4
Rev No: Client: Company Name: Project Title: Drawing Title: Scale: Date: Drawn by: Dwg. No: Checked by: Date: Comments: C. McGee 16/02/2015 Not to Scale 3D Model Glasson Community Centre Proposal CTMN Consulting Engineers Glasson Community Group DWG_001 N. Corrigan CTMN Consulting Engineers Est. January 2015

Preliminary drawings

  • Upload
    group2

  • View
    224

  • Download
    1

Embed Size (px)

DESCRIPTION

Preliminary Proposal Drawings (Scheme Design)

Citation preview

Page 1: Preliminary drawings

Rev No:

Client:

Company Name:

Project Title:

Drawing Title:

Scale:

Date:

Drawn by:

Dwg. No:

Checked by:

Date:Comments:

C. McGee

16/02/2015

Not to Scale

3D Model

Glasson Community Centre Proposal

CTMN Consulting Engineers

Glasson Community Group

DWG_001

N. Corrigan

CTMN Consulting Engineers

Est. January 2015

Page 2: Preliminary drawings

Rev No:

Client:

Company Name:

Project Title:

Drawing Title:

Scale:

Date:

Drawn by:

Dwg. No:

Checked by:

Date:Comments:

T. Berry

16/02/2015

1:150

Elevations

Glasson Community Centre Proposal

CTMN Consulting Engineers

Glasson Community Group

DWG_002

M. Donegan

CTMN Consulting Engineers

Est. January 2015

Front Elevation

Side Elevation

Side Elevation

Rear Elevation

Page 3: Preliminary drawings

Hall

Changing 1

Changing 2

Store 1

Store 2

Hall 2

Hall 2

Lounge

Store

Bar

Female

Male

Plant

Office

Reception

D'abled

Male

Changing 4

Female

Changing 33

46

18

40944

Rev No:

Client:

Company Name:

Project Title:

Drawing Title:

Scale:

Date:

Drawn by:

Dwg. No:

Checked by:

Date:Comments:

M. Donegan

16/02/2015

1:100

Ground floor Plan

Glasson Community Centre Proposal

CTMN Consulting Engineers

Glasson Community Group

DWG_003

T. Berry

CTMN Consulting Engineers

Est. January 2015

Page 4: Preliminary drawings

2

A B

2

BA

1

1

Meeting Room 1

Meeting Room 2Clerk Projection

A

B

Cavity Trays Ltd. Polypropylene

with code 4 integral lead flashing.

To suit 75 brick coursing & 48° pitch

Facing brick 105mm

Cavity 75mm wide

30mm styrofoam insulation will be

making cut above & below cavity

tray

Cavity Trats Ltd Type X

Polypropylene with lead

Integral flashing

Redland Bridgewater tiles

418 long to 340 gauge

Redland Briidgewater tiles

Rev No:

Client:

Company Name:

Project Title:

Drawing Title:

Scale:

Date:

Drawn by:

Dwg. No:

Checked by:

Date:Comments:

N. Corrigan

16/02/2015

As Shown

First floor Plan

Glasson Community Centre Proposal

CTMN Consulting Engineers

Glasson Community Group

DWG_004

C. McGee

CTMN Consulting Engineers

Est. January 2015

Section W-W (Scale 1-50)

Section W-W (Scale 1-50)

First Floor Plan (Scale 1-50)

Abutment View Y-Y (Scale 1-10)