1
Pradhan Mantri Gram Sadak Yojana (PMGSY)
A Presentation of
PMGSY Sanctioned Projects&
Proposals for PMGSY Phase-IX Programme Presented by
Manipur State Rural Roads Dev. Agency (MSRRDA)
12th February 2013
2
Bharat Nirman
Rural roads – a major component of Bharat Nirman for augmentingrural infrastructure launched in Feb 2005.
Aims to provide connectivity to habitations of population of 1000+.Eligibility for Hill States, Tribal (Schedule-V) areas being above500.
To cover designated unconnected habitations of 250+ in North East.
To upgrade/renew Through Routes to ensure farm to marketconnectivity.
Funding & Allocation : At least 80% on the basis of road lengthrequired for providing connectivity to Unconnected Habitationsand upto 20% on the basis of road length requiring Upgradationunder the PMGSY.
2
3
WORKS SANCTIONED UNDER PMGSY (Ph-II to Ph-VIII )
PhaseNos of Roads Habitation Length (Km) Approved Cost (Rs Crore)
Hills Valley Total Hills Valley Total Hills Valley Total Hills Valley Total
II 49 81 130 58 10 68 395 315 710.6 43.44 37.27 80.72
V 36 26 62 75 18 93 405 151 556.2 100.23 52.10 152.33
VI 62 81 143 161 23 184 853 304 1157 251.29 112.37 363.66
VII 65 4 69 149 6 155 723 14 736.6 224.03 7.65 231.68
VIII 50 0 50 112 0 112 502 0 502 254.25 0.00 254.25
Total 262 192 454 555 57 612 2879 784 3663 873.24 209.39 1082.6
Particular Roads Length Cost
Hills 262 58% 2879 79% 873.24 81%
Valley 192 42% 784 21% 209.39 19%
Manipur 454 100% 3663 100% 1082.6 100%
District-wise Details of Roads in Manipur under PMGSY:Ph-II to-VIII
District
No. of Roads Roads Length in Km Cost Rs in Crores
Sanctd Comptd % Sanctd Comptd % ApprovedExpenditure (wrt
Appvd)**
Imphal West 40 38 95% 156 152.56 98% 33.03 30 91%Bishnupur 38 37 97% 162 161.19 99% 38.18 32.91 86%
Imphal East 53 50 94% 203 201.98 100% 62.8 60.28 96%Thoubal 42 42 100% 263 263.08 100% 75.38 71.02 94%
Sub Total 173 167 97% 784 778.81 99% 209.39 194.2 93%
Tamenglong 42 15 36% 458 420.18 92% 123.55 65.66 53%Chandel 59 41 69% 512 396.23 77% 141.78 74.60 53%
CCPur 55 44 80% 579 512.8 89% 163.59 118.00 72%
Ukhrul 51 21 41% 617 447.68 73% 186.74 92.55 50%Senapati 74 34 46% 712 552.03 77% 207.25 120.15 58%
Sub Total 281 155 71% 2879 2328.92 85% 822.91 470.96 64%
Grand Total 454 322 71% 3663 3107.73 85% 1032.30 665.17 64%
3
Sanctioned Roads in Manipur (Hills & Valley) under PMGSY:Ph-II to-VIII
District
No. of Roads Roads Length in Km Cost Rs in Crores
Sanctd Comptd % Sanctd Comptd % ApprovedExpenditure
(wrt Appvd)**
Hills 281 155 71% 2878.68 2328.92 85% 822.91 470.96 64%
Valley 173 167 97% 784.11 778.81 99% 209.39 194.21 93%
Manipur 454 322 71% 3662.79 3107.73 85% 1032.30 665.17 64%
281
2878.68
822.91
173.00
784.11
209.39
1 2 3
Share of PMGSY Works in Hills & Valley (1. Roads, 2. Length & 3. Cost)
Hills Valley
No of Roads Road Length (Km) Cost (Rs Crores)
District Roads No Road Length in Km Cost (Rs in crores)
Sanctd Comptd % Sanctd Comptd % Appvd Expdr wrt Appvd**
TML 42 15 36% 457.7 420.2 92% 124 66 53%
Chandel 59 41 69% 512.4 396.2 77% 142 75 53%
CCPur 55 44 80% 578.7 512.8 89% 164 118 72%Ukhrul 51 21 41% 617.5 447.7 73% 187 93 50%
Senapati 74 34 46% 712.4 552 77% 207 120 58%
(Hills) 281 155 55% 2879 2329 81% 823 471 57%
Status of Roads in 5 Hills Districtsunder PMGSY upto Ph-VIII
Progress & Expenditure inclusive of Phase-VIII works : 6 BB & 46 Roads works with length of 500 Kms and cost of Rs 200Crores in Hills which are being awarded soon.
0
50
100
150
200
250
TML Chandel CCPur Ukhrul Senapati
Amount sanctioned (Rs Crores)
396.23 420.18447.68
512.8552.03
0
100
200
300
400
500
600
Chandel TML Ukhrul CCPur Senapati
Length completed (Km)
65.6674.6
92.55
118 120.15
0
20
40
60
80
100
120
140
TML Chandel Ukhrul CCPur Senapati
Expenditure (Rs in Crores)
4
7
District No of DPRs (Length in Km & cost in Rs Crore)
St-I* St-II* Upgtn* BB* Total Length CostBishnupur 2 - 35 - 37 130.88 95.55Imp East 8 8 32 - 48 211.28 104.17Imp West 1 - 44 - 45 215.07 118.31Thoubal 1 3 56 - 60 266.95 171.41
Sub-Total 12 11 167 0 190 824.18 489.44HillsChandel 10 31 - 2 43 323.74 175.04CCpur 42 21 3 - 66 514.14 292.77Senapati 85 43 7 10 145 1217.8 722.55TML 22 23 5 7 57 620.59 294.32Ukhrul 50 21 1 4 76 725.64 366.91
Sub-Total 209 139 16 23 387 3401.91 1851.59Manipur 221 150 183 23 577 4226.09 2341.03* St-I : Stage-I & St-II : Stage-II, Upgtn : Upgradation & BB for Bailey brdige
New Proposals of Roadsunder PMGSY Phase-IX
Particulars Manipur Hills Valley
Length 4226.09 3401.91 80% 824.18 20%Cost 2341.03 1851.59 79% 489.44 21%
Click mouse to go to program details
0
1000
2000
3000
4000
Length Cost
Hills
Valley
Proposals Ph-IX (Length in Km & Cost in Rs Cr)
8
PROPOSED WORKS PROGRAMME FOR PMGSY PHASE-IX Valley Districts (Block wise & District wise)
(Length in Km & Cost in Rs Lakhs)
Sl. District / BlockStage-I Stage-II Upgradation New (Stage-I+II) Bridge Total Length
Length Cost Length Cost Length Cost Length Cost Length
(m)Cost Road (Km) Bridge (m) Cost
Moirang 54.21 2922.02 1.46 184.89 55.67 3106.911 Bishnupur 71.86 5979.02 3.35 469.00 75.21 6448.02
Bishnupur (Dist) 0.00 0.00 0.00 0.00 126.07 8901.04 4.81 653.89 0 0 130.88 9554.93
2 Jiribam 16.01 672.86 5.11 255.25 12.84 642.00 33.96 1570.11Keirao Bitra 55.4 2659.92 11.80 681.32 67.20 3341.24Sawombung 87.87 4393.5 22.25 1112.50 110.12 5506.00
Imphal East (Dist) 0.00 0.00 16.01 672.86 148.38 7308.67 46.89 2435.82 0 0 211.28 10417.35
3 Wangoi. 82.51 4539.55 82.51 4539.55
Haorangsabal 129.26 7110.4 3.30 182.00 132.56 7292.40
Imphal West (Dist) 0.00 0.00 0.00 0.00 211.77 11650 3.30 182.00 0 0 215.07 11831.95
4 Kakching 112.15 7116.7 112.15 7116.70
Thoubal 3.00 180.00 13.00 819.00 138.8 9025.4 154.80 10024.40
Thoubal (Dist) 3.00 180.00 13.00 819.00 250.95 16142.1 0.00 0.00 0 0 266.95 17141.10
Total (Valley) 3.00 180.00 29.01 1491.86 737.17 44001.8 55.00 3271.71 0 0 824.18 48945.33
5
9
PROPOSED WORKS PROGRAMME FOR PMGSY PHASE-IX [Hill Districts : Block wise & District wise - 1]
(Length in Km & Cost in Rs Lakhs)
Sl. District / Block
Stage-I Stage-II Upgradation New (Stage-I+II) Bridge Total
Length Cost Length Cost Length Cost Length Cost Length
(m)Cost Length
Bridge length
( m )Cost
5 Chandel. 22.00 1110.00 13.50 680.28 35.50 1790.28Machi. 45.64 2108.50 37.41 1944.60 350.00 83.05 4403.10Tengnoupal. 87.67 5110.65 87.67 5110.65Chakpikarong. 40 2040 77.52 4160.19 117.52 6200.19
Chandel Dist 107.64 5258.50 216.10 11895.72 0.00 0.00 0.00 0.00 0.00 350.00 323.74 17504.226 Singhat 18.64 838.8 29.37 1709.25 48.01 2548.05
Tipaimukh 35.94 2696.2 35.94 2696.20Thanlon 22 1309 48.5 3637 70.5 4946.00Henglep 71.23 4017 21.1 1582 92.33 5599.00Samulamlan 105.58 5285.1 6.65 388.32 112.23 5673.39Churchandpur 108.32 5576.1 26.75 1317.09 20.06 921.53 155.13 7814.76
CCPur Dist 325.77 17026.01 168.31 11329.86 20.06 921.53 0.00 0.00 0.00 0.00 514.14 29277.40
10
PROPOSED WORKS PROGRAMME FOR PMGSY PHASE-IX [Hill Districts : Block wise & District wise - 2]
(Length in Km & Cost in Rs Lakhs)
Sl. District / Block
Stage-I Roads Stage-II Roads Up-gradation Roads New (Stage-I+II) Bridge Total
Length Cost Length Cost Length Cost Length Cost Length
(m)Cost Length
Bridge length ( m )
Cost
7 Kangpokpi 96.10 4324.50 17.04 825.92 113.14 5150.42Saitu 67.00 4860.00 29.40 1481.80 96.40 6341.80Paomata 59.00 3304.00 29.55 1654.80 23.96 1341.76 3199.00 112.51 9499.56Saikul 60.00 5247.00 94.30 4495.50 154.30 9742.50Purul 208.59 11681.04 64.97 3638.32 15.50 868.00 289.06 16187.36Tadubi 305.20 17091.20 147.19 8242.64 452.39 25333.84
Senapati Dist 795.89 46507.74 382.45 20338.98 39.46 2209.76 0.00 0.00 0.00 3199.00 1217.80 72255.488 Tamenglong 0.00 0.00 120.43 5419.35 120.43 5419.35
Tamei 101.50 4567.50 52.10 2344.50 153.60 6912.00Nungba 152.25 6851.25 28.21 1269.45 180.46 8120.70Tousem 95.00 4275.00 18.10 814.50 53.00 2385.00 1505.00 166.10 8979.50
Tamenglong Dist 348.75 15693.75 218.84 9847.80 53.00 2385.00 0.00 0.00 0.00 1505.00 620.59 29431.55
6
11
PROPOSED WORKS PROGRAMME FOR PMGSY PHASE-IX [Hill Districts : Block wise & District wise - 3](Length in Km & Cost in Rs Lakhs)
Sl. District /
Block
Stage-I Stage-II Upgradation New (Stage-I+II) Bridge Total
Length Cost Length Cost Length Cost Length Cost Length
(m)Cost Length
Bridge length
( m )Cost
8 Tamei 101.50 4567.50 52.10 2344.50 153.60 6912.00Tousem 95.00 4275.00 18.10 814.50 53.00 2385.00 1505 166.10 8979.50Tamenglong 120.43 5419.35 120.43 5419.35Nungba 152.25 6851.25 28.21 1269.45 180.46 8120.70
Tamenglong Dist 348.75 15693.75 218.84 9847.80 53.00 2385.00 0.00 0.00 0.00 1505 620.59 29431.559 Ukhrul. 211.40 9678.74 35.31 1839.58 9.00 540.00 630 255.71 12688.32
Phungyar. 117.72 5297.40 39.25 2106.60 156.97 7404.00KasomKhullen 27.50 1237.50 21.43 1260.30 48.93 2497.80Chingai. 34.00 1656.18 96.73 6049.04 210 130.73 7915.22Kamjong. 106.00 4770.00 27.30 1415.48 133.30 6185.48
Ukhrul Dist 496.62 22639.82 220.02 12671.00 9.00 540.00 0.00 0.00 0.00 840 725.64 36690.82Total (Hills) 2074.67 107125.82 1205.72 66083.36 121.52 6056.29 0.00 0.00 0.00 5894 3401.91 185159.47
PHOTOGRAPHS OF WORKS TAKEN-UP UNDER PMGSY
IN CHANDEL DISTRICT, MANIPUR
12
7
PMGSY – PHOTOS
13
Inspection of Road from Komlathabi to Lamkang KhunyaiBy NQM, SK Gupta
Road from Komlathabi to Lamkang Khunyai (3.00 Km)Chandel Block, Chandel District, MN0219 (Ph-VI)
PMGSY – PHOTOS
14
ROAD FROM Road from Sajik Tampak to Heikha L. (12.00 Km)Chakpikarong Block, Chandel District, MN0212 (Ph-VI)Inspection of road by NQM : Shri SK Gupta
8
PMGSY – PHOTOS
15Road from Machi Gate to Kangoi Khullen, Machi Block, Chandel District, MN0222 (Ph-VI)
PMGSY – PHOTOS
16
Road from Khudengthabi to Ruilam Centre (35.00 Km)Tengnoupal Block, Chandel District, MN0205 (Ph-V), MN0216 & MN0224 (Ph-VI)
Inspection of road by ACS & MSRRDA Engineers
9
PHOTOGRAPHS OF WORKS TAKEN-UP UNDER PMGSY
IN CHURACHANDPUR DISTRICT, MANIPUR
17
18
Road from Sangaikot to Khongkhai, (Black topped, Phase-VI, MN0328)Churachandpur Block, Churachandpur District.
10
19Road from NH-150 to Tokpa Khul(12.27 Km)Henglep Block, Churachandpur District, MN0315 (Ph-V)
20Road from Singngat to Alusingtam (17.40 Km)Singngat Block, Churachandpur District, MN0350 (Ph-VII)
11
21Road from NH150/Bukpi to Bungpilon : 14.28 KmThanlon Block, Churachandpur District, MN0353 (Ph-VII)
22
Road from Pherzawl to Leisen : 23.00 KmTipaimukh Block, Churachandpur District, MN0306 (Ph-V), MN0319 & MN0332 : 23.00 Km (Ph-VI)
12
PHOTOGRAPHS OF WORKS TAKEN-UP UNDER PMGSY
IN SENAPATI DISTRICT, MANIPUR
23
24Road from NH-39 to Saikotjang (6.71 Km)Kangpokpi Block, Senapati District, MN0671 (Ph-VI)
13
25Road from Yangnoi to Phaibung Khunou (15.07 Km)Saikul Block, Senapati District, MN0648 (Ph-VI)
26Road from NH-39 to Makhan Khuman(6.13 Km)Saitu Block, Senapati District, MN0626 (Ph-VI)
14
27Road from Laii to Phutsero Phek 9.60 KmPaomata Block, Senapati District, MN0609 (Ph-V)
28
Koide Beso to Thingba Khunou (0.00 to 16.128 km) Purul Block, Senapati District, MN0620 (Ph-VI)
15
29Road from Senapati to Thonglan 17 885 km, Tadubi Block, Senapati District, MN0606 (Ph-V) & MN0630 (Ph-VI)
PHOTOGRAPHS OF WORKS TAKEN-UP UNDER PMGSY
IN TAMENGLONG DISTRICT, MANIPUR
30
16
31
Road from Chingkao to T01 to Mongjarong Khullen No. MN0720Nungba Block, Tamenglong District, (Ph-VI)
Inspection of road by SQM, Shri W. Chaoba, EE, PWD (Retd)
32
Road from NH-53/Tupul - Charoi Chagatlong - 0.0 to 13.0 Km, PMGSY Package No. MN0732Nungba Block, Tamenglong District, (Ph-VII)
Inspection of road by SQM, Shri W. Chaoba, EE, PWD (Retd)
17
33
Road from Elleng – Dunong - 0.0 to 10.0 Km, PMGSYPackage No. MN0746
Tamei Block, Tamenglong District, (Ph-VII)
PMGSY – COMPLETED / ONGOING WORKS
34
ROAD FROM OKTAN TO KHUNDONG KHAIBA (6.00 Km) (MN0726, TAMEI BLOCK, TAMENGLONG DISTRICT PMGSY PH-VII)
18
35
Road from Chingkao - Thiulon-BPMGSY Package No. MN0743Tousem Block, Tamenglong District, (Ph-VII)
PHOTOGRAPHS OF WORKS TAKEN-UP UNDER PMGSY
IN UKHRUL DISTRICT, MANIPUR
36
19
Road from Kharasom to New Tusom, Chingai Block, Ukhrul District, MN0911 & MN0917 (Ph-VI)
Inspection of Road from Kharasom to New Tusom (MN0911), Chingai Block, Ukhrul District, by SQM, Kh. Ibochouba
38Road from Litan to Lungphu : 9.30 KmPhungyar Block, Ukhrul District, MN0930 (Ph-VII)
20
39
Road from Sanakeithel to LeisanUkhrul Block, Ukhrul District, MN0915 (Pphase-VI) MN0919 & MN0921 (Ph-VII)
Inspection by NQM
40
Road from BRTF road to Bungpa KhullenKamjong Block, Ukhrul District, MN0914(Ph-VI)
Road from BRTF road to Bungpa KhullenStone Masonry Retaining Wall MN0914(Ph-VI)
21
Road from BRTF Road to Lairam Khullen No. MN0927Kasom Khullen BlockUkhrul District, (Ph-VII)
42
Inspection of Road from NH-150 to Choithar, PMGSY Package No. MN0916, Ukhrul Block, Ukhrul District, by SQM, Kh. Ibochouba
22
44
PMGSY
Click mouse to go to previous
slide
Click mouse to go to previous slide
23
45
Physical Status of Roads under PMGSY upto Phase- II to VIII
Length in Km
Sl Phase
Nos of Roads Length
Sanctioned Completed / Connected Sanctioned
Completed
Roads Habitation Roads %age Habtn %age Km %
1 II 130 68 127 98% 60 88% 710.64 710.64 100%
2 V 62 93 61 98% 90 97% 556.19 556.16 100%
3 VI 143 184 118 83% 133 72% 1157.37 1151.1 99%
4 VII 69 155 16 23% 36 23% 736.57 661.28 90%
5 VIII 50 112 * * 501.98 *
Total 454 612 322 70% 319 52% 3662.75 3079.2 84%
Institutional Architecture
Minister, Rural Development & Panchayati Raj
Chief Secy. to Govt. of Manipur.
Addl. C.S. (R.D & P.R.) / CEO (MSRRDA)
Chief Engr./EO MSRRDA
14 PIUs
MSRRDA: Manipur State Rural Roads Development AgencySQC: State Quality Co-ordinator, SQM: State Quality Monitor, PIU: Programme Implementation Unit
SQMs
46
FC 3 S.Es/SQC
24
47
Financial Status of Roads under PMGSY upto Phase-VIII
Sl Phase Nos of Roads Cost (Rs in Crores)
Sanctioned Approved Released Expenditure
1 II 130 80.72 64.33 80% 80.72 83.48 103%
2 V 62 152.33 154.3 101% 152.33 145.10 95%
3 VI 143 363.66 296.9 82% 363.66 294.05 81%
4 VII 69 231.68 231.7 100% 231.68 142.56 62%
5 VIII 50 254.25 * * 254.25 * *
Total 1078 1082.64 747.24 70% 1082.64 665.19 62%
Click mouse to go to previous slide Completed Works (Ph-V)
25
Completed Works (Ph-V, VI & VII)Chandel District
Click mouse to go to previous slide
Chakpikarong Block
Chandel & Machi Blocks
Tengnoupal Block
Completed Works (Ph-V, VI & VII)Churachandpur District
Click mouse to go to previous slide
Churachandpur & Henglep BlockSamulamlan Singngat Blocks
Thanlon Block
Tipaimukh Block
26
Completed Works (Ph-V, VI & VII)Senapati District
Click mouse to go to previous slide
Kangpokpi Block
Saikul Blocks
Saitu Block
Paomata Block
Purul Block
Tadubi Block
Completed Works (Ph-V, VI & VII)Tamenglong District
Click mouse to go to previous slide
Nungba & Tamei BlockTamenglong Block
Tousem Block
27
Completed Works (Ph-V, VI & VII)Ukhrul District
Click mouse to go to previous slide
Chingai Block
Kamjong & Ukhrul Blocks
Phungyar & Ukhrul Blocks
List of PMGSY works under Chandel DistrictClick mouse to go to previous slide
28
Blo
ckName of Work
Package No. Ph
ase Length (in
Km)
Estimated Cost
(Rs. in Lac)
Remark/ Status as on
Dec'12Ch
akpi
karo
ngChekjang to B.R.T.F. MN0203 II 5.00 59.59 CompletedChakpikarong to Rungchang
MN0202 II1.91 25.87 Completed
Sugnu Chapikarong to Charongching 8.01 24.43 CompletedChakpikarong to Khengjoy MN0204
V
14.00 252.93 CompletedCKG to Khubung Khunou via Thorcham MN0208 7.00 135.71 CompletedCKG to Shajik Tampak MN0206 12.00 186.12 CompletedShajik Tampak to Kholmunlen via Aisi MN0207 15.00 357.71 CompletedChakpikarong to Khengjoy MN0210
VI
17.99 430.48 CompletedChakpikarong to Khengjoy MN0223 14.46 385.56 CompletedToupokpi (Sugnu Chakpikarong Road at 6 km) - to Beru Khudam (Chandel Block)
MN0211 8.50 222.00 Completed
Sajik Tampak to Heikha(L) MN0212 12.00 314.00 CompletedLongja to K. Phoilen MN0213 12.00 314.00 CompletedRungchang to Kanakangbung MN0214 5.00 130.00 CompletedBRTF/TO5 - Molcham MN0229
VII
10.00 268.04 CompletedBRTF Road - P. Chehjang MN0230 5.00 263.09 In ProgressBRTF Road/T05 - K. Sabompha (BADP) MN0231 13.00 470.72 In ProgressBRTF Road - Molngat via Toitung (BADP) MN0232 5.00 284.45 In ProgressKhullen Khailet - Phoilen (BADP) MN0233 15.00 541.81 In ProgressSugnu - Uttangpokpi/Thungcheng (BADP) MN0234 2.40 121.16 In ProgressChakpikarong - Challong Lamkhai/Phiranmachet - Part I MN0242
VIII
13.20 582.74
Tender under Process
Chakpikarong - Challong Lamkhai/Phiranmachet Part-II MN0243 12.80 490.51Sajik Tampak - Khumunllen via Aishe/14.76 Km MN0244 14.76 539.42Sajik Tampak - Molphei/12.21 Km MN0245 12.21 485.62Moltuk - Gamphajol via Tuidam - T. Monglen/Phase-II MN0246 10.00 458.28Chakpikarong - Thorcham/Phase-II MN0247 8.20 326.51
Click mouse to go to previous slide
Back to Chandel District
Blo
ck
Name of Work Package No.
Phas
e Length (in Km)
Estimated Cost
Remark/ Status as on
Dec'12(Rs. in Lac)
Chan
del
Purumchumbang to HeikrutampakMN0202 II
3.55 21.74 Completed
Khudei Khunou to Purum Tampak 1.05 99.61 Completed
Komlathabi to Thamlapokpi MN0209 V 5.00 107.44 Completed
Japhou Bazar to Phunchong MN0217
VI
4.20 110 Completed
Lambung to Lamphou Pasana MN0218 4.95 130 Completed
Komlathabi to Lamkang Khunyai MN0219 2.55 69 Completed
Khudei Khunou - Phunan Sanbum MN0225 VII 6.00 176.33 Completed
Mac
hi
Sora Chingjil to Langol
MN0201 II
7.47 66.3 Completed
Laiching Khullen Lamkhai to Laiching Maipou 6.56 81.77 Completed
Kangching to Laiching Minou 5.04 89.61 Completed
Kangoi Khullen to Phungchong 3.14 31.4 Completed
Tuisimi to Samanphai MN0220
VI
19.00 495 Completed
L030 (KM Rd-Blk Bdry) to Lamlong Khullen MN0221 4.50 117 Completed
Machi Gate at 19 Km to Kangoi Khullen MN0222 9.50 248 Completed
Click mouse to go to previous slide
Back to Churachdnpur District
29
Blo
ck
Name of WorkPackage
No. Phas
e Length (in Km)
Estimated Cost
(Rs. in Lac)
Remark/ Status as on
Dec'12Te
ngno
upal
B.R.T.F. to Chelep
MN0203 II
4.00 28.36 CompletedJoupi Khengjoi to Sehao 2.03 24.73 CompletedLeitan to Khong khang 4.00 26.72 CompletedLamjing to Narum 8.00 59.28 CompletedLeitan to Leibi 5.00 36.56 CompletedSaivom to Molnom 11.24 86.08 CompletedRingkhudam to Molnom 2.28 39.07 CompletedRilam Centre to Dungshiphai. 15.00 111.12 CompletedKhudengthabi to R/Centre MN0205 V 10.00 241.43 CompletedBRTF Road to Khudei Khullen MN0215
VI6.00 156.00 Completed
N.H.39 (Khudengthabi) to R/Center MN0216 15.03 356.84 CompletedN.H.39 (Khudengthabi) to R/Center MN0224 9.97 272.99 CompletedNH-39 - Aimol Khullen/Aimol Tampak i.e. 0.00 to 6.00 (BADP)
MN0238VII
6.00 260.09 In Progress
NH-39 - M. Maipi (BADP) MN0239 8.50 363.58 CompletedRuilam Centre - Lamlong Khunou (BADP) MN0240 17.00 452.58 In ProgressRuilam Centre - Sairen Shaichin via Narum -Yongkhul/Part-I
MN0248
VIII
8.00 368.17
Tender under Process
Ruilam Centre - Sairen Shaichin via Narum -Yongkhul/Part-II
MN0249 7.00 328.96
Moreh/BRTF Road - Maojang MN0250 15.00 557.78Moreh/NH-39 - Woksu/Part-I MN0251 7.00 414.54Moreh/NH-39 - Woksu/Part-II MN0252 8.00 322.93
Total:- 417.80 11964.76
Click mouse to go to previous slide
Back to Churachandpur District
List of PMGSY works under ChURACHANDPUR District
Click mouse to go to previous slide
30
Blo
ck Name of Work Package No.
Ph
ase
Length (in Km)
Estimated Cost(Rs. in Lac)
Remark/ Status as on Dec'12
Ccpu
rBethel to Mini Secretariat & Molnom
MN0301 II
6.14 74.66 Completed
Bijang Co-operative Office to Tuibong & Teiseng. 6.48 69.23 Completed
Zomi Colony to Zellang Veng 3.44 54.91 Completed
Salbung to Tuinaum MN0307V
5.89 212.02 Completed
Buangmual (T01) to Songpi MN0308 2.98 100.99 Completed
Koite to K. Paolen MN0326 11.00 407.00 Inprogress
Telsing Bazar (T01) to Songpikholui MN0327 4.00 148.00 Completed
Sangaikot to Khongkhai MN0328 28.00 940.00 Completed
Sangaikot to Khongkhai MN0331 28.00 940.00 Completed
Hen
glep
Phaibung to Khengjang Rd.MN0302 II
5.00 60.29 Completed
Nabil to Nalon Rd. 5.00 59.88 Completed
NH-150 to Tokpa Khul MN0315
V
12.27 269.79 In Progress
Thinkew to Henglep (Vungbuk & KamkeilonMN0316 11.16 236.51 Completed
S. Nabil to Nalon MN0329VI
5.00 185.00 Completed
Henglep toSongphu Mollen MN0330 2.20 82.00 Completed
Click mouse to go to previous slide
Back to Churachandpur District
Blo
ck
Name of Work Package No.
Phas
e Length (in Km)
Estimated Cost
(Rs. in Lac)
Remark/ Status as on
Dec'12
Sam
ulam
lan Sagang to Tuining MN0303 II 8.00 106.12 Completed
T01 (Wairok) to Ngaryan MN0317VI
8.00 223.00 Completed
Thenjang to Keirap Khunthak MN0318 5.00 140.00 Completed
Sing
ngat
Songtal to Kangkap MN0304 II 8.50 100.12 Completed
Behiang to Ngalzang MN0309V
11.88 239.26 Completed
Mongkot to G. Monglen MN0310 13.02 307.57 Completed
Behiang to Tongzang MN0323VI
15.00 420.00 Completed
Lungchin to Tuikui Muallum MN0324 10.00 280.00 Completed
Guite Road - Tonglun_K (BADP) MN0347
VII
18.75 483.27 Completed
T02/Guite Road - Lungthul - E (BADP) MN0348 10.20 358.35 Inprogress
Singhat - Hiangtam (BADP) MN0349 18.00 471.25 Inprogress
Singhat - Allusingtam (BADP) MN0350 17.40 410.19 Completed
Singhat to Tonglon(T) MN0360
VIII
10.18 366.23
Tender under
Process
Singhat to Songkong MN0361 15.27 547.36
Tiddim Road (Zezaw) to T. Khajang MN0362 9.20 334.26
1 BB(3 nos) MN0363 94.52 373.06
Click mouse to go to previous slide
Back to Churachandpur District
31
Blo
ck Name of Work Package No.
Phas
e Length (in Km)
Estimated Cost
(Rs. in Lac)
Remark/ Status as on
Dec'12
Tha
nlon
Bukpi to Aibulon
MN0305 II6.00 70.46 Completed
Thanlon to Mongkon 4.00 47.13 Completed
Songtal to Kangkap & T01 (Bukpi) to AibulonMN0311 V 24.10 470.13 Completed
Galkapot to Gamhui MN0325 VI 6.50 180.00 Completed
T02/Mualnuam - Kaihlam (BADP) MN0352
VII
15.09 433.15 Completed
NH-150 / Bukpi - Bungpilon (BADP) MN0353 14.28 432.72 Completed
NH-150/ Sainoujang - Phaipeng (BADP) MN0354 10.65 364.38 Inprogress
NH-150(Thanlon) to New Muntha (Pt-I: 20.00-35.00 km)
MN0358
VIII
15.00 521.47 Tender under
ProcessNH-150(Thanlon) to New Muntha (Pt-I: 35.00-48.72 km)
MN0359 13.72 481.00
Click mouse to go to previous slide
Back to Churachandpur District
Blo
ck
Name of Work Package No.
Phas
e Length (in Km)
Estimated Cost
(Rs. in Lac)
Remark/ Status as on Dec'12
Tip
aim
ukh
Pherzawl to DailonMN0306 II
10.00 119.98 Completed
Pherzawl to Leisen 5.50 69.57 Completed
T01 (NH-150) to J.T. Road (17-35.47 Km)MN0314
V
18.47 427.92 Completed
T01 (NH-150) to J.T. Road (0-17 Km) MN0313 17.00 441.80 Completed
NH-150 (T01 Lungthulien) to Parvachom.MN0312 12.00 354.12 Completed
T01 (Pherzawl) to Leisen MN0319
VI
23.00 640.00 Completed
T01 (Pherzawl) to Leisen MN0332 23.00 640.00 Inprogress
T01(Lungthulien) to Parvachom MN0320 19.00 700.00 Inprogress
MB Rd (Jiribam) to Henchang Punjee MN0321 10.00 280.00 Inprogress
T01 (Damdei) to Tuolbung MN0322 15.00 420.00 Completed
Patpuihmun - Sartuinek - 0.0 to 10.0 Km MN0345
VII
10.00 352.83 Inprogress
Patpuihmun - Kangreng - 0.00 to 15.00 Km MN0355 15.00 403.82 Inprogress
Patpuihmun - Kangreng - 15.00 to 30.00 Km MN0356 15.00 400.33 Inprogress
J.T. Road - Saiuinek - 0.0 12.37 Km MN0357 12.37 374.04 Inprogress
Total:- 205.34 5624.41
Back to Churachandpur District
32
List of PMGSY works under SENAPATI District
Blo
ck Name of Work Package No.
Phas
e
Length (in Km)Estimated Cost
(Rs. in Lac)Remark/ Status as on
Dec'12
Kan
gpok
pi
I.T Rd. to Lanka MN0601 II 16.62 158.62 Completed
IT Rd. to Makuli via Songtun(J) MN0608 V 3.11 97.07 Completed
Bendramei to Yangkhullen MNO633
VI
4.12 111.19 Completed
T. Waichong to Gorkha Tapon MNO634 16.00 389.38 Completed
NH-39 to Santalabari MNO635 7.30 162.29 Completed
NH-39 to Saikotjang(Part - II) MN0671
VII
7.60 342.94 Completed
Gurkha Tapon to Timsina MN0653 7.05 268.61 Completed
Dalthri to Tahar basti MN0655 5.00 202.90 In Progress
Manedera to Doring Hare MN0654 5.27 172.01 In Progress
NH-39 to Bileijang MN0 674
VIII
5.19 180.86
Tender under ProcessGurkha tapon to makui Ashang MN0 675 9.20 307.63
Lamchok to Gimthari MN0 676 6.24 228.79
Haipi to Mahavir MN0 677 9.22 305.31
Click mouse to go to previous slide
Back to Senapati District
33
Blo
ckName of Work Package No.
Phas
e Length (in Km)
Estimated Cost
(Rs. in Lac)
Remark/ Status as on
Dec'12Sa
ikul
Saikul to Ichaigoyang MN0601 II 3.00 46.39 Completed
Saikul (SH-7) to Simol (NH-150) MN0610
V
10.00 242.85 Completed
Molkon(T04) to Phaibung (Yangnoi) MN0613 8.50 195.40 Completed
Bungte Chiru to Charoi Pandongba Kabui MN0611 10.79 266.73 Completed
Saikul(SH-7) to Simol (NH-150) (10.00 to 20.50 km) MNO614
VI
10.50 286.57 Completed
T02 to Sailen MNO636 6.14 144.77 CompletedPhunalmaring to Sandangsemba Maring MNO615 12.00 429.72 In Progress
T03 (New Keithelmanbi) to Kamuching MN0660
VII
5.38 297.77 In Progress
Yongnoi to Phaibung Khunou MN0648 15.07 416.45 Completed
To3 to Kamu Saichang MN0659 16.52 409.16 In Progress
Ngarong Chingjin to Irong Tangkhul MN0 678
VIII
16.23 519.38
Tender under
Process
Thingsat to Ekpam Khullen MN0 679 11.52 439.11
Thingsat to Mapao Christain MN0 680 15.00 518.72
T01( Simol) to Tuichin MN0 681 7.92 280.26
Makokching to Sadang Kuki Pt-I(0-12.00km) MN0 682 12.00 456.42
Makokching to Sadang Kuki Pt-I(12-24.00km) MN0 683 12.00 439.71
Nurathel to Mongbung MN0 684 6.51 259.19
Click mouse to go to previous slide
Back to Senapati District
Blo
ck
Name of Work Package No.
Phas
e Length (in Km)
Estimated Cost(Rs. in Lac)
Remark/ Status as on
Dec'12
Sait
u
Orphanage Koubru Hill via HeijangMN0601 II 10.93 127.22 Completed
Chini Ingkhol to Doaong Khunou Rd. MN0607 V 8.50 191.82 Completed
New Keithelmanbi to Charoipandongba ChiruMNO625
VI
11.00 319.46 Completed
NH-39 to Makhan KhumanMNO626 6.13 176.68 Completed
Leilon Vaiphei to Khunkhu KukiMNO627 9.30 273.60 Completed
Kangchup Chingkhong to Irang Naga MN0666
VII
6.75 337.42 In Progress
Bungte chiru Charoi Pangdongba MN0664 19.30 480.80 In Progress
MH-39 to Pheijang MN0665 3.50 168.01 Completed
Kangchup Tuikhun to khokenMN0 672
VIII
17.46 570.99Tender under
ProcessCharai pandongbachiru to Tingkaikhunou
MN0 673 9.45 358.93
Click mouse to go to previous slide
Back to Senapati District
34
Blo
ck
Name of Work Package No.
Phas
e Length (in Km)
Estimated Cost
(Rs. in Lac)
Remark/ Status as on
Dec'12
Paom
ata
Lakhamei - Khongjei via Purul, Phuba & LiyaiMN0602 II 20.00 220.58 Completed
Thungam Affi to Phuba Khuman MN0604V
9.93 215.22 Completed
Laii to Phutsero Phek MN0609 9.60 229.55 Completed
Tungam Affii to Phuba Khuman (9.33 to 18.044 km) MNO622
VI
8.12 289.24 Completed
Liyai Khullen to Purul Rosoffii MNO623 13.23 296.75 Completed
T.T Laii Rd. on 36 Km to Chingmeikhullen MNO624 6.00 246.36 Completed
Tungjoy to Makhufii MN-0638
VII
9.10 281.60 In Progress
Waychishu to Kataphumei MN-0640 3.50 192.24 In Progress
T₀₁ to Chingmai Khunou MN-0641 3.87 213.22 In Progress
Click mouse to go to previous slide
Back to Senapati District
Blo
ck
Name of Work Package No.
Phas
e Length (in Km)
Estimated Cost
(Rs. in Lac)
Remark/ Status as on
Dec'12
Puru
l
Ngamju to Paotheiju Nepali (Laila)
MN0602 II3.42 28.78 Completed
Lakhamei to Ngarilishang11.00 111.42 Completed
Purul Atongba to Thingba Khullen MN0605 V 10.03 219.42 Completed
Purul Atongba to Thingba KhullenMNO616
VI
7.30 227.00 Completed
Lakhamei to Thiwa via Ngari LishangMNO617 10.49 354.43 Completed
U.T Junction to Phaibung KhullenMNO618 4.17 103.57 Completed
Lakhamei to Khongdei ShimphungMNO619 16.66 361.98 Completed
Koide Beso to Thingba Khunou (0.00 to 16.128 km)MNO620 16.13 401.14 Completed
Oinam to NgamjuMNO621 15.69 435.93 Completed
Click mouse to go to previous slide
Back to Senapati District
35
Blo
ck
Name of Work Package No.
Phas
e Length (in Km)
Estimated Cost
(Rs. in Lac)
Remark/ Status as on
Dec'12
Tadu
bi
Karong to Khabung
MN0603 II
15.00 149.84 Completed
Senapati to Taphou-Phymei 1.29 10.83 Completed
NH-39 to Chakumei 9.51 99.03 Completed
Senapati to Thonglan MN0606V
10.00 189.98 Completed
Wilong Khunou to Chakha via Rajamei MN0612 10.33 248.49 Completed
Rural Hospital to Chawainu MNO628
VI
9.69 539.40 Completed
Maram to Maram Khullen MNO629 7.96 276.79 Completed
Senapati to Thonglan (10.00 to 17 885 km) MNO630 7.89 240.19 Completed
Khamsom to Kachai (UKL District) MNO631 14.71 381.97 Completed
Willong Khunou to Rajamei (10.00 to 17.00 km)MNO632 6.67 192.84 Completed
Senapati Oklong to Makui Longdi MN0642
VII
16.50 422.02 In Progress
Katomei to sadimnaga MN0643 16.09 397.93 In Progress
Maram Khullel to Emeffiithumei MN0646 7.00 234.30 In Progress
Willong khunou to Chakha(Pt-II : 16.67-25.17km))MN0 685
VIII8.50 457.34 Tender
under ProcessWillong khunou to Chakha(Pt-III : 25.17-
34.87km))MN0 686 9.70 486.06
Total:- 592.25 16465.57
Click mouse to go to previous slide
Back to Senapati District
List of PMGSY works under TAMENGLONG District
Click mouse to go to previous slide
36
Blo
ck
Name of Work Package No.
Phas
e Length (in Km)
Estimated Cost
(Rs. in Lac)
Remark/ Status as on
Dec'12
Nun
gba
Kekru to Mukti Khullen MN0704 II 15.21 217.29 Completed
Soukhapteng to Nungnang-I MN0709 V 25.28 469.82 In Progress
T02 to Khoupum-II MN0719VI
10.00 300.00 Completed
T01 to Mongjarong Khullen MN0720 15.00 450.00 In Progress
T02/Old Cashar Road - Nungadang Naga - 0.00 to 5.00 Km MN0730VII
5.00 299.42 In Progress
NH-53/Tupul - Charoi Chagatlong - 0.0 to 13.0 Km MN0732 13.00 397.09 In Progress
Tam
ei
Chaton to Kuilong MN0701 II 16.00 203.00 Completed
Tamei to Kuilong-I & II (14.00 to 26.237 Km) MN0706 V 12.24 369.82 Completed
Kuilong (I + II) to Old Lemta MN0716
VI
30.00 890.00In Progress
Kuilong (I + II) to Old Lemta MN0721 In Progress
I.T Rd. (Gelnel) to Kadi (A&B) MN071725.00 735.00
In Progress
I.T Rd. (Gelnel) to Kadi (A&B) MN0722 In Progress
Lenglong (A+B) to Elleng MN0718 22.00 650.00 In Progress
Block Boundary/Oktan - K. Khaiba i.e. 0.00 - 6.00 Km MN0726
VII
6.00 271.26 In Progress
Nallong - Old Lemta and New Lemta i.e. 30-40 Km MN0727 10.00 264.46 In Progress
Tamei - Langmei i.e. 0.00 to 3.30 Km MN0729 3.30 151.89 In Progress
Elleng - Dunong MN0746 10.00 304.09 In Progress
Click mouse to go to previous slide
Back to Tamenglong District
Blo
ck
Name of Work Package No.
Phas
e Length (in Km)
Estimated Cost
(Rs. in Lac)
Remark/ Status as on
Dec'12
Tam
engl
ong
Nungtek to Marang Ching
MN0702
II
10.00 132.80 CompletedNew Lakhambi to Old Lamkhambi 4.83 63.36 Completed
Lower Naga Ching to Upper Naga Ching 4.50 33.20 Completed
Langkhong(Bhalok) to I.T Rd.
MN07036.60 72.86 Completed
Lower Songpram to Upper Songpram 7.23 35.25 Completed
Tamei to Kuilong-I & II (26.237 - 52.00 Km) MN0707V
9.76 264.28 Completed
T03 Nungtek to Marangching (A) Ph-I MN0708 12.24 325.65 Completed
T03 (Thingra) to Kajinglong MN0712
VI
19.00 570.00 In Progress
T03 to Lukhambi MN0713 3.83 110.00 Completed
Tharon to L. Pabram MN071420.00 600.00
In Progress
Tharon to L. Pabram MN0724 In Progress
T01 (NH-53) to Awang Khul © MN0715 5.00 150.00 In Progress
T04 to Nagaching MN0723 3.00 90.00 In Progress
T03/ODR - Kabui Khullen MN0736 VII 7.50 221.04 In Progress
T02 to Kahulong Pt- I (0-9km) MN0747VIII
9.000 350.27 Tender under ProcessT02 to Kahulong Pt- II (9-18km) MN0748 9.000 350.10
Click mouse to go to previous slide
Back to Tamenglong District
37
Blo
ckName of Work Package No.
Phas
e Length (in Km)
Estimated Cost(Rs. in Lac)
Remark/ Status as on
Dec'12
Tous
em
NH-53 to SibilongMN0705 II
8.10 114.23 CompletedNH-53 to Nungkao 7.85 109.75 CompletedT04(ODR) to T01(NH-53)
MN0710
VI
14.15 425.00 In Progress
T04 to ImpahMN0711
18.00 540.00
In Progress
T04 to ImpahMN0725 In Progress
T04 - Tainingjam MN0741
VII
19.50 469.11 In Progress
Katang - Magulong MN0742 11.60 373.39 In Progress
Chingkao - Thuilon-B MN0743 19.20 387.89 In Progress
NH-53 - Phaitol MN0744 10.13 339.13 In Progress
Total:- 374.55 9966.83
Click mouse to go to previous slide
Back to Tamenglong District
List of PMGSY works under UKHRUL District
Click mouse to go to previous slide
38
Blo
ck
Name of Work Package No.
Phas
e Length (in Km)
Estimated Cost
(Rs. in Lac)
Remark/ Status as on
Dec'12
Chin
gai
Chingai to Tusom MN0901 II 11.01 123.06 CompletedChingai to Challou MN0908
V12.27 303.62 Completed
Halong to Paoyi MN0907 13.00 332.64 CompletedHalang to Paoyi MN0909
VI
32.30 920.00Completed
Halang to Paoyi MN0918 CompletedChingai to Huisu MN0910 20.00 550.00 CompletedKharasom to New Tusom MN0911
32.00 940.00Completed
Kharasom to New Tusom MN0917 CompletedPhungcham to Varangarai MN0912 25.00 720.00 Completed
Tuinem to Champhung MN0932
VII
14.00 420.95 In Progress
Kharasom to Soraphung MN0936 15.00 399.75 In Progress
Chingai to Huishu MN0922 15.00 505.41 In Progress
Rachai Khunou to Chingjaroi (CV) MN0925 16.00 409.53 In Progress
Siroi to Chingsui(15 to 30km) MN0929 15.00 370.63 In Progress
Siroi to Chingsui(0 to 15 km) MN0928 15.00 391.20 In Progress
T01 ( Rachai khunou) to Rachai Khullen) MN0940
VIII
8.00 351.69Tender under
ProcessHuishu to Khamasom Phungrei-I MN0941 12.50 550.38
Huishu to Khamasom Phungrei-II MN0942 9.50 476.39
Click mouse to go to previous slide
Back to Ukhrul District
Blo
ck
Name of Work Package No.
Phas
e Length (in Km)
Estimated Cost
(Rs. in Lac)
Remark/ Status as on
Dec'12
Kam
jong
Kamjong to Chatric Khullen MN0904 V 13.00 382.97 Completed
Kamjong to Chatric Khullen MN0913VI
13.00 380.00 In Progress
T02 (BRTF Rd) to Bungpa Khullen MN0914 5.00 145.00 Completed
Chassad Kamjong to Molvai Lup MNO933
VII
14.00 375.35 In Progress
T-02 to Ningthi MN0926 14.00 423.35 In Progress
kamjong to Chatric Khullen MN0920 14.00 441.50 In Progress
Nampisha to Phaikot MN0945
VIII
16.00 592.53
Tender under
Process
BRTF Rd to Chahong Khullen -I MN0946 10.00 395.57
BRTF Rd to Chahong Khullen -II MN0947 10.00 367.48
BRTF to Maku MN0948 10.00 385.31Chatrik Khullen to Maokot MN0949 10.00 399.87T02 ( BRTF Rd) to Shingcha MN0950 10.00 381.14
Kas
om K
hulle
n
Hengjol Lamkhai to Thangkhul Hungdung. MN0903 II 26.50 262.70 Completed
L-029 to Nongdam(T) MN0924
VII
15.66 469.19 In Progress
BRTF Rd to Lairam Khullen MN0927 16.25 462.49 Completed
BRTF Rd to Kangkum MN0935 8.67 242.72 In Progress
T01 ( BRTF Rd/Hongbai) to Kangoi MN0951
VIII
15.65 499.10 Tender under
ProcessT01 ( BRTF Rd) to Khamlang MN0952 8.00 285.69
L021 (Kangkum) to K.Ashangkhullen MN0953 14.10 483.98
Click mouse to go to previous slide
Back to Ukhrul District
39
Blo
ckName of Work Package No.
Phas
e Length (in Km)
Estimated Cost
(Rs. in Lac)
Remark/ Status as on
Dec'12Ph
ungy
ar
Thangkhul Hundung to Honbai (at B.R.T.F Rd.) MN0902 II 20.85 276.64 Completed
Hengzol Lamkhai to Tangkhul Hungdung (LambuiRd.)
MN0905 V 12.00 236.70 Completed
Litan to Lungphu MN0930VII
9.73 305.66 In Progress
Gwaltabi to Thawai MN0923 5.35 189.48 In Progress
Ukh
rul
Lamlang Gate to Tongou MN0906 V 13.00 318.49 CompletedSanakeithel to Leisan MN0915
VI26.00 730.00
CompletedSanakeithel to Leisan MN0919 CompletedT01 (NH-150) to Choither MN0916 10.00 290.00 CompletedNungka to Mollen MN0937
VII
6.50 195.53 Completed
Lamlang gate to Sekhore MN0931 8.50 455.29 In Progress
Sanakheithel to Leisan MN0921 12.50 342.61 In Progress
BRTF Rd. to Khangkhui khunou MN0954 VIII 14.55 519.93Tender under
Process633.84 18481.60
Click mouse to go to previous slide
Back to Ukhrul District
END OF COMPLETED / ONGOING WORKS LIST
Click mouse to go to previous slide