    PPP OPPORTUNITIES OF WATER

    SUPPLY PROJECTS IN INDONESIA

    Presented by:

    Tamin M Zakaria Amin

    Chairman of BPPSPAM

    National Supporting Agency for Water Supply System Development

    Ministry of Public Works and Housing

    Republic of Indonesia

    Singapore, October 2015

  • 8/20/2019 PPP Water Di Indonesia

    2/36

    OUTLINE

    • Preface

    • Water Supply Services In Indonesia

    • National Access to Safe Water

    • 6 Basic Principles for Water Resource

    Management Restriction

    • Water Supply Investment Plan Through PPPScheme:•

    On Going Projects• Tender Process

    • Ready to Offer

    • Potential

    2

  • 8/20/2019 PPP Water Di Indonesia

    3/36

    3

    INDONESIA AT A GLANCE

    According to World Bank (2010), the annual growth rate of Indonesia is 1,21%. In 2019, the

    population of Indonesia is estimated to be 268.074.600. Assuming each household consists of 4

    people (BPS, 2013). Government of Indonesia is expected to provide 100% access to safe water

    by the end of 2019.

  • 8/20/2019 PPP Water Di Indonesia

    4/36

    WATER SUPPLY SERVICES IN INDONESIA

    4

    Served by Local Water SupplyCompanies called PerusahaanDaerah Air Minum (PDAM) (safeaccess, piped)

    There are total 387 PDAMs in

    Indonesia and 39 operators arefrom private sectors.

    Existing house connectionprovided by PDAM is about 11million HC in 2015.

    67.78% is served by safe water

    access (2013) Average NRW level is 32,79%

    74% of the PDAMs operatebelow production cost (nonFCR tariff)

    2012 (328

    PDAM)

    2013 (350

    PDAM)

    2014 (359

    PDAM)

    2015 (369

    PDAM)

    171 176182

    196

    101 104 103 96

    5670 74

    78

    PERFORMANCE OF PDAM 2012 - 2015SEHAT KURANG SEHAT SAKIT

    52%

    31%

    17%

    50%

    30%

    20%

    51%

    29%

    20%

    53%

    26%

    21%

    HEALTHY LESS HEALTHY SICK

    (370

    Sources: BPPSPAM, 2015

  • 8/20/2019 PPP Water Di Indonesia

    5/36

    NATIONAL ACCESS TO SAFE WATER

    5

    As stipulated in National Medium Term Dev. Plan 2015-2019, safeaccess to drinking water in 2019 is targeted to be 100% (60 % bypipeline, 40 % by non pipeline )

    22.4

    25.3

    59.7

    47.9 48.4

    41.429.7

    26

    0

    70.373.7

    78.8

    85.1

    92.6

    100

    0

    20

    40

    60

    80

    100

    2014 2015 2016 2017 2018 2019

       W   a   t   e   r   S   u   p   p    l   y   c   o   v   e   r   a   g   e    (   %    ) Aman - Perpipaan

    Aman - Bukan

    Perpipaan

    Tidak Aman

    Aman

    Safe access,

    piped

    Safe access,

    non piped

    Unsafe access

    Safe access to

    drinking

    water

    13%

    6%

    8%

    4%

    7%47%

    7%

    6%

    National

    Budget

    Raw WaterBudget

    PPP

    Bank Loan

     CSR

    Local Budget

    Sources: Directorate General of Human Settlements,

    Ministry of Public Works and Housing, 2015

  • 8/20/2019 PPP Water Di Indonesia

    6/36

    6

    FUNDING NEEDED

    TO REACH NATIONAL TARGET

    IDR 204.93

    Trillion

    IDR 48.07

    Trillion Other Source of Funding

    National Budget

    Total Funding Required (2015 – 2019) = IDR 253 Trillion

    Sources: Directorate General of Human Settlements,

    Ministry of Public Works and Housing, 2015

  • 8/20/2019 PPP Water Di Indonesia

    7/36

    6 BASIC PRINCIPLES FOR WATER RESOURCE

    MANAGEMENT RESTRICTION

    1. Water resource provision could not disrupt human right toget water resource access;

    2. Human right for water resource should be fulfilled bygovernment;

    3. Environmental Sustainability;

    4. Government has responsibility to monitor and control waterresource;

    5. Main priority of water resource provision is delegated toSOE/ROE; and

    6. Government has a possibility to give license for businessentity to conduct water resource provision based on tightrequirement.

    *AS STATED IN CONSTITUTIONAL COURT DECISION No. 85/PUU-XI/2013

  • 8/20/2019 PPP Water Di Indonesia

    8/36

    SUBJECT ON PPP

    Contracting Agency

    • Minister/ Head of Institution/ Head of Region or

    any other party that has been delegated to act

    on behalf of the Ministry/Institution/Region

    Board of Director of SOE / ROE could act as CAin accordance with the existing law and

    regulation

    • Project bundling is allowed, in which the

    Minister/ Head of Institution/ Head of Region

    will act together as the CA by signing a MoU andagreed on who will act as the CA Coordinator.

    Private Sector• State Owned Enterprise (SOE),

    • Regional Owned Enterprise (ROE),

    • Business entity in the form of

    Indonesian Limited Liability

    Company (PT)• Foreign business entity

    • Cooperatives

    Slide - 8

    Based on Presidential Regulation No.38 /2015 on PPP

  • 8/20/2019 PPP Water Di Indonesia

    9/36

    GOVERNMENT SUPPORT

    • Land

    Acquisition

    • Viability

    Gap Fund

    (VGF)

    • Guarantee

    • Raw Water

    Facilities

  • 8/20/2019 PPP Water Di Indonesia

    10/36

    PPP STRUCTURE FOR INDONESIANWATER SUPPLY PROJECT

    10

    GovernmentContracting

    Agency

    Special Purpose

    Vehicle (SPV)

    IIGF

    (Govt.Guarantee)

    O&M Co, EPC Co,

    Third parties

    Sponsors/

    Investors

    Cooperation Agreement

    Contract

    Recourse Agreement

    Guarantee Agreement

    Banks

    End

    User/Customer

    Service

    Tariff 

    Equity

    Debt

    Board ofDirector of

    SOE / ROE

  • 8/20/2019 PPP Water Di Indonesia

    11/36

    11

    PPP PROJECT CYCLE

    Tender documentprocess and bidding

    team

    Identification

    PPP

    business

    case

    Pre FS

    Project Preparation Transaction Process and Management

    Tender document

    Pre Qualification

    Shortlisted

    Bidding process

    Winning

    Bidder

    Contract

    Financial Close &

    Contract

    implementation

    End of Contract

    Bidder invitation &

    Tender Doc

    Aanwizjing &

    One on One Meeting

    PPP

    nodes

  • 8/20/2019 PPP Water Di Indonesia

    12/36

    12

    WATER SUPPLY INVESTMENT PLAN

    THROUGH PPP SCHEME

    No

    Amount of

    Project

    Location

    Capacity (l/s) Population served(persons)

    Total Investment

    (Billion Rupiah)

    1 ON GOING PROJECT

    4 2.600 1.040.000 895

    2 TENDER PROCESS

    2 4.500 1.510.000 2.830

    3 READY TO OFFER

    2 2.300 920.000 1.649,5

    4 POTENTIAL

    5 12.648 5.160.000 7.401,3

    TOTAL

    13 22.048 8.630.000 12.775,8

  • 8/20/2019 PPP Water Di Indonesia

    13/36

    13

    PPP Cooperation Between Local Government of TangerangRegency and PT. Aetra Air Tangerang

    Contract Signing: 4 August 2008

    Scope of Works

    • Construction of WTP 900 l/s

    • Construction of transmission networks

    • Construction of reservoir

    • Distribution networks for 70.000 HC

    • Pipe networks± 180 km

    TANGERANG REGENCYPT AETRA AIR TANGERANG

    Service Area

    Pasar Kemis, Sepatan, Cikupa, Balaraja, Jayanti, Total of Domestic

    Customers 60.000 HC and Industries 278 HC

    NRW Level 4%

    ON GOING PPPPROJECT

    Technical and Investment Data

    1. Capacity 900 l/s

    2. Investment Rp 503 Billion

    Investment today Rp 589 Billion

    3. Operational 2010

    4. Concession period 25 years

    5. Domestic Water Tariff

    (2007)

    Rp 3.400,-

    6. Non Domestic water tariff

    (2007)

    Rp 10.000,-

    7. Tariff escalation (2008-

    2009)

    7,20%

  • 8/20/2019 PPP Water Di Indonesia

    14/36

    BEKASI REGENCY

    PT MOYA BEKASI JAYA

    Progress of the Project

    Stage I of WTP Uprating has been constructed andultrafiltration unit of 200 l/s has been commercially

    operated with tariff Rp 2.150,-

    Service Area

    Cikarang Utara sub-district, Cikarang Selatan subdistrict and Lemah Abang sub district

    14

    ON GOING PPPPROJECT

    B to B Cooperation Agreementbetween

    PDAM Bekasi Regency with

    PT. Moya Bekasi Jaya

    Contract signing: 18 August 2011

    Scope of Works

    • Stage 1 : Uprating: 2x 20 l/s uprated to be

    1x120 l/s 2x20 l/s uprated to be

    1x120 l/s Ultrafiltration (UF) 200 l/s

    • Stage II WTP construction of500 l/s

    • Stage III Rehabilitation andOperating existing WTP:WTP 2X 60 l/sWTP 1x 200 l/s

    Technical and Investment Data

    Capacity : 1.000 l/s

    TotalInvestment : Rp 187 Billion

    CooperationPeriod : 25 Years

    Initial tariff: Rp. 2.150

  • 8/20/2019 PPP Water Di Indonesia

    15/3615

    GRESIK REGENCYPT. DEWATA BANGUN TIRTA

    Technical and Investment Data

    Capacity : 200 l/s

    Total Investment :Rp 47,5Billion

    Cooperation period : 25 years

    Tariff escalation : 7% annually

    Bulk water price year 1 :Rp. 2.400

    Bulk water price year 2 :Rp. 2.568

    PPP Cooperation Agreement between

    PDAM Gresik Regency and

    PT. Dewata Bangun Tirta

    Contract Signing : 25 May 2012

    Progress of the Project

    Physical construction has been 100% finished and has been commerciallyoperated in 2014 with tariff Rp 2400,-/m³

    Scope of Works

    Intake construction 200 l/s

    WTP Construction 200 l/s

    Resevoir 1.000 m³

    Transmission pipeline with diameter of

    500mm  – 5500 m and Booster pump 700 l/s

    ON GOING PPPPROJECT

  • 8/20/2019 PPP Water Di Indonesia

    16/36

    16

    ON GOING PPPPROJECT

    B to B Cooperation Agreement between

    PDAM Intan Banjar with PT. Drupadi Agung Lestari

    Contract Signing : 4 October 2012

    BANJAR REGENCY AND BANJARBARU MUNICIPALITY

    (PDAM INTAN BANJAR)

    PT. DRUPADI AGUNG LESTARI

    Scope of Works

    • WTP Construction 2 x 250 l/s

    • Reservoir 4.000 m³ and Distribution pump chamber

    • Supplementary building

    Service Area

    Landasan Ulin, Liang Anggang, Gambut, Kertak Hanyar, Tatah Makmur,Aluh-aluh, Beruntung Baru, Sungai Tabuk

    Progress of the Project

    • WTP Construction of 2 x 250 l/s, supplementarybuilding

    • WTP has been commercially operated for 150 l/s• Tariff: Rp 2.098,- /m3

    Technical and Investment Data

    Capacity : 500 l/s

    Total Investment : Rp 71,501 billion

    Cooperation period : 25 Years

    Bulk water priceRp. 2.098,-

  • 8/20/2019 PPP Water Di Indonesia

    17/36

    17

    PPP PROJECTS IN TENDER PROCESS

    No ProjectCapacity

    (l/s)

    House

    Connection

    Population

    served

    (persons)

    Total

    Investment

    (Billion

    Rupiah)

    1 PPP Project –

    Umbulan East

    Java

    4.000 320.000 1.300.000 2.112

    2 PPP Project –

    Bandar Lampung500 42.000 210.000 718

    TOTAL 4.500 362.000 1.510.000 2.830

  • 8/20/2019 PPP Water Di Indonesia

    18/36

    18

    Technical and Investment Data

    PPP Scheme:

    BOT (Built Operate Transfer)

    Capacity:4.000 liter/detik

    Investment Estimate:

    Rp 2.112.090.210.000

    Utilization:

    1,3 million population or 320.000 HC

    Scope of Works:

    Construction of Intake 4.000 l/s

    Procurement and raw water

    transmission installation ND 1000-1800mm for 97 km

    Construction of 2 Pump houses 4000

    L/s with its supplementary equipment

    Offtake system : 16 offtake units andreservoir in 5 Cities/Regencies

    5 Shortlisted Bidders:

    1. Consortium of Marubeni Corp., Nippon

    Koei Co. Ltd., PT Perkom Indah Murni2. Consortium of China Harbour ENG. Co.

    Ltd., Sound Global Ltd., & PT Manggala

    Purnama Sakti

    3. Consortium of Kukdong Eng. & Const.

    Co. Ltd., PT Brantas Abipraya, PT Grundfos

    Pompa, PT Pralon

    4. Consortium of PT Amerta Bumi Capital,

    PT Bakrieland Development Tbk., Beijing

    Enterprise Water Group

    5. Consortium of PT Medco – PT BangunCipta Kontraktor

    PPP Cooperation

    SPAM Umbulan 4000 L/s

    - GCA : Governor of East Java

    - Offtaker:

    1. PDAB Jawa Timur: 100 L/s

    2. PDAM Kab. Pasuruan: 420 L/s

    3. PDAM Kota Pasuruan: 110 L/s

    4. PDAM Kab. Sidoarjo: 1370 L/s

    5. PDAM Kota Surabaya: 1000 L/s

    6. PDAM Kab. Gresik: 1000 L/s

    Tender Process

    Project Location

    Kab. Pasuruan, Kota Pasuruan, Kab.Sidoarjo, Kota Surabaya, Kab. Gresik

    UMBULAN WATER SUPPLY PROJECTEAST JAVA

  • 8/20/2019 PPP Water Di Indonesia

    19/36

    19

    Tender Stages Date

    (A) Publication of Final Request of Proposal (RFP) 30 September 2015

    (B) Deadline of Proposal submission 13 November 2015

    (C) Confirmation of Bidder Winner 31 December 2015

    (D) Signing of Contract Agreement February 2016

    (E) Financial Close December 2016

    (F) Construction Period December 2016 – December 2018

    (G) Commercial Operation December 2018

    (H) Concession Period 25 years commenced from

    commercial operation

    Schedule of Tender Process

    UMBULAN WATER SUPPLY PROJECTEAST JAVA

  • 8/20/2019 PPP Water Di Indonesia

    20/36

    20

    Tender Process

    BANDAR LAMPUNG WATER SUPPLY PROJECT

    Technical and Investment Data

    PPP Modality:BOT + (Built Operate Transfer +)

    Capacity:

    500 l/s

    -Investment Estimate: Rp 718 Billion

    - Cooperation Period : 25 years

    - Bulk water tariff : Rp 3.000 (2015)

    Utilization :

    42.000 HC

    Scope of Works:

    • Construction of intake 500 L/s

    • Procurement and Installation of

    raw water transmission pipe ND 800

    mm for 27 km• Construction of 2 WTPs @ 250 L/s

    with its supplementary equipment

    Short Listed Bidders:

    1. Abeima and PT Wijaya Karya Persero Tbk

    2. Acuatico and Mitsubishi Corporation

    3. Hyundai Engineering and Construction,Itochu Corporation and PT Potum Mundi

    Infranusantara

    4. Manila Water and Great Giant Pineapple

    PPP Cooperation

    SPAM Bandar Lampung 500 l/s

    - GCA : Mayor of Bandar Lampung

    Project Status:

    • Announcement of shortlisted bidders: 31 May 2012

    •Submission of Guarantee Application Document (GAP): 16 Agustus 2012

    • VGF Approval by Ministry of Finance has been issued on 7 May 2015

    • One on one meeting conducted on 1 September 2015

    • Final RFP issued on 15 September 2015

  • 8/20/2019 PPP Water Di Indonesia

    21/36

    21

    Tender Stages Date

    (A) Publication of Final RFP 15 September 2015

    (B) Aanwijzing  15 October 2015

    (C) Preliminary Process : Room Data Opening 15 September 2015  – 31 October 2015

    (D) Last date to submit the date to form initial

    consortium

    23 November 2015

    (E) Closing of proposal document 22 December 2015

    (F) Opening of Proposal documents (Envelope I)

    and commencement of preliminary study of

    Envelope I as stipulated on article 3.16 and 7.3

    23 December 2015

    (G) Opening of Proposal Documents (Envelope II)and commencement of proposal document

    evaluation (technical and financial evaluation)

    1 February 2016

    (H) Announcement of Preferred Bidders 12 February 2016

    Schedule of Tender Process

    BANDAR LAMPUNG WATER SUPPLY PROJECT

  • 8/20/2019 PPP Water Di Indonesia

    22/36

    22

    STATUS UPDATE

    • VGF Approval for PPP Project of SPAM Umbulan has been granted by the Ministry of Finance

    by letter of Minister of Finance number S-759/MK.08/2015 dated 29 September 2015

    concerning Approval of Viability Gap Fund

    • Tender process has been commenced for PPP Project of SPAM Umbulan through the

    issuance of Final Request for Proposal (RFP) on 30 September 2015

    • VGF Approval for PPP Project of SPAM Bandar Lampung has been granted by the Ministry of

    Finance by letter of Minister of Finance number S-362/MK.08/2015 dated 7 May 2015

    concerning Approval of Viability Gap Fund

    • Tender process has been also commenced for PPP Project of SPAM Bandar Lampung through

    the issuance of Final Request for Proposal (RFP) on 15 September 2015

    TENDER PROCESS UPDATE

  • 8/20/2019 PPP Water Di Indonesia

    23/36

    23

    READY TO OFFER

    PPP WATER SUPPLY PROJECTS

    No ProjectCapacity

    (l/s)

    House

    Connection

    Population

    served

    (persons)

    Total

    Investment

    (Billion

    Rupiah)

    Land

    Acquisition

    1 Pondok Gede,

    Bekasi City,West Java

    300 24.000 120.000 285,5 100%

    2 Gresik Regency 2.000 160.000 800.000 1.364,0 Under Process

    TOTAL 2.300 184.000 920.000 1.649,5

  • 8/20/2019 PPP Water Di Indonesia

    24/36

    24

    MedanSatria

    BekasiUtara

    BekasiTimur

    BekasiBarat

    BekasiSelatan

    RawaLumbu

    Mustikajaya

    BantarGebang

    Jati Asih

    PondokGede

    PondokMelati

    JatiSampurna

    PONDOK GEDE WATER SUPPLY PROJECT

    BEKASI CITY, WEST JAVA

    Background of the Project:

    1. High population growth

    of Bekasi city ( 3% per

    year). Bekasi city is a

    prominent satellite city

    of Jakarta.2. Service coverage is only

    21% in 2013

    3. Rapid growth of

    housings, apartment,

    and commercial

    businesses4. High commitment from

    the Central

    Government

    Project Location

    Service Area

    Pondok Gede, Jati Asih of Bekasi City

  • 8/20/2019 PPP Water Di Indonesia

    25/36

    25

    PONDOK GEDE WATER SUPPLY PROJECT

    BEKASI CITY, WEST JAVA

    Project Scope

    - WTP, capacity: 300 L/s

    - Reservoir: 3000 m3

    - Distribution pipeline 40 km

    - Estimated Investment IDR 285,5 billion

  • 8/20/2019 PPP Water Di Indonesia

    26/36

    26

    PONDOK GEDE WATER SUPPLY PROJECT

    BEKASI CITY, WEST JAVANo Document Preparation Progress

    1 Readiness Report Completed

    2 Pre FS review Ongoing

    a. Legal Study Ongoing

    b. Technical Study Raw water study has not

    finished

    c. Market Study Pre-Survey RDS

    d. Economical Study Ongoing

    e. Financial Study Ongoing

    f. Risk Study Ongoing

    g. PPP Scheme recommendation Completed

    h. Environmental and Social Studies Completed

    i. Government Support Study Ongoing

    3 ENVIRONMENTAL IMPACT

    ASSESSMENT

    Completed

    4 PQ Document Completed

    Type of modality :

    Build Operate Transfer

    (BOT)

    IRR :

    15%

    Bulk water tariff :

    Rp 4.800

    GCA :

    Mayor of Bekasi City

    Timeline Schedule:

    Tender: 2016

    Contract Signed: 2016Construction: 2017

    Operation: 2018

  • 8/20/2019 PPP Water Di Indonesia

    27/36

    27

    PDAM GRESIK REGENCY

    Scope of Works

    1. Construction of intake 2200 L/s2. Construction of WTP 2 x 1000 l/s with its supplementary

    building

    3. Procurement and installation of ME

    4. Procurement and installation of primary, secondary, and

    tertiary distribution pipelines

    Technical and Investment Data

    Capacity : 2000 l/s

    Total Investment : Rp 1.364 Billion

    Tariff adjustment : 6% annually

    Cooperation period : 25 Years

    Schedule :Tender: December 2015Financial Close : 2016

    Construction : 2017

    Service Area :Gresik Kota and Gresik

    Utara (Bungah Sub-district)

    Status Update

    Completion of Feasibility StudyCompletion of PQ and RFP DocumentCapacity Building on November 2015Completion of tender documents

    Gerak Sembayat Dam

  • 8/20/2019 PPP Water Di Indonesia

    28/36

    28

    POTENTIAL PPP PROJECTS IN WATER SECTOR

    No ProjectCapacity

    (l/s)

    House

    Connection

    Population

    served

    (persons)

    Total

    Investment

    (Billion

    Rupiah)

    1 West Semarang 1.050 84.000 420.000 824,0

    2 Serang Regency 280 22.400 112.000 103,3

    3 Pekanbaru City 2.070 165.600 828.000 1.950,0

    4 SPAM Jatigede 3.500 280.000 1.400.000 1.504,0

    5 SPAM Karian 6.000 480.000 2.400.000 3.020,0

    TOTAL 12.648 1.032.000 5.160.000 7.401,3

  • 8/20/2019 PPP Water Di Indonesia

    29/36

    29

    WEST SEMARANG MUNICIPALITY WATER

    PROJECT, CENTRAL JAVA

    Background of the Project:1. As the capital city of Central Java, Semarang city

    has high population growth (3% in 2012)

    2. Existing service coverage is 61%

    3. High demand of clean water

    Service Area

    West Part of Semarang City, Central

    Java

    Type of modality :

    Build Operate Transfer (BOT)

    Project Type :

    Solicited

    Capacity :

    1.050 l/s

    IRR :

    15%

    Estimated Investment:

    Rp 824 billion

    Utilization:

    420.000 population (84.000 HC)

    Tariff:

    Rp 4.000,-

  • 8/20/2019 PPP Water Di Indonesia

    30/36

    30

    WEST SEMARANG MUNICIPALITY WATER

    PROJECT, CENTRAL JAVA

    Component Proposed design capacity

    Intake1,050 L/sec, Jatibarang Dam

    (on going project)

    Raw water

    pipeline 2.2 km (dia. 900mm x 2 line)

    WTP 1,050 L/sec, Rapid sand filter

    Transmissionpipeline

    WTP – Reservoir 5: 3.1 km

    (dia. 700mm)

    WTP – Reservoir 1: 9.7 km(dia. 450mm)

    WTP – Reservoir 2: 2.4 km

    (dia. 450mm)

  • 8/20/2019 PPP Water Di Indonesia

    31/36

    31

    WEST SEMARANG MUNICIPALITY WATER

    PROJECT, CENTRAL JAVA

    Status Update

    • Jatibarang Dam is ready to operate;

    • Raw Water Exploitation License has been issued;

    • The progress of Land Acquisition is 5%; the rest of the acquisition plan has been

    alocated in Local Government Budget;

    • VGF has been approved principally by the Minister of Finance; hence waiting for the

    VGF recommendation letter and the issuance of VGF approval from the Minister of

    Finance;

    • Umbrella agreement of the Availability payment in Local Government Budget has not

    been strongly stated in the Regulation of the Ministry of Home Affairs No.37/2014

  • 8/20/2019 PPP Water Di Indonesia

    32/36

    32

    SPAM CIBAJA IN SERANG REGENCY

    Raw Water Source

    Ciujung River

    Scope of Works

    - WTP of 280 L/s- Construction of Reservoir- Distribution pipelines- Investment: Rp 103,3 Billion- PPP modality : BOT

    Service Area

    Serang Timur Subdistrict: Cikande, Kibin, Bandung,and Jawilan (CIBAJA).

    Status

    - Completion of Feasibility Study- Preparation for tender process

  • 8/20/2019 PPP Water Di Indonesia

    33/36

    33

    PEKANBARU WATER SUPPLY

    Status Update

    - Land acquisition will be completed in 2015- GCA will be Government of Pekanbaru Municipal- EIRR of the project : 19,32%

    Scope of Works

    - WTP: 700 L/s (first stage)- WTP 1370 L/s (second stage)- Intake unit- Raw water Transmission pipeline- Treated water transmission pump and pipeline- Distribution reservoirs (towers)

    Timeline Schedule

    - Pre Qualification : 2016- Tender process : 2016- Evaluation and award : 2017- Contract signing : 2017

  • 8/20/2019 PPP Water Di Indonesia

    34/36

    34

    JATIGEDE WATER SUPPLY PROJECT

    Status Update

    - Jatigede dam has been completed, water filling is being done and targeted to be finishedon mid 2015

    - DED of the intake and raw water transmission are being done by West Java Province- Pre FS completion will be done in 2016

    Scope of Works

    - WTP: 3.500 L/s- Reservoir: 5.000 m3

    - Transmission pipeline : 1.600mm, 7.150 m.

    - Investment Rp 1.504 billion

    Service Area

    - Sumedang Regency- Majalengka Regency- Indramayu Regency- Cirebon Regency- Cirebon Municipality

  • 8/20/2019 PPP Water Di Indonesia

    35/36

    35

    KARIAN WATER SUPPLY PROJECT

    Status Update

    - Waiting for the damconstruction to be finished,construction is planned to becompleted in 2019

    Scope of Works

    - WTP: 6.000 L/sTransmission pipeline : 90 km

    IMPLEMENTATION PLAN

    Tender Process : 2016

    Construction : 2016-2019 Operation : 2020

    Service Area

    Serang, Maja, Rangkasbitung,

    Tigaraksa, Kab. Tangerang,Serpong, Parung, dan Jakarta

    SERANG & CILEGON

    KARIAN (14.6)

    Tigaraksa

    P.PANJANG

    SERPONG

    TANGERANG

    6.0

    2.5

    0.2

       C   i  u  y

      a   h   T  u  n  n  e   l

    9.1   C   i  u   j  u  n  g   R   i  v  e  r

    (Unit :

    /s)

    4.0

    6.2

    R.bitung

    Maja 0.1

    0.3

    1.5

    Petir

    Pamarayan

    Water Treatment Plant

    Intake or Tapping Point5.5

    1.5

    3.2

    1.3

    KataTangeran

    g

    KotaTangesel

    W.

    Jakarta

  • 8/20/2019 PPP Water Di Indonesia

    36/36

    36

    TERIMA KASIHTHANK YOU

    FOR FURTHER INFORMATION,

    PLEASE CONTACT:

    Mr. Tamin M. Zakaria Amin, MSc, MBA

    Chairman of BPPSPAM

    Jl. Wijaya I No.68 Kebayoran Baru,

    Jakarta Selatan, Indonesia

    Phone : +6221 72789126

    Fax : +6221 7260520

    Email : [email protected]

    www bppspam com