PR-111001-a-JGU, October 3rd, 2011 J. Gutleber 1 WP CO Progress and Status Q2-Q3 2011 October 3rd, 2011 Johannes Gutleber

PR-111001-a-JGU, October 3rd, 2011 J. Gutleber 1 WP CO Progress and Status Q2-Q3 2011 October 3rd, 2011 Johannes Gutleber

Embed Size (px)

Citation preview

J. Gutleber1

PR-111001-a-JGU, October 3rd, 2011

WP CO Progress and Status Q2-Q3 2011

October 3rd, 2011Johannes Gutleber

J. Gutleber2

Summary

• RMS became operational!• Baseline release carried out manually• T-2 software development lags behind• Continuous integration has highest priority

PR-111001-a-JGU, October 3rd, 2011

2011 – The year in which we conclude!Core functionality by end of year

J. Gutleber3

ROADMAP

PR-111001-a-JGU, October 3rd, 2011

2011-2013

J. Gutleber4

Roadmap Towards Commissioning

PR-111001-a-JGU, October 3rd, 2011

2012 2013 20142010

12/2011 Auto Column

06/2012 Controls Container

12/2012 Functional release

12/2010Column demo

03/2013 Commissioning

09/2011 ITS intermediary release

2011

07/2012 Start IT installation

10/2012 Start CO installation

J. Gutleber5

High-Level Goals

• End 2011 – Functional Column• MTS-PCC-FED + Configuration + SCADA + ProShell• Ion Source integrated, iLLRF in 01/2012

• June 2011 - Control system functionally complete• MTS-PCC-FED final hardware configuration at CERN running• Configuration chain complete (device specs, cycle generator)• All SCADA software complete• ProShell procedure templates and manuals delivered• iLLRF integration demonstrated• SADS, sLLRF, beam stoppers, spec. mag. Positioning as mock ups

• March 2013 - Integrated control system• Control system operational at facility site• Integrated with all existing front-end equipment

PR-111001-a-JGU, October 3rd, 2011

J. Gutleber6

Milestones

• M1 First release of control system software in week 39, 2011• M2 Control System VM + ion source control system delivered

on November 14, 2011 (week 46)• M3 Operate column autonomously in week 50, 2011• M4 Control system core in daily operation end January 2012• M5 Controls Container operational end May 2012

• Full control system in container at CERN

• M6 Transition release delivered in December 2012• All software and systems ready for controls commissioning

• M7 BEACOM control system commissioning on site 2013• January to March 2013 integration and testing on site• System ready for beam commissioning end March 2013

PR-111001-a-JGU, October 3rd, 2011

J. Gutleber7

M1 – First Manual Release

• September 26 – 29, 2011• All software needed for ITS packaged• Documented for manual installation• Baselined in SVN• VM with SCADA and associated tools to be given to ITS• FECOS frozen (apart from 2 CRs affecting states/modes/user)• RMS and database operational (ready to be filled)

• Elements, cables, racks

• RMS tools for viewing data available• ProShell can perform a “run” with timing system emulator

PR-111001-a-JGU, October 3rd, 2011

J. Gutleber8

M2 – Ion Source Controls

• November 14-25, 2011• Ion source control system operational for continuous wave• System configuration for ITS in RMS (VAcc, WS)• Ion source configuration in RMS• Tier 2 automatically configured for operation

• WinCC OA, VAA, MAPS

• Faraday cup readout and data sent via MAPS displayed• Data may be emulated if no FCN available

PR-111001-a-JGU, October 3rd, 2011

J. Gutleber9

M3 – Column Operation

• December 12-16, 2011• CERN team operates entire column autonomously• Components:

• RMS and tools (importers, exporters, viewer)• Cycle generator provides timing sequences and waveforms• WinCC OA and associated scripts and panels• Final MTS with generator and receiver on PXI target system• Final PCC on PXI target system, FlexRIO, FED• VAA with all logic completed• ProShell performs the run

PR-111001-a-JGU, October 3rd, 2011

J. Gutleber10

M4 – Control System Functional

• January 16-20, 2012• The following developments are concluded:

• MTS, PCC, FlexRIO (ordered), FED (ordered), baseboard (ordered)• Ion Source FEC tested at CERN, iLLRF FEC tested at CERN

• The following components are in routine operation:• RMS with initial data and all magnets+PCOs filled (not all data)• RMS importer/exporter, RMS viewing tools• Cycle generator (MAD-X integrated for tuning, standalone operation)• ProShell (spectrum measurement tested)

PR-111001-a-JGU, October 3rd, 2011

J. Gutleber11

Next Project Milestones

• October 2011• Control system setup ready for source tests November 14-25

• December 2011• Entire PCC chain functioning for autonomous operation December 12

PR-111001-a-JGU, October 3rd, 2011

J. Gutleber12

Injector Test Stand

PR-111001-a-JGU, October 3rd, 2011

J. Gutleber13

PR-111001-a-JGU, October 3rd, 2011

DEVELOPMENTPROGRESS

J. Gutleber14

Current Phase (End Of Elaboration)

PR-111001-a-JGU, October 3rd, 2011

• Focus on implementation, system setup and CM (releases)• Core functionality available in 3 months• Elaborate deployment scenarios (computers, cables, IT)

Inception Elaboration Construction Transition Production Retirement

I1 In I1 In I1 In I1 In I1 In I1 In

Business Modeling

Requirements

Analyses & Design

Implementation

Test

Deployment

Configuration Management

Project Management

Environment

Operations & Support

Phases

Iterations

Disciplines

J. Gutleber15

Project Organisation

PR-111001-a-JGU, October 3rd, 2011

Source(s)

Linac

Radio-

Frequenc

y Beam

D

iagnostics V

acuum

Pow

er

Controls/

IT Magnets

Special

Magnets

Radiation

Protectio

n IntegrationO

ptics/D

ynamic

s

W. RupprechtT. HauserF. LuizD. GabrieleP. LandrotS. MarinicsS. PelletierS. BaillyJ. HeimannG. Magrin

A. BeuretI. De CesarisP. FrabouletM. Veenstra

M. JimenezG. HullaJ. Wallner

F. OsmicA. GyorgyS. SchwarzA. KerschbaumM. RepovzS. EngelhardtJ. Bosser

W. PirklE. SargsyanH. GrillB. Lutzer (10/11)

N. Chatzigeorgiou (9/11)

L. Penescu

Accelerator ManagementM. Benedikt, A. WrulichInjector Coordination

W. PirklSynchrotron/HEBT Coordination

U. DordaIBTS Coordination

R. Mayer, S. Vatnitsky, A. WrulichProject Planning and Tracking

A. Fabich

W. PirklG. KotzianJ. S.-Quesada

Administrative Support J. Schueler

work packages

ConsultantEBG employeeStudentWork package leaderJunior partner

J. GutleberR. MoserM. MarchhartA. BrettC. T. De MatosM. ThonkeM. HagerH. PavetitsJ. JunuzovicS. Kent (IT)

H. VinckeFeldbaumerJaegerhofer

Interception D

evices

O. AberleK.

Asvestas

D. Grenier

T. ZicklerM. StocknerC. SiedlerA. Beaumont P. Schwarz (8/11)

B. LangenbeckT. Tortschanoff

Purchasing OfficerS. Mitchell

Risk Management

Technical Safety Officer

Jan BorburghT. KramerT. StadlbauerF. Mueller (???)

O. NairzP. Trnkova

O. NairzM. SchokkerS. TrovatiM. Palm

S. VatnitskyO. NairzP. TrnkovaF. Coreth

A. KoschikU. DordaP. BryantH. SchönauerF. Moser

BD

S

PA

S

MS

S

Gantry

Ion Beam Therapy System

(IBTS)

J. Gutleber16

Cooperations With Organisations

PR-111001-a-JGU, October 3rd, 2011

• radArt department of Paracelsus Medical University• Collaboration in Medical Software Systems and provisioning of

Treatment Control System development

• collaboration be intensified in the future• Common developments in the area of control systems and

beam delivery system

Architecture Overview

PR-111001-a-JGU, October 3rd, 2011 J. Gutleber17

Navigator Operation Panels FrontPanel Procedure GUIs Status Displays Annunciator Panel

Audible Alarms SADS Visualization Video Panels Reports Authentication Devices

SCADA BIS Rule Base Device Specifications Supervisory Scripts Configuration Server

RMS Apps VAA

VAcc Status Display

Logging Server Report Engine Data Relay Service

RMS ProShell Procedures Web data provision Authentication Manager

SADS FECOS REDNet

iLLRF FEC Source FEC PCO FEC

Vacuum FECs

BDI FECs B-Train FEC

RF Cavity FEC

Temp./Flow Switches

BIS

Source FEDs Vacuum FEDs BID FEDs

Synchrotron RF

PCO FED BDI FEDs

B-train probes

Spec. Mag. FEC

Spec. Mag. Pos. FED Spec. Mag. Cool. FED

Technical Network

Technical NetworkSlow Control

Technical NetworkFast Control

Fieldbus Links

Tier

1Ti

er 2

Tier

3Ti

er 4

Injector LLRF

Stripper Foil FEC Beam Stopper FEC

FEC Configurator

iAmplifier FECs

RMS Importer/Exporter

Injector Amplifiers

PCS/XCS

Stripper Foil FED PCS/XCS Sensors

PCS/XCS Consoles BIS Console

Cycle Conf. Generator

Plan until Q4 2011

PR-111001-a-JGU, October 3rd, 2011 J. Gutleber18

Navigator Operation Panels FrontPanel Procedure GUIs Status Displays Annunciator Panel

Audible Alarms SADS Visualization Video Panels Reports Authentication Devices

SCADA BIS Rule Base Device Specifications Supervisory Scripts Configuration Server

RMS Apps VAA

VAcc Status Display

Logging Server Report Engine Data Relay Service

RMS ProShell Procedures Web data provision Authentication Manager

SADS FECOS REDNet

iLLRF FEC Source FEC PCO FEC

Vacuum FECs

BDI FECs B-Train FEC

RF Cavity FEC

Temp./Flow Switches

BIS

Source FEDs Vacuum FEDs BID FEDs

Synchrotron RF

PCO FED BDI FEDs

B-train probes

Spec. Mag. FEC

Spec. Mag. Pos. FED Spec. Mag. Cool. FED

Technical Network

Technical NetworkSlow Control

Technical NetworkFast Control

Fieldbus Links

Tier

1Ti

er 2

Tier

3Ti

er 4

Injector LLRF

Stripper Foil FEC Beam Stopper FEC

FEC Configurator

iAmplifier FECs

RMS Importer/Exporter

Injector Amplifiers

PCS/XCS

Stripper Foil FED PCS/XCS Sensors

PCS/XCS Consoles BIS Console

Cycle Conf. Generator

Status June 2011

PR-111001-a-JGU, October 3rd, 2011 J. Gutleber19

Navigator Operation Panels FrontPanel Procedure GUIs Status Displays Annunciator Panel

Audible Alarms SADS Visualization Video Panels Reports Authentication Devices

SCADA BIS Rule Base Device Specifications Supervisory Scripts Configuration Server

RMS Apps VAA

VAcc Status Display

Logging Server Report Engine Data Relay Service

RMS ProShell Procedures Web data provision Authentication Manager

SADS FECOS REDNet

iLLRF FEC Source FEC PCO FEC

Vacuum FECs

BDI FECs B-Train FEC

RF Cavity FEC

Temp./Flow Switches

BIS

Source FEDs Vacuum FEDs BID FEDs

Synchrotron RF

PCO FED BDI FEDs

B-train probes

Spec. Mag. FEC

Spec. Mag. Pos. FED Spec. Mag. Cool. FED

Technical Network

Technical NetworkSlow Control

Technical NetworkFast Control

Fieldbus Links

Tier

1Ti

er 2

Tier

3Ti

er 4

Injector LLRF

Stripper Foil FEC Beam Stopper FEC

FEC Configurator

iAmplifier FECs

RMS Importer/Exporter

Injector Amplifiers

PCS/XCS

Stripper Foil FED PCS/XCS Sensors

PCS/XCS Consoles BIS Console

Cycle Conf. Generator

Current Status

PR-111001-a-JGU, October 3rd, 2011 J. Gutleber20

Navigator Operation Panels FrontPanel Procedure GUIs Status Displays Annunciator Panel

Audible Alarms SADS Visualization Video Panels Reports Authentication Devices

SCADA BIS Rule Base Device Specifications Supervisory Scripts Configuration Server

RMS Apps VAA

VAcc Status Display

Logging Server Report Engine Data Relay Service

ProShell Procedures Web data provision Authentication Manager

SADS FECOS REDNet

iLLRF FEC Source FEC PCO FEC

Vacuum FECs

BDI FECs B-Train FEC

RF Cavity FEC

Temp./Flow Switches

BIS

Source FEDs Vacuum FEDs BID FEDs

Synchrotron RF

PCO FED BDI FEDs

B-train probes

Spec. Mag. FEC

Spec. Mag. Pos. FED Spec. Mag. Cool. FED

Technical Network

Technical NetworkSlow Control

Technical NetworkFast Control

Fieldbus Links

Tier

1Ti

er 2

Tier

3Ti

er 4

Injector LLRF

Stripper Foil FEC Beam Stopper FEC

FEC Configurator

iAmplifier FECs

RMS Importer/Exporter

Injector Amplifiers

PCS/XCS

Stripper Foil FED PCS/XCS Sensors

PCS/XCS Consoles BIS Console

Cycle Conf. Generator

RMS

Source Display

J. Gutleber21

Integration Weeks (iWeek)

• Validate components and concepts continuously!• Learn using our system!• Identify gaps!• Run the system!

PR-111001-a-JGU, October 3rd, 2011

Test PilotBig Success!

To be continued…

J. Gutleber22

Organization of iWeeks

• One week at distance of about five weeks• Step-by-step integrate all available components• Operate vertical column (tier 1 to tier 3)

• Planning and Execution• Plan prepared and communicated to entire team• Integration carried out by core team at CERN• Results are documented in a record and communicated • Results must be be taken into consideration for developments

PR-111001-a-JGU, October 3rd, 2011

J. Gutleber23

iWeek Schedule 2011

PR-111001-a-JGU, October 3rd, 2011 PR-110328-a-JGU, March 28th, 2011 J. Gutleber23

ICA

LEP

CS

20

11 (

Gre

nobl

e)

SO Ostersonntag

BIS Workshop

BIS Workshop

BIS Workshop

SA

SO

MO

MI

FR

SA

SO

DI

MO

MI

DO

FR

SA

SO

DI

MO

MI

DO

FR

SA

SO

MO

DI

MI

DO

FR

SA

SO

DI

MO

DO

FR

SA

SO

MO

MI

DO

FR

SA

SO

MO

DI

DO

FR

SA

SO

DI

MO

DO

FR

SA

DI

MO

MI

DO

FR

SA

DI

MI

DO

FR

SA

DI

MI

DO

FR

SA

DI

MI

DO

FR

SA

DI

MO

MI

DO

FR

DI

MO

MI

DO

FR

SA

DI

MI

FR

SA

SO

DI

MO

MI

FR

MI

FR

SA

SO

DI

MO

MI

FR

SA

DI

MI

DO

SA

SO

MO

SA DI

MI

FR

SA

SO

DI

MO

MI

DO

FR

SA

SO

DI

MO

MI

DO

FR

SA

SO

DI

MO

MI

DO

DI

MO

MI

SA

MI

DO

FR

SO

DI

MI

DO

FR

SA

DO

FR

SA

SO

DI

MO

MI

DO

FR

SA

SO

DI

MO

MI

DO

FR

SO

MO

SO

DI

MI

DOFR

SA

MO

DI

DO

FR

SA

SO

DI

MO

MI

DO

FR

SA

SO

DI

MO

MI

DO

FR

MO

MI

DO

FR

SA

SO

DI

MO

MI

DO

FR

SA

SO

DI

MO

MI

FR

SA

SA

SO

MO

MI

FR

SA

SO

DI

MO

FR

SO

MI

MI

SA

DOSA

SO

MO

DI

SO

DO

FR

DI

SA

SO

SA

DI SO MI

FR MI

MO

DO

SO

MO

DI FR MI MO DO DI

DI

FR SA DO

DI

FR SA DO

SO

DO

MOSO

MO

SO

MO

SO

MI

MI

MI

SA

DO

FR

DO

FR

SA SA

DI

SO

MO

DI

MI

DO

FR

SA

SO

MO

SA DI

DI

MI

DO

DO

FR

SA

SO

FR

SO

MO

DI

MI

FR

SA

FR

SO

MI

DOSA

MO

DO

MO

DI

MO

DIDO

FR

DI

MI

DO

SO

MO

MI

DO DI

SA

SO

DI

MI MO

SO

MO

SA

MI

DO

DO

FR

DI

MI FR

SA

MO

MI Nationalfeiertag

DI

DO Mariä Empfängnis

SA

MO Mariä Himmelfahrt

DI

DO Hl. 3 Könige

FR

SO Staatsfeiertag

SO

DI Allerheiligen

SA

MO Stefanitag

FR

SO Christtag

MI

MI Aschermittwoch

SO

BIS Workshop

MO

MO Ostermontag

SO

SO Palmsonntag

DO

DO Christi Hf.

DO

DO Fronleichnam

MO

MO Pfingstmontag

SO

SO Pfingstsonntag

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

26

27

28

29

30

31

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

25

24

Jänner Februar März April Mai Juni Juli November DezemberOktoberSeptemberAugust

IPA

C 2

011

(S

. Seb

ast

ian

,Spa

in)

PT

CO

G5

0 (

Ph

ilad

elp

hia

, U

S)

IEE

E/N

SS

(V

ale

ncia

, Spa

in)

23

2

13

4

5

6

7You are here!

J. Gutleber24

Column

PR-111001-a-JGU, October 3rd, 2011

RepositoryManagement

SoftwareRMS Exporter

XML DeviceDescription

Oracle

PCC

PVSS

MTG Panel

OpticalRT Link

MAPS

VAA

FECOS

MTG

EVG

Tier-1

Tier-2

Tier-3

Tier-4

RMS Importer

VAA PanelPCC

ScratchPadFront Panel

SystemManagement

Panel

ProShell

ConfigurationWeb Server

FED Family APCO

FECOS

PCC

OpticalRT Link

FEDCRB

FECOS

J. Gutleber25

DETAILEDSTATUS

PR-111001-a-JGU, October 3rd, 2011

J. Gutleber26

Operations Concepts

• Ion Source FEC • Design settled, implementation close to completion• Hickups in alignment between CSLab & Pantechnik

• Initiated specifications on how to operate individual devices• UDO compiles use-cases – where are we after June MACS week?

• Cycle Configuration Generator• MHA elaborated design, started implementation• RMS extended accordingly• Software is advancing at a good pace• Timing sequences and dipole waveforms already working

PR-111001-a-JGU, October 3rd, 2011

J. Gutleber27

Status of Work with Other WPs

PR-111001-a-JGU, October 3rd, 2011

WP/Subsystem Requirements Design Implementation Integration

Power

Spec. Mag. (BTS)

Vacuum

Injector RF

Synchrotron RF

BDI

BID

Magnets

Sources

MSS

IBTS (TCS,BDS)

Building

IT

CRB Protocol

Trigger, EFE,

Positioning

LLRF AdaptationSchedule

Integrate PT Soft

Requirements Requirements

J. Gutleber28

What We Have Today

PR-111001-a-JGU, October 3rd, 2011

• Completed and frozen frozen design• MTS real-time event distribution• PCC real-time links, custom hardware, Fam. A PCO, EMC Tests• FECOS core and documentation (RT programming framework)• PVSS/C# integrated, additional tools (STEP viewer, libs) done• Virtual Accelerator Allocator• GUIs (FrontPanel, ScratchPad, VAcc/WSE, source)• PVSS script libraries for state-driven devices• ProShell architecture and code skeleton• RMS adapted (missing bug fixes, small functional corrections)• RMS importers/exporters for PVSS, OPC, FECOS, PCC

J. Gutleber29

Planning 2011

• Cosylab• CWO-4 opted, running until February 2012 – goal is complete column• Acceptance of CWO-3 was delayed by about 2 months

• Schedule agreements with WPs for 2011 • SRC, VAC, PO, INJ/RF done• Building infrastructure – final design started now• IT tendering stage 1 concluded – negotiation ongoing• Cabling, racks implemented and data entry started• SADS requirements under review• Synchrotron RF requirements finding started• PCS requirements and design started• Run File description ongoing – radArt cooperation for MSS/TCS• Beam stopper interface first iteration performed

PR-111001-a-JGU, October 3rd, 2011

J. Gutleber30

SUMMARY

PR-111001-a-JGU, October 3rd, 2011

J. Gutleber31

Conclusions

• Development slowed down since last MACS week• Continuous integration ongoing (iWeeks)• Good progress made in completing requirements

• Sources, injector RF, SADS

• ITS software baseline released• System to be delivered in the coming days

• NEXT STEP – FULLY FUNCTIONAL COLUMN • 12/2011-01/2012• MTS, PCC, RMS, GUIs, ProShell, VAA