PRE – FEASIBILITY REPORT
Prepared by M/s Udaipur Min-Tech. Pvt .Ltd
2
Aher bhagwan bhimshi C/O Ajotha Limestone Mine M/S Sorath Minerals Trading Company
TABLE OF CONTENT
Sr.
No.
Content Page
No.
1.0 Executive Summary 25
2.0 Introduction of Project and Background
Information 26
3.0 Project Description 27
4.0 Site Analysis 33
5.0 Planning Brief 38
6.0 Proposed Infrastructure 43
7.0 Rehabilitation & Resettlement 44
8.0 Project Schedule 44
9.0 Analysis of Proposal 45
Prepared by M/s Udaipur Min-Tech. Pvt .Ltd
3
Aher bhagwan bhimshi C/O Ajotha Limestone Mine M/S Sorath Minerals Trading Company
EXECUTIVE SUMMARY
Particulars Details
Location Ajotha Limestone Mine
Tehsil –Veraval,
Distt –Gir Somnath, Gujarat
Latitude 20°54'03.11"N to 21°54'13.92"N
Longitude 70°28'45.48"E to 70°29'04.35"E
Toposheet No. 41L/5
Total lease Lease area 6.47 ha.
Mineable Reserves 12,18,452 tones
Capacity Proposed production – 3,00,000TPA
Life of Mine 5 years
Ultimate depth of mining 2 mRL
Estimated project cost 60/- lacs
EMP Cost 1.00 /- Lac
DG Set Not Required
Highest and Lowest Elevation
S. No. Particulars Elevation (mRL)
1. Highest 19
2. Lowest 14
Land use Govt. waste Land
Nearest Habitation/ Town Ajotha, about 2.00 km from lease area in SW
direction.
Nearest Airport Keshod, 70km from lease area in NW direction.
Nearest Highway SH-6 about 1.00 km in S direction
NH-8E about 1.00 km in S direction
Nearest Railway Station Somnath Railway Station-9 km from mine site in W
direction
Power Supply Ajotha
Nearest Dispensary and Govt.
Hospital
Ajotha
Educational Facility Ajotha
Nearest Telephone Facility Ajotha
Water Demand and Supply 4.00 KLD, Source: nearby water well
Nearest Tourist Places None within the study area
Defense Installations None within the study area
Archeological Features None within the study area
Ecological Sensitive Zones None within the study area
Nearest Streams/ Rivers/
Water Bodies (from mine
boundary)
Kapila river about 1.00 km in s direction
Seismic Zone Seismic zone – III.
Prepared by M/s Udaipur Min-Tech. Pvt .Ltd
4
Aher bhagwan bhimshi C/O Ajotha Limestone Mine M/S Sorath Minerals Trading Company
1. INTRODUCTION OF PROJECT /BACKGROUND INFORMATION
Mining project for Limestone with. Survey no.-389/1. The project is located near
village – Ajotha, Tehsil – Veraval and District – Gir Somnath, (Gujarat). Lease
area – 6.47 ha. Proposed production – 3,00,000 TPA
2.1 Identification of the project and project proponent
Name of the Project Ajotha Limestone Mine
Name of the Lessee Aher Bhagwan Bhimshi
C/O M/S Sorath Minrals TradingCompany
Location of the project Near Village – Ajotha ,Tehsil –Veraval,
Distt – Gir Somnath(Guj.)
Proposed Production 3,00,000 MT
Lease Area 6.47 ha.
Mob. No. +919824659216
Email [email protected]
Status of the Applicant Private indidual
2.2 Brief description of the nature of the project:
Review of Mining Plan is prepared for Ajotha mining lease admeasuring
6.47 hect. Mining lease of survey No. 389/1 Part of Ajotha village of Veraval
was executed on 28-10-1976 for a period of 20 years in favor of Sh. Aher
Bhagwan Bhimshi C/o Sorath Minerals Trading Co., Veraval and expired on
27-10-1996. (Annexure No. 1).
Lessee have applied first renewal for further 30 years on dated 12-08-1996
and is pending with State Govt. under deemed renewal upto 27-10-2026.
(Annexure No. 2)
The Mining plan with PMCP was approved by Regional Controller of Mines,
Indian Bureau of Mines, Udaipur for renewal of the mining lease vide letter
Prepared by M/s Udaipur Min-Tech. Pvt .Ltd
5
Aher bhagwan bhimshi C/O Ajotha Limestone Mine M/S Sorath Minerals Trading Company
no.682(23)(667)/2009 MCCM(N)UDAI dated 18-8-2009 for 5 years period from
2009-10 to 2013-14. Refer Annexure no.3.
The Mining plan had expired on 31-3-2014. No mining proposals were made from
1-4-2014 to 31-3-2016. This period will be considered as lapse period. The inability
to submit Mining plan for this period is due to negligence by the Lessee. This
Mining Plan is proposed for three years from 2016-17 to 2018-19.
Details of production since opening enclosed as Annexure no. 8. There is now
high demand of limestone in Soda Ash & Cement industry. Therefore mining
proposal has been drawn to produce 3.00 lac tons of ROM per year. The
limestone produced will be supplied to Cement & Soda Ash Industries situated
in Gir Somnath & Amreli Dist in Gujarat.
PAN card and Photo ID and address proof of Sh. Aher Bhagwan Bhimshi is
enclosed as Annexure no.4 & 5.
Review of Mining Plan has been approved for Ajotha limestone mine lease
area 6.47 hect. Mining lease of survey No. 389/1 Part of Ajotha village of
Veraval vide letter no. 682(23)(667)/2009 MCCM(N)UDAI dated 23/9/2016
Nature of the Project:
Mining of Limestone is proposed in the lease area 6.47HECT. near village–
AJOTHA, Tehsil – Veraval, District – Gir Somnath, Gujarat. Mining will be
carried out by Opencast Mechanized method. Proposed production is 3,00,000
MT
Prepared by M/s Udaipur Min-Tech. Pvt .Ltd
6
Aher bhagwan bhimshi C/O Ajotha Limestone Mine M/S Sorath Minerals Trading Company
2.3 Need for the project and its importance to the country and or region:
The basic objective of the project is to effective utilization of Material in the
country or region. The limestone produced will be supplied to various cement
plants. The material generated from this mine will be used mainly for building
construction work. The Limestone shall be used in future for local construction
work like retaining wall around pits and applied boundary. Limestone will
helps in the economic growth of the country or region.
2.4 Demands-supply gap:
The use of limestone is in lime making or cement Industries.
2.5 Imports vs. Indigenous Production
There will be no import for the project. There will be indigenous inputs in the
entire mining activity.
2.6 Export Possibility
The mining activity is not prospecting exports.
2.7 Domestic/Export Markets
Lessee would like to sale out the mineral in domestic market as per
requirement. The limestone produced will be supplied to various cement plants.
No export is proposed.
2.8 Employment Generation (Direct or Indirect)
The mining project will generate direct & indirect employment. About 55
people will get direct employment and 20 people will also be affected
indirectly and employed with allied and related industries, such as
transportation, maintenance, etc.
Prepared by M/s Udaipur Min-Tech. Pvt .Ltd
7
Aher bhagwan bhimshi C/O Ajotha Limestone Mine M/S Sorath Minerals Trading Company
3.0 PROJECT DESCRIPTION
3.1 Type of project including interlinked and interdependent projects:
The proposed project is mining unit of Limestone in the area of 6.47 ha.
Situated at N/v- Ajotha, Tehsil – Veraval & District – Gir Somnath, Gujarat.
Proposed Production is 3,00,000 TPA.
No Interlinked or Interdependent project.
3.2 Location (Location map & Key plan is attached as Plate no. I & II respectively).
State : Gujarat
District : Gir Somnath
Tehsil : Veraval
Village : Ajotha
Latitude 20°54'03.11"N to 21°54'13.92"N
Longitude 70°28'45.48"E to 70°29'04.35"E
TOPOSHEET NO. WITH LATITUDE AND LONGITUDE
The lease area forms a part of Survey of India Topo-sheet no. 41L/5.
The lease area is situated between Latitudes 20°54'03.11"N to
21°54'13.92"N N & Longitudes 70°28'45.48"E to 70°29'04.35"E
3.3 Details of Alternate Site Considered and the Basis of Selecting the Proposed
Site, Particularly the Environmental Considerations gone into should be
Highlighted:
Mining is site specific project hence no alternate site is considered.
3.4 Size/Magnitude of Operation
It is proposed to produce 3,00,000MT of Limestone from the area of 6.47HECT.
by Opencast Mechanized method of mining.
3.5 Project description with process details:
Prepared by M/s Udaipur Min-Tech. Pvt .Ltd
8
Aher bhagwan bhimshi C/O Ajotha Limestone Mine M/S Sorath Minerals Trading Company
It is a mining project of Limestone from the lease area 6.47 ha, situated at
near village –Ajotha, Tehsil – Veraval, District – Gir Somnath, Gujarat.
Proposed production is 3,00,000 TPA. The material generated from this mine
will be used mainly as building stone for construction. & supplied to cement
industries.
Proposed Mining Method
The Ajotha Limestone Mine shall be developed by mechanized open cast
mining. The mineral is lying on the sub surface therefor open cast mining has
been the obvious choose.
The bench Parameter shall be for mineral
1. Height – 1m-3 m
2. Width – More than 1m-3m.
The Bench Parameter shall be for O/B Limestone
1. Height 1m- 3m.
2. Width – more than 1m – 3
The main operation shall be drilling, blasting loading and the transportation
by trucks.
Blasting
Small blasting with low charge of holes just to loosen the rocks is proposed in
upper layers to remove the hard overburden. The blasting shall be done by the
authorized contractor on contractual Basis. These contractor have their own
safety explosive container as well as Explosive License.
Prepared by M/s Udaipur Min-Tech. Pvt .Ltd
9
Aher bhagwan bhimshi C/O Ajotha Limestone Mine M/S Sorath Minerals Trading Company
Board blasting Parameters
Depth of holes : 3.3m
Diameter of Shot Holes 65mm
Spacing 2m
Burden 1.7m
Stemming 30%
Inclination of hole 5° to 10°from vertical
Volume of rock broken per hole 10.2cum
Explosive efficiency 4.0t/kg(for chemical gradelimestone)
Type of Explosive
Deferent type of explosive for use in opencast mines
Special Gellain, ANFO, Ordinary plain, Detonator, Safety Fuse,
It has been estimated that consumption of ANFO &other high explosive shall
be in ratio of 75:25.
Storage of Explosive: The explosive shall be supplied by the authorized
contractor at the blasting site at the time of blasting. The explosive shall be
directly used so no storage of explosive is proposed.
Extent of Mechanization
Type of
Machinery
Nos. Make Capacity Total H.P.
JCB 3D
Excavator
1 Altas corpo 30.5m3 80
Compressor 1 XAH210 -- 80
Rock drill DTH 2 atlas copco bvb 125 -- 300
truck 3 Tata engineering LPK2516 14 m3 240
Water tanker 1 -- 10KL 120
Source-Approved Mining Plan
Prepared by M/s Udaipur Min-Tech. Pvt .Ltd
10
Aher bhagwan bhimshi C/O Ajotha Limestone Mine M/S Sorath Minerals Trading Company
3.6 Raw material required along with estimated quantity, likely source, marketing
area of final products, mode of transport of raw material and finished product:
Limestone will be produced by opencast Mechanized method of mining,
proposed production is 3,00,000 MT; it will be transported to users by using
Dumper.
Year wise Production
DETAIL OF YEAR WISE PROPOSED PRODUCTION
Year Total volume Total Limestone MT
I(2016-17) 1,00,011 2,00,022
II(2017-18) 1,02,429 2,04,858
III(2018-19) 1,50,004 3,00,008
Total 3,52,444 7,04,888
3.7 Resource optimization/ recycling and reuse envisaged in the project, if any,
should be briefly outlined.
Not applicable.
3.8 Availability of water its source, energy/power requirement and source :
The total water requirement for the project is estimated 4.00 KLD. Water for
mining operation (dust suppression) and for domestic & drinking purpose will
be arranged from nearby well.
Sr. No. Purpose Total Requirement (KLD)
1 Dust suppression 2.00
2 Drinking 1.00
3 Green belt 1.00
TOTAL 4.00
Prepared by M/s Udaipur Min-Tech. Pvt .Ltd
11
Aher bhagwan bhimshi C/O Ajotha Limestone Mine M/S Sorath Minerals Trading Company
Diesel for tippers/equipment – about 150 Lt. per day is assumed to be
consumed. Diesel will be brought from outside, from nearby diesel pumps.
Ground Water Table
3.9 Quantity of wastes to be generated (liquid and solid) and scheme for their
management /disposal:
There is practically no soil cover as well as overburdun on limestone there is no
occurrence of waste rock in the mine some limestone, about 8%of the total
mineral, is expected to be produced as undersized mineral. this is proposed to
be stacked separately to be used later in cement plant. top soil will be used
simultaneously for plantation during the year.
0 mRL (14m bgl)
WATER TABLE
14 mRL
GENERAL SURFACE
LEVEL
2.00mRL (12 m bgl) ULTIMAE PIT LIMIT
Prepared by M/s Udaipur Min-Tech. Pvt .Ltd
12
Aher bhagwan bhimshi C/O Ajotha Limestone Mine M/S Sorath Minerals Trading Company
3.10 Schematic representations of the feasibility drawing which give information of
EC purpose:
4.0 SITE ANALYSIS
Prepared by M/s Udaipur Min-Tech. Pvt .Ltd
13
Aher bhagwan bhimshi C/O Ajotha Limestone Mine M/S Sorath Minerals Trading Company
4.1 Connectivity
Connectivity Details from Project Site:
4.2 Land form, land use and land ownership
The lease area is almost flat. The highest elevation of the area is 19 mRL and
lowest elevation is14 mRL.
Sr.
No. Particulars Details
1. Road
Connectivity
The village Ajotha, nearest population center is 2.00 km away from the
lease area & it is connected with other important towns and cities through
a good network of roads with regular public transport services. The
Tehsil Headquarters of Veraval is at a distance of 16.00km by road &
District Headquarter Gir Somnath is 12 km connected by road.
2. Nearest
Highway
NH-8E 1.00km from lease area in S direction
SH-6 (1.00 km in S direction)
3.
Nearest
Railway
Station
The nearest railhead is at Somnath at a distance of 9.00 km from lease
area in W direction
4. Nearest
Airport
The nearest civilian airport for regular commercial flights is at
Keshod the road distance from the lease area is around 70 km
in NW direction
Type of Land Area in Hectares
Govt. waste Land 6.47
Total: 6.47
Prepared by M/s Udaipur Min-Tech. Pvt .Ltd
14
Aher bhagwan bhimshi C/O Ajotha Limestone Mine M/S Sorath Minerals Trading Company
4.3 Topography
Topographically the Mining Area comprises flat land. there is no nalla or
stream observed within lease area. The highest elevation is 19 mRL and lowest
is 14mRL. irrigation of agricultural land in the surrounding of the lease area is
done by water source from tube/dug well.
4.4 Existing Land Use Pattern
The lease area is Govt. waste Land (6.47ha.). There is no village or hutments
within the lease area. Existing land use pattern is given as below:
Sr. No. Particulars Pre-Operational
A) Mining Activity
1 Pits 1.52
2 Top soil Dumps -
3 Dump -
4 Plantation -
5 Road & building 0.14
6 Workshop, processing plant, mineral stack
-
7 Backfilled & plantation -
8 Water storage -
9 Infrastructure
10 Remaining Virgin Govt. Land 4.81
Total area
6.47
Prepared by M/s Udaipur Min-Tech. Pvt .Ltd
15
Aher bhagwan bhimshi C/O Ajotha Limestone Mine M/S Sorath Minerals Trading Company
4.5 Existing Infrastructure:
There is no existing infrastructure is available in the lease area. All necessary
infrastructures will be developed before mining operation commenced. Site
services as per Mines Rules 1956 will be developed. First-Aid station with all
necessary medical facilities, Toilets as per the provisions of Mines Rules will be
developed. Regular medical checkup of the mine employees will be carried out
as per the provisions of Mines Rules 1956.
4.6 Soil classification:
The district Gir Somnath is divided into four regions on the basis of distinctive
soil characteristics.
Black Soil : Una, Gir-Dadhada, Kodinar and Talala talukas have black
soil.
Calcareous Soil : Veraval and Sutrapada talukas have Calcareous soil.
Blakish Soil : Along the coastal belt of Veraval, Una and Gir-Dadhada
talukas have Blakish Soil.
Lili Nagher: A strip between Veraval, Kodinar, Una and Gir-Gadhada is
known as “Lili Nagher”
The most part of the district is leveled. So the leveled area is fertile for
agriculture purpose. The black cotton soil is composed largely of clay material.
Regional geology & local geology:
a) Regional geology:-
The rock formation belong to late Pleistocene to early Holocene age and designated
as miliolite formation occupies the Saurasthra coastal plain extending from
northwest of Porbandar to near Gopnath point in Bhavnagar district. this
formation overlaps the Pleistocene and Miocene rock and occurs directly over the
Deccan trap formation of upper cretaceous to Paleocene age toward the north and
east.
The regional stratigraphic sequence is given in table.
Prepared by M/s Udaipur Min-Tech. Pvt .Ltd
16
Aher bhagwan bhimshi C/O Ajotha Limestone Mine M/S Sorath Minerals Trading Company
Regional stratigraphic sequence
Age Formation Rock Type
Recent Alluvium/ recent
limestone
Alluvium soil, black
brown soil, coastal
limestone
Early Holocene to late
Pleistocene
Miliolite formation Arenaceous limestone and
calcareous sandstone
Pliocene Dwark bed Gypsiferous clay and
sandy formation limestone
Miocene Gaj bed Clay calcareous clay
------------------------------------------------Unconformity----------------------------------------------
Paleocene to upper
cretaceous
Deccan trap Basalt and its derivatives
including the
intermediate and acidic
rock granophyre etc.
The rock of milolite formation along the coastal have the appearance of dirty white,
friable oolitic, calcarinite, further inland but still along the coastal plains, these are
somewhat purer, well consolidated, white oolite limestone.
The rock occur in bed which show a gentle seaward dip of 5° to 14°. The rock are
extensively cross –laminated showing dune type current bedding. alterneting
coarse and fine grained lamination are comman. they occur at various level, in the
coastal plains, along the miliolite, belonging to the common foraminifera present in
profusion in the rock. composition –wise, the rock are extremely variable ranging
from near pure limestone devoid of sand to calcareous sandstone and clay
limestone.
The rock formation oriented as beach sediment formed in agitated, warm and very
shallow water. they were subsequently cemented by calcspar precipitated from sea
Prepared by M/s Udaipur Min-Tech. Pvt .Ltd
17
Aher bhagwan bhimshi C/O Ajotha Limestone Mine M/S Sorath Minerals Trading Company
saturated with CaCO3 the warm, shallow, circulating water were favorable living
areas for marine organisms which have left their in shells and fecal pellets.
The occurrence of the Pleistocene beach limestone all over tertiary coastal plains
fringing the Deccan trap plateau and deep in the interior of the deccan trap country
at high elevation, tend to lead to the conclusion that during Pleistocene at high
elevation, tend to lead conclusion that during Pleistocene period the sea level stood
much higher that at present. this may be true in respect of the areas of the coastal
plain and the foothill region. But the occurrence of the miliolite rock at higher
elevation in interior areas also point to an Aeolian origin indicating that the wind
blow particles from the fragmented beach sediment might have been deposited in
the valleys of the high hill which acted as natural wind barrier and the sea need
not have transgressed to such great height in order to form the thinner layer of
milionite rock at such higher altitude.
b) Local Geology
The lease area has been subjected to manual mining isolated pit exposing the lower
layer of the limestone formation. the undisturbed area is also covered by the
limestone. the limestone is followed downwards by a thin layer of clay resting
unconformably over the basement trap rock of the deccan trap formation. The trap
rock has not been drilled into and exposures of the same are also not seen in the
vicinity. The local stratigraphy sequence as could be deciphered from the limited
drilling data is presented in table below
AGE FORMATION ROCK TYPE
Pleistocene Milioliteformation-20.0m(max)
(as encountered in exploratory
DTH hole)
Medium to fine grained, light gray to
brownish gray high grade limestone
with occasional band and lenses of
impure limestone and calcareous clay
Miocene Gaj beds (Impersistent) Clay and calcareous clay
Prepared by M/s Udaipur Min-Tech. Pvt .Ltd
18
Aher bhagwan bhimshi C/O Ajotha Limestone Mine M/S Sorath Minerals Trading Company
Limestone- a part of limestone has already been mined out manually from about
small pits within the lease area the maximum thickness of the limestone horizon
within the lease is about 8-10 meters. whereas thickness of chemical grade varies
from 5 to 7 miter and thickness of cement grade is 3m.
Gaj bed – the lease represented by a thin layer of brownish clay underlying the
limestone. this consist predominantly of brown colored clay and calcareous.
4.7 Climatic details
The climate is moderate and temperature range from 38°C during summer to
about 12°C.during winter. average annual rainfall is 400 to 500mm which
received during monsoon season from June to September. Predominant wind
direction is SW-NE. generally wind blow with a velocity of 10-12 km/hr in all
season. Relative humidity varies from 50% to95%
4.8 Social Infrastructure
The infrastructure like, toilets, first aid stations etc. will be provided inside the
applied area.
The nearest village is Ajotha, health & educational facilities (in the form of
primary schools) are available there.
Medical facilities, Primary Health Centre are there in the area, imparting
services, for advance medical facilities. In each village one health worker has
been appointed by the Govt. to provide primary health facilities.
The water required will be available by the local water well department in the
lease area and through water tanker.
Communication services like post office and telephones are available in the
nearby village. Some of the villagers are having mobile phones.
An occupational health unit will be organized and the proposed measures will
be adopted:
Pre & Periodical Medical Checkup program for all the workers.
Prepared by M/s Udaipur Min-Tech. Pvt .Ltd
19
Aher bhagwan bhimshi C/O Ajotha Limestone Mine M/S Sorath Minerals Trading Company
Compulsory medical checkup program and first-aid box with necessary
equipment will be provided.
Training for workers.
Safety equipment i.e. dusts mask, safety shoes, gloves etc.
5. PLANNING BRIEF
5.1 Planning concept
It is proposed to produce 3,00,000 MT of Limestone from the lease area. It is
situated in Gir Somnath District of Gujarat.
5.2 Population projection
Man power requirement for mining is estimated to be 67 Nos. Most of the
employees will be recruited from neighboring village depending upon the
availability of skilled & unskilled people. Migration of highly educated and
skilled person will take place but it will be on temporary basis. So there will no
permanent migration of people, hence there will be no population projection.
5.3 Land use Planning:
Prepared by M/s Udaipur Min-Tech. Pvt .Ltd
20
Aher bhagwan bhimshi C/O Ajotha Limestone Mine M/S Sorath Minerals Trading Company
Land use pattern (Hects.)
Sr.
No.
Particulars Excisting At the end of
3rd year
At the end of
mine
A) Mining Activity
1 Pits 1.52 3.5650 -
2 Top soil Dumps - - -
3 Dump - - -
4 Plantation - 0.9094 1.2132
5 Road & building 0.14 0.14 -
6 Workshop, processing plant, mineral stack
- -
7 Backfilled & plantation - - -
8 Water storage - - 5.2568
9 Infrastructure - -
10 Remaining Virgin Govt. Land
4.81 1.8556 -
Total area
6.47
6.47
6.47
Note- Total 5.2568Ha. area will be converted into water storage at the end of mine
period 1.2132ha. area will be planted up to end of mine life within Statuary barrier &
backfilled planted.
5.4 Assessment of infrastructure demand (physical and social).
Temporary office and stores will be provided in the mine lease area. Specified
first-aid box with all necessary facilities will be maintained at the site office and
the rest shelter as per Mines Act-1952. Medical facilities, Primary Health Centre
are there in the area, imparting services, for advance medical facilities.
Communication services like post office and telephones are available in the
nearby village. Some of the villagers are having mobile phones.
Prepared by M/s Udaipur Min-Tech. Pvt .Ltd
21
Aher bhagwan bhimshi C/O Ajotha Limestone Mine M/S Sorath Minerals Trading Company
5.5 Facilities provided:
5.5.1 Infrastructure
Additional facilities will be made as per the requirement. Arrangements for
safe and healthy working conditions. Provision of Drinking water from nearby
well. Most workers will be from nearby villages so no accommodation at mine
site will be required.
5.5.2 Landscaping and green belt development
It is proposed that applicant will plant 100 saplings per year. One workman
will be deputed for maintenance of the plantation throughout the year.
1. Babool
2. Gulmohar
3. Amaltas
4. Perkin Sonia
5. Neem
Programme of plantation
s.no. year Proposed plantation Area ha.
1 2016-17 100 0.1
2 2017-18 100 0.1
3 2018-19 100 0.1
5.5.3 Health and safety System
During the opencast working, and allied activities, all the precautionary
measures shall be taken into account as per MMR 1961 and MCDR 1988 for
safety and security.
Following Safety & security measures will be enforced;
Moving front of the quarry shall have temporary fencing.
Prepared by M/s Udaipur Min-Tech. Pvt .Ltd
22
Aher bhagwan bhimshi C/O Ajotha Limestone Mine M/S Sorath Minerals Trading Company
Permanent fencing will be provided where quarry has reached the
ultimate pit limit.
Mine entrance will have a permanent check post and record shall be
maintained of all persons / vehicles entering the mine area.
Round the clock security arrangement shall be provided to prevent
inadvertent entry of persons.
5.5.4 Disaster Management and Risk Assessment
Inspite of following all the precautionary measures and following all safety
rules, regulations and procedures, in mining accidents cannot be ruled out
completely. The Project Proponent will formulate a Disaster Management Plan
with the approval of DGMS. Following are the accidents which can take place
in mechanised opencast mining and measures proposed to be taken.
Fall of human beings or fall of machines from benches/ dumps/haul roads.
Due to drilling / blasting and handling of explosives.
Fire & Explosion in machinery
Emergency situation due to social reason such as public unrest, terrorism
etc.
Preventive Measures:
Creating berm on the side of benches. / haul roads of height greater than or
equal to ½ tyre radius. Minimum height of berm shall be 1.2 m and slope
450. Minimum clearance of 1.5 m will be maintained between outer tyre and
berm.
All provisions of MMR 1961, conditions imposed in permission for Deep hole
drilling and blasting and use of HEMM, and conditions of explosive license
will be followed.
Prepared by M/s Udaipur Min-Tech. Pvt .Ltd
23
Aher bhagwan bhimshi C/O Ajotha Limestone Mine M/S Sorath Minerals Trading Company
Fire fighting equipment in the machinery/ workshop/ office will be
maintained. Persons will be trained in the use of fire fighting equipment
and mock rehearsal will be conducted.
Training of security personnel.
Procedures as laid down in Disaster Management Plan to be followed.
Training;
Persons will be trained in the following:
Knowledge of Chemicals and use of protective equipment
Procedures for reporting emergencies.
Location and use of fire fighting equipment
Knowledge of alarm system and siren
Evacuation procedures.
Training in first aid as per Mines Rules 1955
Emergency Equipment & Facilities:
Mobiles.
Fire fighting equipment’s
Emergency medical supplies
Other protective equipment’s i.e. goggles, helmet, face shield, hand gloves,
Safety belts, barricade tape. First Aid station as per the provisions of Mines
Rules 1955.
Prepared by M/s Udaipur Min-Tech. Pvt .Ltd
24
Aher bhagwan bhimshi C/O Ajotha Limestone Mine M/S Sorath Minerals Trading Company
6. PROPOSED INFRASTRUCTURE
S. No. Details
1 Lease Area 6.47 hectares.
2 Residential Area Not Applicable
3 Connectivity The village Ajotha nearest population center is 2.00 km away
from the lease area & it is connected with other important
towns and cities through a good network of roads with
regular public transport services. The Tehsil Headquarters
of Veraval is at a distance of 16.00 km by road & District
Headquarter Gir Somnath is 12 km connected by road.
The nearest railhead is at Veraval at a distance of 16.00 km from
lease area in SW direction
4 Green Belt 100 plants will be planted per year.
5 Social Infrastructure Social Infrastructure and other necessary other facilities will be
provided by mine’s proponent.
6 Water Management 4.00 KLD, Source: nearby well .
7 Sewerage System Domestic Effluent treated in soak pits and overflow used for
gardening
8 Industrial Waste
Management
N.A.
9 Solid Waste
Management
Waste will be used for plantation .
10 Power requirement N.A.
Prepared by M/s Udaipur Min-Tech. Pvt .Ltd
25
Aher bhagwan bhimshi C/O Ajotha Limestone Mine M/S Sorath Minerals Trading Company
7. REHABILITATION & RESETTLEMENT PLAN
There is no human settlement within the mine lease area. No human
settlement will be disturbed due to the mining activity. So, no Rehabilitation
and Resettlement is proposed.
8. PROJECT SCHEDULE
8.1 Proposed schedule and approval for implementation
The Proposed project shall be established after getting the Environmental
Clearance from SEAC, Gandhinagar. gujrat
8.2 Project cost estimation
Estimated Project Cost for the proposed project is Rs. 60.00/- Lacs.
(A) Capital investment/-
Site facility and PPE for Labors = Rs. 1.89 lac /-
Machineries & Tools = Rs 40.00 lac/-
Financial assurance = Rs. 2.00 lac/-
PMCP = Rs. 2.00/- lacs
Social fund & activities = Rs. 5.00 lac/-
EMP = Rs. 8 lac/-
Miscellaneous = Rs. 80,000/-
Total cost Rs. 59.69 lac/- (say 60 lac/-)
(B) Operational cost-
The mineral will be mined from the applied area and the cost of per ton of
mining will be approx. Rs. 180/- per ton.
Prepared by M/s Udaipur Min-Tech. Pvt .Ltd
26
Aher bhagwan bhimshi C/O Ajotha Limestone Mine M/S Sorath Minerals Trading Company
8.3 ECONOMIC VIABILITY
The anticipated cost of mining is Rs. 180/- per ton cost. Average sale value is
assumed at Rs. 350-400/- ton of stone. Hence the project will be viable.
9. ANALYSIS OF PROPOSAL
Project will create direct & indirect employment opportunities within the
surrounding region. Unit will use good faith efforts to employ local people
from the nearby villages depending upon the availability of skilled & un-
skilled man-power surrounding the project site.
In the proposed project would require significant workforce of non-technical
and technical persons. Migration of highly education and skilled experience
will result in increase of literacy in the surrounding villages.
In addition, the proposed expansion of project shall enhance the prospects of
employment.
Assessment of the potential socioeconomic benefits during mining
focused primarily on work force requirements, acquisition of supplies,
and the temporary increased demand for services related to the mining
project like food, housing, communications, law enforcement, medical care,
local transportation etc. Due to these, additional revenue to local suppliers
for required products and services related to the construction and operation
phases of the project will generate.
Thus, mining activities will provide numerous new, although temporary, work
opportunities for both skilled and unskilled labor, as well as contribute
significantly to the local economy.
Additional government revenue expected from royalty, taxes, duties and other
fees.
An added benefit to the proposed project will result in considerable growth of
stimulating the industrial and commercial activities in the state. Small and
medium scale industries may be further developed as a consequence.
Prepared by M/s Udaipur Min-Tech. Pvt .Ltd
27
Aher bhagwan bhimshi C/O Ajotha Limestone Mine M/S Sorath Minerals Trading Company
ANNEXURES
Prepared by M/s Udaipur Min-Tech. Pvt .Ltd
28
Aher bhagwan bhimshi C/O Ajotha Limestone Mine M/S Sorath Minerals Trading Company
ANNEXURE –I: COPY OF LEASE DEED FOR 6.47HECT. AREA
Prepared by M/s Udaipur Min-Tech. Pvt .Ltd
29
Aher bhagwan bhimshi C/O Ajotha Limestone Mine M/S Sorath Minerals Trading Company
Prepared by M/s Udaipur Min-Tech. Pvt .Ltd
30
Aher bhagwan bhimshi C/O Ajotha Limestone Mine M/S Sorath Minerals Trading Company
Prepared by M/s Udaipur Min-Tech. Pvt .Ltd
31
Aher bhagwan bhimshi C/O Ajotha Limestone Mine M/S Sorath Minerals Trading Company
Prepared by M/s Udaipur Min-Tech. Pvt .Ltd
32
Aher bhagwan bhimshi C/O Ajotha Limestone Mine M/S Sorath Minerals Trading Company
Prepared by M/s Udaipur Min-Tech. Pvt .Ltd
33
Aher bhagwan bhimshi C/O Ajotha Limestone Mine M/S Sorath Minerals Trading Company
Prepared by M/s Udaipur Min-Tech. Pvt .Ltd
34
Aher bhagwan bhimshi C/O Ajotha Limestone Mine M/S Sorath Minerals Trading Company
Prepared by M/s Udaipur Min-Tech. Pvt .Ltd
35
Aher bhagwan bhimshi C/O Ajotha Limestone Mine M/S Sorath Minerals Trading Company
Prepared by M/s Udaipur Min-Tech. Pvt .Ltd
36
Aher bhagwan bhimshi C/O Ajotha Limestone Mine M/S Sorath Minerals Trading Company
Prepared by M/s Udaipur Min-Tech. Pvt .Ltd
37
Aher bhagwan bhimshi C/O Ajotha Limestone Mine M/S Sorath Minerals Trading Company
Prepared by M/s Udaipur Min-Tech. Pvt .Ltd
38
Aher bhagwan bhimshi C/O Ajotha Limestone Mine M/S Sorath Minerals Trading Company
Prepared by M/s Udaipur Min-Tech. Pvt .Ltd
39
Aher bhagwan bhimshi C/O Ajotha Limestone Mine M/S Sorath Minerals Trading Company
Prepared by M/s Udaipur Min-Tech. Pvt .Ltd
40
Aher bhagwan bhimshi C/O Ajotha Limestone Mine M/S Sorath Minerals Trading Company
Prepared by M/s Udaipur Min-Tech. Pvt .Ltd
41
Aher bhagwan bhimshi C/O Ajotha Limestone Mine M/S Sorath Minerals Trading Company
Prepared by M/s Udaipur Min-Tech. Pvt .Ltd
42
Aher bhagwan bhimshi C/O Ajotha Limestone Mine M/S Sorath Minerals Trading Company
Prepared by M/s Udaipur Min-Tech. Pvt .Ltd
43
Aher bhagwan bhimshi C/O Ajotha Limestone Mine M/S Sorath Minerals Trading Company
Prepared by M/s Udaipur Min-Tech. Pvt .Ltd
44
Aher bhagwan bhimshi C/O Ajotha Limestone Mine M/S Sorath Minerals Trading Company
Prepared by M/s Udaipur Min-Tech. Pvt .Ltd
45
Aher bhagwan bhimshi C/O Ajotha Limestone Mine M/S Sorath Minerals Trading Company
ANNEXURE –II: COPY OF APPLICATION OF MINING LEASE RENEWAL IN FORM J
Prepared by M/s Udaipur Min-Tech. Pvt .Ltd
46
Aher bhagwan bhimshi C/O Ajotha Limestone Mine M/S Sorath Minerals Trading Company
Prepared by M/s Udaipur Min-Tech. Pvt .Ltd
47
Aher bhagwan bhimshi C/O Ajotha Limestone Mine M/S Sorath Minerals Trading Company
Prepared by M/s Udaipur Min-Tech. Pvt .Ltd
48
Aher bhagwan bhimshi C/O Ajotha Limestone Mine M/S Sorath Minerals Trading Company
Prepared by M/s Udaipur Min-Tech. Pvt .Ltd
49
Aher bhagwan bhimshi C/O Ajotha Limestone Mine M/S Sorath Minerals Trading Company
Prepared by M/s Udaipur Min-Tech. Pvt .Ltd
50
Aher bhagwan bhimshi C/O Ajotha Limestone Mine M/S Sorath Minerals Trading Company
Prepared by M/s Udaipur Min-Tech. Pvt .Ltd
51
Aher bhagwan bhimshi C/O Ajotha Limestone Mine M/S Sorath Minerals Trading Company
ANNEXURE –III: Copy Of Approval Letter Of Mining Plan From IBM dated
18/8/2009
Prepared by M/s Udaipur Min-Tech. Pvt .Ltd
52
Aher bhagwan bhimshi C/O Ajotha Limestone Mine M/S Sorath Minerals Trading Company
Prepared by M/s Udaipur Min-Tech. Pvt .Ltd
53
Aher bhagwan bhimshi C/O Ajotha Limestone Mine M/S Sorath Minerals Trading Company
ANNEXURE –IV: PHOTO IDENTITY CARD OF LESSEE WITH ADDRESS PROOF
Prepared by M/s Udaipur Min-Tech. Pvt .Ltd
54
Aher bhagwan bhimshi C/O Ajotha Limestone Mine M/S Sorath Minerals Trading Company
Prepared by M/s Udaipur Min-Tech. Pvt .Ltd
55
Aher bhagwan bhimshi C/O Ajotha Limestone Mine M/S Sorath Minerals Trading Company
Prepared by M/s Udaipur Min-Tech. Pvt .Ltd
56
Aher bhagwan bhimshi C/O Ajotha Limestone Mine M/S Sorath Minerals Trading Company
Prepared by M/s Udaipur Min-Tech. Pvt .Ltd
57
Aher bhagwan bhimshi C/O Ajotha Limestone Mine M/S Sorath Minerals Trading Company
ANNEXURE –V: PRODUCTION DETAILS SINCE 1977 TO 2015
Prepared by M/s Udaipur Min-Tech. Pvt .Ltd
58
Aher bhagwan bhimshi C/O Ajotha Limestone Mine M/S Sorath Minerals Trading Company
ANNEXURE –VI: DTH BOREHOLES (3 NOS.) ANALYSIS REPORT
Prepared by M/s Udaipur Min-Tech. Pvt .Ltd
59
Aher bhagwan bhimshi C/O Ajotha Limestone Mine M/S Sorath Minerals Trading Company
ANNEXURE –VII - COPY OF VIOLATION LETTER FROM I.B.M.
Prepared by M/s Udaipur Min-Tech. Pvt .Ltd
60
Aher bhagwan bhimshi C/O Ajotha Limestone Mine M/S Sorath Minerals Trading Company
COPY OF REPLY OF VIOLATION LETTER BY LESSEE
Prepared by M/s Udaipur Min-Tech. Pvt .Ltd
61
Aher bhagwan bhimshi C/O Ajotha Limestone Mine M/S Sorath Minerals Trading Company
Prepared by M/s Udaipur Min-Tech. Pvt .Ltd
62
Aher bhagwan bhimshi C/O Ajotha Limestone Mine M/S Sorath Minerals Trading Company
ANNEXURE –VIII- APPROVAL LETTER OF REVIEW OF MINING PLAN DATED
23/9/2016
Prepared by M/s Udaipur Min-Tech. Pvt .Ltd
63
Aher bhagwan bhimshi C/O Ajotha Limestone Mine M/S Sorath Minerals Trading Company
Prepared by M/s Udaipur Min-Tech. Pvt .Ltd
64
Aher bhagwan bhimshi C/O Ajotha Limestone Mine M/S Sorath Minerals Trading Company
ANNEXURE –IX - DISCLOSURE OF CONSULTANT
Name of The Project : Ajotha limestone Mine, Near Village- Ajotha, Tehsil – veraval, Distt. –
gir somnath (guj), survey no.-49, Lease Area – 6.47 Hect, Mine Cod 38 Guj 08275
Applicant- Aher Bhagwan Bhimshi
Nature of
consultancy
Name and address of the
Consultant/expert
Approvals, if any from
(NABL/DGMS/IBM/
NRBPT/MOEF/CPCB/others etc)*,
give reference
Service provider in
the field of Mining &
Environment.
M/s Udaipur Min-Tech Pvt. Ltd,
206, Apeksha Complex, Hiran
Magari, Sector – 11, Udaipur
(Raj.)
Accredited by NABET under “A”
Category for Sector – 1 & B cat. For
sector 38 & 39.
EIA. Coordinator Mr. S.S. BIST Accredited “A”
Category by
NABET
FAE-LU Mr. RAJVEER SINGH Accredited “A”
Category by
NABET
Mr. KAILASH MEENA AFAE
FAE-AP Dr.R.S. SAINI Accredited “A”
Category by
NABET
Dr. DIPANWITABHAKAT AFAE
FAE-AQ Ms. RASHMI SHRIMALI Team Member
Dr. DIPANWITABHAKAT Team Member
FAE-WP Mr. U. C. SHARMA Accredited “B”
Category by
NABET
Mr. MOHAMMED AFZAL AFAE
Dr. DIPANWITABHAKAT AFAE
FAE-EB
Ms. MANISHA TANWAR Accredited “B”
Category by
NABET
FAE-NV Dr .R.S. SAINI Accredited “B”
Category by
NABET
FAE-SE Mr. NAVEEN MEENA Accredited “B”
Category by
NABET
MR. NEERAJ PATEL Team Member
FAE-HG Mr. SHAILENDRA SINGH
BIST
Accredited “A”
Category by
Prepared by M/s Udaipur Min-Tech. Pvt .Ltd
65
Aher bhagwan bhimshi C/O Ajotha Limestone Mine M/S Sorath Minerals Trading Company
NABET
MR. RAJESH SINGH AFAE
FAE-GEO Mr. SHAILENDRA SINGH
BIST
Accredited “A”
Category by
NABET
Mr. JAVED KHAN Team Member
FAE-SC Ms. RASHMISHRIMALI Team Member
FAE-RH Mr. B.L. MOD Accredited “B”
Category by
NABET
FAE-SHW Mr. B.L. MOD Accredited “B”
Category by
NABET
Hydro geological
study
Soil Analysis /
investigation
** NABL
Mining plan Bheru lal mod, mining engineer
Rainwater
Harvesting
Risk Assessment
Services (STP/ETP
design)etc.
* Only Govt./Statutory Approvals to be mentioned. Put NA where not applicable. Add brief resume where required. I hereby accept all the liabilities and obligations associated with the working and results of the above organizations submitted herein with the report
(Lessee)
Sh. Aher Bhagwan Bhimshi
Prepared by M/s Udaipur Min-Tech. Pvt .Ltd
66
Aher bhagwan bhimshi C/O Ajotha Limestone Mine M/S Sorath Minerals Trading Company
Annexure- X THE BUDGETARY BREAKUP AND DETAILS OF FACILITY
PROVIDED FOR THE LABORERS.
Name of the Project: AJOTHA LIMESTONE MINE, Near village –AJOTHA, Tehsil –
Veraval, District – Gir Somnath, (guj.), Mining Area –6.47HECT. Mine Cod 38 Guj
08275
1) Rest shelters: Rest shelters will be provided at mine site. Maintenance will be
every year.
2) First Aid Box: A first aid box with proper equipment will be provided as per
mines act and Mines Rule.
3) Washroom: Washrooms will be provided separately for male and female
worker as per rule.
4) Drinking Water: Clean potable drinking water will be provided as per Mines
Rule.
Sr.
No.
Facility Provided for
Laborers
Amount
Per Month
Total amount Remark
1. Drinking water By
Tanker
1500/- 18,000/- -
2. First Aid Box - 10,000/- -
3. Rest Shelter - 20,000/- One time
4. Washroom - 30,000/- One time
5. Safety shoes - 16,000/- Two time in a
year
6. Hand Gloves 2000/- 24,000/- One time in a
month
7. Dust Mask 2000/- 24,000/- one time in a
month
8. Ear Plugs / Muffler 400/- 9,600/- Two time in a
month
9. Helmet - 3000/- Three year
10. Insurance - 40,000/- One time
Total 1,94,600/-
Capital Cost: 1,94,600/-/-
(Authorized Signatory )
Aher Bhagwan Bhimshi
Prepared by M/s Udaipur Min-Tech. Pvt .Ltd
67
Aher bhagwan bhimshi C/O Ajotha Limestone Mine M/S Sorath Minerals Trading Company
Annexure- XI - CSR activity will be done in AJOTHA Village
Name of the Project: AJOTHA LIMESTONE MINE, Near village –AJOTHA, Tehsil –
Veraval, District – Gir Somnath, (Guj.), Mining Area –6.47HECT. Mine Cod 38 Guj
08275
S. No. Particulars Total amount per year
1 Facility of Drinking water 10,000
2
Construction and maintenance of washrooms
& other facilities for Public utilization.
30,000
Construction and maintenance of village
approach road
30,000
3 Distribution of notebooks and books in the
school
10,000
4 Free Medical Camp in Association with
Primary Health Center
20,000
Total 1,00,000