Preliminary Design Review Week 10. THE DUKES OF HAZARD CAMILLE LEGAULT, NEIL KENNEDY, OMAR ROJAS, FERNANDO QUIJANO, AND JIMMY BUFFI March 27, 2008. Previous Week’s Action Items. Order All Necessary Parts McMaster-Carr Complete Machining of Platform Base and Fit to Chassis - PowerPoint PPT Presentation

Citation preview

Page 1: Preliminary Design Review Week 10

Preliminary Design ReviewWeek 10

THE DUKES OF HAZARDCAMILLE LEGAULT, NEIL KENNEDY, OMAR ROJAS,

FERNANDO QUIJANO, AND JIMMY BUFFI

March 27, 2008

Page 2: Preliminary Design Review Week 10

Previous Week’s Action Items

Order All Necessary Parts McMaster-Carr

Complete Machining of Platform Base and Fit to Chassis

Continue Working on Program Interfacing with Peripheral Equipment Search Algorithm

Page 3: Preliminary Design Review Week 10

Previous Week Action Items and Status

CURRENT STATUS: Slightly Behind Schedule, No Serious Showstoppers

Page 4: Preliminary Design Review Week 10

Reasons for Delay

Expected to Receive GPS from Mr. Brownell Parts delay:

Due to redesign Platform:

Have platform with grooves Need to drill holes and fit to chassis Will be done by today

Page 5: Preliminary Design Review Week 10

Close Up of the Final Prototype Design

Page 6: Preliminary Design Review Week 10

Close-Up of CAD Features

Page 7: Preliminary Design Review Week 10

Close-Up of CAD Features

Page 8: Preliminary Design Review Week 10

Acquired Parts

12” x 24” x 3/8” Gray PVC 12” x 24” x 3/16” Clear PVC 15 lb/in Springs 57 lb-oz Servo Motor Digital Compass Bumper – Maximum deflection of 0.000406”

3

3

Wl

EI

Page 9: Preliminary Design Review Week 10

Ordered Parts

6” Long 3/16” Dia. Precision Ground Rod 6 Brass Bushings C-Clips L-Brackets 2 Hinges

To be acquired from local stores: 4 Colored Light Bulbs 4 Light Bulb Mounts Set Screws

Page 10: Preliminary Design Review Week 10

Vehicle Interfacing

Utilized keypad to interface with chassis Cued search algorithm steps with keypad Interfaced with LCD Need math.h file for certain math operations

Trigonometry Square roots Etc.

Page 11: Preliminary Design Review Week 10

Next Week’s Action Items

Complete Machining of Enclosure Walls and Top

Obtain and Test GPS from Mr. Brownell Continue Working on Program

Search algorithm and field work Interface with GPS

Page 12: Preliminary Design Review Week 10

QUESTIONS?