21
UCB BERKELEY WAY PROJECT PRELIMINARY DESIGN REVIEW PACKAGE CONTENTS. VICINITY MAP SHADOW STUDY LANDSCAPE PLAN SITE PLAN FLOOR PLAN - LEVEL 1 FLOOR PLAN - LEVEL 2 FLOOR PLAN - LEVEL 3 FLOOR PLAN - LEVEL 4 FLOOR PLAN - LEVEL 5 FLOOR PLAN - LEVEL 6 FLOOR PLAN - LEVEL 7 FLOOR PLAN - LEVEL 8 FLOOR PLAN - MECHANICAL PENTHOUSE BUILDING SECTIONS WEST ELEVATION SOUTH ELEVATION EAST ELEVATION NORTH ELEVATION CONTEXTUAL ELEVATIONS EXTERIOR MATERIALS JANUARY 15TH, 2015

PRELIMINARY DESIGN REVIEW PACKAGE · project #: scale: berkeley way project - preliminary design review 01/06/15 forum section 14001.00 december 21 10 am winter solstice noon winter

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PRELIMINARY DESIGN REVIEW PACKAGE · project #: scale: berkeley way project - preliminary design review 01/06/15 forum section 14001.00 december 21 10 am winter solstice noon winter

UCB BERKELEY WAY PROJECTPRELIMINARY DESIGN REVIEW PACKAGE

CONTENTS.

VICINITY MAPSHADOW STUDYLANDSCAPE PLANSITE PLANFLOOR PLAN - LEVEL 1FLOOR PLAN - LEVEL 2FLOOR PLAN - LEVEL 3FLOOR PLAN - LEVEL 4FLOOR PLAN - LEVEL 5FLOOR PLAN - LEVEL 6FLOOR PLAN - LEVEL 7FLOOR PLAN - LEVEL 8FLOOR PLAN - MECHANICAL PENTHOUSEBUILDING SECTIONSWEST ELEVATIONSOUTH ELEVATIONEAST ELEVATIONNORTH ELEVATIONCONTEXTUAL ELEVATIONSEXTERIOR MATERIALS

JANUARY 15TH, 2015

Page 2: PRELIMINARY DESIGN REVIEW PACKAGE · project #: scale: berkeley way project - preliminary design review 01/06/15 forum section 14001.00 december 21 10 am winter solstice noon winter

SCALE:PROJECT #:

BERKELEY WAY PROJECT - PRELIMINARY DESIGN REVIEW 1" = 50'-0"

01/06/15

VICINTY MAP14001.00

0' 25' 50' 100' 200'

01/15/15

Page 3: PRELIMINARY DESIGN REVIEW PACKAGE · project #: scale: berkeley way project - preliminary design review 01/06/15 forum section 14001.00 december 21 10 am winter solstice noon winter

SCALE:PROJECT #:

BERKELEY WAY PROJECT - PRELIMINARY DESIGN REVIEW 01/06/15

FORUM SECTION14001.00

DECEMBER 21

10 AM WINTER SOLSTICE

NOON WINTER SOLSTICE

3PM WINTER SOLSTICE

SEPTEMBER 21

9 AM EQUINOX

NOON EQUINOX

4PM EQUINOX

JUNE 21

9AM SUMMER SOLSTICE

NOON SUMMER SOLSTICE

4PM SUMMER SOLSTICE

SHADOW STUDY01/15/15

Page 4: PRELIMINARY DESIGN REVIEW PACKAGE · project #: scale: berkeley way project - preliminary design review 01/06/15 forum section 14001.00 december 21 10 am winter solstice noon winter

BIKE LANE

+210

+205

+209

+208

+207

+206

+205

+207.5

+210

+TW207.5

+TW 210

+TW 210

+203+197.5 +205

+TW206.5

+TW206.5

+TW206.5

TW 206.5 +

+200.5

+205

+205

204.6 +

204.5+

203 + 203.6+

203.3 ++203.6+203.1

203.4 +

+204.1+204.6

204.1 +204.6 +

204.85+204.85+

204.55+

204.15+

204.35+

204.7+204.7+

+204.7

TW 206.2+

BERKELEY W AY

UP

UP

1

E

F

G

H

D

C

B

A

2 3 4 5 6 7 8 9

PLAZA

47'-0"

35'-0

"34

'-0"

DRIVEWAY

LIFT

(E) ENERGYBIOSCIENCES

BUILDING

(E)RESIDENTIAL

BUILDING

GAS METER

LOADINGAREA

FIRE PUMPROOM

GENERATORROOM

MAINELECTRICAL

ROOM

RETAIL 1

DOM

ESTI

CW

ATER

PUM

P

RETAIL 2

BIKESTORAGE

(99)

COLLOQUIUM75

COMPUTERLAB

CLASSROOM30

CLASSROOM30

CLASSROOM30

SEMINAR

CLASSROOM30

CLASSROOM30

SEMINARCLASSROOM

45

COLLOQUIUM75

SEMINAR

SEMINAR

SECURITY

BDF

FIRECOMMAND

IDF

STORAGE

STAIR 1

MAIL ROOM

SEMINAR

CLASSROOM30

CO

RRI

DO

R

ELEVATORLOBBY

SEMINAR

WATERMETER

SHOWERROOM

ACCESSIBLESHOWER

ROOM

SHOWERROOM

ACCESSIBLESHOWER

ROOM

40'-11"

7'-0"

BACKFLOWPREVENTER

SEATINGAREA

SEATINGAREA

COMPACTOR

1:12 UP

1:12 UP 1:12 UP

1:12

UP

1:12

UP

SCALE:PROJECT #:

BERKELEY WAY PROJECT - PRELIMINARY DESIGN REVIEW 1" = 20'-0"

01/15/15

SITE PLAN14001.00

1

1

1

1

4 56

7

8

9

9

9 99

9

10

11

11

11

12

12

12

2

22

3

3

3

LEGEND

1. INTEGRAL COLOR CONCRETE PAVING2. INTEGRAL COLOR CONCRETE STAIR3. SITE RETAINING WALL, TYP.4. PERMEABLE UNIT PAVERS5. DECOMPOSED GRANITE PAVING6. BENCH, TYP.

7. PICNIC TABLE, TYP.8. BIKE RACKS, TYP.9. PLANTING AREA10. PROPOSED PLAZA TREES11. PROPOSED STREET TREES12. NEW CONCRETE SIDEWALK

BERKELEY WAY

HEARST AVENUE

WA

LNU

TST

REE

T

WA

LNU

TST

REE

T

SHAT

TUC

K A

VEN

UE

OXF

OR

D S

TREE

T

01/15/15

Page 5: PRELIMINARY DESIGN REVIEW PACKAGE · project #: scale: berkeley way project - preliminary design review 01/06/15 forum section 14001.00 december 21 10 am winter solstice noon winter

BERKELEY W AYBERKELEY W AY

UP

UP

PLAZA

DRIVEWAY

LIFT

(E) ENERGYBIOSCIENCES

BUILDING

(E)RESIDENTIAL

BUILDING

GAS METER

LOADINGAREA

FIRE PUMPROOM

GENERATORROOM

MAINELECTRICAL

ROOM

RETAIL 1

DOM

ESTI

CW

ATER

PUM

P

RETAIL 2

BIKESTORAGE

(99)

COLLOQUIUM75

COMPUTERLAB

CLASSROOM30

CLASSROOM30

CLASSROOM30

SEMINAR

CLASSROOM30

CLASSROOM30

SEMINARCLASSROOM

45

COLLOQUIUM75

SEMINAR

SEMINAR

SECURITY

BDF

FIRECOMMAND

IDF

STORAGE

STAIR 1

MAIL ROOM

SEMINAR

CLASSROOM30

CO

RRI

DO

R

ELEVATORLOBBY

SEMINAR

WATERMETER

SHOWERROOM

ACCESSIBLESHOWER

ROOM

SHOWERROOM

ACCESSIBLESHOWER

ROOM

BACKFLOWPREVENTER

SEATINGAREA

SEATINGAREA

COMPACTOR

BERKELEY WAY

SHAT

TUC

KAV

ENU

E

HEARST AVENUE

OXF

OR

DST

REE

T

BIKE ENTRANCE

ENTRANCE

ENTRANCE

OHLONE WAY BIKE LANE

SCALE:PROJECT #:

BERKELEY WAY PROJECT - PRELIMINARY DESIGN REVIEW 1" = 20'-0"

01/06/15

SITE PLAN14001.00

BERKELEY W AYBERKELEY W AY

UP

UP

PLAZA

DRIVEWAY

LIFT

(E) ENERGYBIOSCIENCES

BUILDING

(E)RESIDENTIAL

BUILDING

GAS METER

LOADINGAREA

FIRE PUMPROOM

GENERATORROOM

MAINELECTRICAL

ROOM

RETAIL 1

DOM

ESTI

CW

ATER

PUM

P

RETAIL 2

BIKESTORAGE

(130)

COLLOQUIUM75

COMPUTERLAB

CLASSROOM30

CLASSROOM30

CLASSROOM30

SEMINAR

CLASSROOM30

CLASSROOM30

SEMINAR

CLASSROOM45

COLLOQUIUM75

SEMINAR

SEMINAR

SECURITY

BDF

FIRECOMMAND

IDF

STAIR 1

MAIL ROOM

SEMINAR

CLASSROOM30

CO

RRI

DO

R

ELEVATORLOBBY

SEMINAR

WATERMETER

SHOWERROOM

ACCESSIBLESHOWER

ROOM

SHOWERROOM

ACCESSIBLESHOWER

ROOM

BACKFLOWPREVENTER

SEATINGAREA

SEATINGAREA

COMPACTOR

BERKELEY WAY

SHAT

TUC

KAV

ENU

E

HEARST AVENUE

OXF

OR

DST

REE

T

BIKE ENTRANCE

ENTRANCE

ENTRANCE

OHLONE WAY BIKE LANE

WAL

NU

T ST

REE

T

WAL

NU

T ST

REE

T

7'-4"

22'-9"

8'-3

"

6'-6

"

LINE OFBUILDINGABOVE

01/15/15

Page 6: PRELIMINARY DESIGN REVIEW PACKAGE · project #: scale: berkeley way project - preliminary design review 01/06/15 forum section 14001.00 december 21 10 am winter solstice noon winter

BERKEL EY WAYBERKEL EY WAY

UP

UP

UP

UP

UP

UP

UP

1

E

F

G

H

D

C

B

A

2 3 4 5 6 7 8 9

30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0"

240'-0"

30'-0

"30

'-0"

30'-0

"20

'-0"

30'-0

"30

'-0"

30'-0

"

200'

-0"

HEARST AVE.

SHAT

TUC

K AV

E.

BERKELEY WAY

LINE OFBUILDINGABOVE

FIRECOMMAND

STAIR 1

392 SFSEMINAR

403 SFSEMINAR

400 SFSEMINAR

399 SFSEMINAR

700 SF

CLASSROOM30

676 SF

CLASSROOM30

676 SF

CLASSROOM30

710 SF

CLASSROOM30

365 SFSEMINAR

365 SFSEMINAR

806 SF

CLASSROOM45

546 SF

CLASSROOM30

576 SF

CLASSROOM30

1,426 SF

COLLOQUIUM75

1,455 SF

COLLOQUIUM75

2,041 SF

COMPUTERLAB

RAMP UP 1:12RAMP UP 1:12

+205.00'+202.00' +203.75'

218 SFGAS METER

RAM

P U

P 1:

12R

AMP

UP

1:12

+209.00'

+207.00'

+205.00'

1,777 SF

BIKESTORAGE (99)

ELEVATORLOBBY

234 SFSECURITY

+208.50'

+203.75'

+202.00'

141 SF

WATERMETER

639 SF

GENERATORROOM

353 SFCOMPACTOR

773 SF

LOADINGAREA

1,205 SF

MAINELECTRICAL

ROOM

3,823 SFRETAIL 1

4,353 SFRETAIL 2

+205.00'

SHOWERROOM

SHOWERROOM

ACCESSIBLESHOWER

ROOM

ACCESSIBLESHOWER

ROOM

231 SFBDF

157 SF

DOMESTICWATER PUMP

319 SF

FIRE PUMPROOM

193 SFIDF

414 SFMAIL ROOM

180 SFSTORAGE

CO

RRID

OR

LINE OFBUILDINGABOVE

1,322 SF

SEATINGAREA

827 SF

SEATINGAREA

183 SF

BACKFLOWPREVENTER

+205.00'

+200.00'

RAMP UP 1:12

+203.75'

+205.00'

+202.00'

LIFT

SERVICECORRIDOR

GREASEINTERCEPTORBELOW, SPD

INTAKEAIR

BAFFLE

EXHAUSTAIR

BAFFLE

RECESSED FUELING PORT

SCALE:PROJECT #:

BERKELEY WAY PROJECT - PRELIMINARY DESIGN REVIEW 3/32" = 1'-0"

01/06/15

FLOOR PLAN - LEVEL 114001.00

01/15/15

Page 7: PRELIMINARY DESIGN REVIEW PACKAGE · project #: scale: berkeley way project - preliminary design review 01/06/15 forum section 14001.00 december 21 10 am winter solstice noon winter

DN UP

UPDN

UP

1

E

F

G

H

D

C

B

A

2 3 4 5 6 7 8 9

30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0"

240'-0"

30'-0

"30

'-0"

30'-0

"20

'-0"

30'-0

"30

'-0"

30'-0

"

200'

-0"

OPEN TOBELOW

GYP BD FURRING ATCONCRETE SHEARWALLS TYPICAL WHEREEXPOSED

STAIR 1

STAIR 2

STAIR 3

849 SF

CLASSROOM45

878 SF

CLASSROOM45

409 SFSEMINAR

2,295 SF

STUDENTLOUNGE

395 SFSEMINAR

183 SFAV ROOM

831 SF

STUDENTSERVICES

CANTILEVERED GLASSGUARDRAIL

266 SF

ELEVATORLOBBY

470 SFSEMINAR

IDF

ELECT

128 SFELECT

92 SFSTORAGEIDF

7,922 SFOFFICE

22,041 SFCLINIC

LEVEL 2

SCALE:PROJECT #:

BERKELEY WAY PROJECT - PRELIMINARY DESIGN REVIEW 3/32" = 1'-0"

01/06/15

FLOOR PLAN - LEVEL 214001.00

01/15/15

Page 8: PRELIMINARY DESIGN REVIEW PACKAGE · project #: scale: berkeley way project - preliminary design review 01/06/15 forum section 14001.00 december 21 10 am winter solstice noon winter

UP

UP

DNUP

1

E

F

G

H

D

C

B

A

2 3 4 5 6 7 8 9

LEVEL 3

44,359 SFOFFICE

OPEN TOBELOW

30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0"

240'-0"

GYP BD FURRING AT CONCRETESHEAR WALLS TYPICAL WHEREEXPOSED

ELEVATORLOBBY

STAIR 2

STAIR 1

STAIR 3

GLASS PARTITIONSPRINKLERED ON BOTHSIDES - 2HR EQUIVALENT

GLASS PARTITIONSPRINKLERED ON BOTHSIDES - 2HR EQUIVALENT

AUTOMATIC MOVEABLE FIREWALL 2-HOUR RATEDAUTOMATIC MOVEABLE FIREWALL 2-HOUR RATED

CANTILEVERED GLASSGUARDRAIL

ELECT

IDF128 SFELECT

92 SFSTORAGE

IDF

30'-0

"30

'-0"

30'-0

"20

'-0"

30'-0

"30

'-0"

30'-0

"

200'

-0"

SCALE:PROJECT #:

BERKELEY WAY PROJECT - PRELIMINARY DESIGN REVIEW 3/32" = 1'-0"

01/06/15

FLOOR PLAN - LEVEL 314001.00

01/15/15

Page 9: PRELIMINARY DESIGN REVIEW PACKAGE · project #: scale: berkeley way project - preliminary design review 01/06/15 forum section 14001.00 december 21 10 am winter solstice noon winter

UP

DNUP

1

E

F

G

H

D

C

B

A

2 3 4 5 6 7 8 9

LEVEL 4

43,600 SFOFFICE

OPEN TOBELOW

30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0"

240'-0"

GYP BD FURRING AT CONCRETESHEAR WALLS TYPICAL WHEREEXPOSED

CANTILEVERED GLASSGUARDRAIL

ELEVATORLOBBY

STAIR 2

STAIR 1

STAIR 3

160 SFIDF 128 SF

ELECT

155 SFIDFELECT

30'-0

"30

'-0"

30'-0

"20

'-0"

30'-0

"30

'-0"

30'-0

"

200'

-0"

SCALE:PROJECT #:

BERKELEY WAY PROJECT - PRELIMINARY DESIGN REVIEW 3/32" = 1'-0"

01/06/15

FLOOR PLAN - LEVEL 414001.00

01/15/15

Page 10: PRELIMINARY DESIGN REVIEW PACKAGE · project #: scale: berkeley way project - preliminary design review 01/06/15 forum section 14001.00 december 21 10 am winter solstice noon winter

UP

DN

1

E

F

G

H

D

C

B

A

2 3 4 5 6 7 8 9

ROOF

OPEN TOBELOW

LEVEL 5

30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0"

240'-0"

GYP BD FURRING AT CONCRETESHEAR WALLS TYPICAL WHEREEXPOSED

GLASS PARTITIONSPRINKLERED ON BOTHSIDES - 2HR EQUIVALENT

AUTOMATIC MOVEABLE FIREWALL 2-HOUR RATEDAUTOMATIC MOVEABLE FIREWALL 2-HOUR RATED

CANTILEVERED GLASSGUARDRAIL

STAIR 3

ELEVATORLOBBY

STAIR 2

STAIR 1

2,294 SF

MECHANICALPENTHOUSE

ELECT

IDF

IDF128 SFELECT

92 SFSTORAGE

30'-0

"30

'-0"

30'-0

"20

'-0"

30'-0

"30

'-0"

30'-0

"

200'

-0"

36,602 SFOFFICE

SCALE:PROJECT #:

BERKELEY WAY PROJECT - PRELIMINARY DESIGN REVIEW 3/32" = 1'-0"

01/06/15

FLOOR PLAN - LEVEL 514001.00

01/15/15

Page 11: PRELIMINARY DESIGN REVIEW PACKAGE · project #: scale: berkeley way project - preliminary design review 01/06/15 forum section 14001.00 december 21 10 am winter solstice noon winter

1

E

F

G

H

D

C

B

A

2 3 4 5 6 7 8 9

30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0"

240'-0"

ELEVATORLOBBY

23,300 SFOFFICE

MECHANICALPENTHOUSE ROOF

ROOF

SKYLIGHT

92 SFSTORAGE

128 SFELECTIDF

30'-0

"30

'-0"

30'-0

"20

'-0"

30'-0

"30

'-0"

30'-0

"

200'

-0"

ROOFBELOW

STAIR 2

LEVEL 6

SCALE:PROJECT #:

BERKELEY WAY PROJECT - PRELIMINARY DESIGN REVIEW 3/32" = 1'-0"

01/06/15

FLOOR PLAN - LEVEL 614001.00

01/15/15

Page 12: PRELIMINARY DESIGN REVIEW PACKAGE · project #: scale: berkeley way project - preliminary design review 01/06/15 forum section 14001.00 december 21 10 am winter solstice noon winter

1

E

F

G

H

D

C

B

A

2 3 4 5 6 7 8 9

LEVEL 7

30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0"

240'-0"

ELEVATORLOBBY

STAIR 1

STAIR 2

128 SFELECT

160 SFIDF

30'-0

"30

'-0"

30'-0

"20

'-0"

30'-0

"30

'-0"

30'-0

"

200'

-0"

23,276 SFOFFICE

SCALE:PROJECT #:

BERKELEY WAY PROJECT - PRELIMINARY DESIGN REVIEW 3/32" = 1'-0"

01/06/15

FLOOR PLAN - LEVEL 714001.00

01/15/15

Page 13: PRELIMINARY DESIGN REVIEW PACKAGE · project #: scale: berkeley way project - preliminary design review 01/06/15 forum section 14001.00 december 21 10 am winter solstice noon winter

1

E

F

G

H

D

C

B

A

2 3 4 5 6 7 8 9

LEVEL 8

30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0"

240'-0"

ELEVATORLOBBY

STAIR 1

STAIR 2

92 SFSTORAGE

128 SFELECTIDF

30'-0

"30

'-0"

30'-0

"20

'-0"

30'-0

"30

'-0"

30'-0

"

200'

-0"

22,726 SFOFFICE

SCALE:PROJECT #:

BERKELEY WAY PROJECT - PRELIMINARY DESIGN REVIEW 3/32" = 1'-0"

01/06/15

FLOOR PLAN - LEVEL 814001.00

01/15/15

Page 14: PRELIMINARY DESIGN REVIEW PACKAGE · project #: scale: berkeley way project - preliminary design review 01/06/15 forum section 14001.00 december 21 10 am winter solstice noon winter

1

E

F

G

H

D

C

B

A

2 3 4 5 6 7 8 9

900 SFBOILER ROOM

ELEVCONTROL

ELEVATORLOBBY

605 SF

PLUMBINGROOM

8,350 SF

MECHANICALPENTHOUSE

30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0"

240'-0"

ROOF

30'-0

"30

'-0"

30'-0

"20

'-0"

30'-0

"30

'-0"

30'-0

"

200'

-0"

STAIR 2

IDEC UNIT, SMD

SUPPLY FAN WALL, SMD

DIRECT EVAP SECTION, SMD

ROOF

SCALE:PROJECT #:

BERKELEY WAY PROJECT - PRELIMINARY DESIGN REVIEW 3/32" = 1'-0"

01/06/15

FLOOR PLAN - MECH PENTHOUSE14001.00

01/15/15

Page 15: PRELIMINARY DESIGN REVIEW PACKAGE · project #: scale: berkeley way project - preliminary design review 01/06/15 forum section 14001.00 december 21 10 am winter solstice noon winter

FF LEVEL 223'-0"

FF LEVEL 335'-9"

FF LEVEL 448'-6"

FF LEVEL 561'-3"

FF LEVEL 674'-0"

FF LEVEL 786'-9"

FF LEVEL 899'-6"

PH ROOF131'-3"

1

FF LEVEL 15'-0"

23456789

FF LEVEL 9112'-3"

18'-0

"12

'-9"

12'-9

"12

'-9"

12'-9

"12

'-9"

12'-9

"12

'-9"

19'-0

"

126'

-3"

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

RETAILCLASSROOM

107'

-3"

STUDENTLOUNGE

2A.330

FF LEVEL 223'-0"

FF LEVEL 335'-9"

FF LEVEL 448'-6"

FF LEVEL 561'-3"

FF LEVEL 674'-0"

FF LEVEL 786'-9"

FF LEVEL 899'-6"

PH ROOF131'-3"

FF LEVEL 15'-0"

EFGH D C B A

FF LEVEL 9112'-3"

1A.330

18'-0

"12

'-9"

12'-9

"12

'-9"

12'-9

"12

'-9"

12'-9

"12

'-9"

19'-0

"

126'

-3"

107'

-3"

SCALE:PROJECT #:

BERKELEY WAY PROJECT - PRELIMINARY DESIGN REVIEW 1/16" = 1'-0"

01/06/15

BUILDING SECTIONS14001.00

1/16" = 1'-0"1 BUILDING SECTION LOOKING SOUTH

1/16" = 1'-0"2 BUILDING SECTION LOOKING WEST

01/15/15

Page 16: PRELIMINARY DESIGN REVIEW PACKAGE · project #: scale: berkeley way project - preliminary design review 01/06/15 forum section 14001.00 december 21 10 am winter solstice noon winter

PENTHOUSE

PARAPET

LEVEL 2

AVG GRADEAVG GRADE

PODIUM

70’-8”

18’-0”

110’-3”

127’-9”

SCALE:PROJECT #:

BERKELEY WAY PROJECT - PRELIMINARY DESIGN REVIEW 01/06/15

WEST ELEVATION14001.00

0' 5' 11' 21' 43'

01/15/15

Page 17: PRELIMINARY DESIGN REVIEW PACKAGE · project #: scale: berkeley way project - preliminary design review 01/06/15 forum section 14001.00 december 21 10 am winter solstice noon winter

PENTHOUSE

PARAPET

LEVEL 2

AVG GRADE

18’-0”

110’-3”

127’-9”

SCALE:PROJECT #:

BERKELEY WAY PROJECT - PRELIMINARY DESIGN REVIEW 01/06/15

SOUTH ELEVATION14001.00

0' 5' 11' 21' 43'

01/15/15

Page 18: PRELIMINARY DESIGN REVIEW PACKAGE · project #: scale: berkeley way project - preliminary design review 01/06/15 forum section 14001.00 december 21 10 am winter solstice noon winter

SCALE:PROJECT #:

BERKELEY WAY PROJECT - PRELIMINARY DESIGN REVIEW 01/06/15

EAST ELEVATION14001.00

0' 5' 11' 21' 43'

PENTHOUSE

PODIUM

PARAPET

LEVEL 2

AVG GRADE AVG GRADE

18’-0”

110’-3”

127’-9”

70’-8”

01/15/15

Page 19: PRELIMINARY DESIGN REVIEW PACKAGE · project #: scale: berkeley way project - preliminary design review 01/06/15 forum section 14001.00 december 21 10 am winter solstice noon winter

PENTHOUSE

PODIUM

PARAPET

LEVEL 2

AVG GRADE

18’-0”

110’-3”

127’-9”

70’-8”

SCALE:PROJECT #:

BERKELEY WAY PROJECT - PRELIMINARY DESIGN REVIEW 01/06/15

NORTH ELEVATION14001.00

0' 5' 11' 21' 43'

01/15/15

Page 20: PRELIMINARY DESIGN REVIEW PACKAGE · project #: scale: berkeley way project - preliminary design review 01/06/15 forum section 14001.00 december 21 10 am winter solstice noon winter

SCALE:PROJECT #:

BERKELEY WAY PROJECT - PRELIMINARY DESIGN REVIEW 01/06/15

FORUM SECTION14001.00

CONTEXTUAL ELEVTATIONS1” = 30’

01/15/15

Page 21: PRELIMINARY DESIGN REVIEW PACKAGE · project #: scale: berkeley way project - preliminary design review 01/06/15 forum section 14001.00 december 21 10 am winter solstice noon winter

SCALE:PROJECT #:

BERKELEY WAY PROJECT - PRELIMINARY DESIGN REVIEW 01/06/15

FORUM SECTION14001.00

WHITE GRFC ANODIZED CHAMPAGNE ALUMINUM NEUTRAL PORCELAIN TILE

EBONY BRICK

CRYSTAL GREY GLASS CORRUGATED METAL (PAINTED)

NEUTRAL/TAN/WHITE BRICK

RETAIL

WHITE GRFC EXTERIORENVELOPE

ANODIZED CHAMPAGNEALUMINUM MULLIONS

PORCELAIN TILEEBONY BRICKNEUTRAL BRICK

BASE:

TOP:

CRYSTAL GREY GLASS

MECHANIZEDINTERIOR SHADES

INTERIOR LIGHT SHELF

SCHEMATIC ENLARGED ELEVATION

OPTIONS

SOLARBAN 72 GLASS

LANDSCAPE MATERIALS

CORRUGATED METAL

EXTERIOR MATERIALS

SOLARBAN 72 GLASS

RICH PORCELAIN TILE

BASE OPTION 1

BASE OPTION 2

BASE OPTION 3BASE OPTION 4

01/15/15