RAMSAY WORDEN ARCHITECTS PROJECT - LOT E - SOUTH CAMPUS PRE-APPLICATION AUDP SUBMISSION March 5, 2015 CONTENTS Location & Context Plan 2 Site Analysis 3 Design Rationale 4 Plans - Level 1 5 Plans - Level 2 6 Plans - Level 3-6 7 Plans - Parkade Level 8 Landscape - Level 1 9 Landscape - Level 3 10 Landscape - Design Rationale 11 Elevations 12 Section 1 13 Section 2 14 Materiality 15 Perspectives 16

PRE-APPLICATION AUDP SUBMISSION 5 2015 - AU… · PROJECT - LOT E - SOUTH CAMPUS PRE-APPLICATION AUDP SUBMISSION March 5, 2015 CONTENTS Location & Context Plan 2 Site Analysis 3 Design

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PRE-APPLICATION AUDP SUBMISSION 5 2015 - AU… · PROJECT - LOT E - SOUTH CAMPUS PRE-APPLICATION AUDP SUBMISSION March 5, 2015 CONTENTS Location & Context Plan 2 Site Analysis 3 Design

R A M S A Y W O R D E NA R C H I T E C T S

PROJECT - LOT E - SOUTH CAMPUSPRE-APPLICATION AUDP SUBMISSION

March 5, 2015

C O N T E N T S Location & Context Plan 2Site Analysis 3Design Rationale 4Plans - Level 1 5Plans - Level 2 6Plans - Level 3-6 7Plans - Parkade Level 8Landscape - Level 1 9Landscape - Level 3 10Landscape - Design Rationale 11Elevations 12Section 1 13Section 2 14Materiality 15Perspectives 16

Page 2: PRE-APPLICATION AUDP SUBMISSION 5 2015 - AU… · PROJECT - LOT E - SOUTH CAMPUS PRE-APPLICATION AUDP SUBMISSION March 5, 2015 CONTENTS Location & Context Plan 2 Site Analysis 3 Design

2

PROJECT - LOT E - SOUTH CAMPUSPRE-APPLICATION AUDP SUBMISSION

March 5, 2015

location plan(south campus)

context plan

LOCATION & CONTEXT PLAN

wesbrook m

all

16th avenue

existing residential

existing mixed -

use

mixed use/grocery store

community centre

retail/office

commercial/retail

existing mixed -

use

high school

SITE

retail/officeretail/officeretail/officeretail/office

high schoolhigh school commercial/commercial/

parking lot

future residential

future elementary

schoolsite

webber lane

birney avenue

berton avenue

village lane

shrum lane

wesbrook m

all

park

existing mixed -

use

existing mixed -

use

park

park

Page 3: PRE-APPLICATION AUDP SUBMISSION 5 2015 - AU… · PROJECT - LOT E - SOUTH CAMPUS PRE-APPLICATION AUDP SUBMISSION March 5, 2015 CONTENTS Location & Context Plan 2 Site Analysis 3 Design

3

PROJECT - LOT E - SOUTH CAMPUSPRE-APPLICATION AUDP SUBMISSION

March 5, 2015

street level retail/office/community centre

residential

site

residential above grade

park/green open space

Overview This prominent site in Wesbrook Village is surrounded by a rich mixture of uses including ground oriented residential, small scale retail, mixed use with retail and/or commercial at grade, a future community centre, park space and pedestrian green way.

This varied context provides a unique opportunity to mix residential, park and commercial at the ground level while at the same time complimenting the existing context.

Two urban design conditions frame this development :

active public uses including street level retail, commercial and community centre

passive ground oriented residential, park/green open space and a pedestrian/cycle pathway

street level second level upper levels

SITE ANALYSIS

Massing Study

Proposed Response

Page 4: PRE-APPLICATION AUDP SUBMISSION 5 2015 - AU… · PROJECT - LOT E - SOUTH CAMPUS PRE-APPLICATION AUDP SUBMISSION March 5, 2015 CONTENTS Location & Context Plan 2 Site Analysis 3 Design

4

PROJECT - LOT E - SOUTH CAMPUSPRE-APPLICATION AUDP SUBMISSION

March 5, 2015

1. The overall building form and massing are determined by the methods of construction and location of uses:• Concrete construction on the first two levels• Building program at Levels 1 & 2 defined by

immediate context • North and East elevations of Level 1 & 2 are

predominately commercial use• South and West elevations are predominately

residential use• Residential on Levels 3-6 are wood frame

construction that have been set back to create relief at the facade, particularly on the south facade facing the Green Lane. This also accommodates patios and outdoor amenity space on Level 3.

2. Proposed use of a surface that formally resolves the two distinctly different methods of construction.

Key Concepts:

Schematic Street Level Plan

site

webber lane

shrum lane

village lane

public open space public

open space

1

2

DESIGN RATIONALE

View 2: from northwest

Green Space

Parking Lot

Park

Village Lane

Greenway

Community Centre

Retail / Office

Mixed Use

Residential

Mixed Use

S I T E

Village Lane

Greenway

View 1 : from southeast

Mixed Use

Mixed Use

Retail / Office

Community Centre

Residential

S I T E Parking Lot

PlazaPlaza

Park

Yu Building(residential)

Proposed Mixed-Use

Page 5: PRE-APPLICATION AUDP SUBMISSION 5 2015 - AU… · PROJECT - LOT E - SOUTH CAMPUS PRE-APPLICATION AUDP SUBMISSION March 5, 2015 CONTENTS Location & Context Plan 2 Site Analysis 3 Design

5

PROJECT - LOT E - SOUTH CAMPUSPRE-APPLICATION AUDP SUBMISSION

March 5, 2015

PLANS - LEVEL 1

Page 6: PRE-APPLICATION AUDP SUBMISSION 5 2015 - AU… · PROJECT - LOT E - SOUTH CAMPUS PRE-APPLICATION AUDP SUBMISSION March 5, 2015 CONTENTS Location & Context Plan 2 Site Analysis 3 Design

6

PROJECT - LOT E - SOUTH CAMPUSPRE-APPLICATION AUDP SUBMISSION

March 5, 2015

PLANS - LEVEL 2

Page 7: PRE-APPLICATION AUDP SUBMISSION 5 2015 - AU… · PROJECT - LOT E - SOUTH CAMPUS PRE-APPLICATION AUDP SUBMISSION March 5, 2015 CONTENTS Location & Context Plan 2 Site Analysis 3 Design

7

PROJECT - LOT E - SOUTH CAMPUSPRE-APPLICATION AUDP SUBMISSION

March 5, 2015

PLANS - LEVELS 3-6

Page 8: PRE-APPLICATION AUDP SUBMISSION 5 2015 - AU… · PROJECT - LOT E - SOUTH CAMPUS PRE-APPLICATION AUDP SUBMISSION March 5, 2015 CONTENTS Location & Context Plan 2 Site Analysis 3 Design

8

PROJECT - LOT E - SOUTH CAMPUSPRE-APPLICATION AUDP SUBMISSION

March 5, 2015

PLANS - PARKADE LEVEL

Page 9: PRE-APPLICATION AUDP SUBMISSION 5 2015 - AU… · PROJECT - LOT E - SOUTH CAMPUS PRE-APPLICATION AUDP SUBMISSION March 5, 2015 CONTENTS Location & Context Plan 2 Site Analysis 3 Design

9

PROJECT - LOT E - SOUTH CAMPUSPRE-APPLICATION AUDP SUBMISSION

March 5, 2015

LANDSCAPE - LEVEL 1

Page 10: PRE-APPLICATION AUDP SUBMISSION 5 2015 - AU… · PROJECT - LOT E - SOUTH CAMPUS PRE-APPLICATION AUDP SUBMISSION March 5, 2015 CONTENTS Location & Context Plan 2 Site Analysis 3 Design

10

PROJECT - LOT E - SOUTH CAMPUSPRE-APPLICATION AUDP SUBMISSION

March 5, 2015

LANDSCAPE - LEVEL 3

Page 11: PRE-APPLICATION AUDP SUBMISSION 5 2015 - AU… · PROJECT - LOT E - SOUTH CAMPUS PRE-APPLICATION AUDP SUBMISSION March 5, 2015 CONTENTS Location & Context Plan 2 Site Analysis 3 Design

11

PROJECT - LOT E - SOUTH CAMPUSPRE-APPLICATION AUDP SUBMISSION

March 5, 2015

LANDSCAPE - DESIGN RATIONALE

UBC SC LOT E LANDSCAPE RATIONALE

CONTEXT

THE LOT E PROJECT ANCHORS THE SOUTH EDGE OF THE VIBRANT WESBROOK VILLAGE COMMERCIAL AREA. THE PROJECT IS ADJACENT THE VILLAGE LANE GREENWAY TO THE SOUTH AND FRAMES THE NORTH EDGE OF THIS WALK. ALONG THE WEST SIDE IS A FUTURE PARKETTE AND LINK TO THE COMMUNIT Y CENTRE AND TO THE EAST IS SHRUM LANE. THE PROJECT IS CENTRALLY LOCATED IN THE VILLAGE IN EASY WALKING DISTANCE TO WESBROOK VILLAGE SHOPS, THE FUTURE COMMUNIT Y CENTER, THE HIGH SCHOOL AND FUTURE ELEMENTARY SCHOOL, SPORTS FIELDS, PARKS AND GREENWAYS.

THE SITE IS RELATIVELY FLAT WITH THE LARGEST GRADE CHANGE OCCURRING NORTH TO SOUTH WITH THE SOUTH EDGE ±.6M LOWER THAN THE NORTH COMMERCIAL EDGE. THE SITE IS CURRENTLY USED FOR MULTIPURPOSE FUNCTIONS AND IS A GRAVEL SURFACE WITH NEWER PLANTED TREES ALONG THE NORTH AND SOUTH EDGE.

DESIGN INTENT

THE LANDSCAPE DESIGN FOR THIS PROJECT PROVIDES A CONTEMPORARY EXPRESSION UTILIZING MATERIALS THAT REFLECT THE CHARACTER OF THE WESBROOK PLACE VILLAGE NEIGHBOURHOOD. THE PRINCIPAL PEDESTRIAN CONNECTIONS TO THE BUILDING OFF THE VILLAGE PARKING AREA FEATURES CONCRETE UNIT PAV-ING AND GRANITE SETS IN A PATTERN TO MATCH THAT USED AT THE GRANITE TERRACE (FOODSTORE) PROJECT. ALONG THE SOUTH, GREENWAY, EDGE OF THE PROJECT THE PAVING WILL BE CONCRETE IN KEEPING WITH THE EXISTING CHARACTER OF THE VILLAGE GREENWAY. AT THE SOUTHEAST CORNER OF THE PROJECT AN EXTERIOR PATIO WILL BE PROVIDED FOR FUTURE CRU USE TO CAPTURE ONE OF THE SUNNIER SPOTS ON THE SITE AND IN THE VILLAGE. ALONG THE GREENWAY EDGE THE RESIDENTIAL UNITS WILL HAVE A LOW WALL WITH A PLANTED SEPARATION BETWEEN THE GREENWAY AND THE PATIO FOR PRIVACY. A SEATING NODE IS PROVIDED MIDWAY ALONG THE SOUTH ELEVATION TO TAKE ADVANTAGE OF THE SUN AND TO PROVIDE A RESTING PLACE. THIS NODE WILL BE INTEGRATED WITH A SMALL WATER FEATURE AND A GREEN SCREEN ELEMENT ADJACENT THE BUILDING EDGE. EACH UNIT WILL BE PROVIDED DIRECT WALKWAY CONNECTIONS TO THE EXISTING GREENWAY WALKWAY. PATIOS HAVE BEEN MADE AS GENEROUS AS POSSIBLE WHILE STILL PROVIDING FOR ADEQUATE ROOM FOR SOFT LANDSCAPE SCREENING FROM THE PUBLIC REALM. PATIO PAVING MATERIALS WILL INCLUDE 300MM X 600MM SHOT BLAST FINISH HYDROPRESSED SLABS SET IN A STACKED BOND PATTERN. PLANTINGS HAVE BEEN DESIGNED TO REINFORCE THE STREET EDGE, PROVIDE PRIVACY BETWEEN ADJACENT UNIT PATIOS AND WINDOWS, AND TO PROVIDE COLOUR AND INTEREST THROUGH THE SEASONS. PLANTS HAVE BEEN SELECTED TO SUIT THE VARIOUS MICROCLIMATES AROUND THE BUILDING WITH PREFERENCE GIVEN TO DROUGHT TOLERANT AND INSECT RESISTANT PLANTS. A DRIP IRRIGATION SYSTEM WILL BE PROVIDED TO MAINTAIN PLANT QUALIT Y THROUGH THE SUMMER MONTHS.

AT THE RESIDENTIAL LEVEL GENEROUS ROOF DECK PATIOS HAVE BEEN PROVIDED FOR EACH UNIT. ALONG THE NORTH EDGE THE PATIOS WILL HAVE A PLANTED NORTH EDGE TO PROVIDE SCREENING FROM THE ADJACENT PARKING AND TO PROVIDE VISUAL INTEREST AND ANIMATION WHEN VIEWED FROM THE PARKING LOT. ALONG THE SOUTH SIDE OF THE PROJECT THE ROOF DECK PATIOS ARE GENEROUS IN SIZE AND HAVE EXTENSIVE PLANTINGS. PLANTER DEPTHS HAVE BEEN COOR-DINATED TO KEEP THE PLANT MATERIAL AT THE LEVEL OF THE PATIO PAVING AND TO PROVIDE A .6M - .9M DEPTH OF GROWING MEDIUM FOR SHRUBS AND TREES. THE TREES WILL PROVIDE SOLAR SCREENING FOR THE PROJECT THROUGH THE SUMMER MONTHS AND WILL PROVIDE A STRONG VISUAL AMENIT Y TO THE PEDESTRIAN EXPERIENCE OF THE GREENSTREET.

BIKE PARKING

EXTERIOR CLASS 2 BIKE STALLS HAVE BEEN PROVIDED. WE HAVE LOCATED 16 BIKES UNDER COVER AT THE MAIN STAIRED ENTRY AND HAVE PLACED THE REMAINDER OF THE BIKES AROUND HE SITE AS INDICATED ON THE PLANS.

Page 12: PRE-APPLICATION AUDP SUBMISSION 5 2015 - AU… · PROJECT - LOT E - SOUTH CAMPUS PRE-APPLICATION AUDP SUBMISSION March 5, 2015 CONTENTS Location & Context Plan 2 Site Analysis 3 Design

12

PROJECT - LOT E - SOUTH CAMPUSPRE-APPLICATION AUDP SUBMISSION

March 5, 2015

ELEVATIONS

* Note: Differentiating colour (TBD) to define vertical circulation

Page 13: PRE-APPLICATION AUDP SUBMISSION 5 2015 - AU… · PROJECT - LOT E - SOUTH CAMPUS PRE-APPLICATION AUDP SUBMISSION March 5, 2015 CONTENTS Location & Context Plan 2 Site Analysis 3 Design

13

PROJECT - LOT E - SOUTH CAMPUSPRE-APPLICATION AUDP SUBMISSION

March 5, 2015

SECTION 1

Yu Building(residential)

Village Green(pedestrian lane)

WesbrookVillageParking

Page 14: PRE-APPLICATION AUDP SUBMISSION 5 2015 - AU… · PROJECT - LOT E - SOUTH CAMPUS PRE-APPLICATION AUDP SUBMISSION March 5, 2015 CONTENTS Location & Context Plan 2 Site Analysis 3 Design

14

PROJECT - LOT E - SOUTH CAMPUSPRE-APPLICATION AUDP SUBMISSION

March 5, 2015

SECTION 2

Yu Building(residential)Yu Building(residential)

Village Green(pedestrian lane)

WebberLane

Page 15: PRE-APPLICATION AUDP SUBMISSION 5 2015 - AU… · PROJECT - LOT E - SOUTH CAMPUS PRE-APPLICATION AUDP SUBMISSION March 5, 2015 CONTENTS Location & Context Plan 2 Site Analysis 3 Design

15

PROJECT - LOT E - SOUTH CAMPUSPRE-APPLICATION AUDP SUBMISSION

March 5, 2015

MATERIALITY

dark brickgraniteporous paving

wood

storefrontgreen walls hardie cladding & metal trim

Page 16: PRE-APPLICATION AUDP SUBMISSION 5 2015 - AU… · PROJECT - LOT E - SOUTH CAMPUS PRE-APPLICATION AUDP SUBMISSION March 5, 2015 CONTENTS Location & Context Plan 2 Site Analysis 3 Design

16

PROJECT - LOT E - SOUTH CAMPUSPRE-APPLICATION AUDP SUBMISSION

March 5, 2015

PERSPECTIVES

* Note: Differentiating colour (TBD) to define vertical circulation