PRE‐BID CONFERENCE
IFB 1‐18‐C067Southwest Ticket Counter and Baggage Handling
System at DCAFebruary 2, 2018
1-18-C067 – Southwest Ticket Counter and Baggage Handling System
DisclaimerThe information contained in thispresentation is for informational
purposes only
In the event of a discrepancy between the information contained herein and the Bid documents, the Bid documents
will take precedence
2
1-18-C067 – Southwest Ticket Counter and Baggage Handling System
LDBE Participation RequirementsThis IFB has a 20% Local Disadvantaged Business Enterprise (LDBE) participation requirement. Firms located within a 100‐mile radius of the Washington, DC zero mile marker and whose 3 year average annual gross receipts, including all affiliates, do not exceed the specified size standards are eligible for consideration.
LDBE Size Standards:
For any LDBE/MBE/WBE information, including other LDBE size standards, contacts the Supplier Diversity Department at 703‐417‐8660
3
1-18-C067 – Southwest Ticket Counter and Baggage Handling System 4
Supplier Diversity Management System• Online contract compliance monitoring
• On-line certification application and renewal
• Real-time monitoring of certification applications in process
• Targeted outreach for contracting opportunities
• Contractor visibility into MWAA directory of certified firms
mwaa.diversitycompliance.com
1-18-C067 – Southwest Ticket Counter and Baggage Handling System
Summary of Solicitation• Procurement Method: Invitation For Bid (sealed bidding)• Estimate: $1,000,000.00 ‐ $5,000,000.00 • Price Breakdown will be requested to the lowest bidder• Performance Period: 400 days from Notice to Proceed• Anticipated Contract Award: April, 2018• Contract Type: Firm fixed‐price• Self‐Performance Requirement, Section VII, Contract Provision 44: 20%• Payment & Performance Bonds ‐ MWAA will reimburse reasonable and customary bond
costs upon proof of payment (Section V, Solicitation Provision 22). Bond costs are not to be included in the bid amount.
• Liquidated damages are set at $1,050.00 per day of delay in completion.• The Owner Controlled Insurance Program details can be found in the solicitation
Section VII, Contract Provision 20‐ This contract is covered by the Aviation Owner Controlled Insurance Program (OCIP) and participation by the contractor and subcontractors is required. OCIP coverage, as described in Contract Provision 20 is provided by the Authority at no cost to the contractor.
• Term and Conditions are not negotiable in any material way. Contractors are encouraged to ask questions or clarifications during the Q&A period
6
1-18-C067 – Southwest Ticket Counter and Baggage Handling System
Bid Requirements• Bids are due February 22, 2018 NLT 2:00 PM (EST) at the address identified
on the solicitation
• Refer to Section V – Solicitation Provisions, 20 – Offer Documents
7
1-18-C067 – Southwest Ticket Counter and Baggage Handling System
SECTION V – Solicitation Provisions 20. Offer Documents
Offerors shall include in their submission all documents required by this solicitation including, but not limited to, the following:
A. Solicitation Offer and AwardB. Price Schedule (Section III)C. Representations and Certifications (Section IV)D. Bid Bond, if applicableE. Section VII – Contract Provision 42, Brand Name or Approved Equal, Comparability of
products of other manufacturersF. LDBE Certification Exhibits as applicable:
• Exhibit A, Voluntary Efforts to Obtain MBE/WBE Participation• Exhibit D, Contract Participation Form• Exhibit F, LDBE Certification Application or proof of certification• Exhibit G, Application for Joint Venture Eligibility
8
1-18-C067 – Southwest Ticket Counter and Baggage Handling System
(continues…)
• Exhibit H, Request for Waiver• Exhibit I, LDBE Unavailability Certification
G. Insurance Affidavit (Section X – Attachment 03)H. Compliance Requirements Checklist (Section X – Attachment 07)
9
1-18-C067 – Southwest Ticket Counter and Baggage Handling System
Contract Scope• Project consists of construction services associated with the Terminal A
– Southwest Airline Ticket Counter and BHS (Baggage Handling System) at Ronald Reagan National Airport (DCA).
• The project includes the following:
• 1. Installation of Checked Baggage Inspection System (CBIS)
• 2. Construction of a new baggage handling system.
• 3. Oversized baggage freight lift.
• 4. Construction will also include new gypsum board partitions, concrete masonry walls, concrete foundations.
11
1-18-C067 – Southwest Ticket Counter and Baggage Handling System
Contract Scope• 5. Install new HVAC system
• 6. Demolition of rooms and equipment etc.
• 7. Environmental issues
• 8. Removal of trash
• 9. The bag screening process shall remain operational during construction (phasing )
• 11. Security and safety
12
1-18-C067 – Southwest Ticket Counter and Baggage Handling System
On-Line Resources• The Pre‐Bid Conference Attendees List and this presentation
will be posted to the Airports Authority website
• All questions must be submitted through the Airports Authority website by 3:00 PM February 7, 2018
• Answers to all questions received will be posted on‐line, and all registered Planholders will be notified
13