of 121 /121
SAP Consultant Certification Solution Consultant mySAP Supply Chain Management – Planning Page 1 of 121 2006/Q4 © 2003 SAP® AG. All rights reserved. SAP Consultant Certification Solution Consultant mySAP Supply Chain Management – Planning (SCM 4.0) !"#$!""#$%!""" &##’ &(&! &)&#* &)&!+!%*#, -(!&)&!!* ,!($ -(!&.* ( /* )’,,(0# &)1 ,! * &!’,,(00# !)2 33 &4, 3! 3!!!# 5!&(-!# !# !3!23# * &!’,,(0# 5(’ 5(’ . 5’ ,! 6)1) %* 34!!23!00# 1 1’! 7), 8* 39-!00# ’,,(9-! ! 9- 4!!9-

PP(SCM) Consultant Certification Question Bank

Embed Size (px)

Text of PP(SCM) Consultant Certification Question Bank

SAP Consultant Certification Solution Consultant mySAP Supply Chain Management Planning Page 1 of 121 2006/Q4 2003 SAP AG. All rights reserved. SAP Consultant Certification Solution Consultant mySAP Supply Chain Management Planning (SCM 4.0) Certification duration: 3 hours Number of certification questions: 80 Required certificates for participation in this certification test: None Courses for certification preparation: TSCN20 (Planning !), TSCN22 (Planning !!), TSCN2+ (Planning !!! (Case Study)) OR Please note that you are not allowed to use any reference materials during the certification test (no access to online documentation or to any SAP system). The certification test Solution Consultant mySAP Supply Chain Nanagement - Planning (SCN +.0) verifies the knowledge in the area of the mySAP Supply Chain Nanagement for the consultant profile Planning. This certificate proves that the candidate has a basic understanding within this consultant profile, and can implement this knowledge practically in projects. The certification test consists of questions from the areas specified below: Topic Areas 1. SAP Overview (+) mySAP Business Suite Navigation 2. Supply Chain Planning Overview (++) Planning processes in SAP Rf3 Naster Data and Transaction Data Capacity Evaluations Demand Planning Demand Nanagement (planning strategies) Cross-Plant Planning (Supply Network Planning) Naterial Requirements Planning (NRP) Production Planning and Detailed Scheduling (PPfDS) 3. Supply Chain Nanufacturing Overview (+) Order-Controlled Production with Production Orders Order-Controlled Production with Process Orders Project-Orientated Production Repetitive Nanufacturing KANBAN +. Naster Data: EngineeringfDesign (++) Naterial Naster Bill of Naterials BON reporting functions variants and Alternatives 5. Naster Data: Work Scheduling (++) Overview Work Scheduling Routings Work Center Engineering Workbench SAP Consultant Certification Solution Consultant mySAP Supply Chain Management Planning Page 2 of 121 2006/Q4 2003 SAP AG. All rights reserved. Scheduling 6. Naster Data !ntegration (SAP Rf3-SAP APO) (++) Naster Data !ntegration Architecture of !ntegration Transfer of Naster Data SAP APO Naster Data 7. Production Planning Part 1 (++) Demand Nanagement NRP Basics NRP Evaluations 8. Production Planning (SAP Rf3) (++) Consumption-based planning Demand Nanagement Strategies for make-to-stock production Strategies for make-to-order production Processing of material requirements planning Naster Production Scheduling Long Term Planning Technical Details of the Planning Run NRP reporting NRP Areas 9. Production Planning (SAP APO PPfDS) (++) Naster Data for PPfDS Planned !ndependent Requirements and sales orders in APO PPfDS Production Planning Run Planning of quantity and capacity requirements Planning heuristics Planning strategies Special functions of production planning Planning result and integration with SAP Rf3 Evaluation of the planning results Product view Alert Nonitor 10. !ntegration Transaction Data (SAP Rf3-SAP APO) (+) Transfer of Transaction Data NonitoringfError Handling 11. Solution Nanager (+) Solution Nanager - Overview 12. Experiences from !mplementations (Case Study or Project)* (+) Setting up company structures (organizational units in mySAP Business Suite) !ntegration and Dependencies SAP Consultant Certification Solution Consultant mySAP Supply Chain Management Planning Page 3 of 121 2006/Q4 2003 SAP AG. All rights reserved. * = !n topic area 12, you will be tested on cross-topic implementation and integration issues. !mplementation and integration knowledge that refers to a specific area (such as production orders) will be tested in the relevant topic (such as Production Planning). Amount of questions by topic (as percentage of test): + = 1 - 10 ++ = 11 - 20 +++ = over 20 No responsibility is taken for the correctness of this information. Copyright SAP AG 200+. SAP Consultant Certification Solution Consultant mySAP Supply Chain Management Planning Page 4 of 121 2006/Q4 2003 SAP AG. All rights reserved. They contain important basic data for numerous areas of a company, for As Follow:: A. MRP B. Material provisions for production C. Product costing D. Plant maintenance E. None of above Correct Answers (A, B, C, D) You can create the following BOMs in the SAP system: A. Material BOMs B. Equipment BOMs C. Functional location BOMs D. Document structures E. Order BOM F. Work breakdown structure (WBS) BOM G. None of above Correct Answers (A, B, C, D) The data stored in bills of material is also used in other activities in a company such as: A. Sales orders B. Reservation and goods issue C. As an aid to data entry D. Product costing E. None of above Correct Answers (A, B, C, D) The following authorization objects are defined for maintaining BOMs: A. General Authorization Object for Processing BOMs B. Authorization Object for BOM Plant C. Authorization to Process BOM without Change Number D. Authorization Object for Mass Changes E. Authorization Object for Variable Lists Correct Answers (A, B, C, D) SAP Consultant Certification Solution Consultant mySAP Supply Chain Management Planning Page 5 of 121 2006/Q4 2003 SAP AG. All rights reserved. This authorization object lets you restrict maintenance of the following objects in variable lists: A. List name B. Profile C. Maximum block D. Display block E. Only Option A &B Correct Answers (A, B, C, D) Variant BOMs are supported for the following BOM categories: A. Material BOMs B. Document structures C. Equipment BOMs D. Functional location BOMs Correct Answers (A, B, C, D) BOM data is structured as follows in the R/3 System: A. The BOM header contains data that applies to the entire BOM. B. The BOM item contains data that only applies to a specific component of the BOM. C. Sub-items contain data on the different installation points for partial quantities of an item. Correct Answers (A, B, C) In the BOM header, you maintain data that refers to the entire object: A. For a multiple BOM, this means one of the alternative BOMs for an object B. For a variant BOM, this means one of the variants C. None of above Correct Answers (A, B) SAP Consultant Certification Solution Consultant mySAP Supply Chain Management Planning Page 6 of 121 2006/Q4 2003 SAP AG. All rights reserved. On this screen, the system displays the data that identifies the BOM. Select true following validity data: A. Date BOM was created B. Name of user who created the BOM. C. Date BOM was last changed D. Name of user who last changed the BOM Correct Answers (A, B, C, D) You can assign a document to a BOM header or item. On the header detail screen and the item detail screen of each item there is a tab page with a list of the assigned documents. In this list, you can: A. Assign documents B. Delete document assignments C. Look for documents D. Sort the list in ascending or descending order E. Go to document info records F. Display and print out original documents G. Add notes Correct Answers (A, B, C, D, G) The following data is relevant to document items. A. Document Number B. Document type C. Document part D. Version Correct Answers (A, B, C, D) In R/3 the deletion indicator ensures that a document is deleted in the following processing situations: A. Using the report MCDOKDEL B. After the archiving session C. None of above Correct Answers (A, B) SAP Consultant Certification Solution Consultant mySAP Supply Chain Management Planning Page 7 of 121 2006/Q4 2003 SAP AG. All rights reserved. These checks take place in the following processing situations: A. Create document (CV01N) B. Change document (CV02N) C. Display document (CV03N) D. All of above Correct Answers (D) The following attributes can be checked: A. Document Number B. Document version C. Document part Correct Answers (A, B, C) Interface for an enhancement you can use to check enterprise-specific requirements you made in processes. These processes can be integrated into the following functions: A. Find document B. Web scenarios C. All of above Correct Answers (C) This section gives you additional background information about Data Archiving: A. Reasons for Archiving Data B. Archiving Requirements C. Important Terms Correct Answers (A, B, C) This section defines some basic Data Archiving terms: A. Optical Archiving B. Reorganization C. Residence and Retention Periods D. Backup/Restore Correct Answers (A, B, C, D) SAP Consultant Certification Solution Consultant mySAP Supply Chain Management Planning Page 8 of 121 2006/Q4 2003 SAP AG. All rights reserved. SAP Data Archiving has the following key features: A. Data Security During Archiving B. Connection to an External Archive C. Data Compression D. Archiving Without Database Backup E. Access to Archived Data F. Automatic Conversion of Old Archive Files Correct Answers (A, B,D,F) The archiving object for FI documents, FI_DOCUMNT, includes the following data, which is stored in various database tables: A. Document header B. Document segment accounting C. Document segment control data D. Posting procedures that depend on company codes E. Document segment variable data F. Document segment change data G. Change documents Correct Answers (A, B, C,E,G) Archive selection is relevant for the following actions: A. Delete B. Read C. Build index D. Reload E. Post processing Correct Answers (A, B, C, E) All parameters can be set using the Customizing function. You can set the following parameters: A. Logical File Name B. Archive File Size C. Delete Program Settings D. File System to Storage System Correct Answers (A, B, C, D) Before you can use the Archive Explorer functions you must: SAP Consultant Certification Solution Consultant mySAP Supply Chain Management Planning Page 9 of 121 2006/Q4 2003 SAP AG. All rights reserved. A. Create a suitable archive information structure B. Activate the information structure C. Fill the information structure Correct Answers (A, B, C) BOMs are archived by the archiving object CS_BOM and deleted. The BOMs can be identified by the following data: A. BOM category (for As Follow :, material BOM) B. Use (for As Follow :, production) C. Plant (such as 0001) D. BOM number E. Alternative BOM Correct Answers (A, B, C, D) The following BOMs make up a BOM group: A. Alternatives of a multiple BOM B. Variants of a variant BOM C. None of above Correct Answers (A, B) The program runtime depends on the following factors: A. Selection criteria B. Number of records to be archived C. System load D. System performance Correct Answers (A, B, C, D) The archiving object Archiving Process Orders contains the following information: A. Operations B. Material components C. Production resources/tools D. Inspection characteristics and their values E. Trigger points F. Confirmations G. Goods movements with errors H. Texts Correct Answers (A, B, D, E, G) SAP Consultant Certification Solution Consultant mySAP Supply Chain Management Planning Page 10 of 121 2006/Q4 2003 SAP AG. All rights reserved. You can select process orders for archiving using the following criteria: A. Order number B. Order type C. Plant D. MRP controller E. Production scheduler F. Selection profile G. Days in excess of delivery date Correct Answers (A, B, C, D) Archiving object PI_PLAN for archiving master recipes contains the following data for a master recipe: A. Material-recipe assignment B. Operations and phases C. Relationships D. Material components and material quantity calculation E. Production resources/tools Correct Answers (B, C, D) Archiving object PI_PLAN for archiving master recipes contains the following data for a master recipe Purchasing data : A. Classification data B. Inspection characteristics and characteristic values C. Process instructions and process instruction characteristics D. Texts Correct Answers (A, C, D) The standard log contains the following information for each archiving run or archive file: A. Number of archived data objects B. Tables concerned C. Number of table records processed Correct Answers (A, B, C) SAP Consultant Certification Solution Consultant mySAP Supply Chain Management Planning Page 11 of 121 2006/Q4 2003 SAP AG. All rights reserved. If you want to archive a master recipe, you must no longer use it in the following objects: A. Material master records with production versions B. Run schedule headers C. Inspection lots Correct Answers (A, B, C) You can select the production orders to be archived according to the following criteria: A. Order number B. Order type C. Plant D. MRP controller E. Production scheduler Correct Answers (A, B, C, D) You can use the following criteria to select the production orders that are to be archived: A. Order number B. Order type C. Plant D. Material number E. MRP controller F. Production scheduler Correct Answers (A, B,D,E,F) You can select followings routings for several materials within one plant. A. Task list type, group, and group counter B. Status C. Usage D. Group E. Last time task list was called F. Deletion flag Correct Answers (B, C,E,F) SAP Consultant Certification Solution Consultant mySAP Supply Chain Management Planning Page 12 of 121 2006/Q4 2003 SAP AG. All rights reserved. The standard log contains the following information for each archiving run or archive file: A. Number of archived data objects B. Tables concerned C. Number of table records processed Correct Answers (A, B, C) If you want to archive a routing you cannot use it in the following objects: A. Material master records with production versions B. Run schedule headers C. Inspection lots Correct Answers (A, B, C) Work centers that are not used in certain objects, which physically exist in the database, can be deleted. These objects are: A. work center hierarchy B. operation in a task list C. task list header D. operation in an order E. order confirmations Correct Answers (A, B, C, D) The standard R/3 System contains the following item categories: A. Item Categories for Material Items B. Document Items C. Class Items D. Text Items Correct Answers (A, B, C, D) You can use the following item categories for material items: A. Stock Items B. Non-Stock Items C. Variable-Size Items D. PM Structure Elements E. Intra Materials Correct Answers (A, B, C, D) SAP Consultant Certification Solution Consultant mySAP Supply Chain Management Planning Page 13 of 121 2006/Q4 2003 SAP AG. All rights reserved. In the standard R/3 System, material type INTR is defined for intra materials. The views you maintain for this material type include: A. Basic data B. Classification C. Quality management Correct Answers (A, B, C) The basic data is divided into the following datasets: A. Identifying BOM Items B. Classification Data C. Quantity Data D. Scrap Data E. General Data F. MRP Data Correct Answers (C, D,E) The following data is maintained under general data: A. Co-product B. Recursiveness Check C. Alternative Items in an Alternative Item Group D. Discontinuation Data E. CAD indicator Correct Answers (A, B, C, D) Before you maintain alternative items, decide the following points for MRP and withdrawal postings: A. Do you want to assign the same item number to all alternative items in an alternative item group? B. Which character string do you want to use to group alternative items together in an alternative item group? C. What is the usage probability for the individual alternative items in the assembly? D. What are the priorities of items in an alternative item group? E. Which strategy do you want to use for withdrawal postings? Correct Answers (B, C, D) SAP Consultant Certification Solution Consultant mySAP Supply Chain Management Planning Page 14 of 121 2006/Q4 2003 SAP AG. All rights reserved. You display and enter the data for discontinuation in a dialog box. A. Discontinuation indicator B. Discontinuation groups C. Follow-up groups Correct Answers (A, B, C) You can maintain the following material requirements planning (MRP) data for a BOM item: A. Entering a Lead-Time Offset B. Distribution Key C. Special Procurement Key D. Explosion Types Correct Answers (A, B,D) The following application areas read the lead-time offset for an operation: A. Maintenance orders B. Networks C. Production orders Correct Answers (A, B, C) You can assign a document to a BOM header or item. On the header detail screen and the item detail screen of each item there is a tab page with a list of the assigned documents. In this list, you can: A. Assign documents B. Delete document assignments C. Look for documents D. Sort the list in ascending or descending order E. Go to document info records F. Display and print out original documents G. Add notes Correct Answers (A,C, D,G) Creating New Items, you can perform the following functions: A. Entering Material Items B. Entering Document Items C. Entering Class Items D. Entering Text Items Correct Answers (A, B, C, D) SAP Consultant Certification Solution Consultant mySAP Supply Chain Management Planning Page 15 of 121 2006/Q4 2003 SAP AG. All rights reserved. When you create a BOM, you can also use the following functions: A. Allocating a Component to an Operation B. Classifying an Item C. Maintaining Header Data D. Defining the Technical Type Correct Answers (A, B, C, D) You can classify any material item that has a material master. In the standard R/3 System, the following material items have a material master record: A. Stock item B. Non-stock item with a material master C. Variable-size item D. PM structure element E. Intra material Correct Answers (A, B, C, D) To display the BOM with all the data you require, you need to establish the following: A. Do you want to display a specific alternative of a multiple BOM or a specific variant of a variant BOM, or the entire BOM group? B. Which validity period do you want to use for displaying the BOM? C. Which required quantity to you wants the component quantities to refer to? Correct Answers (A, B, C) On the initial screen, you can use the following four fields to define the validity period: A. Change number B. Valid-to date C. Valid-from date D. Revision level Correct Answers (A, B, C, D) You can display the material master record of a material component from all item overviews: A. Material item overview B. Document item overview C. Class item overview SAP Consultant Certification Solution Consultant mySAP Supply Chain Management Planning Page 16 of 121 2006/Q4 2003 SAP AG. All rights reserved. D. General item overview Correct Answers (A, B, C, D) The following display functions for bills of material are also available: A. Displaying Discontinuation Data B. Displaying Allocations to Operations C. Displaying Classification Data D. Displaying Revision Levels Correct Answers (A, B, C, D) Before you change a BOM, you should consider the following questions: A. Does the change need to be documented for future reference? B. Is there a history requirement for the BOM? C. Do you need to create a change master record? D. Is the valid-from date of the change number in a protected time period? E. Which change number do you want to use for the change? Correct Answers (A, B, C, D) You cannot change the following data on the item overviews for materials, documents, and classes: A. Validity data for an item B. Item category C. Component description Correct Answers (B, C) You can go to the BOM header from various screens: A. Initial screen B. Item overviews C. Item detail Correct Answers (A, B, C) The standard system does not support allocation to operations for the following item categories: A. Class item B. Document item C. Text item D. PM structure element Correct Answers (A, B, C, D) SAP Consultant Certification Solution Consultant mySAP Supply Chain Management Planning Page 17 of 121 2006/Q4 2003 SAP AG. All rights reserved. There are two ways of deleting BOMs: A. Using the Delete function. B. Using the Deletion indicator. Correct Answers (A, B) You can use a mass change to perform the following functions: A. Change B. Deleting items C. Creating items Correct Answers (A, B, C) Lists produced by BOM reporting functions are displayed according to list profiles. These list profiles are used for: A. Screen display B. Printouts Correct Answers (A, B) You can redefine each line of the list, for As Follow:: A. Create a new list header B. Define the position and size of frames Correct Answers (A, B) To create a new list profile, perform the following activities: A. Creating a New List Profile B. Displaying the Standard Profile (Display Blocks) C. Creating Display Blocks for the New Profile D. Processing New Display Blocks E. Checking a New Profile Correct Answers (A, C, D,E) A BOM explosion answers the question: What is the product made of? This question arises in various situations, such as when you want to: A. Determine material requirements for a product B. Look at the overall structure of a product in a design department C. As Follow : an overview of the parts and materials required D. Calculate the effects of changes to costs SAP Consultant Certification Solution Consultant mySAP Supply Chain Management Planning Page 18 of 121 2006/Q4 2003 SAP AG. All rights reserved. Correct Answers (A, B, C, D) The BOM explosion is available to you for the following BOM types: A. Material BOMs B. Order BOMs C. None of above D. Only option A Correct Answers (A, B) The application is the key to the following criteria for the search process: A. Priority of BOM usage B. Priority of a specific alternative in a multiple BOM C. Production versions from the material master record D. Checks for specific status indicators for different application areas Correct Answers ( B, C, D) Production versions allow you to define the following criteria for selecting an alternative BOM: A. Alternative BOM B. BOM usage C. No Correct Answers (A, B) You can enter values for effectively parameters in the following reporting functions: A. BOM explosion level by level B. Displaying a Multi-Level BOM Explosion C. Summarized BOM D. BOM Comparison Correct Answers (A, B, C, D) You can use the following indicators to influence the BOM explosion: A. Alternative priority B. Scrap C. Sort D. None of above Correct Answers (A, B, C) SAP Consultant Certification Solution Consultant mySAP Supply Chain Management Planning Page 19 of 121 2006/Q4 2003 SAP AG. All rights reserved. This reporting function is available to you for the following BOM types: A. Material BOMs B. Order BOMs C. Work breakdown structure BOMs D. None of above Correct Answers (A, B, C) In certain situations, the following checks can stop an assembly from being exploded: A. Recursiveness check B. Authorization check C. All of above Correct Answers (C) In the general item data of the BOM component that causes recursiveness, you can maintain the following indicators: A. BOM is recursive B. Recursiveness allowed C. None of above Correct Answers (A, B) You can produce a where-used list for the following objects: A. Material (multi-level) B. Document (single-level) C. Class (single-level) Correct Answers (A, B, C) You can maintain some of the selection criteria for a where-used list in the following datasets on the initial screen: A. Where-used lists, types B. Selection C. Use in Correct Answers (A, B, C) SAP Consultant Certification Solution Consultant mySAP Supply Chain Management Planning Page 20 of 121 2006/Q4 2003 SAP AG. All rights reserved. Where-used lists for materials and documents are supported for the following BOM categories: A. Equipment BOM B. Order BOM C. Material BOMs D. Work breakdown structure (WBS) BOM E. Standard BOM F. Functional location BOMs G. Document structure (not for materials) Correct Answers (A, B, D, E, G) You can compare two different BOMs with each other. This can be useful, if you have created more than one BOM for a specific material. You can use as following conditions: A. BOMs with different BOM usages B. BOMs with different change states or versions C. Different alternatives of a multiple BOM D. Only with Multiple BOM Correct Answers (A, B, C) You can compare the following BOM categories: A. Material BOM B. Document structure C. Equipment BOM D. Functional location BOM E. Order BOM F. Work breakdown structure (WBS) BOM G. Production order "BOM" Correct Answers (A,C, D,E,G) The following fields are displayed for both comparison types: A. Quantity B. Unit of measure C. Item category Correct Answers (A, B, C) SAP Consultant Certification Solution Consultant mySAP Supply Chain Management Planning Page 21 of 121 2006/Q4 2003 SAP AG. All rights reserved. Before you start the comparison, select the fields for comparison for the different object types: A. Relevant to all item categories B. Relevant to material items C. Relevant to document items D. Relevant to text items E. Relevant to intra materials Correct Answers (A, B, C, D) Change documents are created for the following BOM categories: A. Material BOM B. Document structure C. Equipment BOM D. Functional location BOM E. Standard BOM F. Order BOM Correct Answers (A, B, C,F ) BOM group can be: A. All variants of a variant BOM B. All alternatives of a multiple BOM C. None of above Correct Answers (A, B) Order BOMs are supported in the following components: A. SD - Sales B. LO Variant Configuration C. LO Engineering Change Management D. PP Routings E. PS Project System F. CO Costing G. PP Requirements planning H. PP Production orders Correct Answers (B, C, D,E,G) SAP Consultant Certification Solution Consultant mySAP Supply Chain Management Planning Page 22 of 121 2006/Q4 2003 SAP AG. All rights reserved. A detached order assembly has the same structure as a normal assembly; however, it has the following special features: A. It was created with reference to a sales order item. B. Its header material has not yet been inserted into the multi-level BOM for the sales order item. C. None of above Correct Answers (A, B) This means that a detached order assembly has: A. A reference to the sales order and to the sales order item B. No reference to the multi-level BOM of the material that you entered in the sales order item C. None of above Correct Answers (A, B) If you execute one of the following functions in the browser, the system creates a log: A. Material exchange B. Fix single-level C. Fix multi-level Correct Answers (A, B, C) Material exchange is necessary, is an assembly is used on more than one node and you A. Want to make order-specific changes to one of the nodes, but want to use the unchanged material BOM on the other nodes B. Want to make different changes to various nodes in the bill of material C. Transfer a BOM to Project System Correct Answers (A, B, C) The following restrictions apply to order BOMs: A. A result-oriented order BOM is non-configurable. Therefore, you cannot create class items in these bills of material either. B. You cant create alternative BOMs for an order BOM. C. You cant create variant BOMs for an order BOM. D. When you change an order BOM, you can work with change numbers, but not with revision levels. Correct Answers (A, C, D) SAP Consultant Certification Solution Consultant mySAP Supply Chain Management Planning Page 23 of 121 2006/Q4 2003 SAP AG. All rights reserved. The BOM Transfer screen, The following fields are already pre assigned and are not ready for input, Following fields are maintained. A. Sales document (sales order number) B. Sales document item (sales order item) C. Material D. Plant E. BOM Usage Correct Answers (A, B, C, D) You can display a multi-level BOM for a sales order item in the following ways: A. As a list sub-divided by assemblies B. As a hierarchically structured list C. As an overview of the quantities of all parts required to assemble a product Correct Answers (A, B, C) In sales order processing you basically use two costing functions : A. Sales order costing B. Order BOM cost estimate Correct Answers (A, B) You can create a cost estimate for the following sales document types: A. Inquiries B. Quotations C. Sales orders Correct Answers (A, B, C) To cost sales orders with the functions of product costing, you must define the following parameters in Customizing for Product Cost Controlling: A. Costing variant B. Costing type C. Valuation variant D. Transfer strategy E. Date control F. Quantity structure determination G. Cost components Correct Answers (B, C, D,E,G) SAP Consultant Certification Solution Consultant mySAP Supply Chain Management Planning Page 24 of 121 2006/Q4 2003 SAP AG. All rights reserved. To cost sales orders with unit costing, you must define the following parameters in Customizing for Product Cost by Sales Order: A. Costing variant B. Valuation variant Correct Answers (A, B) When a sales order cost estimate is created, this has the following effects: A. The conditions are updated in SD. B. The planned costs are updated to the sales order item. Correct Answers (A, B) In the cost estimate for the sales order item, you can: A. Use the lot size of the sales order as the basis for calculating the planned costs B. Determine the quantity structure for the product through the configuration in the sales order C. Include the costs of raw materials and trading goods procured externally when costing the sales order D. Calculate overhead rates based on contractual terms unique to the sales order Correct Answers (A, B, C, D) You can create a sales order cost estimate: A. Using a product cost estimate for the multilevel BOM for the sales order item B. With unit costing C. By creating a product cost estimate and modifying it with unit costing Correct Answers (A, B, C) You can define the following default values in Customizing for Product Cost by Sales Order under Control of Sales-Order-Related Production Check Requirements Classes: A. Costing method B. Costing variant C. Costing sheet Correct Answers (A, B, C) SAP Consultant Certification Solution Consultant mySAP Supply Chain Management Planning Page 25 of 121 2006/Q4 2003 SAP AG. All rights reserved. If the standard price was calculated in a product cost estimate for the sales order item, you should save an itemization if: A. You want to calculate variances B. You want to calculate work in process at target costs C. You want to valuate the scrap Correct Answers (A, B, C) You change recipient data, for As Follow :, the changes must also be made in the following tables: A. Table T_DRZA (document rcipient relation) B. Table T_REC (to display the change in the table control) C. Structure Correct Answers (A, B, C) The function module is called in the following function modules: A. CVV5_EVENT_START_DISTRIBUTION (start distribution initiated by an event) B. CVV5_EVENT_START_DIST_ECM (start distribution when change master record event is released) Correct Answers (A, B) In R/3 the deletion indicator ensures that a document is deleted in the following processing situations: A. using the report MCDOKDEL B. after the archiving session Correct Answers (A, B) These checks take place in the following processing situations: A. Create document (CV01N) B. Change document (CV02N) C. Display document (CV03N) Correct Answers (A, B, C) SAP Consultant Certification Solution Consultant mySAP Supply Chain Management Planning Page 26 of 121 2006/Q4 2003 SAP AG. All rights reserved. The following attributes can be checked: A. Document Number B. Document version C. Document part Correct Answers (A, B, C) If you execute one of the following functions in the browser, the system creates a log: A. Material exchange B. Fix single-level C. Fix multi-level Correct Answers (A, B, C) The BOMs are called up in a list on the individual tab pages. For this list, various functions are available such as: A. Sort B. Filter C. Print D. Export (such as into spreadsheet) Correct Answers (A, B, C, D) Operations are carried out at a work center. In the R/3 System work centers are business objects that can represent the following real work centers, for As Follow:: A. Machines, machine groups B. Production lines C. Assembly work centers D. Employees, groups of employees Correct Answers (A, B, C, D) The data is grouped thematically together in screens and screen groups. As Follow: s of such screen or screen groups are: A. Basic Data B. Assignments C. Capacities D. Scheduling Correct Answers (A, B, C, D) SAP Consultant Certification Solution Consultant mySAP Supply Chain Management Planning Page 27 of 121 2006/Q4 2003 SAP AG. All rights reserved. You can display the following administrative data about a work center: A. Object ID that the work center is stored under in the system B. When and by whom the work center was last changed C. Locked indicator or deletion indicator Correct Answers (A, B, C) You can display the following administrative data about a work center: A. Object ID that the work center is stored under in the system B. When and by whom the work center was last changed C. Locked indicator or deletion indicator Correct Answers (A, B, C) The system does not delete after archiving in the following cases: A. Work centers used in objects that have been logically deleted but are still in the database. B. Pooled capacities and reference capacities Correct Answers (A, B) Default values in work centers are for instance: A. Wage type and wage group B. Control key C. Standard text key D. Suitability Correct Answers (A, B, C, D) You can set a reference indicator for each default value in a work center and thus specify that the default value is referenced in the task list. This means that: A. The default value can only be changed in the work center and not in the task list. B. A change in the work center is automatically transferred to the task list, when the task list is called up. Correct Answers (A, B) SAP Consultant Certification Solution Consultant mySAP Supply Chain Management Planning Page 28 of 121 2006/Q4 2003 SAP AG. All rights reserved. The following data is entered in a capacity: A. the operating time B. the available capacity C. Formulas for calculating capacity requirements Correct Answers (A, B, C) Capacities can be entered and changed in work centers, but also independently. The system distinguishes between: A. Work center capacities B. Pooled capacities C. Reference capacities D. Default capacities Correct Answers (A, B, C, D) Capacities in work centers are distinguished by capacity categories Capacity categories are for As Follow: A. Machine capacity B. Personnel capacity C. Reserve capacity for rush orders D. Emissions E. Energy requirements Correct Answers (A, B, C, D) The available capacity of a shift is defined by the following data: A. Shift start, shift end, break times B. Capacity utilization rate C. Number of individual capacities Correct Answers (A, B, C) Capacity data is maintained on the following screens: A. Capacity overview (only for work center capacities) B. Header C. Interval of available capacity D. Available capacity profile Correct Answers (A, B, C, D) SAP Consultant Certification Solution Consultant mySAP Supply Chain Management Planning Page 29 of 121 2006/Q4 2003 SAP AG. All rights reserved. If you want to maintain an available capacity, you can transfer the following data from a reference capacity: A. the standard available capacity B. the active available capacity version Correct Answers (A, B) Following the cumulating period the cumulated available capacity of the last day of the cumulating period is valid. The period pattern key is used for: A. displaying available capacities graphically B. Cumulating of available capacities using work center hierarchies in work center maintenance Correct Answers (A, B) You can only assign LO work centers directly to either a HR organizational unit or a HR work center. If you link the LO work center to a HR work center, you can link the LO work center with the following HR objects: A. People B. Positions C. Qualifications D. Requirements profile Correct Answers (A, B, C, D) You can prescribe fixed validity periods for the following assignments to a work center: A. Cost centers B. People C. Positions D. Qualifications E. Requirements profile Correct Answers (A, B, C, D) Use the following data for your own reports: A. Logical database: CR B. Application: C Correct Answers (A, B) SAP Consultant Certification Solution Consultant mySAP Supply Chain Management Planning Page 30 of 121 2006/Q4 2003 SAP AG. All rights reserved. You can use the following standard reports to produce lists of work centers according to various selection criteria, for instance cost center assignment or assigned capacity categories: A. Work center list B. Cost center assignment C. Work center capacities Correct Answers (A, B, C) Changes to data elements in work centers are logged in change documents Changes to data elements are only logged in change documents if the following indicators have both been set: A. The Change doc indicator in Customizing for Work centers under Define work center category. B. The Change document indicator for the data element in the Data Dictionary. Correct Answers (A, B) A where-used list for capacities lets you know in which work centers a selected capacity is used A. Pooled capacity B. Scheduling basis C. to copy from Correct Answers (A, B, C) You can replace work centers as follows : A. Manually in the task list operations B. Automatically in all task lists, in which the work center is used Correct Answers (A, B) When you replace a work center in an operation with another, the following data is transferred to the new work center: A. Basic Data B. Default values and activity types, which have their reference indicator set. C. Performance Efficiency Rate Key Correct Answers (A, B, C) SAP Consultant Certification Solution Consultant mySAP Supply Chain Management Planning Page 31 of 121 2006/Q4 2003 SAP AG. All rights reserved. You can carry out mass replacement of work centers A. In the Work centers area menu B. In the Routings area menu. Correct Answers (A, B) When you create a work center you have to enter the work center category with which you determine: A. Which data can be entered in the work center B. Whether the data fields are mandatory or optional C. In which task lists the work center can be used in D. Whether change documents are created for the work center Correct Answers (A, B, C, D) A data field can be defined as: A. an entry field B. a required entry field C. a hidden field D. a highlighted field Correct Answers (A, B, C, D) The properties of the data fields in each screen group can be defined: A. In the Modified field view B. In the Influencing view Correct Answers (A, B) Screen groups are for instance: A. Basic Data B. Default values C. Scheduling D. Capacity overview Correct Answers (A, B, C, D) SAP Consultant Certification Solution Consultant mySAP Supply Chain Management Planning Page 32 of 121 2006/Q4 2003 SAP AG. All rights reserved. You use formulas in the work center to calculate the following data in costing, scheduling and capacity planning: A. Costs B. Execution times for production orders C. Internal processing times for networks and maintenance orders D. Capacity requirements. Correct Answers (A, B, C, D) In the R/3 System you can: A. Use predefined SAP formulas B. Define your own formulas. Correct Answers (A, B) Formulas and formula parameters are maintained in Customizing - Work center: A. Formula parameter in Define formula parameters for work centers B. Formulas in Define formulas for work centers C. None of above Correct Answers (A, B) You can use formulas in work centers in the Capacities, Scheduling and Assignment (Costs) views. From these views you can: A. Display formulas B. Test formulas C. Assign a value to a formula constant Correct Answers (A, B, C) Routings (generic) consist of the following objects: A. Routing B. Rate routing C. Reference operation set D. Reference rate routing Correct Answers (A, B, C, D) SAP Consultant Certification Solution Consultant mySAP Supply Chain Management Planning Page 33 of 121 2006/Q4 2003 SAP AG. All rights reserved. When you create a routing, you can assign it to a group. You combine routings in a group that describe : A. Similar production processes for different materials B. Different production processes for the same material Correct Answers (A, B) Plant-dependent data are handled in the following manner when copying between plants: A. In the case of the materials to be produced by the routing, the reference to the plant of the source is kept in the new routing. B. All other data are copied with reference to the plant of the new routing. C. The data on the detail screens of the routing objects are checked. Correct Answers (A, B, C) You can link routings and the material to be produced in the following ways (As Follow : graphic): A. A routing can be used to produce several materials B. Material and routing can belong to different plants, C. A material can be produced with different routings. Correct Answers (A, B, C) In the QM data in the header you decide: A. Whether you use inspection points B. Which field combination you use for identifying the inspection points (for instance Lock Container and Shift?) C. Whether you want to group the inspection points for partial lots and batches together. Correct Answers (A, B, C) In the QM data in the header you decide: A. Whether the inspection scope is dynamically modified B. Whether this is done at inspection lot level or at inspection characteristic level that is with different dynamic modification rules for individual characteristics. C. Which dynamic modification rule is used? SAP Consultant Certification Solution Consultant mySAP Supply Chain Management Planning Page 34 of 121 2006/Q4 2003 SAP AG. All rights reserved. D. If you work at characteristic level this value only serves as a default for the characteristic dynamic modification rule. Correct Answers (A, B, C, D) If you want to assign a material component as a part-to-be- provided to an operation, you A. choose a control key that allows external processing B. Set the Subcontracting indicator in the purchasing data for the operation. Correct Answers (A, B) The following data are contained in the master record of the work center that is assigned to the operation or sub-operation: A. A standard value key, which determines which standard values you can enter B. A rule for maintenance for every standard value, which determines if you must, should or can enter a value C. Default values for the units of measure for the standard values as well as the necessary activity types (if required) Correct Answers (A, B, C) Standard values are important for planning The system uses standard values for the following functions: A. Scheduling of in-house operations and sub-operations and, if the relevant settings have been made, externally processed operations. B. Determining capacity requirements for operations and costs for operations and sub-operations C. The standard values of subordinate sub-operations are cumulated in the operation. Correct Answers (A, B, C) By assigning a field key to an operation or sub-operation, you determine A. Which user-defined fields are available in the particular object B. Which field names or key words are used for these fields Correct Answers (A, B) SAP Consultant Certification Solution Consultant mySAP Supply Chain Management Planning Page 35 of 121 2006/Q4 2003 SAP AG. All rights reserved. Goods issue has to be posted for every material that is withdrawn during order processing. This can occur at the following times: A. Directly as the goods are issued B. When the operation is confirmed, the materials assigned to the operation have the goods issue posted. Correct Answers (A, B) You decide whether a material can be backflushed in three different places. These are the master records of A. The routing B. The material master C. The work center Correct Answers (A, B, C) Inspection points are freely defined reference objects for entering inspection results below operation level. To define inspection points you use one of the following references: A. Quantity (for instance, container) B. Time (for instance, date and time of day) C. Freely definable event Correct Answers (A, B, C) In the routing header you decide followings : A. Whether you want to use inspection points B. Which field combinations and therefore which reference you use to define the inspection points (for instance, container and shift) C. Whether you want to combine product quantities for partial lots and batches Correct Answers (A, B, C) For each respective step in the operations for the routing you define, A. What the inspection interval should be between the inspection points B. How the quantity should be entered with time-related intervals C. Whether the last partial lot assignment, which is therefore relevant to goods receipt, takes place during results recording Correct Answers (A, B, C) SAP Consultant Certification Solution Consultant mySAP Supply Chain Management Planning Page 36 of 121 2006/Q4 2003 SAP AG. All rights reserved. On the header level of a routing you define, A. Whether the inspection scope is dynamically modified B. On which level (lot or inspection characteristic) the dynamic modification takes place C. Which dynamic modification rule is used when doing this Correct Answers (A, B, C) You have installed the application component Quality management (QM). The following data exist there: A. The inspection data of the material to be produced. B. If you want to dynamically adjust the inspection scope, C. the dynamic modification criteria of the routing origin (As Follow : Customizing for quality management) D. the dynamic modification rule Correct Answers (A, B, C, D) In the QM data in the header you decide: A. Whether you want to use inspection points B. which field combination you use for identifying the inspection points (for instance Lock Container and Shift) C. Whether you want to group the inspection points for partial lots and batches together. Correct Answers (A, B, C) You have installed the application component Quality management (QM). The following data exist there: A. The inspection data of the material to be produced. B. If you want to dynamically adjust the inspection scope, C. the dynamic modification criteria of the routing origin (As Follow : Customizing for quality management) D. the dynamic modification rule Correct Answers (A, B, C, D) SAP Consultant Certification Solution Consultant mySAP Supply Chain Management Planning Page 37 of 121 2006/Q4 2003 SAP AG. All rights reserved. To simplify and standardize inspection planning, you can use the following options: A. You can use master inspection characteristics, that is, characteristics that are created as master records in quality management. B. You can use a control key that contains default values for the control indicator of the characteristics. C. You can maintain default values for characteristic maintenance in the planning profile. Correct Answers (A, B, C) The R/3 System differentiates between the following types of production resources/tools, according to their properties and business function: A. Materials that are accounted for in materials management, for instance in inventory management, requirements planning and procurement. B. Equipment, for instance measuring instruments or valuable tool, which are serviced C. Documents, for instance drawings or programs, which use the document management system. D. Miscellaneous production resources/tools (with a PRT master record), that require less maintenance in the system. Correct Answers (A, B, C, D) For information about how to classify the other PRT categories, As Follow: - A. for materials - LO - Managing material Master Data B. for equipment - PM - Structuring Technical Systems C. for documents - CA - Document Management Guide Correct Answers (A, B, C) You use production resources/tools (PRT) that have an equipment master record you can, A. plan and monitor the wear of the PRT B. create a maintenance plan that accounts for the Correct Answers (A, B) You create the following information for the maintenance planning of PRTs : A. a PRT wear counter that gives information about the level of wear for a PRT. B. the wear to be expected for each operation C. an activity related maintenance plan SAP Consultant Certification Solution Consultant mySAP Supply Chain Management Planning Page 38 of 121 2006/Q4 2003 SAP AG. All rights reserved. Correct Answers (A, B, C) You can only delete a production resource/tool (PRT) A. if it is no longer assigned to an operation B. if it is no longer linked with a document C. None of above Correct Answers (A, B) For information about how to set deletion flags for the other PRT categories, As Follow: - A. for materials - LO - Managing Material Master Data B. for equipment - PM - Structuring Technical Systems C. for documents - CA - Document Management Correct Answers (A, B, C) The PRTs must have a master record in the system. According to the PRT category the following conditions have to be met additionally: A. Materials, equipment and documents must be released, using their status, as production resources/tools. B. Production resources/tools with a PRT master record must be released in their status for use in resource planning. C. PRTs with material masters, PRT masters or equipment masters must be intended for use in routing in their task list usage. Correct Answers (A, B, C) You have the following choices for assigning test equipment A. You assign a piece of test equipment directly to an inspection characteristic. B. If you have entered several materials to be produced in the routing header, you can additionally assign each material/inspection characteristic combination its own test equipment. Correct Answers (A, B) The float before production has the following two functions in the order: A. It can compensate for delays in the staging of the material components. B. If there is a capacity bottleneck at the work centers involved, you can move the production dates forward in the future. Correct Answers (A, B) SAP Consultant Certification Solution Consultant mySAP Supply Chain Management Planning Page 39 of 121 2006/Q4 2003 SAP AG. All rights reserved. The lead time of an operation can be divided into the following segments: A. queue time B. setup time C. processing time D. teardown time E. wait time Correct Answers (B, C, D) You can maintain the move time A. In the individual operations B. In Customizing per location group in the move time matrix Correct Answers (A, B) The following rules apply to scheduling: A. If the unit of the operation segment is smaller than the unit "day", scheduling is carried out taking into account the operating time per working day. B. If the unit of the individual operation segment is "day" or greater than "day", the system schedules in the unit "day" taking into account the valid calendar. Correct Answers (A, B) The operating time per working day is calculated in the work center based on the following data: A. work start and finish B. break times C. capacity utilization rate Correct Answers (A, B, C) The operating time for the move is determined using the parameters in the move time matrix. In the Calendar field, you can specify whether the system should use the operating time from the followings: A. source work center B. target work center C. move time matrix Correct Answers (A, B, C) SAP Consultant Certification Solution Consultant mySAP Supply Chain Management Planning Page 40 of 121 2006/Q4 2003 SAP AG. All rights reserved. The alignment key controls whether these floats are to be positioned at the start or at the finish of the sequence: A. If the sequence is aligned with the earliest possible date, the float is at the finish of the sequence. B. If the sequence is aligned with the latest possible date, the float is at the start of the sequence. Correct Answers (A, B) You can assign a reduction strategy to each operation in the interoperation times section of the Operation Details screen. This strategy specifies A. how many reduction levels may be applied to an operation B. which reduction measures are carried out at the individual levels Correct Answers (A, B) Splitting an operation has the following effects on the operation dates: A. The processing time/execution time becomes shorter. B. Setup and teardown must be carried out more than once for the operation. Correct Answers (A, B) The following data can be transferred when you update the material master: A. Setup time B. Processing time C. Interoperation time D. Assembly Scrap Correct Answers (A, B, C, D) The scheduling log is used to: A. Collect the messages issued by the system B. Sort and group the system messages according to specific criteria Correct Answers (A, B) SAP Consultant Certification Solution Consultant mySAP Supply Chain Management Planning Page 41 of 121 2006/Q4 2003 SAP AG. All rights reserved. System messages can be distinguished according to their message type. There are four different message types displayed in the scheduling log: A. notification message B. warning messages C. error messages D. termination messages Correct Answers (A, B, C, D) In the following cases, the system checks consistency again when an order is created: A. If you have saved a routing despite inconsistencies. B. If the valid from date of the change number for a checked routing has changed. C. If a configurable material is assigned to the routing. Correct Answers (A, B, C) You can limit the selection of routing data by entering the following criteria: A. Task list type B. Material C. Plant D. Group E. Group counter Correct Answers (A, B, C, D) You can print the following routing objects in addition to operations: A. Long texts for routings or operations B. Sub-operations with and without long texts C. Material components D. Production resources/tools with and without long texts Correct Answers (A, B, C, D) You can edit unlocked operations exactly like normal operations in a routing In particular you can: A. change the data of unlocked operations B. insert other operations between unlocked operations Correct Answers (A, B) SAP Consultant Certification Solution Consultant mySAP Supply Chain Management Planning Page 42 of 121 2006/Q4 2003 SAP AG. All rights reserved. You have the following possible choices: You replace the reference operation set as followings: A. in one particular routing B. in all routing in which it is referenced Correct Answers (A, B) The following information is contained on the operation overview of the (rate) routing: A. The group of the referenced reference operation set B. The group counter of the referenced reference operation set C. You can also call up the following additional information D. The operation increment the system uses to insert operations from the reference operation set E. Long text Correct Answers (A, B, C, D) You create a routing for a configurable material in the same way as any other routing. However, you must also maintain object dependencies for: A. Sequences B. Operations/sub-operations C. Production resource/tool assignments Correct Answers (A, B, C) By generating where-used lists, you can display the routings which use particular A. Work centers B. Reference operation sets, reference rate routings C. Production resources/tools (PRTs) Correct Answers (A, B, C) You can carry out the following functions for the routings and routing objects displayed in the where-used list of the old work center: A. change routing data B. display detail screens for an operation SAP Consultant Certification Solution Consultant mySAP Supply Chain Management Planning Page 43 of 121 2006/Q4 2003 SAP AG. All rights reserved. C. display overviews of individual routing objects and, from these overviews, branch to other routing screens Correct Answers (A, B, C) System messages can be distinguished according to their message type. There are four different message types in the error log: A. notification messages B. warning messages C. error messages D. termination messages Correct Answers (A, B, C, D) The following functions are available for representing production processes in the rate routing: A. You can create parallel sequences to the main line in order to represent the feeder lines. B. You can create parallel sequences to a parallel sequence to represent the relationship between the individual feeder lines. C. A graphic display of the sequences and operations that you have created helps you with your planning. D. The rate routing displays the takes of a line segment in a separate column. You can assign operations directly to a takt. E. You can select operations which are not value-added and carry out evaluations in the line balance. Correct Answers (A, B, C, D) You use this process to reproduce the structure of your production line in the system. A. You can divide the production line into line segments and assign these line segments a number of takts and a number of individual capacities. B. You can enter production rates or takt times and thus control takt-based scheduling. Correct Answers (A, B) SAP Consultant Certification Solution Consultant mySAP Supply Chain Management Planning Page 44 of 121 2006/Q4 2003 SAP AG. All rights reserved. Process Line Balances for the same Prerequisites has to be maintained: A. You must not have selected the indicator No line balancing in the initial screen for the line hierarchy. B. You must have created one or more rate routings for the materials you want to produce. C. You must have entered the rate routing (or standard routing) in the production version in the material master. Correct Answers (A, B, C) You can insert the following data from the SAP System into the operational method sheets: A. Tables, which contain operation data, component assignments or production resources/tools B. graphics, which reproduce the workflow, for As Follow : C. Data for individual fields from the rate routing, such as the name of a work center or data from the task list header. Correct Answers (A, B, C) You require the following mySAP.com components to use Integrated Product and Process Engineering: A. Engineering Change Management (ECM) B. Classification System C. Variant Configuration Correct Answers (A, B, C) iPPE(Integrated Product and Process Engineering) is basically made up of abstract elements, which are especially shaped in Customizing for specific applications. The basic elements of iPPE are: A. Nodes B. Variants C. Alternatives D. Relationships Correct Answers (A, B, C, D) SAP Consultant Certification Solution Consultant mySAP Supply Chain Management Planning Page 45 of 121 2006/Q4 2003 SAP AG. All rights reserved. IPPE nodes represent general elements in the application models that form iPPE: A. Product Structure B. Process structure (iPPE routing) C. Factory layout or iPPE line design D. Color scheme E. Production Resource Correct Answers (A, B, C, D) The functions for the worklists are the same as those for the favorites. A. Loaded nodes can be added to the worklists. B. Folders can be created for nodes and structures with related contents. C. Nodes and structures can be loaded directly from the worklists into the iPPE workbench. D. Drag Drop can be used to link objects in the work list to objects in the navigation tree. Correct Answers (A, B, C, D) To use the iPPE structure, you require the following components of the SAP R/3 System: A. Engineering Change Management (ECM) B. Classification System C. Variant Configuration Correct Answers (A, B, C) The standard parameters in the Automotive System are: A. Class B. Class type C. Plant D. Start-up parameters E. Scope SAP Consultant Certification Solution Consultant mySAP Supply Chain Management Planning Page 46 of 121 2006/Q4 2003 SAP AG. All rights reserved. F. Date Correct Answers (A, B, C, D) You can maintain object dependencies only in the form of selection conditions in the PVS. The combination of object dependencies at the variants and the control indicators A. multiple selection B. required component C. standard variant Correct Answers (A, B, C) The iPPE Workbench has the following evaluations: A. Consistency check B. Configuration simulation C. Structure Comparison D. Variance Scheme Correct Answers (A, B, C, D) The selection range is comprised of A. The selection period B. Possibly an assignment of affectivity parameter values Correct Answers (A, B) The context contains input lines for: A. An object of the type that is displayed in the overview. B. The objects that are superior to the objects displayed. C. The material that is assigned to the routing header or bill of material Correct Answers (A, B, C) SAP Consultant Certification Solution Consultant mySAP Supply Chain Management Planning Page 47 of 121 2006/Q4 2003 SAP AG. All rights reserved. You can (de)select objects line-by-line or: A. Select a block of objects B. Select all objects on the overview C. Deselect all objects on the overview Correct Answers (A, B, C) You can copy the following objects: A. Headers B. Operations C. Inspection characteristics D. BOM headers E. Items Correct Answers (B, C, D) You can make multi-level copies of the following objects in the Engineering Workbench: A. Headers B. BOM headers C. Operations D. Inspection characteristics Correct Answers (A, B, C, D) Efficient measurement functions are available for the following measurement analyses: A. Point B. Length C. Chain D. Fan Correct Answers (A, B, C, D) The following operation properties are cumulated onto a work center operation set: A. Material components B. Production resources and tools (PRTs) C. Trigger points D. Inspection characteristics E. Standard values Correct Answers (A, B, C, D) SAP Consultant Certification Solution Consultant mySAP Supply Chain Management Planning Page 48 of 121 2006/Q4 2003 SAP AG. All rights reserved. This function enables you to simultaneously process an item in several of the following types of BOMs: A. In alternatives of a multiple BOM B. In variants of a variant BOM C. None of above Correct Answers (A, B) The PP system has interfaces to: A. Materials Management (MM) B. Controlling (CO) C. Personnel Planning and Development (PD) Correct Answers (A, B, C) In the SAP system, standard values are used in formulas for A. scheduling, B. capacity planning, and C. Costing. Correct Answers (A, B, C) Costing calculates the costs incurred when a material is produced in-house. Costing provides the basic information for: A. pricing and pricing policy B. evaluation C. cost control D. profitability analysis Correct Answers (A, B, C, D) You can maintain the following rules for determining values. A. Validation rule B. Search rule C. Conversion rule Correct Answers (A, B, C) SAP Consultant Certification Solution Consultant mySAP Supply Chain Management Planning Page 49 of 121 2006/Q4 2003 SAP AG. All rights reserved. In one process you can: A. evaluate several different methods and so several different standard values or B. evaluate a method several times, add the results and transfer them to a standard value or C. evaluate several different methods, add the results and transfer them to a standard value Correct Answers (A, B, C) The value of a characteristic can be determined using a table field. The following types of table can be used. A. Normal tables B. Table for a work center C. Database tables Correct Answers (A, B, C) The system displays the following data on the Method Result screen: A. work center B. sub-calculation C. process D. method E. method result Correct Answers (A, B, C, D) On the screen Sub-calculations you get an overview of the calculated methods and their results. The system displays the following data: A. Number of the sub-calculation B. The method, its description and the value type it is used to calculate C. The type of process text generation D. Method result calculated and its unit Correct Answers (A, B, C, D) SAP Consultant Certification Solution Consultant mySAP Supply Chain Management Planning Page 50 of 121 2006/Q4 2003 SAP AG. All rights reserved. You can carry out a CAPP calculation of standard values when changing or creating a routing or a reference operation set. You can call it up from the following screens: A. from the operation overview B. from the operation detail screen C. from the object overview Correct Answers (A, B, C) You can generate a single-level where-used list for the following components: A. characteristics B. formulas C. methods D. processes Correct Answers (A, B, C, D) In Sales & Operations Planning (SOP), you can manage plans for various types of master data: A. Manually created planning hierarchies B. Automatically generated planning hierarchies C. Product groups D. Materials Correct Answers (A, B, C, D) You create proportional factors in one of three ways: A. Enter them manually B. Distributing them evenly across the planning level C. Have the system calculate them automatically Correct Answers (A, B, C) A line in a planning type contains one of the following: A. Planned key figure B. Actual key figure from the current year C. Actual key figure from the previous year D. Cumulative events for a key figure E. Proportional events for a key figure Correct Answers (A, B, C, D) SAP Consultant Certification Solution Consultant mySAP Supply Chain Management Planning Page 51 of 121 2006/Q4 2003 SAP AG. All rights reserved. You can record the following situations as events: A. Changes in price such as promotions B. Special deals with major customers C. Special deals with vendors D. Management overrides E. Delivery problems of a competitor F. Market intelligence Correct Answers (A, B, C, D) Before you run a forecast, you must specify which model the system should use to calculate the forecast values. There are three possibilities: A. Manual model selection B. Automatic model selection C. Manual model selection with the system also testing for a pattern Correct Answers (A, B, C) The following models are possible: A. Constant B. Trend C. Seasonal D. Seasonal trend Correct Answers (A, B, C, D) The list of forecast results shows: A. Original historical values B. Corrected historical values C. Values determined by the ex-post forecast D. Original values determined by the forecast E. Corrected forecast values Correct Answers (A, B, C, D) SAP Consultant Certification Solution Consultant mySAP Supply Chain Management Planning Page 52 of 121 2006/Q4 2003 SAP AG. All rights reserved. The statistical forecast is based on several types of formula: A. Formulas on which the forecast models are based B. Formulas that are used to evaluate the forecast results C. Formula to calculate the tolerance lane for automatic outlier correction Correct Answers (A, B, C) Rough-cut planning profiles are used in resource leveling. In a rough-cut planning profile, you plan the requirements of one or more of the following resources: A. Work center capacities B. Materials (typically, raw materials) C. Production resources/tools D. Costs Correct Answers (A, B, C, D) You have the following options for transferring SOP data to other R/3 applications: A. Transfer to Demand Management (PP-MP-DEM) B. Transfer to Profitability Analysis (CO-PA) C. Transfer to Cost Center Accounting (CO-OM-CCA) D. Transfer to Activity-Based Costing (CO-OM-ABC) Correct Answers (A, B, C, D) Followings reports are offered in standard SOP: A. Product Group Breakdown B. Product Group Usage C. Material Usage D. Planning Situation Correct Answers (A, B, C, D) Distribution resource planning provides a framework for determining the need to replenish inventory by: A. Linking market requirements with manufacturing and demand management B. Relating current inventory positions and demand forecasts to production scheduling C. Matching material supply to manufacturing demand, and customer demand to product supply SAP Consultant Certification Solution Consultant mySAP Supply Chain Management Planning Page 53 of 121 2006/Q4 2003 SAP AG. All rights reserved. Correct Answers (A, B, C) In order to perform a DRP run, you must: A. Set up a distribution network, including identification of quota arrangements and lead times. B. Define MRP parameters in the material master record for all the materials in the distribution network. Correct Answers (A, B) The deployment results, displayed after the deployment run, indicate: A. Quantities to be deployed to each DC from the specified supplying plant B. Delivery dates C. Additional information used by the system to determine the deployment Correct Answers (A, B, C) You specify a fair share rule in the MRP 4 view of the material master record to identify how you want fair share to be implemented: A. Fair share rule A distributes the stock proportionally to all DCs according to demand. B. Fair share rule B is raises the stock levels in all DCs to approximately the same percentage of target stock level. Correct Answers (A, B) The organizational units are as follows: A. Client B. Company Code C. Plant D. Storage Location E. Purchasing Organization F. Sales Organization G. Warehouse Number H. Storage Type Correct Answers ( B, C, D,E,G) SAP Consultant Certification Solution Consultant mySAP Supply Chain Management Planning Page 54 of 121 2006/Q4 2003 SAP AG. All rights reserved. The following are typical example of storage types that can be defined using the WM system: A. Goods receipt area B. Goods issue area C. Picking area D. High rack storage area Correct Answers (A, B, C, D) The standard R/3 System contains the following industry sectors. The ID used to identify the industry sector internally appears in parentheses. A. Plant engineering and construction (A) B. Chemical industry (C) C. Mechanical engineering (M) D. Pharmaceuticals (P) Correct Answers (A, B, C, D) When you create a material master record, the material type you choose determines: A. Whether the material is intended for a specific purpose, B. Whether the material number can be assigned internally or externally C. The number range from which the material number is taken D. Which screens appear and in what sequence Correct Answers (A, B, C, D) You can create or extend a material master record in one of the following ways: A. Immediately B. By scheduling it Correct Answers (A, B) Maintain all material master records as fully as possible, users need the following information: A. User departments that need to extend a material master record B. Material master records that a user department needs to extend Correct Answers (A, B) SAP Consultant Certification Solution Consultant mySAP Supply Chain Management Planning Page 55 of 121 2006/Q4 2003 SAP AG. All rights reserved. You can change the data contained in a material master record in one of the following ways: A. Immediately B. By scheduling the change C. None of above Correct Answers (A, B) Change documents contain the following information: A. When the change was made B. Who made the change C. What value the field contained before and after the change Correct Answers (A, B, C) When flagging a material master record for deletion, you have the following options: A. Setting the deletion flag with immediate effect B. Scheduling the setting of the deletion flag C. None of above Correct Answers (A, B) A material master record for industry contains the following subject areas: A. Accounting B. Basic Data C. Classification D. Costing E. Forecasting F. Materials Planning G. Production Resources and Tools H. Purchasing Correct Answers (A, B, C, D,G) With the Information about the Material you can display the following information on any main or additional screen: A. Industry and type of material B. Whether the material is marked for deletion, on what organizational level it has been marked for deletion, and who set the deletion indicator, at what time C. Who created the departmental data on which organizational level, and / or who changed it last SAP Consultant Certification Solution Consultant mySAP Supply Chain Management Planning Page 56 of 121 2006/Q4 2003 SAP AG. All rights reserved. Correct Answers (A, B, C) The change documents offer more detailed information. You can find more information under: A. Change Document B. Displaying Change Documents and Relevant Changes C. None of above Correct Answers (A, B) The following fields are in every departmental area: A. Material description B. Base unit of measure C. All of above Correct Answers (A, B) The R/3 System allows you to valuate stocks of a material either together or separately, that is, according to different valuation criteria. Split valuation is necessary if, for As Follow:: A. Stock from in-house production has a different valuation price than externally procured stock. B. Stock obtained from one manufacturer is valuated at a different price than stock obtained from another manufacturer. C. Different batch stocks of a material have different valuation prices. Correct Answers (A, B, C) On the Forecasting screen, you have the following options: A. You can access the screens on which you enter consumption values and forecast values as a basis for the initial calculations. B. You can directly execute an individual forecast for a material. Starting from the maintained forecast parameters, you can simulate the forecast in several dialog steps. Correct Answers (A, B) SAP Consultant Certification Solution Consultant mySAP Supply Chain Management Planning Page 57 of 121 2006/Q4 2003 SAP AG. All rights reserved. Forecast values are usually determined by the system in forecasting and updated in the material master record. However, you can enter forecast values manually for the following purposes: A. As a basis for material requirements planning B. To correct the forecast values calculated by the system Correct Answers (A, B) The R/3 System distinguishes between the following types of production resource/tool on the basis of their attributes and business function: A. Materials considered in materials management, for As Follow :, in inventory management, material requirements planning, and procurement B. Equipment such as measuring devices or high-quality tools requiring preventive maintenance C. Documents such as drawings or programs for which document management functions are used D. Other PRTs (with a PRT master record) requiring less maintenance Correct Answers (A, B, C, D) In the following objects, you can assign PRTs to operations and phases: A. Task lists (including standard networks and recipes) B. Production orders and maintenance orders C. Networks Correct Answers (A, B, C) The following data on the Purchasing screen is also used by other user departments so consult with the other users before making your entries: A. Batch management B. Goods receipt processing time Correct Answers (A, B) you have created the material master record, you can select the following data screens in the Select View(s) dialog box for displaying the stocks held at a particular plant or storage location: A. Plant stock B. Storage location stock Correct Answers (A, B) SAP Consultant Certification Solution Consultant mySAP Supply Chain Management Planning Page 58 of 121 2006/Q4 2003 SAP AG. All rights reserved. You can enter work scheduling times in one of the following ways: A. By entering the setup time, interoperation time, and processing time for the material, as well as the base quantity to which the processing time relates. B. By entering the entire in-house production time, this being the sum of setup time, interoperation time, and processing time. Correct Answers (A, B) You can only change the base units of measure under the following circumstances: A. No stocks are available for the material. B. There are no existing purchase requisitions, purchase orders, or scheduling agreements for the material. C. At present, no purchase orders or purchase order items are being created or changed. Correct Answers (A, B, C) You can also define that one or more of the following are hidden whenever you create a material master record: A. Industry sector field B. Select View(s) dialog box C. Organizational Levels dialog box Correct Answers (A, B, C) This function allows you to list materials according to one or more of the following selection criteria: A. Material number B. Plant C. Material type D. Material group E. Person who created the material Correct Answers (A, B, C, D) A production version determines the various production techniques that can be used to produce a material. It defines the following information: A. Alternative BOM for a BOM explosion B. Task list type, task list group, and group counter for assignment to task lists C. Lot-size restrictions and period of validity SAP Consultant Certification Solution Consultant mySAP Supply Chain Management Planning Page 59 of 121 2006/Q4 2003 SAP AG. All rights reserved. Correct Answers (A, B, C) When creating or changing a material master record, you can create individual production versions at plant level for the following materials: A. Materials allowing in-house production B. Materials only procured externally Correct Answers (A, B) If you have assigned an MRP profile and/or forecast profile to a material, it may later be necessary to: A. Delete the assignment of the profile to the material if you want to overwrite the fixed values defined in the profile B. Assign the material to a different profile Correct Answers (A, B) The current period and the indicator allowing posting to the previous period are set, and the control record is created. The control record contains the following information: A. Current period B. Previous period C. Last period of the previous year Correct Answers (A, B, C) When the system is in operation, you normally run the period closing program once a month at the beginning of a new period. You can run it in one of the following modes: A. Online B. In the background Correct Answers (A, B) You use a distributed system, you also need to exchange data within this system itself. The following situations also require the distribution of material master data: A. Transfer of material data from an R/2 system B. Distribution of changed and/or newly-created material data between R/3 systems Supply of old or non-SAP systems with changed or newly-created material data C. Transfer of data from data pools D. Targeted distribution of materials SAP Consultant Certification Solution Consultant mySAP Supply Chain Management Planning Page 60 of 121 2006/Q4 2003 SAP AG. All rights reserved. Correct Answers (A, B, C, D) For data transfer and distribution, you can maintain materials in the same way in dialog, as with maintaining all additional data. However, this is not the case for the following data: A. Variant configuration and assignment for a configurable material B. Export licenses and customs tariff preferences C. Production versions Correct Answers (A, B, C) The pure material data is transferred in an Idocs, and the additional data in an individual Idocs. This has the following reasons: A. For most additional data there are already Idocs and corresponding distribution and transfer functions available. B. The additional data must be distributable separately, as there are normally possibilities for individual maintenance, as well as the material master, for this data. Correct Answers (A, B) The stocks are managed not only on a quantity basis but also by value. The system automatically updates the following data each time there is a goods movement: A. Quantity and value for Inventory Management B. Account assignment for cost accounting C. G/L accounts for financial accounting via automatic account assignment Correct Answers (A, B, C) The movement type plays an important role in A. Updating of quantity fields B. Updating of stock and consumption accounts C. Determining which fields are displayed during entry of a document in the system Correct Answers (A, B, C) SAP Consultant Certification Solution Consultant mySAP Supply Chain Management Planning Page 61 of 121 2006/Q4 2003 SAP AG. All rights reserved. When you enter a goods movement, you start the following chain of events in the system: A. A material document is generated, which is used as proof of the movement and as a source of information for any other applications involved. B. If the movement is relevant for Financial Accounting, one or more accounting documents are generated. C. The stock quantities of the material are updated. D. The stock values in the material master record are updated, as are the stock and consumption accounts. Correct Answers (A, B, C, D) When goods movements for stock transport orders involve Shipping, note the following: A. When a goods issue is posted for a delivery, the serial numbers are taken from the delivery. B. When a goods receipt is posted for a delivery, the serial numbers are also taken from the delivery Correct Answers (A, B) To create a delivery via Shipping, the following data has to be maintained in the R/3 System: A. The plant data, sales organization, distribution channel, shipping point, and division B. The sales and distribution data in the material master C. The customer field in the central vendor master record, as the vendor for shipping is also the customer Correct Answers (A, B, C) You can manage the following goods movements via Shipping: A. Goods issues for a delivery B. Stock transfers using stock transport orders C. Returns from the customer D. Return deliveries to vendors E. Returns for stock transport orders Correct Answers (A, B, C, D) When you create deliveries via Shipping, you can plan the following activities using the functions of shipment scheduling (refer to Transportation and Delivery Scheduling): SAP Consultant Certification Solution Consultant mySAP Supply Chain Management Planning Page 62 of 121 2006/Q4 2003 SAP AG. All rights reserved. A. Material availability date B. Transportation planning date C. Loading date D. Goods issue date Correct Answers (A, B, C, D) The R/3 System distinguishes between the following types of goods receipts: A. Goods receipts with reference to a reservation B. Goods receipts with reference to an order C. Other goods receipts Correct Answers (A, B, C) You want to plan goods receipts using the Purchasing component; this component provides two sources of information for planning the receipt of ordered goods: A. the purchase order B. the shipping notification C. Features Correct Answers (A, B, C) The purchasing department can order a material for the following destinations: A. warehouse B. consumption/usage Correct Answers (A, B) When entering a goods receipt, you can also search for purchase orders using the following search criteria: A. Vendor B. Material C. Delivery date D. EAN/UPC code E. Material number used by vendor Correct Answers (A, B, C, D) SAP Consultant Certification Solution Consultant mySAP Supply Chain Management Planning Page 63 of 121 2006/Q4 2003 SAP AG. All rights reserved. The shipping notification permits more precise planning of the delivery advised by the vendor. In the shipping notification, Purchasing can record the following data relevant for goods receipt: A. Delivery date for each of the notified quantities B. Means of transport C. Bill of lading D. EAN/UPC code E. Material number used by vendor Correct Answers (A, B, C, D) Entering the goods receipt quantity in both units of measure is important for three reasons: A. The goods receipt is valuated on the basis of the goods receipt quantity in the order price unit. B. Invoice verification is based on the goods receipt quantity in the order price unit. C. Entering the goods receipt in the order price quantity allows the system to immediately detect and report variances in the order price quantity during the goods receipt. Correct Answers (A, B, C) In the Customizing system for Inventory Management, you can define two tolerances for variances in the order price quantity: A. Tolerance for an error message: if the variance is larger than this tolerance specified, the system issues an error message, and you cannot post the goods receipt. B. Tolerance for a warning message: if the variance reaches this tolerance specified, the system issues a warning message during entry of the goods receipt Correct Answers (A, B) At the time of a goods receipt for a purchase order, you may have to change the display format of the selection list in a way that allows you to maintain the following data: A. Vendor material (material number used by vendor) B. EAN number C. Shelf life expiration date/production date D. Reference document Correct Answers (A, B, C, D) SAP Consultant Certification Solution Consultant mySAP Supply Chain Management Planning Page 64 of 121 2006/Q4 2003 SAP AG. All rights reserved. In the material master record, the following indicators are relevant to the expiration date check: A. Minimum remaining shelf life in days B. Total shelf life in days Correct Answers (A, B) The following functions are supported when a material is not handled in batches: A. Entry and Check Upon Goods Receipt B. Printout on Goods Receipt/Issue Slip Correct Answers (A, B) If a material is handled in batches, the following functions are supported when the expiration date is checked: A. Entry and Check at Goods Receipt B. Printout on Goods Receipt/Issue Slip C. Analysis of Batches According to Shelf Life Expiration Date D. Batch Determination by Expiration Date upon Goods Issues Correct Answers (A, B, C, D) The SAP System differentiates between two different forms of quality management: A. Quality Management in Material Procurement B. Quality Management in Material Inspection Correct Answers (A, B) You can display goods receipt blocked stock from two viewpoints: A. Goods receipt blocked stock for a material (at plant level) B. Goods receipt blocked stock for a purchase order item Correct Answers (A, B) You can enter the goods receipt as follows: A. together with the goods issue of the components B. by means of a separate posting Correct Answers (A, B) SAP Consultant Certification Solution Consultant mySAP Supply Chain Management Planning Page 65 of 121 2006/Q4 2003 SAP AG. All rights reserved. You use the following movement types to enter an initial entry of stock balances manually: A. Unrestricted-use stock B. Stock in quality inspection C. Blocked stock Correct Answers (A, B, C) The Inventory Management system supports the following types of goods issues: A. Withdrawal of material for production orders B. Scrapping and withdrawal of material for sampling C. Return deliveries to vendors D. Other types of internal staging of material E. Deliveries to vendors without the involvement of the SD Shipping component Correct Answers (A, B, C, D) You might scrap a material if you cannot use it any more, because: A. the quali