PRE-FEASIBILITY REPORT FOR PROPOSED EXPANSION
OF SHOGUN ORGANICS AT KURKUMBH MIDC, PUNE. 2017
SadekarEnviro Engineers Pvt. Ltd. Page 1
Table of Content
Sr. Title Page
1 Executive summary 2
2 Introduction of the project 4
3 Description of Project 7
4 Site Analysis 22
5 Planning 26
6 Proposed infrastructure 27
7 Rehabilitation and resettlement 28
8 Project schedule and cost estimation 28
9 Analysis of proposal 28
PRE-FEASIBILITY REPORT FOR PROPOSED EXPANSION
OF SHOGUN ORGANICS AT KURKUMBH MIDC, PUNE. 2017
SadekarEnviro Engineers Pvt. Ltd. Page 2
1. Executive summary
Salient Features of Project
Name & Address of
Company M/s Shogun Organics Limited
Plot no – D-18, MIDC Kurkumbh, Taluka – Daund, Distt – Pune Pin code : 413802
Schedule of project
as per EIA
Notification, 2006
5 (b)
Category of Project 'A'
Total Plot Area Particulars Existing area in
Sq. m.
Proposed Area
in Sq. m.
Total area in Sq.
m.
Total Plot Area 1,06,384 -- 1,06,384
Built-up Area 9048.82 3375 12423.82
Parking Area 3802.82 6835.58 10638.40
Greenbelt Area 7164.5 11825 18989.5
Production details Type of Product Existing Qty. Proposed Qty Total Qty.
Technical Product 5.7 MT/M 38.8 MT/M 44.5 MT/M
Intermediates 22.25 MT/M 10 MT/M 12.25 MT/M *1
By Product -- 13.8 MT/M 13.8 MT/M
Formulations -- 113.6 MT/M 113.6 MT/M
Heater Machine -- 25,000 Nos/M 25,000 Nos/M
Water
Requirement of
Project
• Existing Water Requirement : 9.30 CMD
• Proposed water requirement : 34.25 CMD
• Total Water requirement : 43.55 CMD
Source of water: MIDC Kurkumbh.
Effluent generation Industrial Effluent (Existing: 5.2 CMD as per CTO & Proposed : 11.58 CMD) :
16.78 CMD
Domestic Effluent ( Existing : 0.9 as per CTO & Proposed: 4.4 CMD ) : 5.3 CMD
Effluent Treatment
Facility/ STP Existing :
1) Industrial Effluent : 18 CMD Effluent with pre – primary treatment,
distillation unit followed by sand filter and carbon filter.
2) Domestic Effluent : Overflow from Septic tank to gardening.
Proposed (After expansion) :
1) Industrial Effluent: Total trade industrial effluent after expansion i.e. 16.78
CMD will be treated by existing 18 CMDeffluent treatment scheme.
2) Domestic Effluent: Total domestic effluent i.e. 5.3 CMD will be treated in
STP of 6 CMD facility.
Power requirement
of project Electricity Supplied by: MSEDCL
Connected Load: 270 KW
Existing Power Demand : 95 KW
Proposed Power Demand: 130 KW
Total Power Demand : 225 KW
Boiler Details Existing : 1 Steam boiler: 1250 Kg/ hr steam capacity
1 Thermic fluid heater- 4 Lakh Kcal capacity ( Standby )
PRE-FEASIBILITY REPORT FOR PROPOSED EXPANSION
OF SHOGUN ORGANICS AT KURKUMBH MIDC, PUNE. 2017
SadekarEnviro Engineers Pvt. Ltd. Page 3
Note: Existing boiler will be sufficient for proposed expansion, only hours of
operation will get increased.
D.G. Set Existing: 320 KVA X 1 nos (Existing D.G. set will be sufficient for proposed
expansion unit during power failure)
Fuel Requirement Existing requirement of Diesel for Steam Boiler: 62.5 Ltr/ Day
Proposed requirement of Diesel for Steam Boiler : 548.5 Ltr/Day
Total requirement for Diesel for Steam Boiler : 611 Ltr/Day
Diesel for DG Set: 75 Ltr/Hr
Stack height
Common Stack of Steam Boiler & TFH is 20 mtr. Height which would be increased
to 30 metres.
D.G. set : 3 mtr height above roof top
Scrubber : 9 mtr Ht.
ETP capacity 18 CMD
Hazardous waste Sr.
No Particulars Categor
y Existing
Proposed
Total Method of
Disposal
1 Chemical
sludge
containing
residue
Pesticides
29.2 1.25 MT/M 0.625
MT/M 1.875
MT/M
Sent to
CHWTSDF
Ranjangaon
2 ETP Sludge
( Chemical
Sludge from
Waste
Treatment
Plant)
35.3 0.3 MT/M 13.9
MT/M 14.2
TPM
Sent to
CHWTSDF
Ranjangaon
Non hazardous
waste Category Existing
Kg/Day
Proposed
Kg/Day
Total
Kg/Day Method of Disposal
Scrap &
paper 20 Kg/Day 20 kg/Day 40
Kg/Day Sold to registered vendors.
Total man power 68 employees (Existing: 27 + Proposed: 41 = Total 68)
EMP cost Capital Cost Rs. 24.15 Lakh
Recurring Cost Rs. 16.20 Lakh
Project Cost
Existing Project Cost :Rs. 8.85 Cr.
Proposed Project Cost Rs. 5.65 Cr.
Total Project Cost Rs. 14.50 Cr.
Note : *1) Two existing intermediate Allethlone Alcohol & Prallethrolone Alcohol each of capacity
10MT/M will be stopped
2. Introduction of the project
2.1 Identification of Project Proponent:
PRE-FEASIBILITY REPORT FOR PROPOSED EXPANSION
OF SHOGUN ORGANICS AT KURKUMBH MIDC, PUNE. 2017
SadekarEnviro Engineers Pvt. Ltd. Page 4
Shogun Organics Limited is a company focused on mosquito control and household insecticides. The
company provides range of high quality safe products for use in mosquito repellents. The company
makes ingredients and formulations for mosquito repellent products, mainly focused on household
insecticide category.
The company now plans to expand its range of products to agrochemicals to cater to domestic and
export needs. As per the EIA Notification No. S. O. 1533 dated 4th
September 2006, and proposed
project is covered under the schedule 5(b) which is “pesticides industry and pesticide specific
intermediates” (excluding formulations). The schedule comes under ‘A category’ as per EIA
notification.The company had already made application and received TOR approval on 30-04-2013.
This present application is made under Notification S.O. 804(E) dated 14th March, 2017.The
manufacturing unit is located at D-18 MIDC Kurkumbh, Taluka - Daund , Pune District, Maharashtra
State. It is located in chemical zone of Industrial park of Maharashtra Industrial Development
Corporation (MIDC).
2.2 Nature of project:
There is a demand for safer effective products for household insecticide use. The company also plans to
expand its range of products to agrochemicals to cater to domestic and export needs. The proposed
project will manufacture pesticides, insecticides, agro-chemicals and intermediate chemicals. The
proposed project will be located at plot no. D-18 MIDC Kurkumbh, Taluka-Daund, District - Pune,
Maharashtra State. Project is located in chemical zone of industrial park of Maharashtra Industrial
Development Corporation (MIDC).
2.3 Need for the project and its importance to the country and or region:
The main products of the company are mosquito repellents and household insecticides. With the
increasing cases in India of Dengue, Malaria, and other mosquito borne diseases, need for high quality,
safe cost effective mosquito control products has become a necessity. The demand for food and food
produce is increasing and therefore the need for agro-chemicals to increase food yield. The company
also plans to expand its range of products to agrochemicals to cater to domestic and export needs.
Exports is a key focus area to support the vision of Hon’ble Prime Minister “Make In India” program.
Some of the products will help reduce imports and develop indigenous production.
• History of the Project :
Our Environmental clearance (EC) application was made in year 2012 and received TOR approval on 30-04-
2013
PRE-FEASIBILITY REPORT FOR PROPOSED EXPANSION
OF SHOGUN ORGANICS AT KURKUMBH MIDC, PUNE. 2017
SadekarEnviro Engineers Pvt. Ltd. Page 5
The sequence of events is given below for your information.
Date Event and Status
20-12-2012 Our application for Terms of Reference (TOR) with MoEF
30-04-2013 We received TOR approval from MoEF
02-02-2014 We submitted final EIA (Environment Impact Assessment)
02-04-2014 We received MoEF letter asking for details of EIA / EMP by Accredited Environmental
Consultant
21-04-2014 We re-submitted EIA Report with details and disclosure of Accredited consultant.
08-05-2014 Our EC application was considered complete and listed in Agenda for presentation in
19th Reconstituted Expert Appraisal Committee on 29th May 2014)
16-05-2014 Our case was removed from Agenda for 29
th May meeting, only for requirement of Public
hearing at our factory site.
21-07-2014 We received MoEF letter for conducting Public Hearing
13-10-2014 We made complete submission of documents with MPCB, Pune, Maharashtra to conduct
Public Hearing
10-12-2014 Office memorandum of MoEF, stating Public Hearing is not required. Our factory being
in industrial zone was exempted from Public hearing.
03-03-2015 Re-submitted our application for EC online
07-04-2015 Once again MoEF asked for Accredited Environmental Consultant details
14-04-2015 Once again we submitted EIA/EMP with details of Accredited Environmental Consultant
01-07-2015 Deficiency letter received from MoEF asking for Compliance report of our factory from
Regional unit of MoEF&CC ( i.e. Maharashtra Pollution Control Board - MPCB)
13-08-2015 Our reply letter given for this deficiency
23-09-2015 Email from Joint Director(S) of MoEF, asking to appear and present our case before Joint
Secretary, IA Division, MoEF on 28-09-2015.
26-09-2015 We sent email reply requesting another date for hearing with Joint Secretary
05-10-2015 Email from Joint Director(S) of MoEF , asking us to appear for hearing with Joint
Secretary on 19-10-2015
20-10-2015 Hearing was held in chamber of Joint Secretary, IA Division, MoEF
29-10-2015 We sent email to Joint Secretary, copy to Additional Director and Joint Director,
containing details of our EC application and summary of the hearing.
27-11-2015 Our EC application was considered complete and listed in Agenda for presentation in
the 1st Expert Appraisal Committee meeting dated 30-11-2015 to 01-12-2015
01-12-2015 Our application was not heard in Expert Appraisal Committee dated 01-12-2015.
Committee asked us to submit application for quantity amendment in our application.
12-01-2016 Received email from Joint Director(S) of MoEF , asking us to appear for hearing with
Joint Secretary, IA Division, MoEF on 25-01-2016
25-01-2016 Hearing was held in chamber of Joint Secretary, IA Division, MoEF
25-01-2016 We submitted application for quantity amendment
15-03-2016 Our EC application was once again considered complete and listed in Agenda for
presentation in the 6th Expert Appraisal Committee meeting dated 30-03-2016
21-03-2016 We sent email to Joint Secretary, copy to Additional Director and Joint Director, asking
for information and direction to Committee, pursuant to hearing on 25-01-2016
PRE-FEASIBILITY REPORT FOR PROPOSED EXPANSION
OF SHOGUN ORGANICS AT KURKUMBH MIDC, PUNE. 2017
SadekarEnviro Engineers Pvt. Ltd. Page 6
30-03-2016
Our application was not heard in Expert Appraisal Committee meeting, stating
requirement of Compliance report of our factory from Regional unit of MoEF & CC ( i.e.
Maharashtra Pollution Control Board - MPCB)
18-04-2016
We receive a letter from MoEF dated 05-02-2016 with reference of our EC application
file. Letter asked us to stop manufacturing activity. Copy of letter marked to Chairman
Maharashtra Pollution Control Board (MPCB).
03-08-2016 Visit from MPCB, Pune, Maharashtra office to our factory. Report sent to MPCB
Mumbai office
20-10-2016 Based on letter from MoEF, we receive letter from MPCB asking us to stop
manufacturing activity
This present application is made under Notification S.O. 804(E) dated 14th March, 2017.
• Demand supply gap
The need for indigenous production of low cost, efficacious and safe chemicals for insecticide and
pesticide is much in demand. In case of mosquito repellents there is a growing need for products to
control spread of mosquito borne diseases. The demand for food and food produce is increasing and
therefore the need for agro-chemicals to increase food yield. Demand- supply gas is created due to
lower supply capacity of certain products.
• Import Vs. Indigenous production
The proposed products including production of insecticides / pesticides and intermediates have demand
in the domestic as well as export market. Some of the products will help reduce imports and develop
indigenous production.
• Export & economic feasibility
The Indian crop protection industry is of USD 4.25 billion in FY14 and is expected to grow at a CAGR
of 12% to reach USD 7.5 billion by FY19. Exports currently constitute almost 50% of Indian crop
protection industry and are expected to grow at a CAGR of 16% to reach USD 4.2 billion by FY19,
resulting in 60% share in Indian crop protection industry. Domestic market on the other hand would
grow at 8% CAGR, as it is predominantly monsoon dependent, to reach USD 3.3 billion by FY19.
PRE-FEASIBILITY REPORT FOR PROPOSED EXPANSION
OF SHOGUN ORGANICS AT KURKUMBH MIDC, PUNE. 2017
SadekarEnviro Engineers Pvt. Ltd. Page 7
Source:IndustryAnalysisbyTataStrategic
• Domestic/ export markets
The finished goods will be sold in domestic market and it would be exported to the Regulated
International Market as per demand.
• Employment generation:
The company will employ 27 to 68 skilled and unskilled personnel in its facility. It is expected that
proposed plant will generate employment for semi-skilled and unskilled people.
Description of Project
3.1 Project type:
The proposed pesticides and insecticides manufacturing project is an expansion project.
PRE-FEASIBILITY REPORT FOR PROPOSED EXPANSION
OF SHOGUN ORGANICS AT KURKUMBH MIDC, PUNE. 2017
SadekarEnviro Engineers Pvt. Ltd. Page 8
3.2 Location
The Existing & proposed pesticide manufacturing unit is located at Plot no. D-18, MIDC
Kurkumbh, Taluka - Daund, Distt – Pune 413802, Maharashtra. The location is shown in the Google
earth image below.
Figure 1: Location of Shogun Organics Ltd.
Nearby Industries
Sr. no Direction Industry
1 North Pearl Polymers Ltd.
2 South National Highway
3 East Godavari Paper Ltd.
4 West MIDC Internal Road
Proposed unit is well connected by Pune – Solapur State highway. The nearest railway station is
Daund Junction, which is approximately 15 km away from site. The MIDC map is given in figure 2
showing location of plot in MIDC.
PRE-FEASIBILITY REPORT FOR PROPOSED EXPANSION
OF SHOGUN ORGANICS AT KURKUMBH MIDC, PUNE. 2017
SadekarEnviro Engineers Pvt. Ltd. Page 9
Figure 2: MIDC Kurkumbh Map
The plot layout of Shogun Organics Ltd. is given in figure 3. Total plot area is 106384 sq. m. the
location of plant building, utility building, ware house, internal roads, parking area is shown in the
layout.
PRE-FEASIBILITY REPORT FOR PROPOSED EXPANSION
OF SHOGUN ORGANICS AT KURKUMBH MIDC, PUNE. 2017
SadekarEnviro Engineers Pvt. Ltd. Page 10
Figure 3 : Plot layout of Shogun Organics Ltd.
PRE-FEASIBILITY REPORT FOR PROPOSED EXPANSION
OF SHOGUN ORGANICS AT KURKUMBH MIDC, PUNE. 2017
SadekarEnviro Engineers Pvt. Ltd. Page 11
Area statement of M/s. Shogun Organics Ltd.
Sr. Particulars Area (sq. m.)
1 Total plot area 1,06,384.0
2 Built up area 12,423.82
3 Green belt area 18,989.50
4 Parking area 10,638.40
3.3 Details of sites considered:
The MIDC Kurkumbh is situated close to Pune – Solapur State Highway. The land rates are
cheaper to promote the industrialization and the MIDC have all adequate facilities viz. good
road and rail network, 24 hour electricity, water supply, MIDC roads, CETP and availability of
man power etc.
3.4 Size of operation
The production capacity with byproducts is given in following table.
List of Products &Quantity: (Existing & Proposed):
A. Technicals :
Sr.
No.
Product Description Existing Qty. per
Month ( MT )
Proposed Qty. Per
Month ( MT )
Total Qty. Per
Month ( MT )
1.
d-trans Allethrin Tech
2.5 MT
2.5 MT
5.00 MT
2.
Allethrin Tech.
1 MT
1.0 MT
2.00 MT
3.
Prallethrin Tech.
1 MT
5.0 MT
6.00 MT
4.
Transfluthrin Tech.
1.2 MT
4.8 MT
6.00 MT
5.
Deltamethrin Tech
0
2.0 MT
2.00 MT
6.
Imidacloprid Tech
0
5.0 MT
5.00 MT
7.
Bifenthrin Tech.
0
1.5 MT
1.50 MT
8.
Fipronil Tech.
0
2.5 MT
2.50 MT
9.
Cypermethrin Tech.
0
4.5 MT
4.50 MT
10.
Permethrin Tech.
0
1.5 MT
1.50 MT
11.
DEET Tech.
0
1.5 MT
1.50 MT
12.
Renofluthrin Tech.
0
4.0 MT
4.00 MT
13.
Dimefluthrin Tech.
0
3.0 MT
3.00 MT
PRE-FEASIBILITY REPORT FOR PROPOSED EXPANSION
OF SHOGUN ORGANICS AT KURKUMBH MIDC, PUNE. 2017
SadekarEnviro Engineers Pvt. Ltd. Page 12
TOTAL QUANTITY
PER MONTH - ( A )
5.7 MT
38.8 MT
44.5 MT
B. List of Intermediates & Quantity : ( Existing & Additional) :
Sr.
No.
Product Description Existing Qty. Per
Month ( MT )
Proposed Qty.
Per Month ( MT )
Total Quantity
Per Month ( MT)
1.
Chrysanthemic Acid Chloride
2.25 MT
0.0
2.25 MT
2.
Allethlone Alcohol
10.0 MT
0.0 ( Production
will be
discontinued )
0.0 MT
( Production will
be discontinued )
3.
Prallethrolone Alcohol
10.0 MT
0.0( Production
will be
discontinued )
0.0 MT
( Production will
be discontinued )
4.
R-Cypermethric Acid
Chloride
0.0
4.0 MT
4.0 MT
5.
Cypermethric Acid Chloride
0.0
6.0 MT
6.0 MT
TOTAL QUANTITY PER
MONTH - ( B )
22.25 MT
10.0 MT
12.25 MT
GRAND TOTAL OF
QUANTITY ( A + B )
27.95 MT
48.8 MT
56.75 MT
C. List of By Products & Quantity : ( Existing & Proposed) :
Sr.
No.
Product Description Existing Qty.
Per Month (
MT )
Proposed Qty.
Per Month (
MT )
Total Quantity
Per Month (
MT
1.
Hydrochloric Acid
0.0
1.9 MT
1.9 MT
2.
Sodium Sulphate
0.0
4.9 MT
4.9 MT
3.
S-Cypermethric Acid
0.0
7.0 MT
7.0 MT
TOTAL QUANTITY PER
MONTH – ( C )
0.0
13.8 MT
13.8 MT
PRE-FEASIBILITY REPORT FOR PROPOSED EXPANSION
OF SHOGUN ORGANICS AT KURKUMBH MIDC, PUNE. 2017
SadekarEnviro Engineers Pvt. Ltd. Page 13
D. List of Formulations & Quantity : ( Existing & Proposed) :
Sr.
No.
Product Description Existing
Quantity
per Month
Proposed Qty. Per
Month
Total Quantity
Per Month
1.
LV with 0.88% Transfluthrin
( 35 ML & 45 ML )
0
9. 0 MT
(200,000 bottles)
9.0 MT
(200,000 bottles)
2.
LV with 1.6% Transfluthrin
( 35 ML & 45 ML )
0
9. 0 MT
(200,000 bottles)
9. 0 MT
(200,000 bottles)
3.
Imidacloprid 2.15% Gel
0
1.25 MT
(50,000 tubes)
1.25 MT
(50,000 tubes)
4.
Imidacloprid 17.8% SL
0
1.25 MT
(50,000 tubes)
1.25 MT
(50,000 tubes)
5.
Imidacloprid 30.5% SC
0
1.25 MT
(50,000 tubes)
1.25 MT
(50,000 tubes)
6.
Fipronil 5% Gel
0
1.25 MT
(50,000 tubes)
1.25 MT
(50,000 tubes)
7.
Transfluthrin 1% FU
0 3.0 MT
(75000 sachets)
3.0 MT
(75000 sachets)
8.
Renofluthrin 5% MUP
0
30.0 MT
30.0 MT
9.
Solvent Mix
0
3.0 MT
3.0 MT
10.
DEP with Perfume
0
3.0 MT
3.0 MT
11.
Renofluthrin 0.025% Coil
0
5.0 MT
5.0 MT
12.
Renofluthrin 0.03% Coil
0
5.0 MT
5.0 MT
13.
Transfluthrin 12% AE
0
10.0 MT
(100,000 Cans)
10.0 MT
(100,000 Cans)
14. Renofluthrin 0.17% Insence
Sticks ( Agarbatti )
0
4.2 MT
4.2 MT
15. Renofluthrin 0.20% Insence
Sticks ( Agarbatti )
0
4.2 MT
4.2 MT
16. Renofluthrin 0.125% Insence
Sticks ( Agarbatti )
0
4.2 MT
4.2 MT
17.
Renofluthrin 0.75% Liquid
Vaporiser
0
9.0 MT
(200,000 Bottles)
9.0 MT
(200,000 Bottles)
18. Transfluthtin 0.06% +
Cypermethrin 0.11% AE
0
10.0 MT
(100,000 Cans)
10.0 MT
(100,000 Cans)
GRAND TOTAL OF
PRE-FEASIBILITY REPORT FOR PROPOSED EXPANSION
OF SHOGUN ORGANICS AT KURKUMBH MIDC, PUNE. 2017
SadekarEnviro Engineers Pvt. Ltd. Page 14
QUANTITY ( D ) 0 MT 113.6 MT 113.6 MT
E. Heater Machines :
Sr.
No.
Product Description Existing
Quantity
per Month
Proposed Qty. Per
Month
Total Quantity
Per Month
01.
Heater Machines
0
25,000 Nos.
25,000 Nos.
3.5 Project description with process detail.
The process details and material balance for d-trans Allethrin Technical is given in
following table. Manufacturing process of other products is given in Annexure-2.
The production capacity with byproducts is given in following table.
PRODUCT NAME :d-trans Allethrin Technical
PRODUCT DETAILS :
Grade MT/Day MT/Month For
Months MT/Year Application
Tech 0.192 5 12 60 Household Insecticide
RAW MATERIALS :
Input output data per day. Reaction& Washing
INPUTS OUTPUTS
Sr. No. Name MT/Day Role in
Reaction Sr. No. Name of
outputs Qty
MT/Day
1.0 Allethlone Alcohol 0.103 Reactant 1.0 Organic Layer 0.782
2.0 Chry. Acid
Chloride 0.126 Reactant 2.0
Pyridine
Hydrochloride 0.095
3.0 Sodium Hydroxide 0.004 Washing 3.0 Effluent 0.062
4.0 Pyridine 0.072 Solvent
5.0 HCL 0.044 Washing
6.0 Toluene 0.590 Solvent
Total 0.939 0.939
Distillation
1.00 Organic layer 0.782 1.00 Recovered
Solvent 0.531
2.00 Residue
(Product) 0.192
3.00 Solvent Loss 0.059
Total 0.782 0.782 Distillation ( Recovery of Pyridine
)
2.0 Pyridine Hydrochloride 0.095 1.00 Pyridine 0.081
PRE-FEASIBILITY REPORT FOR PROPOSED EXPANSION
OF SHOGUN ORGANICS AT KURKUMBH MIDC, PUNE. 2017
SadekarEnviro Engineers Pvt. Ltd. Page 15
2.00 Effluent 0.014
Total 0.095 0.095
CHEMICAL FORMULAE : CH3
CH2
O
OH
+
CH3 CH3
CH3
CH3Cl
O
CH3
CH3
CH3
CH3
O
CH3
CH2
O
O
M. F : C19H26O3
Chrysanthemic Acid Chloride
M. F : C10H15ClO
F. W : 186.67
Alletholone Alcohol
M. F :C9H12O2
F. W : 152.19
+ HCl
d-Trans Allethrin
F. W : 302.40
Hydrochloric acid
F. W.: 36.46
CHEMICAL EQUATION:
C9H12O2+ C10H15ClO C19H26O3+ HCl
1.0000 0.9952 0.9294
BRIEF PROCESS DESCRIPTION : Charge Allethlone Alcohol, Pyridine and Tolune in room temperature. Add Chry. Acid Chloride slowly by
maintaining temperature to 25°C under string. On completion, wash the unreacted content with HCL and
make neutral by NaOH Solution. Then transfer the mass to distillation. Distilled out solvent and get the
product.
FLOW SHEET & MASS BALANCE :
Raw
Materials Qty Product Qty
Allethlone
Alcohol 0.103
Organic Layer 0.782
Chry. Acid
Chloride 0.126
Pyridine
Hydrochloride 0.095
Toluene 0.590 Effluent 0.062 Sod.
Hydroxide 0.004
Pyridine 0.072
HCL 0.044
Total 0.939 Total 0.939
Organic
Layer 0.782
Recovered
Solvent 0.531
Residue (Product) 0.192
Solvent Loss 0.059
Total 0.782 Total 0.782
Reaction&
Washing
Distillation
PRE-FEASIBILITY REPORT FOR PROPOSED EXPANSION
OF SHOGUN ORGANICS AT KURKUMBH MIDC, PUNE. 2017
SadekarEnviro Engineers Pvt. Ltd. Page 16
Distillation
:
Recovery of
Pyridine
Pyridine
Hydrochloride 0.095 Pyridine 0.081
Effluent 0.014
Total 0.095 0.095
Total outlet
Byproduct Type Qty /Day Remark
0 0
Total
Solid Waste 0 CHWTSDF 0
Empty
Containers
,Nos. 4.58
Re-used for packing
3.6 Raw material details
All basic raw material details with its quantity is given below. The raw materials are available in
domestic market and they will be transported by road to the manufacturing unit. Some key raw
materials are imported. They are imported as per requirement and stored in storage room (Godown)
Bags, Carbuoys and drums will be stored in storage area( Godown). The nitrogen gases will be
stored in the cylinders as per storage specifications.
Sr. Product Name of RM
Input
MT/Day
Max
Storage
( MT/10
days)
Storage
Facility
1 d-trans Allethrin
Tech.
Allethlone Alcohol 0.103 1.030 Godown
Chry. Acid Chloride 0.126 1.260 Godown
Toluene 0.590 5.900 Godown
Sodium Hydroxide 0.004 0.040 Godown
d-Allethrin Tech..
Allethlone Alcohol 0.041 0.410 Godown
2
Chry. Acid Chloride 0.050 0.500 Godown
Toluene 0.233 2.330 Godown
Sodium Hydroxide 0.002 0.020 Godown
3 Prallethrin Tech.
Prallethlone Alcohol 0.139 1.390 Godown
Chry. Acid Chloride 0.176 1.760 Godown
Toluene 0.917 9.170 Godown
Pyridine 0.097 0.970 Godown
4 Transfluthrin
Tech.
Tetrafluoro Benzyl Alc. 0.119 1.190 Godown
RCMAC 0.156 1.560 Godown
Toluene 0.632 6.320 Godown
PRE-FEASIBILITY REPORT FOR PROPOSED EXPANSION
OF SHOGUN ORGANICS AT KURKUMBH MIDC, PUNE. 2017
SadekarEnviro Engineers Pvt. Ltd. Page 17
Hydrochloric Acid 0.004 0.040 Godown
Activated Charcoal 0.012 0.120 Godown
5 Deltamethrin
Tech
RR Cyperm. Acid Chlo. 0.970 9.700 Godown
m-Phenoxybenzaldehyd 0.548 5.48 Godown
TBAB 0.013 0.130 Godown
Toluene 0.210 2.100 Godown
Isopropyl Alcohol 3.932 39.32 Godown
Tri-ethyl Amine 0.665 6.650 Godown
6 Imidacloprid Tech
CCMP 0.764 7.640 Godown
Nitroguanidine 0.673 6.730 Godown
Sodium Hydroxide 0.200 2.000 Godown
Dimethyl Formamide 4.545 4.545 Godown
7 Bifenthrin Tech.
Cyhalothric Acid Chlo. 0.643 6.430 Godown
n-Hexane 1.846 18.460 Godown
3-Biphenyl Methanol 0.456 4.560 Godown
8 Fipronil Tech
Thiopyrazole 0.994 9.940 Godown
MCB 1.058 10.580 Godown
Tri-chloro Acetic Acid 2.470 24.700 Godown
H202 0.185 1.850 Godown
9 Cypermethrin
Tech
DV Acid Chloride 0.586 5.860 Godown
Metaphenoxybenzalde 0.495 4.950 Godown
n-Hexane 1.500 15.000 Godown
Sodium Hydroxide 0.063 0.630 Godown
Sod. Cyanide 0.369 3.690 Godown
10 Permethrin Tech.
DV Acid Chloride 0.603 6.030 Godown
3-Biphenyl Methanol 0.520 5.200 Godown
n-Hexane 1.267 12.670 Godown
11 DEET Tech
Meta-toluic Acid 1.000 10.000 Godown
Diethyl Amine 0.590 5.900 Godown
Orthophosphoric Acid 0.100 1.000 Godown
12 Renofluthrin Tech
W52 Alcohol 0.101 1.000 Godown
Cypermethric Acid Chlo 0.101 1.010 Godown
Toluene 0.452 4.520 Godown
Catalyst 0.0720 0.720 Godown
13
Dimefluthrin Tech
W52 Alcohol 0.074 0.740 Godown
Chrys. Acid Chloride 0.067 0.670 Godown
Toluene 0.338 3.380 Godown
Pyridine 0.051 0.510 Godown
PRE-FEASIBILITY REPORT FOR PROPOSED EXPANSION
OF SHOGUN ORGANICS AT KURKUMBH MIDC, PUNE. 2017
SadekarEnviro Engineers Pvt. Ltd. Page 18
3.7 Resource optimization ( recycle/ reuse):
1. The effluent generated from process scrubber will be sold as byproduct namely sodium sulphite
and HCl.
2. The proposed expansion will be ZLD system wherein the entire effluent will be recycled /
reused within the plant. Thus, the fresh water requirement will be significantly reduced.
3. The treated domestic sewage will be reused for gardening which will reduce daily fresh water
need for gardening.
4. The company has installed rooftop rain water harvesting and the harvested rain water will be
stored in dedicated underground water tank. In rainy season the fresh water need will be
reduced.
5. The sludge from STP will be used in house as a manure for gardening.
3.8 Availability of water, energy fuel:
The water will be supplied by MIDC Kurkumbh. Total fresh water need for domestic and process
water requirement will be 43.55 CMD.
A load of 270 KW has been sanctioned by MSEDCL. Out of which the present consumption of 95
KW and proposed consumption would be 130 KW. Hence there is no requirement of additional
load.
3.9 Quantity of waste to be generated
• Total 16.78 CMD process waste will be generated. It will be treated in distillation system and
CMD water will be recycled to process.
• Total 5.3CMD domestic sewage will be treated and treated sewage will be used for gardening.
• Existing Water Budget :
Parameter Water Requirement
CMD Losses
CMD Effluent CMD Remark
Domestic Process
Domestic
1.3
0.4
0.9
0
Treated Effluent ( 0.9 ) is used for
Gardening.
Process
3.5
0.2
0
3.3
Treated water ( 2.6KL ) is used
for Cooling tower
Cooling
Tower
2.0 Fresh water + 3.6 KL recycled water
4.6
0
1.0
Boiler
2.5
1.3 0
0.2
Boiler condensate ( 1 KL ) is used
for Cooling tower.
Gardening 0.9 ( Recycled water) 0.9 0 0
Total 9.3 (Fresh water) + 4.5
( Recycled water) 7.4 0.9 4.5
PRE-FEASIBILITY REPORT FOR PROPOSED EXPANSION
OF SHOGUN ORGANICS AT KURKUMBH MIDC, PUNE. 2017
SadekarEnviro Engineers Pvt. Ltd. Page 19
• Total Water Budget :
Parameter Water Requirement,
CMD Losses
CMD Effluent CMD Remark
Domestic Process
Domestic
6.6
1.3
5.3
0
Treated Effluent (5.3 KL)
will be used for Gardening.
Process 14.0 1.50 0 12.50 Treated water ( 10 KL ) is
used for Cooling tower
Cooling
Tower
6.0 Fresh water + 13.58
KL recycled water 16.0 0 3.58
Boiler
8.95
4.48
0
0.70
Boiler condensate (3.77 KL)
is used for Cooling tower.
Gardening 8 (fresh water )+ 5.3
(Recycled Water) 13.3 0 0
Total 43.55 ( Fresh water) +
18.88 ( Recycled water)
36.58 5.3 16.78
Solid hazardous waste which will be generated from the manufacturing activity will be,
Sr.
No Particulars Category
Existing
TPM
Proposed
TPM
Total
TPM
Method of
Disposal
1 Chemical sludge
containing residue
Pesticides
29.2 1.25
MT/M 0.625 MT/M
1.875
MT/M
Sent to
CHWTSDF
Ranjangaon
2 ETP Sludge
(Chemical Sludge
from Waste
Treatment Plant)
35.3
0.3
MT/M 13.9 MT/M
14.2 TPM Sent to
CHWTSDF
Ranjangaon
Non hazardous waste generation will be given as,
Category
Existing
Kg/Day
Proposed
Kg/Day
Total
Kg/Day
Disposal
Scrap paper &
Garbage
20 Kg / Day 20 kg/Day 40 Kg/Day Sold to registered
vendors.
PRE-FEASIBILITY REPORT FOR PROPOSED EXPANSION
OF SHOGUN ORGANICS AT KURKUMBH MIDC, PUNE. 2017
SadekarEnviro Engineers Pvt. Ltd. Page 20
3.10 Schematic representation of feasibility drawing for EIA purpose
PRODUCTION ACTIVITY
RESOURCE CONSUMPTION
(WATER)
POWER CONSUMPTION
WASTE
GENERATION FINISHED PRODUCTS
MARKET
ECONOMY
EMPLOYMENT
RAW MATERIAL
POLLUTION
ABATEMENT
CLEAN
ENVIRONMENT
PRE-FEASIBILITY REPORT FOR PROPOSED EXPANSION
OF SHOGUN ORGANICS AT KURKUMBH MIDC, PUNE. 2017
SadekarEnviro Engineers Pvt. Ltd. Page 21
Site Analysis
3.11 Connectivity:
The project is located at MIDC Kurkumbh Industrial area, Taluka – Daund, Distt. Pune
413802, Maharashtra. The MIDC area at Kurkumbh is notified Chemical Zone MIDC area,
Kurkumbhisclose to the Pune – Solapur highway, which is a state highway.It is around 35
kms from the well developed township of Baramati and around 75kms away from Pune
which isthe site ofthe National Chemical Laboratory. The nearest railway station is Daund,
which is15 kms away. There are already large chemical plants like Reliance
Petrochemicals, CIPLA Ltd., Emcure Pharmaceuticals located in this area. The proximity
to the highway is a great advantage, since the company's raw materials and finished
products will move by road.
• Nearest Railway Station : Daund Junction.approximately at a distance of 15 km.
• Nearest Airport : Pune International Airport, Lohgaon. approximately
of 80 Kms.
• Location and Access
The industrial area is centrally located and easily accessible through all modes of transport.
There is no problem for getting transport. Many transport companies are nearby our
Industrial plot.
• Road: The entire industrial area is well connected by internal roads.
Land Form, Land use and Land Ownership
The Project location & the surrounding environs being located in the notified Chemical zone and it
prevails industrial land use form.
3.12 Topography:
Majority of the site is plane with gentle slope.
M/s. Shogun Organics Ltd.
Location: Plot no. D-18, MIDC Kurkumbh, Taluka –
Daund, Distt – Pune , Pin – 413802. Maharashtra
Latitude : 18° 24' 20.34"N
Longitude : 74° 29' 58.90"E
PRE-FEASIBILITY REPORT FOR PROPOSED EXPANSION
OF SHOGUN ORGANICS AT KURKUMBH MIDC, PUNE. 2017
SadekarEnviro Engineers Pvt. Ltd. Page 22
Environmentally sensitive features within 15 km radius of the plant
The environmentally sensitive features exist around 15 km radial distance from the plant is,
Sr.No.
Areas
Name/
Identity
Aerial distance (with 15 km.)
Proposed project location boundary
1
Areas protected under international
conventions, national or legislation
for their ecological, Landscape,
cultural or other related value
No
Following Reserve Forests exists within
15 km from project boundary location:
1. Reserve Forest at Dandwadi towards
EES direction from the project site
approximately at an aerial distance of 10
km
2. Reseve Forest at Lonkarmala towards
EES from the project site approximately
at an aerial distance of 12 km
3. Reserve Forests at Sonwadi & Gar
towards NNE direction from the project
site approximately at an aerial distance of
10 & 11 km respectively
2
Areas which are important or
sensitive for ecological reasons-
Wetlands, watercourses or other
water bodies, coastal zone,
biospheres, mountains, forests
Yes
1. New Mutha Right Bank Canal is
present towards NE direction from the
project site approximately at an aerial
distance of 2.4 km
2. Bhima River flows at North direction
from the project site approximately at an
aerial distance of 10 km
3. Sirsuphal Talab is present at EES
direction from the project site
approximately at an aerial distance of
11.9 km
4. Victoria Talav is present at WWN
direction from project site at an
approximate aerial distance of 8.6 km
3
Areas used by protected, important
or sensitive species of flora or fauna
for breeding, nesting, foraging,
resting, over wintering, migration
No No such areas are present within 15 km
from the project location boundary.
4 Inland, coastal, marine, or
underground waters No
1. New Mutha Right Bank Canal is
present towards NE direction from the
project site approximately at an aerial
distance of 2.4 km
2. Bhima River flows at North direction
from the project site approximately at an
PRE-FEASIBILITY REPORT FOR PROPOSED EXPANSION
OF SHOGUN ORGANICS AT KURKUMBH MIDC, PUNE. 2017
SadekarEnviro Engineers Pvt. Ltd. Page 23
aerial distance of 10 km
3. Sirsuphal Talab is present at EES
direction from the project site
approximately at an aerial distance of
11.9 km
4. Victoria Talav is present at WWN
direction from project site at an
approximate aerial distance of 8.6 km
5 State, National boundaries No
None state or national boundaries pass
within 15 km from the project location
boundary
6
Routes or facilities used by the
public for access to recreation or
tourist, pilgrim areas
No
No such routes or facilities exists in the
15km within 15 km from the project
location boundary
7 Defence installations No No defense installations are within 15 km
from the project location boundary
8 Densely populated or built-up area Yes Daund town is 15 km away from the
boundary of the project plot
9
Areas occupied by sensitive man-
made land uses (hospitals, schools,
places of worship, community
facilities)
No
The project is located is Notified in
Kurkumbh MIDC area which is
surrounded by several populated localities
hence several hospitals, schools, places of
worship, community facilities are present
within 15 km from the project location
boundary
10
Areas containing important, high
quality or scarce resources
(ground water resources, surface
resources, forestry, agriculture,
fisheries, tourism, minerals)
No
The project is located is Notified in
Kurkumbh MIDC area which is
surrounded by large number of
agricultural feilds
11
Areas already subjected to pollution
or environmental damage. (those
where existing legal environmental
standards are exceeded)
No No such areas are present within 15 km
from the project location boundary
12
Areas susceptible to natural hazard
which could cause the project to
present environmental problems
(earthquakes, subsidence, landslides,
erosion, flooding Or extreme or
adverse climatic conditions)
No The project is located in Notified
Kurkumbh MIDC area
PRE-FEASIBILITY REPORT FOR PROPOSED EXPANSION
OF SHOGUN ORGANICS AT KURKUMBH MIDC, PUNE. 2017
SadekarEnviro Engineers Pvt. Ltd. Page 24
3.13 Existing land use pattern
The project site is located in the notified chemicalzone in Maharashtra Industrial Development
Corporation which has been developed for industrial development. The existing land use pattern in
the 10 km radial distance of the project site comprises of Industrial, human habitations/settlements,
small agricultural/ crop lands.
3.14 Existing infrastructure:
We have ready constructions for existing production. We have not yet started additional
construction for expansion products. Most of products can be accommodated with the existing plant
& machineries.
3.15 Soil classification:
The main type of soils found in the district are forest soils, varkas soils, rice soils, & laterite soils.
Climatic data from secondary sources
Average rainfall in the district is 600 to 700 mm. This is usually during the monsoon months from
July – October. Moderate temperatures are mainly observed here. The rainfall is unpredictable in
tune with the Indian monsoon. Summers here begin from early March to July. Summers are dry and
hot. The temperature ranges from 20 °C to 38 °C, though at the peak they may reach 40 °C.
From November to February, is the winter season. Temperatures at the peak drop to single digits
but usually they hover around 7 °C to 12 °C sometimes lowers up to 3 °C. January to March are the
months with moderate temperatures.
3.16 Social infrastructure available:
Social infrastructure like schools, road, hospitals, is available near Kurkumbh MIDC.
PRE-FEASIBILITY REPORT FOR PROPOSED EXPANSION
OF SHOGUN ORGANICS AT KURKUMBH MIDC, PUNE. 2017
SadekarEnviro Engineers Pvt. Ltd. Page 25
4. Planning Brief
5.1 Planning concept:
• M/s. Shogun Organics Ltd. has valid consent to establish and Operates for setting up a
Insecticides / pesticides technical and formulation plant. The company later decided to increase
volume of existing technical products and increase of new technicals and formulations of
pesticide manufacturing because of the change in global demand and supply for technical and
formulation products.
• The Kurkumbh MIDC have road network and water will be provided by MIDC, therefore
company will not be relied on ground water in the MIDC area.
• Electricity will be provided by MSEDCL and transformer have been installed .
5.2 Land use planning:
The proposed manufacturing expansion unit will be established in plot D-18, MIDC, Kurkumbh.
The land is acquired by MIDC and the land use will be industrial type. No cultivated land or forest
land will be utilized for the proposed unit.
5.3 Assessment of Infrastructure demand
The major physical infrastructure like road, water supply is provided by MIDC Kurkumbh. The
electricity will be supplied by MSEDCL by means of continuous feeder substation.
5.4 Amenities:
Basic amenities like road, electricity, process water will be available at site. The drinking water will
be provided by further purification of process water by RO purification unit. In the plant personal
hygiene facilities will be provided to workers as per the rule.
PRE-FEASIBILITY REPORT FOR PROPOSED EXPANSION
OF SHOGUN ORGANICS AT KURKUMBH MIDC, PUNE. 2017
SadekarEnviro Engineers Pvt. Ltd. Page 26
5. Proposed infrastructure:
6.1 Industrial area
The proposed pesticide expansion manufacturing unit of Shogun Organics Ltd. will be
established on plot no. Plot No. D-18, Kurkumbh MIDC, Taluka – Daund, District – Pune, Pin
– 413802, Maharashtra.,
Residential area
The unit is pesticide manufacturing unit and situated at Chemical notified zone., therefore
there will be no need of residential infrastructure on the plot.
6.2 Green belt
The proposed unit have provided with 19,989.50sq. m. of green belt area around the boundary
and inside of the plot.
6.3 Social infrastructure:
The project site is approximately 15 km from Daund city. All basic social infrastructure
facilities are available in the study area.
6.4 Connectivity
The site can be accessed by State highway from Pune to Kurkumbh. The MIDC Kurkumbh
have excellent internal and connecting road network therefore no additional connectivity
infrastructure will be constructed.
6.5 Sewerage system
The sewage will be treated in STP and the treated sewage will be utilized for gardening
purposes.
6.6 Industrial waste management
Total 16.78 CMD process liquid waste will be generated. It will be treated in distillation system
and treated water will be recycled to cooling tower makeup.
5.3 CMD domestic sewage will be treated in STP and treated sewage will be used for
gardening.
6.7 Solid waste management
The hazardous waste will be segregated as per category in schedule I of “Hazardous and Other
Wastes and it will be stored in demarcated area. The hazardous waste will be treated at
CHWTSD facility.
PRE-FEASIBILITY REPORT FOR PROPOSED EXPANSION
OF SHOGUN ORGANICS AT KURKUMBH MIDC, PUNE. 2017
SadekarEnviro Engineers Pvt. Ltd. Page 27
6.8 Power requirement/ supply/ source
A load of 270 KW has been sanctioned by MSEDCL. Out of which the present consumption os
95 KW and proposed consumption would be 130 KW. Hence there is no requirement of
additional load.
Rehabilitation and resettlement
The unit will be established in notified Chemical Zone at MIDC Kurkumbh. No rehabilitation
and resettlement will be incorporated.
6. Project schedule and cost estimation
Most of the proposed products can be accommodated in the Existing Plant. It is proposed that
the project will be commissioned after 12 months from grant of EC. The cost estimation is
presented in CA certificate attached as Annexure – 4.
7. Analysis of proposal
• Proposed production activity will provide employment to the local residents, resulting financial
and social benefits of the nearby people.
• Indirect employment will be generated by the proposed unit like canteen, transportation
facilities to workers.
• The export will result in generation of foreign exchange to the Country.