Prepared By:

Eng. Mohammad Tamimi (Project Manager)

Eng. Hamdi Tahboub (Deputy Manager)

Investment In RE Conference - Ramallah, Palestine

Ahli Wind Energy Project (AWEP) Imagination and Reality

EU Funded Project

Outline • Background (Ahli Hospital)• Introduction (AWEP)• Achievements

• Actual Achievements until know• Experience

• Barriers • Overcoming Barriers

• AWEP as Investment

Prepared By Eng. Mohammad Tamimi (Project Manager) www.awep.psEng. Hamdi Tahboub (Deputy Manager) Tel: 02 - 2228113

Fax: 02 - 2229061

Outline • Background (Ahli Hospital)• Introduction (AWEP)• Achievements

• Actual Achievements until know• Experience

• Barriers • Overcoming Barriers

• AWEP as Investment

Prepared By Eng. Mohammad Tamimi (Project Manager) www.awep.psEng. Hamdi Tahboub (Deputy Manager) Tel: 02 – 2228113

Fax: 02 - 2229061

Patients’ Friends Society Ahli Hospital – Hebron, Palestine

Prepared By Eng. Mohammad Tamimi (Project Manager) www.awep.psEng. Hamdi Tahboub (Deputy Manager) Tel: 02 - 2228113

Fax: 02 - 2229061

• Largest Hospital in Palestine (27,500 m2 ).• Started work on 1993.• 200 beds which will be 350 beds in the near future . • More than 470 staff members are working in the hospital

which deals with more than 150,000 patients per year .

Patients’ Friends Society Ahli Hospital – Hebron, Palestine

Prepared By Eng. Mohammad Tamimi (Project Manager) www.awep.psEng. Hamdi Tahboub (Deputy Manager) Tel: 02 - 2228113

Fax: 02 - 2229061

Outline • Background (Ahli Hospital)• Introduction (AWEP)• Achievements

• Actual Achievements until know• Experience

• Barriers • Overcoming Barriers

• AWEP as Investment

Prepared By Eng. Mohammad Tamimi (Project Manager) www.awep.psEng. Hamdi Tahboub (Deputy Manager) Tel: 02 – 2228113

Fax: 02 - 2229061

Introduction Ahli Wind Energy Project (AWEP)

Project NameIntegrated Wind Energy Production System for Al-Ahli Hospital

Duration: 48 Month Started 1/1/2009

Budget: 1.644.340 EURO

EU Contribution: 79.63% = 1.309.440 EURO

AL-Ahli Contribution: 20.37% = 334.900 EURO

Prepared By Eng. Mohammad Tamimi (Project Manager) www.awep.psEng. Hamdi Tahboub (Deputy Manager) Tel: 02 - 2228113

Fax: 02 - 2229061

• AWEP is a pioneer project in Palestine that is funded by the EU . This project will directly benefit Al-Ahli Hospital from the Wind Energy .

• Wind Turbine and Solar Thermal System will be used to achieve the goal of the project.

• Objectives • To produce ~30-40 % of the hospital Power needs.• To reduce the environmental costs, such as carbon emissions.• To provide the hospital with an alternative source of power.• Increasing the awareness of the local community• Building the capacity of the hospital’s staff and its associates.

Introduction Ahli Wind Energy Project (AWEP)

Prepared By Eng. Mohammad Tamimi (Project Manager) www.awep.psEng. Hamdi Tahboub (Deputy Manager) Tel: 02 - 2228113

Fax: 02 - 2229061

Diesel Generator

Intelligent Electricity Panels

Hospital

P.V SystemWind Turbine

SystemUtility Meter

225 KW 200 KWp – future Project 500 KW

Grid meter

Wind Turbine Planned Site

Prepared By Eng. Mohammad Tamimi (Project Manager) www.awep.psEng. Hamdi Tahboub (Deputy Manager) Tel: 02 – 2228113

Fax: 02 - 2229061

Prepared By Eng. Mohammad Tamimi (Project Manager) www.awep.psEng. Hamdi Tahboub (Deputy Manager) Tel: 02 - 2228113

Fax: 02 - 2229061

Grid connection for wind turbine

Prepared By Eng. Mohammad Tamimi (Project Manager) www.awep.psEng. Hamdi Tahboub (Deputy Manager) Tel: 02 – 2228113

Fax: 02 - 2229061

Prepared By Eng. Mohammad Tamimi (Project Manager) www.awep.psEng. Hamdi Tahboub (Deputy Manager) Tel: 02 – 2228113

Fax: 02 - 2229061

Solar Thermal Panels Planned Site

Prepared By Eng. Mohammad Tamimi (Project Manager) www.awep.psEng. Hamdi Tahboub (Deputy Manager) Tel: 02 – 2228113

Fax: 02 - 2229061

Prepared By Eng. Mohammad Tamimi (Project Manager) www.awep.psEng. Hamdi Tahboub (Deputy Manager) Tel: 02 – 2228113

Fax: 02 - 2229061

Thermal System - Block Diagram

Prepared By Eng. Mohammad Tamimi (Project Manager) www.awep.psEng. Hamdi Tahboub (Deputy Manager) Tel: 02 – 2228113

Fax: 02 - 2229061

Thermal System Schematic

Prepared By Eng. Mohammad Tamimi (Project Manager) www.awep.psEng. Hamdi Tahboub (Deputy Manager) Tel: 02 – 2228113

Fax: 02 - 2229061

Prepared By Eng. Mohammad Tamimi (Project Manager) www.awep.psEng. Hamdi Tahboub (Deputy Manager) Tel: 02 - 2228113

Fax: 02 - 2229061

Outline • Background (Ahli Hospital)• Introduction (AWEP)• Achievements

• Actual Achievements until know• Experience

• Barriers • Overcoming Barriers

• AWEP as Investment

Prepared By Eng. Mohammad Tamimi (Project Manager) www.awep.psEng. Hamdi Tahboub (Deputy Manager) Tel: 02 – 2228113

Fax: 02 - 2229061

Actual Achievements until know

• Installation of measurement station.• Already record data for 3 years.

Prepared By Eng. Mohammad Tamimi (Project Manager) www.awep.psEng. Hamdi Tahboub (Deputy Manager) Tel: 02 – 2228113

Fax: 02 - 2229061

Potential of wind at Al Ahli Site

Prepared By Eng. Mohammad Tamimi (Project Manager) www.awep.psEng. Hamdi Tahboub (Deputy Manager) Tel: 02 - 2228113

Fax: 02 - 2229061

1 2 3 4 5 6 7 8 9 10 11 120.00

1.00

2.00

3.00

4.00

5.00

6.00

7.00

8.00

Average Wind Speed (m/s)

m/s

Month

• Training, and Capacity Building• Many activities abroad and in Palestine

Prepared By Eng. Mohammad Tamimi (Project Manager) www.awep.psEng. Hamdi Tahboub (Deputy Manager) Tel: 02 – 2228113

Fax: 02 - 2229061

Tendering and Contracting

Prepared By Eng. Mohammad Tamimi (Project Manager) www.awep.psEng. Hamdi Tahboub (Deputy Manager) Tel: 02 – 2228113

Fax: 02 - 2229061

•Workshops and Dissemination

• Five workshops.

Prepared By Eng. Mohammad Tamimi (Project Manager) www.awep.psEng. Hamdi Tahboub (Deputy Manager) Tel: 02 – 2228113

Fax: 02 - 2229061

Barriers

• Political Barriers (Rules & Regulations not completed).• Market Barriers. • Technical Barriers.

Prepared By Eng. Mohammad Tamimi (Project Manager) www.awep.psEng. Hamdi Tahboub (Deputy Manager) Tel: 02 – 2228113

Fax: 02 - 2229061

Overcoming Barriers

• The Authorities are collaborative.• We already find market for our desire.• We’ve received a technical assistant from our EU partner in

addition to local and international consultants.

Prepared By Eng. Mohammad Tamimi (Project Manager) www.awep.psEng. Hamdi Tahboub (Deputy Manager) Tel: 02 – 2228113

Fax: 02 - 2229061

Outline • Background (Ahli Hospital)• Introduction (AWEP)• Achievements

• Actual Achievements until know• Experience

• Barriers • Overcoming Barriers

• AWEP as Investment

Prepared By Eng. Mohammad Tamimi (Project Manager) www.awep.psEng. Hamdi Tahboub (Deputy Manager) Tel: 02 – 2228113

Fax: 02 - 2229061

Why PFS decided to invest in RE

• As a medical organization aims to go green.

• The power invoice of Al-Ahli Hospital is huge (reduce bill).

• Investing in RE will reduce the energy bill, so give the opportunity to enhance the quality of medical service.

Prepared By Eng. Mohammad Tamimi (Project Manager) www.awep.psEng. Hamdi Tahboub (Deputy Manager) Tel: 02 – 2228113

Fax: 02 - 2229061

EU Investments in Wind Energy

Prepared By Eng. Mohammad Tamimi (Project Manager) www.awep.psEng. Hamdi Tahboub (Deputy Manager) Tel: 02 – 2228113

Fax: 02 - 2229061

Source: European Wind Energy Association

Some Facts about AL Ahli Hospital

• Electricity 1,791,045 KWh/year.(2009).• Diesel 233,352 Liters /year.(2009), this is equivalent to

2,238,545 KWh/year. • Electricity consumption Invoice on 2009 = 240,000 €.• Diesel consumption invoice on 2009 = 245,950 €• Total energy consumption = 4,029,590 KWh/year • Total energy bill = 485,950 €

Prepared By Eng. Mohammad Tamimi (Project Manager) www.awep.psEng. Hamdi Tahboub (Deputy Manager) Tel: 02 – 2228113

Fax: 02 - 2229061

Prepared By Eng. Mohammad Tamimi (Project Manager) www.awep.psEng. Hamdi Tahboub (Deputy Manager) Tel: 02 – 2228113

Fax: 02 - 2229061

Electricity 44%

Diesel 56%

Energy Consumption in AL Ahli - 2009

Wind Turbine Expected Outcome

Prepared By Eng. Mohammad Tamimi (Project Manager) www.awep.psEng. Hamdi Tahboub (Deputy Manager) Tel: 02 – 2228113

Fax: 02 - 2229061

Sector # power

[W/m²] AEP [MWh] 1 139 14.2112 121 20.2663 99 8.1584 88 3.7535 120 10.216 178 17.9087 216 25.8238 192 18.4519 137 16.346

10 229 14.42411 163 9.73112 231 15.23513 364 39.06314 260 37.32315 133 38.29916 122 40.637

Total Energy 330 MWhAverage Power Density 174 W/m2

The total operating Hours , “the wind speed above cut in speed” , of the wind turbine per year : 5800 Hours .

Wind Turbine Expected Outcome

• Electricity Saving from wind turbine = 330,000 KWh/year / 1,791,045 KWh/year *100% = 18.4 % per year.

• Saving of electricity bill = 18.4% * 240,000 € = 44,160 €.

Prepared By Eng. Mohammad Tamimi (Project Manager) www.awep.psEng. Hamdi Tahboub (Deputy Manager) Tel: 02 – 2228113

Fax: 02 - 2229061

Solar Thermal Expected Outcome

• The daily energy required from the SWHS is 50% of the daily thermal energy consumption, which equals 2.238.545X50% = 1.119.272

• Our SWHS (Solar Water Heating System) is designed to save 1,200,000 Kwh/year; this is equivalent to a saving of 53.6% (3287Kwh/day).

• The average solar radiation on the horizontal surface in Palestine is 5400wh/m2/day.

• The area of the solar collector is 2.55m2• The number of the necessary solar collectors is 355. • Each collector of this type has a supposed production of (0.77 Kwh).• The total area of the collectors is 905m2.• The hot water storage tank capacity is 5X4 m3.• The daily production of the SWHS is 23.0 m3 (at 70cº).• The annual production of SWH is 8395.5m3.

Prepared By Eng. Mohammad Tamimi (Project Manager) www.awep.psEng. Hamdi Tahboub (Deputy Manager) Tel: 02 – 2228113

Fax: 02 - 2229061

Solar Thermal Expected Outcome

• Thermal energy Saving from Solar Thermal = 1,200,000 KWh/year / 2,238,545 KWh/year *100% = 53.6% per year.

• Saving of diesel bill = 53.6% * 245,950 € = 131829.2 €

Prepared By Eng. Mohammad Tamimi (Project Manager) www.awep.psEng. Hamdi Tahboub (Deputy Manager) Tel: 02 – 2228113

Fax: 02 - 2229061

Total Energy Saving from Wind & Solar

• Total Energy Saving From Wind & Solar = 329552 KWh\year + 1,200,00 KWh/year / 4,029,950 KWh/year * 100% = 37.9 % per year.

• Total Savings = 44,160 € + 131,829.2 € = 175,989.2 € per year.

Prepared By Eng. Mohammad Tamimi (Project Manager) www.awep.psEng. Hamdi Tahboub (Deputy Manager) Tel: 02 – 2228113

Fax: 02 - 2229061

Energy, Cost and Savings

Prepared By Eng. Mohammad Tamimi (Project Manager) www.awep.psEng. Hamdi Tahboub (Deputy Manager) Tel: 02 – 2228113

Fax: 02 - 2229061

Electricity

Diesel

Total Energy

0 500000 1000000 1500000 2000000 2500000 3000000 3500000 4000000 4500000

1791045

2238545

4029590

240000

245950

485950

44160

131829.2

175989.2

Savings (€) Cost (€) KWh/year

Pay Back Period

• Pay back period for wind turbine = 501260 € \ 44,160 € = 11.3 years.

After 20 years = 9 * 44,160€ = 397,440 €

• Pay back period for solar thermal = 245,950 € \ 131829.2 € = 1.86 year.

After 5 years = 3 * 131829.2 = 395487.6 €

Prepared By Eng. Mohammad Tamimi (Project Manager) www.awep.psEng. Hamdi Tahboub (Deputy Manager) Tel: 02 – 2228113

Fax: 02 - 2229061

Thanks For Listening

With Our Best Regards……….

Eng. Mohammad Tamimi (Project Manager)

Eng. Hamdi Tahboub (Deputy Manager)

Mrs. Asmaa Sultan (Administrative Assistant)