Preliminary Design Review Week 10. THE DUKES OF HAZARD CAMILLE LEGAULT, NEIL KENNEDY, OMAR ROJAS, FERNANDO QUIJANO, AND JIMMY BUFFI March 27, 2008. Previous Week’s Action Items. Order All Necessary Parts McMaster-Carr Complete Machining of Platform Base and Fit to Chassis - PowerPoint PPT Presentation
Citation preview
Preliminary Design ReviewWeek 10
THE DUKES OF HAZARDCAMILLE LEGAULT, NEIL KENNEDY, OMAR ROJAS,
FERNANDO QUIJANO, AND JIMMY BUFFI
March 27, 2008
Previous Week’s Action Items
Order All Necessary Parts McMaster-Carr
Complete Machining of Platform Base and Fit to Chassis
Continue Working on Program Interfacing with Peripheral Equipment Search Algorithm
Previous Week Action Items and Status
CURRENT STATUS: Slightly Behind Schedule, No Serious Showstoppers
Reasons for Delay
Expected to Receive GPS from Mr. Brownell Parts delay:
Due to redesign Platform:
Have platform with grooves Need to drill holes and fit to chassis Will be done by today
Close Up of the Final Prototype Design
Close-Up of CAD Features
Close-Up of CAD Features
Acquired Parts
12” x 24” x 3/8” Gray PVC 12” x 24” x 3/16” Clear PVC 15 lb/in Springs 57 lb-oz Servo Motor Digital Compass Bumper – Maximum deflection of 0.000406”
3
3
Wl
EI
Ordered Parts
6” Long 3/16” Dia. Precision Ground Rod 6 Brass Bushings C-Clips L-Brackets 2 Hinges
To be acquired from local stores: 4 Colored Light Bulbs 4 Light Bulb Mounts Set Screws
Vehicle Interfacing
Utilized keypad to interface with chassis Cued search algorithm steps with keypad Interfaced with LCD Need math.h file for certain math operations
Trigonometry Square roots Etc.
Next Week’s Action Items
Complete Machining of Enclosure Walls and Top
Obtain and Test GPS from Mr. Brownell Continue Working on Program
Search algorithm and field work Interface with GPS