  • Punjab Infrastructure Development Board

    ChandigarhAug 20, 2008

  • Development of Punjab Habitat

    Centre at MohaliPre-bid Meeting

    Aug 20, 2008

    Punjab Infrastructure Development Board

  • Habitat Centre It should provide finest convention facilities and

    should be able to host premier cultural and entertainment events

    It should cover a wide range of activities that would maximize the effectiveness of individuals and institutions

    It should have a variety of restaurants with elaborate menu options

    The principal resolve should be restore environment and ecology to reflect a balanced, harmonious and improved way of life

  • Built Configuration

    To be designed to achieve Platinum LEED rating from Green Building Council- India

    Iconic Structure to reflect the image of PunjabThe drawing shown is for illustrative purpose only. Actual design may be different

    Conceptual Idea

  • Site Details1 Location Sector 68

    Area 4.787 acres of prime land

    Adjoining Municipal Council Building

    Surrounded by roads on two sides

    Proposal to develop adjoining road into urban expressway within Mohali by GMADA in order to provide fast airport connectivity

    Proposed IT Park located in the plot opposite Municipal Building

  • Site Details2

    Mohali City Centre About 2 Kms

    Mohali Stadium About 2 Kms

    Proposed International Airport at Mohali About 7 kms

    Chandigarh Railway Station About 10 kms

    Proposed IT Park Opposite

  • Location

    Proposed Site

  • Sector 68Proposed Site for

    Habitat CentreArea 4.787

    acres

    Municipal Bhavan

    Location

  • Land Use Habitat Centre

    Floor Area Ratio (FAR): 1:3

    Maximum Ground Coverage: 40%

    No height restriction subject to clearance from Air Force and other relevant authorities

    General Development and Control Regulation

  • Project Brief1

    Project Structure : Design, Build, Operate, Transfer GMADA Area(About 10% of BUA):

    Certain Facilities would be built and handed over to GMADA free of cost immediately after construction

    Interiors of GMADA area would be done by GMADA at its own cost

    Operation & Maintenance of GMADA area would be under GMADA

    Design and Architecture of GMADA Area shall be consistent with the overall design and concept

    Concessionaire Area: Certain minimum development obligations

  • Project Brief2

    Concession Period: 35 years (including construction period)

    Construction Period : 2 years extendable to maximum 3 years

    Bid Parameter : Upfront Concession Fee Annual Concession Fee : 5% of Upfront

    Consideration with inflation-linked escalation every year

  • Project Brief3

    Upfront Concession Fee payable in two tranches: Tranche 1: 50% within the stipulated time of the

    issue of Letter of Intent Tranche 2: 50% within 6 months of the execution

    of Concession Agreement Annual Concession Fee payable on the

    Compliance Date

  • Project Brief4

    Project Development Fee (Rs. 1 Crore) payable within 3 weeks of issue of LOI

    Lease Rental : Rs. 50000 p.a. payable on the date of signing of Lease Deed

  • Project Brief3

    Concessioning Authority: Greater Mohali Area Development Authority (GMADA)

    Developer: SPC formed by the Private Sector Participant (Selected Bidder)

    Confirming Party: The Selected Bidder

  • Project Implementation

    15

  • Development Brief1

    The spatial, infrastructural and aesthetical demands of all facilities should be blended well with the aesthetics, design, energy conservation concepts, eco-friendliness and green building architecture.

    Detailed design should conform to the prevalent building bye-laws and development regulations

    The design should also conform to LEED INDIA Green Building Rating System, Abridged Reference Guide- For New Construction & Major Renovations (LEED NC) Version 1.0 such that the Project gets LEED Certified rating under the Rating system.

  • Development Brief2

    Scope of Work Conceptualization, Planning, Designing, Detailing,

    Construction and Implementation of the Project Facilities and Support Facilities

    Carry out Minimum Development Obligations

    Technical and Financial Closure

    Marketing of the Project.

  • Development Brief2

    Scope of Work Routine and Periodic Maintenance of Project

    Components in Developer Area; and Common Areas

    Operation & Management of Project Facilities in Developer Area

    Transfer of Project Facilities to GMADA at the end of Authorization Period as prescribed in RFP

  • Essential Facilities with the Concessionaire

    Business Complex - banks and corporate offices, which will twine as an integral part of the overall Habitat Centre (2,33,600 sqft minimum)

    Art Gallery/Exhibition Space (5000 sqft minimum)

    Pictures shown are for illustrative purpose only. Actual design may be different

    Pictures shown are for illustrative purpose only. Actual design may be different

  • Essential Facilities with the Concessionaire

    Conference and Banquet Halls (47250 sqft minimum)

    Administration Block (4500 sqft minimum)

    Support Facilities, Parking and On-site Infrastructure

    Pictures shown are for illustrative purpose only. Actual design may be different

    Pictures shown are for illustrative purpose only. Actual design may be different

  • Optional Facilities with the Concessionaire

    Lodging and Boarding Facility (indicative area-1,22,700 sqft ) 10% of the total rooms shall be

    reserved for GMADA at a concessional rate of Rs. 1000/-per day subject to an increase of 10% every two years

    Ethnic/High-end Shopping (indicative area -31050 sqft )

    Pictures shown are for illustrative purpose only. Actual design may be different

    Pictures shown are for illustrative purpose only. Actual design may be different

  • Essential Facilities to be Transferred to GMADA1

    Conference & Banquet Facility ( Area 3500 sqft)

    Health Club, Swimming Pool, Filtration Plant and Changing Rooms (18000 sq.ft)

    Restaurants (3 nos)

    Restaurant 1 (2500 sqft)

    Restaurant 2 (4600 sqft)

    Restaurant 3 (4000 sqft)

    Pictures shown are for illustrative purpose only. Actual design may be different

  • Essential Facilities to be Transferred to GMADA3

    Library & Resource Centre (Area: 8500 sqft)

    Family Hall (Area 9000 sqft)

    Activity Rooms (3 x 2500 sqft)

    Open Space for Club Activities (7000 sqft)

    Area in Administration Block (1500 sqft)

    Pictures shown are for illustrative purpose only. Actual design may be different

    Pictures shown are for illustrative purpose only. Actual design may be different

  • Private Sector Parties

    PIDB & IL&FS IDC

    Concessioning Authority & PIDB

    Selected Bidder

    PIDB & IL&FS IDC

    Pre Proposal Conference

    Submission of Technical & Financial Proposal

    Evaluation of Technical & Financial Proposal

    Issue of Notice of Award

    Compliance of Preconditions

    PIDB& IL&FS IDC Finalization of Concession Agreement

    Concessioning Authority &

    PIDB & IL&FS IDC Issue of RFP document

    PIDB & IL&FS IDC Notice Inviting Proposal

    Execution of Concession Agreement

    Bidding Process

    Selected Bidder & PIDB

  • Proposal Requirement1

    Each Bidder shall submit only one proposal

    Special Purpose Company to be mandatorily incorporated by the preferred bidder/bidding consortium

    Maximum number of members/partners in consortium, partnership or joint venture allowed is limited to 5, including the Lead Member

    Lead Member of Consortium shall hold at least 51% equity in the SPC. Other members shall hold at least 10% equity in the SPC at all times during a period which shall not be less than eight (8)years from the date of signing of the Concession Agreement.

  • Proposal Requirement2

    Period of Proposal Validity: 180 days from Proposal Due DateAmount of Proposal Security: Rupees One Crore Only in form of Demand

    Draft/ Bank Guarantee from a scheduled bank (not being cooperative bank)

    Amount of Project Development Fees:

    Rupees One Crore only

    Proposal (As per Volume 1: Section1- Part 6 of RFP)

    Outer Envelope Envelope A : Capability Statement Envelope B: Technical Proposal Envelope C: Financial Proposal

    No of Copies of Proposal: Original + 2 CopiesConcession Period: 35 years; inclusive of construction period

    of 2 years extendable by max 1 year in two blocks of 6 months each subject to payment of additional premium(i)First extension 5% of Upfront Concession Fee(ii)Second extension 10% of Upfront Concession Fee

  • Outer Envelope Covering Letter/Application as per Appendix A1 of Section II, Volume I of

    RFP Checklist of submissions as per Appendix A2 of Section II, Volume I of RFP Bid Security Letter of Undertaking that the Bidder is not barred from participating in such

    projects as per Appendix A3 Section II, Volume I of RFP. Project Undertaking as per Appendix A4 of Section II of Volume I of this

    RFP. An undertaking to pay the Project Development Fee as per Appendix A5 of

    Section II of Volume I In case of Bidder being a Consortium: Consortium Agreement duly signed by all members of the Consortium as

    per Appendix A6 of Section II, Volume I Power of Attorney and nominating one member as Lead Member of the

    Consortium as per Appendix A7 of Section II, Volume I Power of Attorney for the Bid Signatory as per Appendix A8 of Section II,

    Volume I of this RFP. Envelopes 1, 2 and 3 as mentioned earlier containing Capability Statement,

    Technical Bid and Price Bid.

  • Envelope 1: Capability Statement

    General Information of the Bidder (Appendix B1 of Volume 1 Section II)

    Financial Data (Appendix B2 of Volume 1 Section II)

    Development/ Construction Experience Details (Appendix B3 of Volume 1 Section II)

  • Envelope 2: Technical Proposal

    Undertaking by the Bidder as per Appendix C1 of VolumeI - Section II

    A copy of the RFP document duly signed on each page

  • Envelope 3: Financial Proposal

    Price Bid and Letter as per Form of Bid Letter as per Appendix D1 of Volume 1 Section II

  • Key Features of the Concession Agreement

    Conditions Precedent of the Concessioning Authority Hand over vacant possession of the site Execute Project Site Lease Deed Procure change in land-use, if required Appoint Independent Engineer Constitute Maintenance Board Issue necessary notifications /Government orders,

    if required, regarding implementation of the Project

    Pictures shown are for illustrative purpose only. Actual design may be different

  • Key Features of the Concession Agreement

    Conditions Precedent of the Concessionaire Make all applications at its cost and procure Applicable

    Permits Provide notarized true copies of its constitutional

    documents and board resolutions authorizing the execution, delivery and performance of the agreement

    Achieve Financial Closure and provide notarized true copies of the Financing Documents

    Procure approval of DPR by the Independent Engineer Procure Environment Clearance Confirm in writing that all representations and warranties

    forming part of the agreement are true and correct

    Pictures shown are for illustrative purpose only. Actual design may be different

  • Key Features of the Concession Agreement

    Obligation to Satisfy Conditions Precedent Each party shall make reasonable efforts to comply with

    CP within 180 days of execution of Concession Agreement If CP are not met by the Concessioning Authority, both

    Upfront Concession Fee and Construction Performance Security shall be refunded in full, provided there are no other outstanding claims on the Concessionaire

    If CP are not met by Concessionaire, Performance Security will be forfeited by the Concessioning Authority

    The parties may, by mutual agreement, extend the time for fulfilling Conditions Precedent

    Pictures shown are for illustrative purpose only. Actual design may be different

  • Key Features of the Concession Agreement

    No Lease/ Sub-lease of Project Site The Concessionaire shall not sub-lease the whole or any

    part of the land comprising the Project Site, leased to it by Concessioning Authority under the Project Site Lease Deed, to any person in any form or under any arrangement, device or method. This is an essential condition of this Agreement, the breach of which shall constitute an Concessionaire Event of Default

    Pictures shown are for illustrative purpose only. Actual design may be different

  • Key Features of the Concession Agreement

    Project Monitoring Concessioning Authority shall, within 6 months of

    Execution of CA, appoint a consulting firm/company having requisite experience as an Independent Engineer through a competitive bidding process (QCBS)

    Role: Review, approve and monitor at the design phasen and construction phase

    Concesionaire will have a right to shortlist 3 from a list of 5 shortlisted by CA

    CA shall bear the fees and costs of IE

    Pictures shown are for illustrative purpose only. Actual design may be different

  • Key Features of the Concession Agreement

    Project Maintenance Board To be constituted within 15 days of COD Will comprise:

    A nominee of CA A nominee of Concessionaire Independent Engiineer Such other members as the Concessioning Authority

    may determine

    Role: Monitor operations and maintenance of the Project

    Pictures shown are for illustrative purpose only. Actual design may be different

  • PERFORMANCE SECURITY

    1. Construction Performance Security

    a. Amount Rs. 10 Crore as Bank Guarantee from a Nationalized/Scheduled Bank and enforceable in Mohali/Chandigarh

    b. Validity Till the issuance of Construction Completion Certificate

    2. Operations Performance Security

    a. Amount Rs. 5 Crore as Bank Guaranatee to be paid one month prior to Scheduled Completion Date, or COD whichever is earlier

    b. Validity Until the issue of Vesting Certificate in favour of the Concessioning Authority.

    c. Enhancement: 15% escalation every 3 years.

    Key Features of the Concession Agreement

  • COMPENSATION ON TERMINATION

    1. Termination due to Political Force Majeure Event or CA Event of Default

    Upon termination due to a Non Political Force Majeure Event by the Concessionaire or Concessioning Authority, the CA shall pay to the Concessionaire by way of Termination Payment an amount which is higher of:

    Aggregate Depreciated Historic Cost (DHC) of the tangible and movable assets of use to the CA Less any amount due from the Concessionaire and insurance claims claimed or received;

    AND

    Debt due

    Performance Security shall be returned, provided there are no other outstanding claims on the Concessionaire

    Key Features of the Concession Agreement

  • COMPENSATION ON TERMINATION

    2. Termination due to Non-political Force Majeure Event

    Concessioning Authority shall refund the Performance Security to the selected bidder

    3. Termination due to Concessionaire Event of Default

    CA shall forfeit and retain the Performance Security

    Key Features of the Concession Agreement

  • Queries

  • 1.What happens if there is a holiday or other event like BAND etc. in other states?

    2.Why there is so heavy amount as Bid Security, Project Development Fee & Construction Performance

    security for the land measuring 4.7 acres as compared to MOHALI & PATIALA Bus Terminals? These

    as well as Operations & Maintenance performance security should be revised.

    3.Is there any Minimum Upfront Concession fee?

    4.What is the tentative schedule for opening of BIDS?

    5.How & who will be maintaining GAMADA/PIDB area handed over to them after construction?

    6.What will be the number of Banquet halls in Concessionaire control are of 47250 sq. ft.?

    7.Is there any minimum number of offices in head OFFICE COMPLEX?

    8.No Restaurants is provisioned for the bidder/concessionaire, Why? You should allow at least one

    Restaurant to be run by concessionaire for the concession period.

    9. Is there any minimum area defined for parking & support facilities?

    10.Are there any specifications for ON Site Infrastructure as well?

  • 11.GAMADA/PIDB should book rooms at least 3-4 days in advance otherwise there could be

    any problem regarding availability of rooms as one day notice is very short duration?

    12.Validity of BID Security Should be 180 days?

    13.Can you please elaborate ESCALATION in Annual Concession Fees?

    14.You have mentioned 2 types of Annual Fees to GAMADA vi a vis Annual Concession Fees &

    Annual lease Rental. One should be waived off / eliminated from list.

    15.You have mentioned 21 days in Numerals while 15 Days in words on page 36 of Volume I:

    Section I Instructions to Bidders to deposit the Project Development Fees to PIDB. Can you

    correct & clarify the correct time period?

    16. Concession period defined on page 36 of Volume I: Section I Instructions to Bidders is 33

    years whereas it has been defined 35 years elsewhere. Could you please check & correct?

  • 17.Could you please reserve some memberships offered for Punjab habitat Centre for Bidder /

    Concessionaire?

    18.Could you explain Point (d) of article 4.5.1 on page 20 of Volume I: Section I Instructions

    to Bidders?

    19.Is there any provision for the Concessionaire to get Share in Revenue Receivable to

    GAMADA/PIDB from the Facilities to be handed over to them soon after the construction?

    20.When Concessionaire is supposed to build Boarding & Lodging Facilities that means a hotel

    of 3 star rating or above then we need to run Restaurants, Banquets & Health club etc.

    Therefore it is requested to give Restaurants, Swimming pool & Health Club Facilities under

    the control of Concessionaire. In turn revenue sharing or Privileged Membership could be

    mutually decided between Concessionaire & GAMADA/PIDB

    21.As per the Draft Concession agreement page No 18 the Environment Clearance is the

    liability of the Concessionaire. Our view is that the liability of the same should be of the client