Pre-Feasibility Report Page 1 of 10 PRE-FEASIBILITY REPORT For PRIOR ENVIRONMENTAL CLEARANCE STORAGE CAPACITY ENHANCEMENT OF IOCL, LPG BOTTLING PLANT Capacity: 2 X 1200 MT At Plot No. 2649 & 2655 Tabiji, Beawer Bypass Road, NH-8, Ajmer (Raj.)-305001 Project Proponent: M/s. Indian Oil Corporation Limited, Ajmer Environmental Consultant: ENVIRO INFRA SOLUTIONS PVT. LTD. Accredited by NABET (Quality Council of India) for EIA studies as ‘A’ Category Consultant (S. No. 48 th , List of Accredited Consultant Organizations August 08, 2017) Address: - 301, 302 & 305, SRBC, Sec.-9, Vasundhara, GZB-201012 Ph.: 0120-4151183 Email: [email protected] Website: www.enviroinfrasolutions.com August 2017

Pre-Feasibility Report PRE-FEASIBILITY REPORTPFR).pdf · for EIA studies as ‘A’ Category Consultant (S. No. 48th, List of Accredited Consultant Organizations August 08, ... Pre-Feasibility

Embed Size (px)

Citation preview

Page 1: Pre-Feasibility Report PRE-FEASIBILITY REPORTPFR).pdf · for EIA studies as ‘A’ Category Consultant (S. No. 48th, List of Accredited Consultant Organizations August 08, ... Pre-Feasibility

Pre-Feasibility Report

Page 1 of 10

PRE-FEASIBILITY REPORTFor

PRIOR ENVIRONMENTAL CLEARANCESTORAGE CAPACITY ENHANCEMENT OF

IOCL, LPG BOTTLING PLANTCapacity: 2 X 1200 MT

At

Plot No. 2649 & 2655Tabiji, Beawer Bypass Road, NH-8,

Ajmer (Raj.)-305001

Project Proponent:

M/s. Indian Oil Corporation Limited, Ajmer

Environmental Consultant:

ENVIRO INFRA SOLUTIONS PVT. LTD.Accredited by NABET (Quality Council of India)

for EIA studies as ‘A’ Category Consultant(S. No. 48

th, List of Accredited Consultant Organizations August 08, 2017)

Address: - 301, 302 & 305, SRBC, Sec.-9, Vasundhara, GZB-201012

Ph.: 0120-4151183 Email: [email protected]: www.enviroinfrasolutions.com

August 2017

Page 2: Pre-Feasibility Report PRE-FEASIBILITY REPORTPFR).pdf · for EIA studies as ‘A’ Category Consultant (S. No. 48th, List of Accredited Consultant Organizations August 08, ... Pre-Feasibility

Pre-Feasibility Report

Page 2 of 10

1. EXECUTIVE SUMMARY

This is Storage capacity enhancement project of Existing IOCL LPG bottling Plant from 2000

MT to 4400 MT at Village Tabiji, Beawer Road, NH-8, District- Ajmer (RJ) – 305001.This project

falls under item no. 6 (b): Isolated storage & handling of hazardous chemicals under the

category “B” (general conditions apply) as per the EIA notification

2006 and its amendments. The proposal will increase LPG storage capacity and enhance from

3.5 days cover to 5.5 days cover.

2. INTRODUCTION OF THE PROJECT

2.1 Identification of the Project and Project Proponent

M/s Indian oil Corporation Limited (IOCL), a Government of India Undertaking, is engaged in

Refining, Storage and Marketing of Petroleum Products. Indian Oil Corporation Limited (IOCL)

is a leading government owned PSU in India. Due to its strong presence in the market for long

time, it has acquired a sizeable share in the Indian market. The company has already setup

many bottling plants all over India. The LPG Bottling Plant is situated in Village Tabiji, Beawer

Road, NH-8, District- Ajmer (RJ) – 305001, the present setup has a bottling facility spread over

area of 30 acres for LPG cylinder filling. It is engaged in receiving bulk tankers from GAIL

through Pipelines and from Koyali through trucks etc. The bulk tankers are unloaded into three

storage vessels of total 2000 MT (3x600 mounded bullets & 2 x 100 above ground auto lpg

bullets) capacities. Plant is having Tank truck decantation unit with six bays each having

unloading arms. IOCL LPG bottling Plant Ajmer supplies packed LPG domestic & non domestic

filled cylinders in seven revenue district of Rajasthan.

2.2 Brief Description of nature of the Project

The proposed LPG storage capacity enhancement of LPG bottling plant from 2000 MT to 4400

MT by constructing new 2 X 1200 MT Mounded Storage Vessels within existing plant premises.

LPG will be coming to the Plant from GAIL through Pipelines and from Koyali through trucks etc.

This is being stored in bullets then filled in various capacities of the cylinders within the plant

and sold (dispatched) to the distributors and direct customers.

Page 3: Pre-Feasibility Report PRE-FEASIBILITY REPORTPFR).pdf · for EIA studies as ‘A’ Category Consultant (S. No. 48th, List of Accredited Consultant Organizations August 08, ... Pre-Feasibility

Pre-Feasibility Report

Page 3 of 10

2.3 Need for the Project and its importance

Based upon LPG consumption scenario, need is felt to enhance the LPG storage capacity at

Ajmer LPG Bottling plant. To achieve the same, IOCL LPG Bottling Plant proposes to install two

new mounded storage vessels of capacity 1200 MT each. This will improve the storage capacity

of LPG at existing plant with enhanced cover from 3.5 days to 5.5 days and distribution network.

Moreover Mounded Storage Vessel is the safest and proven storage in vogue.

2.4 LPG Import

At IOCL LPG Bottling Plant Ajmer, LPG is being received from GAIL through Pipelines and from

Koyali through trucks.

2.5 Cylinder Supply

IOCL LPG bottling Plant Ajmer supplies packed LPG domestic & non domestic filled cylinders in

seven revenue districts of Rajasthan.

2.6 Employment Generation due to the Project

The proposed Expansion project will provide indirect employment to about 30-40 persons during

the construction phase and also in transportation during construction phase.

3. PROJECT DESCRIPTION

3.1 Type of the Project

This is Storage capacity enhancement project of Existing IOCL LPG bottling Plant from 2000

MT to 4400 MT at Village Tabiji, Beawer Road, NH-8, Ajmer, Rajasthan. This project falls under

item no. 6 (b): Isolated storage & handling of hazardous chemicals under the category “B”

(general conditions apply) as per the EIA notification 2006 and its amendments. Plant layout is

given in Figure-1.

3.2 Project Location

The Project site is located at Village Tabiji, Beawer Road, NH-8, District- Ajmer (RJ) – 305001.

The distance between project site & Ajmer city is 10 KM. Google map showing Ajmer Bottling

Plant is given in Figure-2 & Figure-3.

Page 4: Pre-Feasibility Report PRE-FEASIBILITY REPORTPFR).pdf · for EIA studies as ‘A’ Category Consultant (S. No. 48th, List of Accredited Consultant Organizations August 08, ... Pre-Feasibility

Pre-Feasibility Report

Page 4 of 10FIGURE 1: PLANT LAYOUT IOCL, AJMER LPG BOTTLING PLANT

Page 5: Pre-Feasibility Report PRE-FEASIBILITY REPORTPFR).pdf · for EIA studies as ‘A’ Category Consultant (S. No. 48th, List of Accredited Consultant Organizations August 08, ... Pre-Feasibility

Pre-Feasibility Report

Page 5 of 10

FIGURE 2: AERIAL VIEW IOCL, AJMER LPG BOTTLING PLANT

Page 6: Pre-Feasibility Report PRE-FEASIBILITY REPORTPFR).pdf · for EIA studies as ‘A’ Category Consultant (S. No. 48th, List of Accredited Consultant Organizations August 08, ... Pre-Feasibility

Pre-Feasibility Report

Page 6 of 10

FIGURE 3: GOOGLE MAP SHOWING AJMER LPG BOTTLING PLANT

Page 7: Pre-Feasibility Report PRE-FEASIBILITY REPORTPFR).pdf · for EIA studies as ‘A’ Category Consultant (S. No. 48th, List of Accredited Consultant Organizations August 08, ... Pre-Feasibility

Pre-Feasibility Report

Page 7 of 10

3.3 Process Details

At Ajmer Plant, LPG is being received from GAIL through Pipelines and Non Domestic and Auto

LPG is received through Truck Tankers of generally 17 MT capacities from Koyali. There is a 6

bay gantry for unloading/loading of LPG. Further it is stored in Mounded bullets 3 X 600 MT and

2 X 100 MT Above ground Bullets. Maximum existing inventory of LPG at the plant is 2000 MT.

Plant operates in two shifts. LPG from Bullets is pumped with the help of LPG pumps to

electronic carousel for cylinder filling operation. Domestic and Commercial cylinders of sizes 5

Kg, 14.2 kg & 19 kg, 47.5 kg are filled. 450 kg cylinder filling is also proposed. IOCL LPG bottling

Plant supplies packed LPG domestic & non domestic filled cylinders to the seven revenue

districts of Rajasthan.

Defective cylinders are segregated for correction before dispatch to the market.

All standard operating procedures are followed as per OISD and best engineering practices.

Receipt of Bulk LPG from Road Tankers and GAIL

Storage of LPG in above ground bullets and Mounded Bullets

Bottling of LPG through electronic Carousal into 5 kg ,14.2,19 kg and 47.5 Kg LPG Cylinders

Empty Cylinders

Loading of Filled Cylinders into Packed Trucks

Dispatch of Filled Packed Cylinder Trucks to Dealers

Figure 3: Process Flow Diagram for IOCL, Ajmer LPG Bottling plant

Page 8: Pre-Feasibility Report PRE-FEASIBILITY REPORTPFR).pdf · for EIA studies as ‘A’ Category Consultant (S. No. 48th, List of Accredited Consultant Organizations August 08, ... Pre-Feasibility

Pre-Feasibility Report

Page 8 of 10

3.4 Risk Analysis and ERDMP

Since plant is having Hazardous chemical inventory exceeding threshold quantity as per MSIHC

Rule-1989, amendment 2000”. Quantitative Risk Analysis and DMP report has been prepared and

updated regularly. Same shall be reviewed and updated with augmented facility. ERDMP report

has also been prepared and shall be in compliance with PNGRB regulations-2010.

3.5 Liquid Waste Management

There is no manufacturing process as it is only storage and filling plant hence there will be no

generation of Effluent. Sewage will be treated through septic tanks and soak pits. Effluent from

Cylinder washings and soap solution/Lubricant used for conveyor belt will be treated in effluent

treatment plant and treated water will be used for gardening purpose.

3.6 Hazardous and solid waste Management

There will be no generation of any hazardous waste by the plant. Only used oil from DG sets, etc.

shall be stored and disposed to authorized recyclers as per Hazardous and Other Wastes

(Management and Transboundary Movement) Rules, 2016. Total Solid Waste Generated from the

proposed facility will be disposed through pollution control board approved vendor.

3.7 Fire Fighting Details

3.7.1 Fire Fighting System Description as per OISD 144 standard

Following are the type of fire protection systems for LPG bottling plant,

Automatic Fire Water Pumping System consisting of five Main firefighting Pumps & two

jockey pump.

External Hydrant & Water Monitor System covering the entire plant area for

manual firefighting.

Page 9: Pre-Feasibility Report PRE-FEASIBILITY REPORTPFR).pdf · for EIA studies as ‘A’ Category Consultant (S. No. 48th, List of Accredited Consultant Organizations August 08, ... Pre-Feasibility

Pre-Feasibility Report

Page 9 of 10

Medium Velocity Water Spray System for Cylinder filling shed, Filled storage shed, Tank

truck gantry (six bays), LPG Pump /Compressor shed, above ground bullets,

Loading/Unloading shed, Cold Repair Shed and Connecting platforms.

Fire Detection & Alarm System covering the entire plant area.

Portable Fire Extinguishers.

Personnel protective equipment.

3.8 Power Supply

For the existing project, power is received from Ajmer vidyut vitran nigam limited. The power

demand is 11 KV, 800 KVA. The power requirement shall be remain same after the proposed

capacity expansion. DG sets are available for emergency

Generators Capacity: 500 KVA - 1 No.

250 KVA - 2 No.750 KVA- 1 No.

3.9 Water Requirement

Since the plant is based on the filling of LPG bottle and whole process is automatic and require

water only for Washing and in Domestic section. Maximum quantity of water requires would be for

the washing of bottle and domestic use in housekeeping, toilets and in Gardening. Unit requires

after expansion total 42 KL/D water (Fresh Water 22KLD) which shall be used for Process &

Domestic purpose and that shall be met by supply of surface water purchase through tankers. No

ground water shall be used.

3.10 Man Power Requirement

Total manpower required during construction is 35. Total 43 numbers of permanent employeesand 115 numbers of temporary workers engaged in current operation. After expansion totalrequirement of permanent employees will be 50 numbers and temporary workers will be 130numbers.

3.11 Communication System

Communication facility available at plant for internal and external communication purpose is as

follows

Telephones/mobile - 6 Nos.

VHF - 14 Nos.

PA Page phone - 14 Nos.

Electric siren - 2

Page 10: Pre-Feasibility Report PRE-FEASIBILITY REPORTPFR).pdf · for EIA studies as ‘A’ Category Consultant (S. No. 48th, List of Accredited Consultant Organizations August 08, ... Pre-Feasibility

Pre-Feasibility Report

Page 10 of 10

Hand siren - 09

4. SITE ANALYSIS

4.1 Connectivity

The Plant site located around 10.50 Km away from Ajmer City. The connectivity of the site to

airport, railway and road is as follows:

a. Airport connectivity- The nearest domestic and international airport is Jaipur which is

about 136 Kilometers.

b. Upcoming domestic airport at Kishangarh is 25 kms away.

c. Rail connectivity- The nearest railway station is Adarsh Nagar, which is about 7

kilometers from the site

d. Road connectivity- Nearest highway is NH-8.

e. Police Station – Mangliyawas Ajmer Police Station.

f. Hospital- Satellite Hospital Adarsh nagar

5.0 PROJECT SCHEDULE AND COST ESTIMATES

5.1 Project schedule

The company has proposed to enhance the storage capacity of the LPG in the plant by 2 X 1200

MT Mounded storage vessels to increase the storage capacity to 4400 MT. This will improve the

storage cover from existing 3.5 days to 5.5 days.

However, this increase in storage capacity will in no way increase the filling capacity of LPG

cylinders at present.

5.2 Cost estimates

The total cost of the project is estimated to be 30.74 crores.

5.3 Corporate Social Responsibility (CSR) PolicyThe company is actively involved in CSR related activities, budgetary provisions have been made

in the financial year 2017-2018 to spend on Corporate Social Responsibility (CSR) by IOCL head

office.

Classrooms and toilets have been constructed and donated for the Higher secondary school at

Tabiji.

As part of CSR, location has provided Kota stone flooring at Makupura higher secondary school.