushing the boundaries of design.

MuhannadÍs wife, two sons and daughter support helps contribute to his ceaseless passion for his profession. Muhannad and his wife fell in love at university while studying architecture. Therefore, architecture continues to be a common thread, a common passion between them. His wife, Yasmin, constantly encourages him to push the envelope and deliver the best.Muhannad Sh. Assam is a man of great vision and his dream for BEAD, growth in the architecture industry and personal satisfaction is being realized every day.

20Brimaxx Consultancy JLt | Prequalification Document | Brimaxx Creative | Vers. 1.0 | October 2010

Page 21: Prequalification Document - Brimaxx · PDF filePrOJeCt management Brimaxx internal project management is a carefully planned and organized effort to accomplish a success-ful implementation

Brimaxx CreatiVe - POrtFOLiO

21Brimaxx Consultancy JLt | Prequalification Document | Brimaxx Creative | Vers. 1.0 | October 2010

Page 22: Prequalification Document - Brimaxx · PDF filePrOJeCt management Brimaxx internal project management is a carefully planned and organized effort to accomplish a success-ful implementation

Brimaxx CreatiVe - POrtFOLiO

22Brimaxx Consultancy JLt | Prequalification Document | Brimaxx Creative | Vers. 1.0 | October 2010

Page 23: Prequalification Document - Brimaxx · PDF filePrOJeCt management Brimaxx internal project management is a carefully planned and organized effort to accomplish a success-ful implementation

Brimaxx CreatiVe - POrtFOLiO

23Brimaxx Consultancy JLt | Prequalification Document | Brimaxx Creative | Vers. 1.0 | October 2010

Page 24: Prequalification Document - Brimaxx · PDF filePrOJeCt management Brimaxx internal project management is a carefully planned and organized effort to accomplish a success-ful implementation

Brimaxx CreatiVe - POrtFOLiO

24Brimaxx Consultancy JLt | Prequalification Document | Brimaxx Creative | Vers. 1.0 | October 2010

Page 25: Prequalification Document - Brimaxx · PDF filePrOJeCt management Brimaxx internal project management is a carefully planned and organized effort to accomplish a success-ful implementation

Brimaxx CreatiVe - POrtFOLiO

25Brimaxx Consultancy JLt | Prequalification Document | Brimaxx Creative | Vers. 1.0 | October 2010

Page 26: Prequalification Document - Brimaxx · PDF filePrOJeCt management Brimaxx internal project management is a carefully planned and organized effort to accomplish a success-ful implementation

Brimaxx CreatiVe - POrtFOLiO

26Brimaxx Consultancy JLt | Prequalification Document | Brimaxx Creative | Vers. 1.0 | October 2010

Page 27: Prequalification Document - Brimaxx · PDF filePrOJeCt management Brimaxx internal project management is a carefully planned and organized effort to accomplish a success-ful implementation

Brimaxx CreatiVe - POrtFOLiO

[email protected]

dubaiÊmediaÊcity,shathaÊtower,Ê1303p.o.ÊboxÊ502706

+971Ê50Ê17Ê88Ê707+971ÊÊÊ4Ê36Ê94Ê633+971ÊÊÊ4Ê42Ê78Ê170Ê

VeselinÊRadovicgeneralÊmanagercreativeÊdirector

GravitasÊM

ediaÊGroupÊFZÊLLC

ÊÊÊÊÊDubaiÊM

ediaÊCity,ÊS

hathaÊTowerÊ13thÊFloor,Ê1303;ÊÊtel:Ê04Ê369Ê4633Êfax:Ê04Ê427Ê8170ÊÊÊÊoffice@

gmg-dubai.com

ÊÊÊÊÊwww.gm

g-dubai.comÊÊÊÊP.O

.ÊBox:Ê502706

GravitasÊMediaÊGroupÊFZÊLLCDubaiÊMediaÊCity,ÊShathaÊTowerÊ13thÊFloor,Ê1303

tel:Ê04Ê369Ê4633Êfax:Ê04Ê427Ê[email protected]ÊÊÊÊÊwww.gmg-dubai.com

P.O.ÊBox:Ê502706

27Brimaxx Consultancy JLt | Prequalification Document | Brimaxx Creative | Vers. 1.0 | October 2010

Page 28: Prequalification Document - Brimaxx · PDF filePrOJeCt management Brimaxx internal project management is a carefully planned and organized effort to accomplish a success-ful implementation

Brimaxx CreatiVe - POrtFOLiO

ww

w.in

sigh

tuae

.com

ww

w.in

sigh

tuae

.com

INSI

GH

T

PLU

S

28Brimaxx Consultancy JLt | Prequalification Document | Brimaxx Creative | Vers. 1.0 | October 2010

Page 29: Prequalification Document - Brimaxx · PDF filePrOJeCt management Brimaxx internal project management is a carefully planned and organized effort to accomplish a success-ful implementation

Brimaxx CreatiVe - POrtFOLiO

29Brimaxx Consultancy JLt | Prequalification Document | Brimaxx Creative | Vers. 1.0 | October 2010

Page 30: Prequalification Document - Brimaxx · PDF filePrOJeCt management Brimaxx internal project management is a carefully planned and organized effort to accomplish a success-ful implementation

Brimaxx CreatiVe - POrtFOLiO

IHG Lagos11.07.2010

PS (Pool Side)Pool Bar Logo design

B & W application

Window graphics / foiling

Individual letters

IHG Lagos11.07.2010

EkaaboAll day dining restaurantLogo design

B & W application

design elements

IHG Lagos11.07.2010

MilanoItalian RestaurantLogo design

RESTAURANT & BAR

RESTAURANT & BAR

B & W application

design elements

design elements

IHG Lagos11.07.2010

SohoChinese RestaurantLogo design

B & W application

design element

IHG Lagos11.07.2010

Lobby CafeLobby Cafe Logo design

B & W application

SOUL

SOULIHG Lagos11.07.2010

SoulLobby Bar / LoungeLogo design

B & W application

30Brimaxx Consultancy JLt | Prequalification Document | Brimaxx Creative | Vers. 1.0 | October 2010

Page 31: Prequalification Document - Brimaxx · PDF filePrOJeCt management Brimaxx internal project management is a carefully planned and organized effort to accomplish a success-ful implementation

Brimaxx CreatiVe - POrtFOLiO

31Brimaxx Consultancy JLt | Prequalification Document | Brimaxx Creative | Vers. 1.0 | October 2010

Page 32: Prequalification Document - Brimaxx · PDF filePrOJeCt management Brimaxx internal project management is a carefully planned and organized effort to accomplish a success-ful implementation

Brimaxx CreatiVe - POrtFOLiO

32Brimaxx Consultancy JLt | Prequalification Document | Brimaxx Creative | Vers. 1.0 | October 2010

Page 33: Prequalification Document - Brimaxx · PDF filePrOJeCt management Brimaxx internal project management is a carefully planned and organized effort to accomplish a success-ful implementation

Brimaxx CreatiVe - POrtFOLiO

33Brimaxx Consultancy JLt | Prequalification Document | Brimaxx Creative | Vers. 1.0 | October 2010

Page 34: Prequalification Document - Brimaxx · PDF filePrOJeCt management Brimaxx internal project management is a carefully planned and organized effort to accomplish a success-ful implementation

Brimaxx CreatiVe - POrtFOLiO

34Brimaxx Consultancy JLt | Prequalification Document | Brimaxx Creative | Vers. 1.0 | October 2010

Page 35: Prequalification Document - Brimaxx · PDF filePrOJeCt management Brimaxx internal project management is a carefully planned and organized effort to accomplish a success-ful implementation

Brimaxx CreatiVe - POrtFOLiO

35Brimaxx Consultancy JLt | Prequalification Document | Brimaxx Creative | Vers. 1.0 | October 2010

Page 36: Prequalification Document - Brimaxx · PDF filePrOJeCt management Brimaxx internal project management is a carefully planned and organized effort to accomplish a success-ful implementation

Brimaxx CreatiVe - POrtFOLiO

36Brimaxx Consultancy JLt | Prequalification Document | Brimaxx Creative | Vers. 1.0 | October 2010

Page 37: Prequalification Document - Brimaxx · PDF filePrOJeCt management Brimaxx internal project management is a carefully planned and organized effort to accomplish a success-ful implementation

Brimaxx CreatiVe - POrtFOLiO

37Brimaxx Consultancy JLt | Prequalification Document | Brimaxx Creative | Vers. 1.0 | October 2010

Page 38: Prequalification Document - Brimaxx · PDF filePrOJeCt management Brimaxx internal project management is a carefully planned and organized effort to accomplish a success-ful implementation

Brimaxx CreatiVe - POrtFOLiO

All prices are in AED and Subject to 10% service charge and 6% tourism fees

From the Bakery

Basket of Breakfast Bakeries 28Six Pieces from the Following ChoicesCroissants plain, cheese or zatar, warm rolls,Danish pastries, muffins, toast or Arabic breadWhole wheat toastServed with butter, preserves, marmalade, honey

Eggs and Omelets

Fried, Poached, Scrambled or Boiled it’s up to you! 37Turkey bacon, veal sausage, potato cake, mushrooms and grilled tomato

Three Egg Omelet 37With your choice of emmenthal cheese, smoked turkey breast, tomatoes, mushrooms, onions, chili peppers or fresh herbs

Egg White Frittata 45Goats cheese, fresh herbs,tomatoes and baby spinach

Smoked Salmon and Eggs 45Scrambled eggs, smoked salmon, chives, toasted bagel

Choices BreakfastChoices BreakfastChoices Breakfast

All prices are in AED and Subject to 10% service charge and 6% tourism fees

38Brimaxx Consultancy JLt | Prequalification Document | Brimaxx Creative | Vers. 1.0 | October 2010

Page 39: Prequalification Document - Brimaxx · PDF filePrOJeCt management Brimaxx internal project management is a carefully planned and organized effort to accomplish a success-ful implementation

Brimaxx CreatiVe - POrtFOLiO

39Brimaxx Consultancy JLt | Prequalification Document | Brimaxx Creative | Vers. 1.0 | October 2010

Page 40: Prequalification Document - Brimaxx · PDF filePrOJeCt management Brimaxx internal project management is a carefully planned and organized effort to accomplish a success-ful implementation

Brimaxx CreatiVe - POrtFOLiO

40Brimaxx Consultancy JLt | Prequalification Document | Brimaxx Creative | Vers. 1.0 | October 2010

Page 41: Prequalification Document - Brimaxx · PDF filePrOJeCt management Brimaxx internal project management is a carefully planned and organized effort to accomplish a success-ful implementation

Brimaxx CreatiVe - POrtFOLiO

41Brimaxx Consultancy JLt | Prequalification Document | Brimaxx Creative | Vers. 1.0 | October 2010

Page 42: Prequalification Document - Brimaxx · PDF filePrOJeCt management Brimaxx internal project management is a carefully planned and organized effort to accomplish a success-ful implementation

Brimaxx CreatiVe - POrtFOLiO

42Brimaxx Consultancy JLt | Prequalification Document | Brimaxx Creative | Vers. 1.0 | October 2010

Page 43: Prequalification Document - Brimaxx · PDF filePrOJeCt management Brimaxx internal project management is a carefully planned and organized effort to accomplish a success-ful implementation

Brimaxx CreatiVe - POrtFOLiO

43Brimaxx Consultancy JLt | Prequalification Document | Brimaxx Creative | Vers. 1.0 | October 2010

Page 44: Prequalification Document - Brimaxx · PDF filePrOJeCt management Brimaxx internal project management is a carefully planned and organized effort to accomplish a success-ful implementation

Brimaxx CreatiVe - POrtFOLiO

44Brimaxx Consultancy JLt | Prequalification Document | Brimaxx Creative | Vers. 1.0 | October 2010

Page 45: Prequalification Document - Brimaxx · PDF filePrOJeCt management Brimaxx internal project management is a carefully planned and organized effort to accomplish a success-ful implementation

Brimaxx CreatiVe - POrtFOLiO

45Brimaxx Consultancy JLt | Prequalification Document | Brimaxx Creative | Vers. 1.0 | October 2010

Page 46: Prequalification Document - Brimaxx · PDF filePrOJeCt management Brimaxx internal project management is a carefully planned and organized effort to accomplish a success-ful implementation

Brimaxx CreatiVe - POrtFOLiO

46Brimaxx Consultancy JLt | Prequalification Document | Brimaxx Creative | Vers. 1.0 | October 2010

Page 47: Prequalification Document - Brimaxx · PDF filePrOJeCt management Brimaxx internal project management is a carefully planned and organized effort to accomplish a success-ful implementation

Brimaxx CreatiVe - POrtFOLiO

47Brimaxx Consultancy JLt | Prequalification Document | Brimaxx Creative | Vers. 1.0 | October 2010

Page 48: Prequalification Document - Brimaxx · PDF filePrOJeCt management Brimaxx internal project management is a carefully planned and organized effort to accomplish a success-ful implementation

Brimaxx CreatiVe - POrtFOLiO

48Brimaxx Consultancy JLt | Prequalification Document | Brimaxx Creative | Vers. 1.0 | October 2010

Page 49: Prequalification Document - Brimaxx · PDF filePrOJeCt management Brimaxx internal project management is a carefully planned and organized effort to accomplish a success-ful implementation

Brimaxx CreatiVe - POrtFOLiO

49Brimaxx Consultancy JLt | Prequalification Document | Brimaxx Creative | Vers. 1.0 | October 2010

Page 50: Prequalification Document - Brimaxx · PDF filePrOJeCt management Brimaxx internal project management is a carefully planned and organized effort to accomplish a success-ful implementation

Brimaxx CreatiVe - POrtFOLiO

50Brimaxx Consultancy JLt | Prequalification Document | Brimaxx Creative | Vers. 1.0 | October 2010

Page 51: Prequalification Document - Brimaxx · PDF filePrOJeCt management Brimaxx internal project management is a carefully planned and organized effort to accomplish a success-ful implementation

Brimaxx CreatiVe - POrtFOLiO

51Brimaxx Consultancy JLt | Prequalification Document | Brimaxx Creative | Vers. 1.0 | October 2010

Page 52: Prequalification Document - Brimaxx · PDF filePrOJeCt management Brimaxx internal project management is a carefully planned and organized effort to accomplish a success-ful implementation

Brimaxx CreatiVe - POrtFOLiO

52Brimaxx Consultancy JLt | Prequalification Document | Brimaxx Creative | Vers. 1.0 | October 2010

Page 53: Prequalification Document - Brimaxx · PDF filePrOJeCt management Brimaxx internal project management is a carefully planned and organized effort to accomplish a success-ful implementation

Brimaxx CreatiVe - POrtFOLiO

53Brimaxx Consultancy JLt | Prequalification Document | Brimaxx Creative | Vers. 1.0 | October 2010

Page 54: Prequalification Document - Brimaxx · PDF filePrOJeCt management Brimaxx internal project management is a carefully planned and organized effort to accomplish a success-ful implementation

Brimaxx CreatiVe - POrtFOLiO

54Brimaxx Consultancy JLt | Prequalification Document | Brimaxx Creative | Vers. 1.0 | October 2010

Page 55: Prequalification Document - Brimaxx · PDF filePrOJeCt management Brimaxx internal project management is a carefully planned and organized effort to accomplish a success-ful implementation

Brimaxx CreatiVe - POrtFOLiO

MR. MAX JOHNSTONSTORE MANAGER

WWW.EMIRATESPALACE.COMLASBIRSAS.EMIRATESPALACE@

KEMPINSKI.COM

EMIRATES PALACEABU DHABI CORNICHEP.O. BOX 3999 • ABU DHABIUNITED ARAB EMIRATESTELEPHONE +971 2 681 1140FAX +971 2 681 8197

55Brimaxx Consultancy JLt | Prequalification Document | Brimaxx Creative | Vers. 1.0 | October 2010

Page 56: Prequalification Document - Brimaxx · PDF filePrOJeCt management Brimaxx internal project management is a carefully planned and organized effort to accomplish a success-ful implementation

Brimaxx CreatiVe - POrtFOLiO

56Brimaxx Consultancy JLt | Prequalification Document | Brimaxx Creative | Vers. 1.0 | October 2010

Page 57: Prequalification Document - Brimaxx · PDF filePrOJeCt management Brimaxx internal project management is a carefully planned and organized effort to accomplish a success-ful implementation

Brimaxx CreatiVe - POrtFOLiO

57Brimaxx Consultancy JLt | Prequalification Document | Brimaxx Creative | Vers. 1.0 | October 2010

Page 58: Prequalification Document - Brimaxx · PDF filePrOJeCt management Brimaxx internal project management is a carefully planned and organized effort to accomplish a success-ful implementation

Brimaxx CreatiVe - POrtFOLiO

58Brimaxx Consultancy JLt | Prequalification Document | Brimaxx Creative | Vers. 1.0 | October 2010

Page 59: Prequalification Document - Brimaxx · PDF filePrOJeCt management Brimaxx internal project management is a carefully planned and organized effort to accomplish a success-ful implementation

Brimaxx CreatiVe - POrtFOLiO

59Brimaxx Consultancy JLt | Prequalification Document | Brimaxx Creative | Vers. 1.0 | October 2010

Page 60: Prequalification Document - Brimaxx · PDF filePrOJeCt management Brimaxx internal project management is a carefully planned and organized effort to accomplish a success-ful implementation

Brimaxx CreatiVe - POrtFOLiO

60Brimaxx Consultancy JLt | Prequalification Document | Brimaxx Creative | Vers. 1.0 | October 2010

Page 61: Prequalification Document - Brimaxx · PDF filePrOJeCt management Brimaxx internal project management is a carefully planned and organized effort to accomplish a success-ful implementation

BriMaxx Consultancy JLT

One Lake Plaza – Jumeirah Lakes towersOffice 704P.O. Box 119658Dubai, U.a.e.Phone: +971 4 369 3743Fax: +971 4 430 8847

Christian Berglehnermobile: +971 50 [email protected]

Page 62: Prequalification Document - Brimaxx · PDF filePrOJeCt management Brimaxx internal project management is a carefully planned and organized effort to accomplish a success-ful implementation

reFerenCeS

Page 63: Prequalification Document - Brimaxx · PDF filePrOJeCt management Brimaxx internal project management is a carefully planned and organized effort to accomplish a success-ful implementation

reFerenCeS (DireCt inVOLVement katie taWiL)

1. Burj Dubai tower, Dubai 2. emirates Palace Hotel, abu Dhabi 3. atlantis Hotel, the Palm, Dubai 4. rashid Bin khamis al mansouri Commercial Building5. Burj Dubai Old town, (all Phases) 6. Burj Dubai residences South ridge 7. Burj Dubai Old town Hotel a & B 8. Burj Dubai Lake Hotel 9. Burj Dubai mall 10. Burj Dubai mall Hotel 11. Dubai marina residence Phase ii, Dubai 12. interContinental Hotel renovation 13. Sheraton Hotel refurbishment, abu Dhabi 14. abu Dhabi trade Center Hotel tower 15. abu Dhabi trade Center apartment tower 16. Capital towers, Dubai 17. Park Place, Dubai 18. World trade Center residence, Dubai 19. Beach rotana Hotel, renovation, abu Dhabi 20. aDWea HQ Building renovation, abu Dhabi

21. aDgaS HQ Office Building, Das island, abu Dhabi 22. giC Building, abu Dhabi 23. amenities Building (trains), Das island 24. ministry of Foreign affairs, (renovation), abu Dhabi 25. al ain University extension, al ain, abu Dhabi 26. abu Dhabi industrial City, Contract 1&3, abu Dhabi 27. abu Dhabi Ship Building, musafah, abu Dhabi 28. Dubai airport Free Zone extension, Phase iii, Dubai 29. nadd al Sheeba international Stables, Dubai 30. nadd al Sheeba grandstands, Dubai 31. Le meridian extension royal Suites, Dubai 32. Le royal meridian Hotel extension, amman, Jordan 33. Zara trade Center, amman, Jordan 34. grand Hyatt, amman, Jordan 35. king abdullah Hospital, irbid, Jordan 36. Four Seasons Hotel, amman, Jordan 37. interContinental refurbishment, amman, Jordan 38. marriott Dead Sea resort, Jordan Valley, amman 39. movenpick Dead Sea resort, Jordan Valley, amman40. 18 Schools al ain

63Brimaxx Consultancy JLt | Prequalification Document | Brimaxx Creative | Vers. 1.0 | October 2010