Pre Com CHK & PRotocol for Dense Phase Dust Conveying System

  • Upload
    chcrr

  • View
    214

  • Download
    0

Embed Size (px)

Citation preview

  • 8/11/2019 Pre Com CHK & PRotocol for Dense Phase Dust Conveying System

    1/3

    EECC - THANE

    Pre Commissioning Check for Dense Phase Dust Conveying system

    1. Phase out the electrical connection between Relay Based Control Panel, Junction Box(as applicable) and Pneumatic Panel. This will ensure the proper seuential

    !unctionin" o! the system.

    #. Chec$ the Control Panel whether the seuential operations are bein" displayed andchec$ that the seuence is in line with the Control write up.

    %. &ll Timer 'ettin"s should be done as per the recommended timer settin" chart.

    . Chec$ the pressure switches !or proper operation and its settin" as per the

    recommendations.

    . Chec$ whether the le*el probe is mounted as per the drawin" to maintain minimum

    one *essel *olume o! material o*er the dome *al*e and ensure the proper !unctionin".

    +. Chec$ lea$a"e in the airwaterash con*eyin" pipe line with the soap solution test

    -. Chec$ the oil le*el in lubricator. Chec$ oil re"ulator settin"s and ensure one drop o!

    oil per cycle by settin" the adustin" screw.

    /. Chec$ the operation o! the euipments !or proper !unctionin" o! all the components

    li$e 0ome al*e, blow *al*e, solenoid *al*e, limit switches etc. on all mode o!

    selections i.e. Timerle*el probe mode.

    2. Chec$ the hoppersur"e chute to ensure no !orei"n material is inside the hopper,

    be!ore openin" the isolation plate *al*e to put the system on load.

    13. while openin" the plate *al*e , ensure that it is !ully opened ( 4ote 5 The plate *al*e

    should always be !ully opened or !ully closed)

    11. Be!ore char"in" air recei*er, ensure that no !orei"n material is inside. Chec$ byopenin" the manhole.

    1#. Chec$ the proper !unctionin" o! sa!ety *al*e at air recei*er and chec$ the operation o!

    drain trap.

    1%. Chec$ all the pneumatic pipin"s are as per the P 6 7 dia"ram and ensure that no air

    lea$a"e throu"h !ittin"s tubin"s etc. Chec$ the ori!ice as per the recommended P 6 7

    dia"ram.

    1. Chec$ alarm system by ammin" 8 94 : 9;;< the ash chute probes in the !ull

    Position. &larm should !unction a!ter set time, dependin" on alarm timer settin".

    1. =nsure recommended 7nstrument and Con*eyin" &ir pressures are a*ailable be!ore

    puttin" the system on load.

    1+. 7! !luidi>in" pads are pro*ided on the sur"e hoppers, chec$ the !unctionin" o! the

    same.

  • 8/11/2019 Pre Com CHK & PRotocol for Dense Phase Dust Conveying System

    2/3

    EECC - THANE

    COMMISSIONING PROTOCOL FOR DNS P!"S D#ST

    CON$%ING S%STM

    Client5 0ate5

    Proect5

    Compressor 'l. 4o.5

    ?otor Ratin"5

    ?otor 'l. 4o.5

    &' Physica( Ins)ection

    a. 7nstallation o! &sh essel

    b. 7nstallation o! 0ome al*e

    c. 7nstallation o! Blow *al*e

    d. 7nstallation o! solenoid *al*e

    e. 7nstallation o! @imit 'witches

    !. 7nstallation o! Plate *al*e

    ". 7nstallation o! &ir Recei*er

    h. 7nstallation o! @e*el switch

    i. &ir lea$a"e Test o! airash con*eyin" pipeline

    . 7nstallation o! air and ash con*eyin" pipelines

    &s per drawin"

    $. 9il le*el in lubricator

    l. Chec$in" o! electrical connections in !ield instrumentseuipments

    m. Chec$in" o! electrical connections in 0PC' panel !or con*eyin" system

    n. 7nstallation o! ?aster Panel'la*e panel and 0PC'.

    C(ient Manufacturer "CC

  • 8/11/2019 Pre Com CHK & PRotocol for Dense Phase Dust Conveying System

    3/3

    EECC - THANE

    *' Pressure S+itch an, Timer settings

    Pressure

    'witch identity

    @ocation Purpose Pressure 'et

    Timer 7dentity Purpose Time 'et

    -' O)erationa( Check .

    a. 'euential operation display chec$ throu"h Control panel7n line with Control write up

    b. 9peration o! Pressure switches

    c. 9peration o! @e*el switches

    d. 9peration o! 0ome al*e

    e. 9peration o! Blow *al*e

    !. 9peration o! 'olenoid *al*e

    ". 9peration o! @imit switches

    h. 9peration o! Plate al*es

    i. &larm system chec$

    . 9peration o! ;luidi>in" Pads (i! pro*ided)

    $. 9perational chec$ o! the entire system throu"h P@C in Timer ?ode

    l. 9perational chec$ o! the entire system throu"h P@C in @e*el Probe ?ode

    m. 7nter!acin" between P@C ( !or con*eyin" system ) and ?arshallin" Box

    n. ?anual o*er ride operation5

    C(ient Manufacturer "CC