10
820 825 830 835 840 845 850 855 860 865 1065 10 70 1075 1080 1085 15O 15O FEET O DESIGN TEAM PROJECT NUMBER SHEET NUMBER COUNTY ENGLISH FILE NO. 9:10:46 AM dsibert \\hrgreen.com\HRG\Data\2021\40120012.02\CAD\Design\CADD_Files\Sheet_Files\SHT_40120012_J01_temp.dgn Iowa DOT \ HR Green, Inc. JOHNSON IM-80-6(253)242--13-52 J.08 9/17/2021 PHASE 1 STAGE 1 NOTES LEGEND R A M P D R A M P A R A M P C R A M P B I- 80 W B I- 80 E B I-80 WB I-80 EB 1ST AVE 1ST AVE 9TH ST L AN D I NG P L A C E I O W A R I V E R DRI VEWAY MAGELLAN Pedestrian Box Culvert, MSE Wall, or Bridge Permanent Pavement Temporary Pavement CONSTRUCTION IN PREVIOUS STAGES: Bridge Pedestrian Box Culvert Permanent Pavement Temporary Pavement Pavement Removal CONSTRUCTION IN CURRENT STAGE: Staging Area Unpinned Temporary Barrier Rail Pinned Temporary Barrier Rail Channelizer Temporary Pedestrian / Bike Path Construction Ingress / Egress Direction of Traffic Temporary Shoring in Place Existing Pavement require intermittent full or partial lane closures on 1st Ave. Remove curb and construct temp. pavement, which may lane north of Ramp C. Maintain pedestrian access during construction of temp. turn Proposed alignments shown in blue for reference only. Interchange functions as existing diamond interchange. 4 3 2 1 SHT_40120012_J01_temp.dgn J.08 9/17/2021 9:10:54 AM PRELIMINARY SUBJECT TO CHANGE

PRELIMINARY SUBJECT TO CHANGE

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PRELIMINARY SUBJECT TO CHANGE

820

825

830

835

840

845

850 855 8

60 8

65

1065

1070

1075

1080

1085

15O15O

FEET

O

DESIGN TEAM PROJECT NUMBER SHEET NUMBER COUNTYENGLISHFILE NO.

9:10:46 AM dsibert \\hrgreen.com\HRG\Data\2021\40120012.02\CAD\Design\CADD_Files\Sheet_Files\SHT_40120012_J01_temp.dgn

Iowa DOT \ HR Green, Inc. JOHNSON IM-80-6(253)242--13-52 J.089/17/2021

PHASE 1 STAGE 1 NOTES LEGEND

RAMP D

RAMP ARAMP C

RAMP B

I-80 WB

I-80 EB I-80 WB

I-80 EB

1S

T

AV

E

1S

T

AV

E

9TH ST

LANDING P

LACEIOWA R

IVER

DRI

VE

WA

Y

MA

GE

LL

AN

Pedestrian Box Culvert, MSE Wall, or Bridge

Permanent Pavement

Temporary Pavement

CONSTRUCTION IN PREVIOUS STAGES:

Bridge

Pedestrian Box Culvert

Permanent Pavement

Temporary Pavement

Pavement Removal

CONSTRUCTION IN CURRENT STAGE:

Staging Area

Unpinned Temporary Barrier Rail

Pinned Temporary Barrier Rail

Channelizer

Temporary Pedestrian / Bike Path

Construction Ingress / Egress

Direction of Traffic

Temporary Shoring in Place

Existing Pavement

require intermittent full or partial lane closures on 1st Ave.

Remove curb and construct temp. pavement, which may

lane north of Ramp C.

Maintain pedestrian access during construction of temp. turn

Proposed alignments shown in blue for reference only.

Interchange functions as existing diamond interchange.

4

3

2

1

SHT_40120012_J01_temp.dgn J.08 9/17/2021 9:10:54 AMPRELIMINARY SUBJECT TO CHANGE

Page 2: PRELIMINARY SUBJECT TO CHANGE

PHASE 2 STAGE 1 (PROPOSED WINTER STAGE) NOTES

5

4

3

2

1

bridge construction to continue over the winter months.

near bridge abutments should be complete to allow for

abutments, piling for bridge abutments, and retaining walls

Before November 15th, essential grading near bridge

D and all of Ramp C detour.

for ramps and pedestrian trail. Pave parts of Ramps B, C, and

lanes along I-80 west of the interchange. Grade east infields

temporary pavement, trail, and bridges. Construct parallel

pedestrian box culverts, retaining walls, permanent pavement,

Remove east bridge and construct on east side of 1st Ave:

All existing ramps function as existing diamond interchange.

in each direction, in addition to SB to EB left turn lane.

1st Ave: traffic shifted to west side. One lane of traffic open

lane, otherwise routed on existing path.

Pedestrian traffic routed along outside of SB to WB turn

LEGEND

RAMP D

RAMP ARAMP C

RAMP B

I-80 WB

I-80 EB I-80 WB

I-80 EB

1S

T

AV

E

1S

T

AV

E

9TH ST

LANDING P

LACEIOWA R

IVER

DRI

VE

WA

Y

MA

GE

LL

AN

Pedestrian Box Culvert, MSE Wall, or Bridge

Permanent Pavement

Temporary Pavement

CONSTRUCTION IN PREVIOUS STAGES:

Bridge

Pedestrian Box Culvert

Permanent Pavement

Temporary Pavement

Pavement Removal

CONSTRUCTION IN CURRENT STAGE:

Staging Area

Unpinned Temporary Barrier Rail

Pinned Temporary Barrier Rail

Channelizer

Temporary Pedestrian / Bike Path

Construction Ingress / Egress

Direction of Traffic

Temporary Shoring in Place

Existing Pavement

DESIGN TEAM PROJECT NUMBER SHEET NUMBER COUNTYENGLISHFILE NO.

9:10:57 AM dsibert \\hrgreen.com\HRG\Data\2021\40120012.02\CAD\Design\CADD_Files\Sheet_Files\SHT_40120012_J01_temp.dgn

Iowa DOT \ HR Green, Inc. JOHNSON IM-80-6(253)242--13-52 J.119/17/2021

15O

FEET

O

SHT_40120012_J01_temp.dgn J.11 9/17/2021 9:11:03 AMPRELIMINARY SUBJECT TO CHANGE

Page 3: PRELIMINARY SUBJECT TO CHANGE

PHASE 2 STAGE 2 NOTES

OFF-SITE DETOUR ROUTES

80

SB 1ST AVE TO EB I-80

NB 1ST AVE TO WB I-80

WB I-80 TO SB 1ST AVE

portion of pedestrian box culvert.

Construct north side of IRL Place, including MSE wall and north

ramp A. Construct remaining portion of ramp D and ramp D gore.

adjacent temp. pavement, including south portion of tie to existing

Construct northeast portion of ramp A connection to 1st Ave and

Ramp C to Coral Ridge Ave to I-80 eastbound.

ramp connection, and new ramp. 1st Ave SB traffic is detoured via

Ramp D: 1st Ave NB traffic uses new IRL Place pavement, temp.

used to allow for the use of the parallel acceleration lane.

Ave SB. SB traffic uses temp right turn lane. Ramp detour pavement is

Ramp C: 1st Ave NB traffic detoured to Holiday Rd roundabout to 1st

Ramps B: Traffic unchanged from Phase 2 Stage 1.

detoured to Coral Ridge Ave to I-80 eastbound to Ramp B.

existing median, and existing 1st Ave pavement. 1st Ave SB traffic is

Ramp A: 1st Ave NB traffic uses existing ramp, temp pavement in

is unchanged from Phase 2 Stage 1.

1st Ave: other than removal of SB to EB left turn lane, through traffic

Pedestrian traffic unchanged from Phase 2 Stage 1.

7

6

5

4

3

2

1

LEGEND

RAMP D

RAMP ARAMP C

RAMP B

I-80 WB

I-80 EB I-80 WB

I-80 EB

1S

T

AV

E

1S

T

AV

E

9TH ST

LANDING P

LACEIOWA R

IVER

DRI

VE

WA

Y

MA

GE

LL

AN

Pedestrian Box Culvert, MSE Wall, or Bridge

Permanent Pavement

Temporary Pavement

CONSTRUCTION IN PREVIOUS STAGES:

Bridge

Pedestrian Box Culvert

Permanent Pavement

Temporary Pavement

Pavement Removal

CONSTRUCTION IN CURRENT STAGE:

Staging Area

Unpinned Temporary Barrier Rail

Pinned Temporary Barrier Rail

Channelizer

Temporary Pedestrian / Bike Path

Construction Ingress / Egress

Direction of Traffic

Temporary Shoring in Place

Existing Pavement

1ST A

VE

HOLIDAY RD

9TH ST

US 6 / 2ND ST

965

AV

E / HIG

HW

AY

CO

RA

L RID

GE IO

WA RIV

ER

DESIGN TEAM PROJECT NUMBER SHEET NUMBER COUNTYENGLISHFILE NO.

9:11:06 AM dsibert \\hrgreen.com\HRG\Data\2021\40120012.02\CAD\Design\CADD_Files\Sheet_Files\SHT_40120012_J01_temp.dgn

Iowa DOT \ HR Green, Inc. JOHNSON IM-80-6(253)242--13-52 J.189/17/2021

15O15O

FEET

O

SHT_40120012_J01_temp.dgn J.18 9/17/2021 9:11:11 AMPRELIMINARY SUBJECT TO CHANGE

Page 4: PRELIMINARY SUBJECT TO CHANGE

PHASE 2 STAGE 3 NOTES

OFF-SITE DETOUR ROUTES

80

6

5

4

3

2

1

WB I-80 TO SB 1ST AVE

NB 1ST AVE TO WB I-80

SB 1ST AVE TO EB I-80

either side, including temp pedestrian trail pavement.

Construct remaining north crossover pavement and temp. pavement on

and the Coral Ridge Ave interchange.

ramp. 1st Ave SB traffic is detoured to eastbound I-80 via Ramp C

Ramp D: 1st Ave NB traffic uses new 1st Ave pavement and new

Ramps B and C: Traffic unchanged from Phase 2 Stage 2.

traffic detoured NB to Holiday Rd roundabout to 1st Ave SB.

1st Ave pavement, temp pavement, and existing pavement. 1st Ave SB

Ramp A: 1st Ave NB traffic uses existing ramp, temp connection, new

1st Ave: through traffic unchanged from Phase 2 Stage 2.

interchange, crossing 1st Avenue at the hotel driveway intersection.

temp. pavement on the east side of 1st Avenue north of the

the stage when it is switched to the proposed trail, new bridge, and

Pedestrian traffic unchanged from Phase 2 Stage 2, until the end of

LEGEND

RAMP D

RAMP ARAMP C

RAMP B

I-80 WB

I-80 EB I-80 WB

I-80 EB

1S

T

AV

E

1S

T

AV

E

9TH ST

LANDING P

LACEIOWA R

IVER

DRI

VE

WA

Y

MA

GE

LL

AN

Pedestrian Box Culvert, MSE Wall, or Bridge

Permanent Pavement

Temporary Pavement

CONSTRUCTION IN PREVIOUS STAGES:

Bridge

Pedestrian Box Culvert

Permanent Pavement

Temporary Pavement

Pavement Removal

CONSTRUCTION IN CURRENT STAGE:

Staging Area

Unpinned Temporary Barrier Rail

Pinned Temporary Barrier Rail

Channelizer

Temporary Pedestrian / Bike Path

Construction Ingress / Egress

Direction of Traffic

Temporary Shoring in Place

Existing Pavement

1ST A

VE

HOLIDAY RD

9TH ST

US 6 / 2ND ST

965

AV

E / HIG

HW

AY

CO

RA

L RID

GE IO

WA RIV

ER

DESIGN TEAM PROJECT NUMBER SHEET NUMBER COUNTYENGLISHFILE NO.

9:11:14 AM dsibert \\hrgreen.com\HRG\Data\2021\40120012.02\CAD\Design\CADD_Files\Sheet_Files\SHT_40120012_J01_temp.dgn

Iowa DOT \ HR Green, Inc. JOHNSON IM-80-6(253)242--13-52 J.229/17/2021

15O15O

FEET

O

SHT_40120012_J01_temp.dgn J.22 9/17/2021 9:11:20 AMPRELIMINARY SUBJECT TO CHANGE

Page 5: PRELIMINARY SUBJECT TO CHANGE

PHASE 2 STAGE 4 NOTES

OFF-SITE DETOUR ROUTES

80

SB 1ST AVE TO EB I-80

NB 1ST AVE TO WB I-80

6

5

4

3

2

1

pavement.

Construct east side of south crossover and adjacent temp

C and the Coral Ridge Ave interchange.

3. 1st Ave SB traffic is detoured to eastbound I-80 via Ramp

Ramp D: 1st Ave NB traffic unchanged from Phase 2 Stage

Ramps B and C: Unchanged from Phase 2 Stage 3.

pavement.

existing ramp, temp. connection, and existing 1st Ave

connection, and new 1st Ave pavement. 1st Ave SB traffic uses

Ramp A: 1st Ave NB traffic uses existing ramp, temp.

construction.

except for bump-out around south crossover pavement

1st Ave: through traffic unchanged from Phase 2 Stage 1,

Stage 3.

Pedestrian traffic uses temp. route described in Phase 2

LEGEND

RAMP D

RAMP ARAMP C

RAMP B

I-80 WB

I-80 EB I-80 WB

I-80 EB

1S

T

AV

E

1S

T

AV

E

9TH ST

LANDING P

LACEIOWA R

IVER

DRI

VE

WA

Y

MA

GE

LL

AN

Pedestrian Box Culvert, MSE Wall, or Bridge

Permanent Pavement

Temporary Pavement

CONSTRUCTION IN PREVIOUS STAGES:

Bridge

Pedestrian Box Culvert

Permanent Pavement

Temporary Pavement

Pavement Removal

CONSTRUCTION IN CURRENT STAGE:

Staging Area

Unpinned Temporary Barrier Rail

Pinned Temporary Barrier Rail

Channelizer

Temporary Pedestrian / Bike Path

Construction Ingress / Egress

Direction of Traffic

Temporary Shoring in Place

Existing Pavement

1ST A

VE

HOLIDAY RD

9TH ST

US 6 / 2ND ST

965

AV

E / HIG

HW

AY

CO

RA

L RID

GE IO

WA RIV

ER

DESIGN TEAM PROJECT NUMBER SHEET NUMBER COUNTYENGLISHFILE NO.

9:11:23 AM dsibert \\hrgreen.com\HRG\Data\2021\40120012.02\CAD\Design\CADD_Files\Sheet_Files\SHT_40120012_J01_temp.dgn

Iowa DOT \ HR Green, Inc. JOHNSON IM-80-6(253)242--13-52 J.269/17/2021

15O15O

FEET

O

SHT_40120012_J01_temp.dgn J.26 9/17/2021 9:11:29 AMPRELIMINARY SUBJECT TO CHANGE

Page 6: PRELIMINARY SUBJECT TO CHANGE

15O15O

FEET

O

DESIGN TEAM PROJECT NUMBER SHEET NUMBER COUNTYENGLISHFILE NO.

9:11:33 AM dsibert \\hrgreen.com\HRG\Data\2021\40120012.02\CAD\Design\CADD_Files\Sheet_Files\SHT_40120012_J01_temp.dgn

Iowa DOT \ HR Green, Inc. JOHNSON IM-80-6(253)242--13-52 J.299/17/2021

OFF-SITE DETOUR ROUTE

80

EB I-80 TO NB 1ST AVE

PHASE 3 STAGE 1 NOTES

9

8

7

6

5

4

3

2

1

connection before November 15th.

Pave remaining portion of Ramp B (except gore), including temp. ramp

over winter during the next stage.

before November 15th to allow for the construction of the new west bridge

drive piling, and build retaining walls near the new west bridge abutments

Demolish existing west bridge and pedestrian bridge. Complete essential grading,

IRL Place: Right in / right out movements allowed.

Ramp D: traffic uses new 1st Ave pavement and new ramp.

Ramp C: traffic unchanged from Phase 2 Stage 4.

ramp and existing 1st Ave pavement.

ramp A. Locals may use 9th St and IRL Place. 1st Ave SB traffic uses existing

Ramp B: 1st Ave NB traffic detoured to Dubuque St interchange to I-80 WB to

Ramp A: traffic uses existing ramp, temp. connection, and new 1st Ave pavement.

pavement on east side with left turn lanes onto on-ramps.

1st Ave: through traffic shifted to new bridge, new pavement and temp.

Pedestrian traffic follows temporary path described in Phase 3 Stage 2.

LEGEND

RAMP D

RAMP ARAMP C

RAMP B

I-80 WB

I-80 EB I-80 WB

I-80 EB

1S

T

AV

E

1S

T

AV

E

9TH ST

LANDING P

LACEIOWA R

IVER

DRI

VE

WA

Y

MA

GE

LL

AN

Pedestrian Box Culvert, MSE Wall, or Bridge

Permanent Pavement

Temporary Pavement

CONSTRUCTION IN PREVIOUS STAGES:

Bridge

Pedestrian Box Culvert

Permanent Pavement

Temporary Pavement

Pavement Removal

CONSTRUCTION IN CURRENT STAGE:

Staging Area

Unpinned Temporary Barrier Rail

Pinned Temporary Barrier Rail

Channelizer

Temporary Pedestrian / Bike Path

Construction Ingress / Egress

Direction of Traffic

Temporary Shoring in Place

Existing Pavement

1ST A

VE

HOLIDAY RD

9TH ST

DUBUQ

UE ST

IOW

A RIV

ER

SHT_40120012_J01_temp.dgn J.29 9/17/2021 9:11:38 AMPRELIMINARY SUBJECT TO CHANGE

Page 7: PRELIMINARY SUBJECT TO CHANGE

PHASE 3 STAGE 2 (PROPOSED WINTER STAGE) NOTES

7

6

5

4

3

2

1

most of Ramp A. Construct permanent median barrier along I-80.

culvert and crossover pavement, and remainder of Ramp C. Construct

Magellan entrance, most of Ramp B gore, remainder of north box

Ramp B. Construct most of the remaining west side, including

Complete construction of proposed west bridge. Remove existing

IRL Place: traffic unchanged from Phase 3 Stage 1.

Ramps C and D: traffic unchanged from Phase 3 Stage 1

connection to new 1st Ave pavement.

Ramp B: traffic uses temp. connection, new ramp, and temp.

Ramp A: traffic unchanged from Phase 3 Stage 1.

1st Ave: through traffic unchanged from Phase 3 Stage 1.

Pedestrian traffic unchanged from Phase 3 Stage 1.

LEGEND

RAMP D

RAMP ARAMP C

RAMP B

I-80 WB

I-80 EB I-80 WB

I-80 EB

1S

T

AV

E

1S

T

AV

E

9TH ST

LANDING P

LACEIOWA R

IVER

DRI

VE

WA

Y

MA

GE

LL

AN

Pedestrian Box Culvert, MSE Wall, or Bridge

Permanent Pavement

Temporary Pavement

CONSTRUCTION IN PREVIOUS STAGES:

Bridge

Pedestrian Box Culvert

Permanent Pavement

Temporary Pavement

Pavement Removal

CONSTRUCTION IN CURRENT STAGE:

Staging Area

Unpinned Temporary Barrier Rail

Pinned Temporary Barrier Rail

Channelizer

Temporary Pedestrian / Bike Path

Construction Ingress / Egress

Direction of Traffic

Temporary Shoring in Place

Existing Pavement

DESIGN TEAM PROJECT NUMBER SHEET NUMBER COUNTYENGLISHFILE NO.

9:11:43 AM dsibert \\hrgreen.com\HRG\Data\2021\40120012.02\CAD\Design\CADD_Files\Sheet_Files\SHT_40120012_J01_temp.dgn

Iowa DOT \ HR Green, Inc. JOHNSON IM-80-6(253)242--13-52 J.339/17/2021

15O15O

FEET

O

SHT_40120012_J01_temp.dgn J.33 9/17/2021 9:11:49 AMPRELIMINARY SUBJECT TO CHANGE

Page 8: PRELIMINARY SUBJECT TO CHANGE

X

X

X

X

X

X

X

X

PHASE 3 STAGE 3 NOTES

9

8

7

6

5

4

3

2

1

C shoulder. Construct I-80 shoulder at existing Ramp B and Ramp C gores.

temp. detour connection. Construct Ramp B gore, Ramp B shoulder, and Ramp

north crossover, adjacent retaining wall, and new trail. Construct Ramp A

Finish Magellan entrance connection. Construct SB 1st Ave pavement north of

must exit from the existing driveway.

Magellan: traffic must enter from SB 1st Avenue into the new entrance. Traffic

IRL Place: traffic unchanged from Phase 3 Stage 2.

Ramp D: traffic unchanged from Phase 3 Stage 2.

Ramp C: traffic uses temp connection to new ramp.

pavement. SB traffic unchanged from Phase 3 Stage 2.

Ramp B: NB traffic uses new ramp and temp connection to 1st Ave

Ramp A: traffic unchanged from Phase 3 Stage 2.

1st Ave: through traffic unchanged from Phase 3 Stage 2.

Pedestrian traffic unchanged from Phase 3 Stage 2.

LEGEND

RAMP D

RAMP ARAMP C

RAMP B

I-80 WB

I-80 EB I-80 WB

I-80 EB

1S

T

AV

E

1S

T

AV

E

9TH ST

LANDING P

LACEIOWA R

IVER

DRI

VE

WA

Y

MA

GE

LL

AN

Pedestrian Box Culvert, MSE Wall, or Bridge

Permanent Pavement

Temporary Pavement

CONSTRUCTION IN PREVIOUS STAGES:

Bridge

Pedestrian Box Culvert

Permanent Pavement

Temporary Pavement

Pavement Removal

CONSTRUCTION IN CURRENT STAGE:

Staging Area

Unpinned Temporary Barrier Rail

Pinned Temporary Barrier Rail

Channelizer

Temporary Pedestrian / Bike Path

Construction Ingress / Egress

Direction of Traffic

Temporary Shoring in Place

Existing Pavement

DESIGN TEAM PROJECT NUMBER SHEET NUMBER COUNTYENGLISHFILE NO.

9:11:53 AM dsibert \\hrgreen.com\HRG\Data\2021\40120012.02\CAD\Design\CADD_Files\Sheet_Files\SHT_40120012_J01_temp.dgn

Iowa DOT \ HR Green, Inc. JOHNSON IM-80-6(253)242--13-52 J.409/17/2021

15O15O

FEET

O

SHT_40120012_J01_temp.dgn J.40 9/17/2021 9:11:59 AMPRELIMINARY SUBJECT TO CHANGE

Page 9: PRELIMINARY SUBJECT TO CHANGE

PHASE 4 STAGE 1 NOTES

proposed Ramp A gore.

Remove existing Ramp A pavement. Grade and pave

interchange.

All movements opened at the intersections north of the

entrance intersection with fully operational traffic signals.

All movements opened at the IRL Place and Magellan

to proposed ramp pavement.

Ramp A: traffic uses temporary detour connection from I-80

permanent pavement.

All 1st Ave traffic changed to operate as a full DDI on

5

4

3

2

1

LEGEND

RAMP D

RAMP ARAMP C

RAMP B

I-80 WB

I-80 EB I-80 WB

I-80 EB

1S

T

AV

E

1S

T

AV

E

9TH ST

LANDING P

LACEIOWA R

IVER

DRI

VE

WA

Y

MA

GE

LL

AN

Pedestrian Box Culvert, MSE Wall, or Bridge

Permanent Pavement

Temporary Pavement

CONSTRUCTION IN PREVIOUS STAGES:

Bridge

Pedestrian Box Culvert

Permanent Pavement

Temporary Pavement

Pavement Removal

CONSTRUCTION IN CURRENT STAGE:

Staging Area

Unpinned Temporary Barrier Rail

Pinned Temporary Barrier Rail

Channelizer

Temporary Pedestrian / Bike Path

Construction Ingress / Egress

Direction of Traffic

Temporary Shoring in Place

Existing Pavement

DESIGN TEAM PROJECT NUMBER SHEET NUMBER COUNTYENGLISHFILE NO.

9:12:16 AM dsibert \\hrgreen.com\HRG\Data\2021\40120012.02\CAD\Design\CADD_Files\Sheet_Files\SHT_40120012_J01_temp.dgn

Iowa DOT \ HR Green, Inc. JOHNSON IM-80-6(253)242--13-52 J.469/17/2021

15O15O

FEET

O

SHT_40120012_J01_temp.dgn J.46 9/17/2021 9:12:23 AMPRELIMINARY SUBJECT TO CHANGE

Page 10: PRELIMINARY SUBJECT TO CHANGE

PHASE 4 STAGE 2 NOTES

3

2

1

be required on 1st Ave and ramp terminals.

markings, etc. Intermittent full and partial lane closures may

Finish any remaining removals, grading, seeding, pavement

and gutter and landscaping in islands.

Remove temp pavement in DDI islands and construct curb

All traffic operates in the final layout.

LEGEND

RAMP D

RAMP ARAMP C

RAMP B

I-80 WB

I-80 EB I-80 WB

I-80 EB

1S

T

AV

E

1S

T

AV

E

9TH ST

LANDING P

LACEIOWA R

IVER

DRI

VE

WA

Y

MA

GE

LL

AN

Pedestrian Box Culvert, MSE Wall, or Bridge

Permanent Pavement

Temporary Pavement

CONSTRUCTION IN PREVIOUS STAGES:

Bridge

Pedestrian Box Culvert

Permanent Pavement

Temporary Pavement

Pavement Removal

CONSTRUCTION IN CURRENT STAGE:

Staging Area

Unpinned Temporary Barrier Rail

Pinned Temporary Barrier Rail

Channelizer

Temporary Pedestrian / Bike Path

Construction Ingress / Egress

Direction of Traffic

Temporary Shoring in Place

Existing Pavement

DESIGN TEAM PROJECT NUMBER SHEET NUMBER COUNTYENGLISHFILE NO.

9:27:08 AM dsibert \\hrgreen.com\HRG\Data\2021\40120012.02\CAD\Design\CADD_Files\Sheet_Files\SHT_40120012_J01_temp.dgn

Iowa DOT \ HR Green, Inc. JOHNSON IM-80-6(253)242--13-52 J.499/17/2021

15O15O

FEET

O

SHT_40120012_J01_temp.dgn J.49 9/17/2021 9:27:18 AMPRELIMINARY SUBJECT TO CHANGE