PRE-FEASIBILITY REPORT OF CHEJA PATTHAR (MASONRY STONE) MINING PROJECT (M.L. No. 276/2003, ML Area: 1.0 ha) Near Village: Beri, Tehsil: Kotputli, District: Jaipur Rajasthan PROJECT PROPONENT Miss Shikha Agarwal R/o Village Beri, Tehsil- Kotputli, District-Jaipur (Rajasthan) Contact Person: Shri Krishan Kumar Swami

PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_02_Dec... · Seismic Zone II. Masonry Stone ... The stone will be supplied

  • Upload
    vuhanh

  • View
    226

  • Download
    2

Embed Size (px)

Citation preview

Page 1: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_02_Dec... · Seismic Zone II. Masonry Stone ... The stone will be supplied

PRE-FEASIBILITY REPORT

OFCHEJA PATTHAR (MASONRY STONE)

MINING PROJECT

(M.L. No. 276/2003, ML Area: 1.0 ha)

Near Village: Beri,Tehsil: Kotputli, District: Jaipur

Rajasthan

PROJECT PROPONENT

Miss Shikha AgarwalR/o Village Beri, Tehsil- Kotputli,

District-Jaipur (Rajasthan)Contact Person: Shri Krishan Kumar Swami

Page 2: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_02_Dec... · Seismic Zone II. Masonry Stone ... The stone will be supplied

INDEX

S. NO. PARTICULARS PAGE NO.

1.0 EXECUTIVE SUMMARY 1

2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION 1

i Identification of Project Proponent and Project 3ii Brief Description of the Nature of Project 3iii Need for the Project & Its Importance to the Country/ Region 3iv Demand – Supply Gap 3v Imports vs. Indigenous Production 3vi Export Possibility 3vii Domestic/Export Markets 3viii Employment Generation (Direct and Indirect) due to the Project 33.0 PROJECT DESCRIPTION 2

i Type of Project Including Interlinked And Independent Projects,If Any

2

ii Location (map showing general location, specific location, andproject boundary & project site layout) with coordinates

3

iii Details of alternative site considered 5

iv Size and magnitude of operation 5

v Project Description with Process Detail 5

4.0 SITE ANALYSIS 9

5.0 PLANNING BRIEF 12

6.0 PROPOSED INFRASTRUCTURE 12

7.0 REHABILITATION AND RESETTLEMENT (R & R) PLAN 13

8.0 PROJECT SCHEDULE & COST ESTIMATES 13

9.0 ANALYSIS OF PROPOSAL 13

Page 3: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_02_Dec... · Seismic Zone II. Masonry Stone ... The stone will be supplied

Masonry Stone Mining Project, M.L. No. 276/2003, ML Area 1.0 ha. Near Village: Beri, Tehsil:Kotputli, District: Jaipur (Rajasthan)

Pre – Feasibility Report

Miss Shikha Agrawal D/o Shri Sita Ram Agrawal 1

PRE – FEASIBILITY REPORT

1.0 EXECUTIVE SUMMARYThis is an existing mine. Proposal for obtaining Environmental Clearance of ChejaPatthar Mining Project, production capacity 199999.5 TPA near Village- Beri, Tehsil-Kotputli, District: Jaipur(Rajasthan). The lease area is 1.0 ha. which is an Govt. WasteLand.The mining lease for an area 1.0 ha was granted in favor of Smt. Vidhya Devi W/o ShriRajendra Prasad MAhajan R/o Nagal Choudhary, Tehsil- Narnol, District- Mahendragarh(Haryana) vide order no. AME/Kot/CC/ML-276/03/682 on dated 23/02/2006 for 20years.The mining lease was transferred in favor of Miss Shikha Agrawal D/o Shri Sita RamAgrawal R/o Narehda, Tehsil- Kotputli, Dist- Jaipur (Rajasthan) vide order no.AME/Kot/CC/A Pra/ML-276/03/206 on dated 30/03/2011 .Table-1

Salient Features of the Project

S. No. Particulars DetailsA. Mining Lease Details1. Name of the Project Cheja Patthar Mining project2. Mineral Cheja Patthar3. Mining Lease Number M.L. No. 276/20034. Mining Lease Area 1.0 ha5. Lease Holder Miss Shikha Agrawal D/o Shri Sita RamAgrawalB Location6. Village Beri7. Tehsil Kotputli8. District Jaipur9. State Rajasthan10. Latitude & Longitude Geographical Extends-Latittude-27°40’40.64” N to 27°40’43.62”NLongitude-76°2’41.15’’ E to 76°2’46.34’’ EC. Other details11. Bulk Density 2.5 tonnes/cum12. Ultimate Working Depth 25 m13. Cost of the project Rs. 10 Lacs14. Cost for EnvironmentalProtection Measures Rs. 0.50 lac per annum15. Budget for CSR Rs. 0.50 Lac per annum16. Average Annual Rainfall 250-300 mm17. Seismic Zone II

Page 4: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_02_Dec... · Seismic Zone II. Masonry Stone ... The stone will be supplied

Masonry Stone Mining Project, M.L. No. 276/2003, ML Area 1.0 ha. Near Village: Beri, Tehsil:Kotputli, District: Jaipur (Rajasthan)

Pre – Feasibility Report

Miss Shikha Agrawal D/o Shri Sita Ram Agrawal 2

ENVIRONMENTAL MANAGEMENT PLAN

AIR POLLUTION CONTROL

Plantation will be developed within ML areas and will also be developed outside theML area equal to 33% of the lease area. Periodical water spraying on the roads will be done. Proper maintenance of all machines will be carried out that will control emission ofgaseous pollutant.WATER MANAGEMENT

There is no surface water body in and around the mining lease area. The rain water collected in mining pit will be used in plantation and dustsuppression.NOISE POLLUTION CONTROL

Proper maintenance of all machines will be carried out which will reduce noisegeneration during operations.LAND RECLAMATION

From the total 1.0 ha lease area about 0.79 ha area will be excavated which will beconvert as a water reservoir and 0.21 ha will be used as green belt on around thelease periphery.SOLID WASTE MANAGEMENT

The generated solid waste will be used for construction and maintenances of kuchaapproach road time to time. There will no waste dump at the end of life of the mine.GREEN BELT DEVELOPMENTGreen Belt/plantation will be developed equal to 33% of total lease area. The trees willbe planted at suitable spacing to encourage proper growth around the lease boundary.The dead plants will be replaced by fresh plants. Native Plant species will be plantedSOCIO ECONOMIC IMPROVEMENT

As the mining activities will increase, better employment opportunity. Semi skilled & unskilled workers will be recruited from the nearby villages. Adult Education programme are proposed for up-gradation of literacy level. The leesee will associate awarness programe.HEALTH & SAFETY

Page 5: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_02_Dec... · Seismic Zone II. Masonry Stone ... The stone will be supplied

Masonry Stone Mining Project, M.L. No. 276/2003, ML Area 1.0 ha. Near Village: Beri, Tehsil:Kotputli, District: Jaipur (Rajasthan)

Pre – Feasibility Report

Miss Shikha Agrawal D/o Shri Sita Ram Agrawal 3

Protective respiratory devices will be provided to personnel working in dusty areaswith adequate training. The lessee will associate in various health and safety awarness program in nearbyvillages.

2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION

(i) Identification of Project and Project ProponentThis is an existing Cheja Patthar mining lease, with production capacity 199999.5 tonnes,Near Village:Beri, Tehsil-Kotputli District: Jaipur (Rajasthan). The mining lease for anarea 1.0 ha was granted in favor of Smt. Vidhya Devi W/o Shri Rajendra Prasad MAhajanR/o Nagal Choudhary, Tehsil- Narnol, District- Mahendragarh (Haryana) vide order no.AME/Kot/CC/ML-276/03/682 on dated 23/02/2006 for 20 years.The mining lease was transferred in favor of Miss Shikha Agrawal D/o Shri Sita RamAgrawal R/o Narehda, Tehsil- Kotputli, Dist- Jaipur (Rajasthan) vide order no.AME/Kot/CC/A Pra/ML-276/03/206 on dated 30/03/2011.The Simplified Mining Scheme has been approved by Additional Superintending MiningEngineers, Jaipur vide letter no. SME/JAI/S.M.Scheme/425/13/7326 on dated14/10/2013.Mining operation will be worked by semi mechanized open cast method. EnvironmentalClearance is required As per EIA Notification dated 2006, as amended time to time, thisproject is comes under B Category.(ii) Brief Description of the Nature of ProjectThis is an existing mine. Proposal for obtaining Environmental Clearance of ChejaPatthar Mining Project, production capacity 199999.5 TPA near Village: Beri, Tehsil –Kotputli, District: Jaipur (Rajasthan). The Lease area is 1.0 ha.(iii) Need for the Project & Its Importance to the Country/ RegionCheja Patthar is used in various construction activities and will be sold to nearbymarkets to fulfill the requirements of the local people.The mining activities will increase better employment opportunities. Average incomelevel which is the indicator of socio-economic status of house hold is expected that it willuplift the economic standard. Thus, to improve quantity of life and prosperity.(iv) Demand – Supply GapConsidering the demand of mineral sufficient availability of the mineral in the area, it isessential to have Masonry stone mine to sustain the supply of mineral for construction.

(v) Imports vs. Indigenous Production

Page 6: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_02_Dec... · Seismic Zone II. Masonry Stone ... The stone will be supplied

Masonry Stone Mining Project, M.L. No. 276/2003, ML Area 1.0 ha. Near Village: Beri, Tehsil:Kotputli, District: Jaipur (Rajasthan)

Pre – Feasibility Report

Miss Shikha Agrawal D/o Shri Sita Ram Agrawal 4

It is a cheap mineral used in construction activities therefore export is not possible.(vi) Export PossibilityThere is no export possibility as this mineral is quite cheap and locally available inabundance and used in rural areas.

(vii) Domestic/Export MarketsThese minerals have only domestic market and will fulfill the requirement of local. The stonewill be supplied to Stone Crusher, which will be proposed at mine site after obtaining EC.(viii) Employment Generation (Direct and Indirect) due to the ProjectApprox 110 skilled and semiskilled manpower will be needed to run the mine.3.0 PROJECT DESCRIPTION

(i) Type of Project Including Interlinked And Independent Projects, If AnyThere is no interlinked or interdependent project based on mineral produced. The mineralwill be sold directly.(ii) Location (map showing general location, specific location, and project boundary &

project site layout) with coordinates.

Page 7: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_02_Dec... · Seismic Zone II. Masonry Stone ... The stone will be supplied

Masonry Stone Mining Project, M.L. No. 276/2003, ML Area 1.0 ha. Near Village: Beri, Tehsil:Kotputli, District: Jaipur (Rajasthan)

Pre – Feasibility Report

Miss Shikha Agrawal D/o Shri Sita Ram Agrawal 5

Figure1: Location Map

Page 8: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_02_Dec... · Seismic Zone II. Masonry Stone ... The stone will be supplied

Masonry Stone Mining Project, M.L. No. 276/2003, ML Area 1.0 ha. Near Village: Beri, Tehsil:Kotputli, District: Jaipur (Rajasthan)

Pre – Feasibility Report

Miss Shikha Agrawal D/o Shri Sita Ram Agrawal 6

(iii) Details of Alternate Sites ConsideredIt is a site specific project for mining lease for an area 1.0 ha was granted in favor of MissShikha Agrawal D/o Shri Sita Ram Agrawal R/o Narehda, Tehsil- Kotputli, Dist- Jaipur(Rajasthan) vide order no. AME/Kot/CC/A Pra/ML-276/03/206 on dated 30/03/2011.(iv) Size and magnitude of operationMining lease area is estimated proposed production capacity of Cheja Patthar-199999.5 TPA.(v) Project Description with Process Detail

1. Salient features along with project vicinity details of the Mining project is givenbelow:

Table - 2

Salient Features of the Project

S. No. Particulars Details1. Name of the Project Cheja Patthar Mining Project2. Mineral Cheja Patthar3. Mining Lease Number M.L. No. 276/20034. Mining Lease Area 1.0 ha5. Applicant Miss Shikha Agrawal D/o Shri Sita RamAgrawal6. Method of Mining Open cast Semi mechanized7. Elevation Range 389 mRL to 381 mRL8. Total geological Reserve 990000 tonnes9. Mineable Reserve 688500 tonnes10. General Ground Level 377mRL11. Ground Water Table 60 m bgl – 65 m bgl12. Ultimate Working Depth 25 m bgl

(1) GEOLOGY OF THE AREA

Strategraphic sequence of Regional Geology is given below:Recent SoilPost Delhi PegmatiteDelhi SuperGroup

Ajabgarh Group Bharkhol Formation Gritty Quartizite, Quartzitewith phyllite.

Page 9: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_02_Dec... · Seismic Zone II. Masonry Stone ... The stone will be supplied

Masonry Stone Mining Project, M.L. No. 276/2003, ML Area 1.0 ha. Near Village: Beri, Tehsil:Kotputli, District: Jaipur (Rajasthan)

Pre – Feasibility Report

Miss Shikha Agrawal D/o Shri Sita Ram Agrawal 7

Thanaghazi Formation Biotite Sericite schistQuartizite with phylliteMica SchistCalc-silicate rock withactinolite tremeolite bearingmarble

Seriska Formation Brecciated Ferruginousquartizite

Kushalgarh Formation Impur marble ,calcgnesisand amphibole quartizite

Alwar Group Pratpgarh formation Massive quartizite grittyquartizite

Kankwarhi Formation Schist and phyllite

LOCAL GEOLOGYRecent SoilPost DelhiDelhi Super Group Delhi Group Silicuous Lime stone/ Low grade

Dolomite Lime Stone

(4) Method of MiningProposed method of mining will be semi mechanized opencast by forming proper benches.The mining is proposed as per present situation of the deposit.Excavation is proposed by blasting. Hydraulic excavator/loader is proposed for removal andloading of blasted stone.The haul/ approach roads have been provided up to the proposedworking faces and will be provided in future also. The stone and waste are proposed to betransported by tractor trolley and tippers.The mining will be carried out by opencast method by developing the bench of height 5-6 mheight and width. Four slices are considered in a bench. The calculations are as per the fourslices of a bench. Thus the end position of the bench is 6 meter height. Width is also proposed6 meter.EXTENT OF MECHANIZATION

Table-3S.No Machinery Number1. Jack Hammer 022. Compressor 013. D.G.Set 014. Poklean 01

Page 10: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_02_Dec... · Seismic Zone II. Masonry Stone ... The stone will be supplied

Masonry Stone Mining Project, M.L. No. 276/2003, ML Area 1.0 ha. Near Village: Beri, Tehsil:Kotputli, District: Jaipur (Rajasthan)

Pre – Feasibility Report

Miss Shikha Agrawal D/o Shri Sita Ram Agrawal 8

5. Dumper 036. Water Tankar 017. Wagon Drill m/c 015. PROPOSED YEAR WISE PRODUCTION DETAILS OF THE NEXT FIRST FIVE YEARSThe proposed Year-wise production plan for next five years is mentioned in the table givenbelow:

Table – 4

Year Wise Production for Next Five Years

Year ROM tonnageFirst year 70162.5Second year 91410Third year 132810Fourth year 153195Fifth year 199999.5Source-As per approved Simplified Mining Scheme

6. LOADING & TRANSPORTTyre mounted Hydraulic excavator will be deployed from time to time and when required.Trucks and tracor troley will be deployed for transportation of Masonry stone from working.7. WASTE GENERATION & DISPOSALThe masonry stone shall be excavated then carried to the tempory stack yard. The waste willcome around 10% toward maxmimum in the form of powder and weathered stone. This wastewill be used for construction and maintances of kucha approach road time to time.The year wise waste generation is given below:

Table – 5

Year Wise Waste/Reject Generation for Next Five Years

Year Waste in TonnageFirst year 7016.5Second year 9141Third year 13281Fourth year 15319.5Fifth year 20000

Page 11: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_02_Dec... · Seismic Zone II. Masonry Stone ... The stone will be supplied

Masonry Stone Mining Project, M.L. No. 276/2003, ML Area 1.0 ha. Near Village: Beri, Tehsil:Kotputli, District: Jaipur (Rajasthan)

Pre – Feasibility Report

Miss Shikha Agrawal D/o Shri Sita Ram Agrawal 9

Source- As per Approved Simplified Mining Scheme

8. CONCEPTUAL PLANThe conceptual mining plan considering proposed capacity of mine for the mineral has beenprepared by considering the probable category of reserve.2. Raw Material Required Along With Estimated Quantity, Likely Source, Marketing Area

of Final Products, Mode of Transport of Raw Material and Finished ProductThe Masonry stone will be transported by hired vehicles. No raw material will be required.(vii) Resources Optimization/ Recycling and Reuse Envisaged in the Project, if any, should

be briefly Outlined

No waste water will be generated from mining operation Domestic sewage water generated from office will be disposed in soak pits via septic tank.

(viii) Availability of Water Its Source, Energy /Power Requirement and Source

A. Water requirement:Total water requirement for the proposed project will be 3.0 KLD which will be sourced fromnearby villages.B. Power requirement:The electric power will not be used in mining. Only HSD Fuel will be required for operatingmachineries.

(ix) Quantity of Waste to Be Generated (Liquid and Solid) And Scheme for Their

Management/Disposal:Domestic sewage water generated from office toilet will be disposed in soak pits via septictank. Solid waste will be generated which will also be sold.4.0 SITE ANALYSIS

(i) ConnectivityThe lease area is about 1.0 km from village Beri. Nearest Railway Station is Neem KaThana Railway Station at a distance of ~16.0 km. in NW direction from Mining Leasearea. The lease area is well connected to roads.(ii) Land Use PatternThe total ML area of 1.0 ha comprises of Govt. Waste Land.(iii) TopographyThe lease area falls in Govt. Waste land. The highest contour is 389 mRL and lowestcontour is 381 mRL. General ground level of the area is 377 mRL.

Page 12: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_02_Dec... · Seismic Zone II. Masonry Stone ... The stone will be supplied

Masonry Stone Mining Project, M.L. No. 276/2003, ML Area 1.0 ha. Near Village: Beri, Tehsil:Kotputli, District: Jaipur (Rajasthan)

Pre – Feasibility Report

Miss Shikha Agrawal D/o Shri Sita Ram Agrawal 10

Table – 6

Environmental Settings

S.No.

Particular Details

1. Nearest Village Village Beri2. Nearest city/ town Kotputli3. Nearest Railway Station Neem Ka Thana, Railway Station (~26.0 km,NW)4. Nearest Airport Jaipur International Airport, Jaipur5. Archaeological Important Place None, within 10 km radius area of mine site.6. Ecological Sensitive Areas(National Park, WildlifeSanctuary, Biosphere Reserveetc.)

There is no National Park, Wild Life Sanctuaries, BiosphereReserves, Tiger Reserves, Wildlife Corridors, etc. within 10km radius7. Reserved/Protected Forestwithin 10 km radius Hasanpur PF (8.0km,NW)Gardrata PF(5.5 km, SW)Dantli PF (5.0 km, SW)Bhopiya PF (7.0 km, N)8. Nearest River / water body Sota Nadi (6.0 km,SE)(IV) Existing Land Use Pattern {Agriculture, Non-Agriculture, Forest, Water Bodies

(Including Area Under CRZ)}, Shortest Distances From The Periphery Of The ProjectTo Periphery Of The Forests, National Park, Wild Life Sanctuary, Eco Sensitive Areas,Water Bodies (Distance From The HFL Of The River), CRZ. In Case Of NotifiedIndustrial Area, A Copy Of The Gazette Notification

Page 13: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_02_Dec... · Seismic Zone II. Masonry Stone ... The stone will be supplied

Masonry Stone Mining Project, M.L. No. 276/2003, ML Area 1.0 ha. Near Village: Beri, Tehsil: Kotputli, District: Jaipur (Rajasthan)

Pre – Feasibility Report

Miss Shikha Agrawal D/o Shri Sita Ram Agrawal 11

Page 14: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_02_Dec... · Seismic Zone II. Masonry Stone ... The stone will be supplied

Masonry Stone Mining Project, M.L. No. 276/2003, ML Area 1.0 ha. Near Village: Beri, Tehsil: Kotputli, District: Jaipur (Rajasthan)

Pre – Feasibility Report

Miss Shikha Agrawal D/o Shri Sita Ram Agrawal 12

Page 15: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_02_Dec... · Seismic Zone II. Masonry Stone ... The stone will be supplied

Masonry Stone Mining Project, M.L. No. 276/2003, ML Area 1.0 ha. Near Village: Beri, Tehsil: Kotputli,District: Jaipur (Rajasthan)

Pre – Feasibility Report

Miss Shikha Agrawal D/o Shri Sita Ram Agrawal 13

(iii) Existing Infrastructure:There is no building & structure within mining lease area except some vegetationsexisting on the lease area which will be cleared as and when required.5.0 PLANNING BRIEF

(i) Planning Concept (Type of Industries, Facilities, and Transportation etc.) Townand Country Planning/Development Authority Classification

Uses: This is a mining Project

(ii) Population ProjectionManpower required will be engaged from nearby Villages. No significant influx ofpeople is anticipated in the area.(iii) Land Use PlanningThe area extent of proposed mining lease is 1.0 ha. The area comprises of Govt. Wasteland.(iv) Assessment of Infrastructure Demand (Physical & Social)Lessee will assess the demand of infrastructure (Physical & Social) in nearby area of theproposed mine site and same will be developed under social work

(v) Amenities/FacilitiesLessee will develop the Amenities/Facilities in the nearby area of the proposed minesite as per requirement of local people of the nearby area under corporate socialresponsibility programs.6.0 PROPOSED INFRASTRUCTURE

(i) Residential Area (Non Processing Area)This is not required as mine workers will come from nearby villages. Rest shelter to theworkers will be provided outside the lease area.(ii) Green BeltGreen Belt/plantation will be developed equal to 33% of total lease area. The trees willbe planted at suitable spacing to encourage proper growth around the lease boundary.The dead plants will be replaced by fresh plants. Native Plant species will be planted.(iii) ConnectivityThe lease area is about 1.0 km from village Beri. Nearest Railway Station is Neem KaThana Railway Station at a distance of ~16.0 km. in NW direction from Mining Leasearea. The lease area is well connected to roads.(iv) Water Management (Source & Supply of water)Total water requirement for the project will be 3.0 KLD which will be used for domesticplantation as well as dust supression purpose and sourced from nearby village.(v) Sewerage SystemDomestic sewage water generated from office toilet will be disposed in soak pits viaseptic tank. Outside discharge is not envisaged.(vi) Industrial Waste ManagementNo industrial waste water will be generated from mining operation.(vii) Solid Waste ManagementSolid Waste generated around 61214 cu.m during the mining operation. The waste willcome around 10% toward maximum in the form of powder.(viii) Power Requirement & Supply/Source

Page 16: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_02_Dec... · Seismic Zone II. Masonry Stone ... The stone will be supplied

Masonry Stone Mining Project, M.L. No. 276/2003, ML Area 1.0 ha. Near Village: Beri, Tehsil: Kotputli,District: Jaipur (Rajasthan)

Pre – Feasibility Report

Miss Shikha Agrawal D/o Shri Sita Ram Agrawal 14

Electric power will not be required in mining operations.7.0 REHABILITATION AND RESETTLEMENT (R & R) PLAN

(i) Policy To Be Adopted (Central/State) In Respect Of The Project Affected PersonsIncluding Home Oustees, Land Oustees And Landless Laborers (Brief Outline ToBe Given)Not Applicable as the lease area falls in Govt. Waste Land and is already in possession ofthe lessee.

8.0 PROJECT SCHEDULE & COST ESTIMATES

(i) Likely Date Of Start Of Construction And Likely Date Of Completion (TimeSchedule For The Project To Be Given)The mining activity is done in the area and enhancement in production will be doneafter Environmental Clearance from MoEF, Rajasthan and consent to establish andoperate from RSPCB.

(ii) Estimated Project Cost Along With Analysis In Terms Of Economic Viability of theProject

Total Project Cost : 10.0 Lacs Environment Protection Cost : 0.50 Lacs Per annum

9.0 ANALYSIS OF PROPOSAL

Proposed Masonry Stone Mining Lease will result in growth of the surrounding areas byincreasing direct and indirect employment opportunities in the region includingancillary development and supporting infrastructure. Special emphasis on Financial andSocial benefits will be given to the local people including tribal population, if any, in thearea. Development of social amenities will be in the form of medical facilities, education tounderprivileged and creation of self help groups. No major adverse effect on environment is envisaged as the required mitigationmeasures are inbuilt in the project.

Page 17: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_02_Dec... · Seismic Zone II. Masonry Stone ... The stone will be supplied

{lsReIFI g*DI{3lfreToT sR q.ft-tr<r qqg< Ed G'.qg{

*q,6r s-s3r / sqlfu.:q.r&q / 425 I 13 / >3) 4go firer erroe g* Sarw a.r+raFrqNft tli

?llz= l:eqr:f r eso. . -. -:- .:=-

- -:-

ia<io 1f , ro, t:

l) 6. 2413

a .a 2a'3

eeme o]dY dt,fu''ar uug{ I

r\.-- a::-::a = -=: :- t - -,- = - ---

-- ':: = -- -:- - -:-= ?=-- . - -.=:: -

-. - ::r

j

3. Eg cT{ crf.rT @T l-.J.ii<- ii = --.'- - =i- ;==-. = -c.l<rr qT ft{ar qr cfiqd !r-nq Gld &cT fuq rrr t I

,.. a1=-:frFe: :ss: ,i -gr.ria- rgr= ar zra 6G o1 ea.a {fl{ rqqir rFI

.* i",li- friffidr 6T 3r€tqtud rC iRn rrn 3;i}Fnq d -€.n ffiiqq BqFrqd +1 qrd.cr a1 Elgrfr

5 E!{ q}trcT 6r fiq<.]/fuqrqq ft+rffin/3rlB$4rr31r, qfi o}i tt a;-ftn +i d 3{e,t{ drql r

elr gq qftq (fadrg qq fuiqqq) 3Tfuft-qq sr isd drd {i fui' ''--slc 3-ftft{q d cr<.if, 3rift-d 4f{ {q{r/{asq q{{ 6r

----------------.={srT,/fucrrr.qft qrqr qnr i <t s+c qrs{r sT 3nE+e{ g.< g'rilq e -dqT qrqT qlTr

I

3r-Jdftd s{q slqiT 4t w qid snqd 3TR.4{,q}. 6l ..)d w {S i

G { ftl-*rq f}qr.t. llc1{lrl rrianl,s{ilg{ I

z rrerro qB iiW ol ergdrk< q+q q'fslT d qfi i =:;:. qRs T Aqqq af ons?e

'g=fq qf.fl tr q' - u 4-j

(..l.dqcl) ri q -aoi ffi sri 'q-r:= '-:.'

7.

+. ff iifrqs. sfu-fl qrEii

I

r{arq: qarJqR

A^fle."/1 :

m u: '\44-==q.srte? =+ :- i'---

sr:i :: ,-,1

Page 18: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_02_Dec... · Seismic Zone II. Masonry Stone ... The stone will be supplied

z

IIiI

'::.:a a4:.:;, r l

l: ln; I

;x.:.i:.t,rrtt l;,rr r:::; i

,: .,i;x

Page 19: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_02_Dec... · Seismic Zone II. Masonry Stone ... The stone will be supplied

i

:I

Page 20: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_02_Dec... · Seismic Zone II. Masonry Stone ... The stone will be supplied

I

']

j

II

i

L

Page 21: PRE-FEASIBILITY REPORT - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0_02_Dec... · Seismic Zone II. Masonry Stone ... The stone will be supplied

. , ta.::!.:.::

- ,.i €:j:-:

'l') ii-,

..r,. : ::, :r,'-..'.i.tj.: r:

' :: - l':::.'i.ir:.; :.'

. !' i::i,t.i:-.t::.i1r_.::.;.:'.:ir::1:..1::_t-._..r':r1]r:,i.:ri.:lrrl

I,I

C-

lF---*" --(r6q,{re*--_

t