Review by Chief Secretary,Government of MP
25th April 2011
Cabinet Committee under the Chairmanship of Hon'ble Chief Minister
State/Department Level Empowered Committees to streamline projects approval
State level capacity building with IIM Indore. 102 officers trained
MP Project Development Fund Scheme for financial assistance for project development
Comprehensive omnibus PPP Policy being drafted
Pre-Sankalp 2013 (up to May 2010)Projects awarded : Rs 4,600 Cr (approx)
Post-Sankalp 2013 (since May 2010)Targets allotted : Rs 18,500 CrProjects sanctioned by SLEC : Rs 3,650 CrTotal sanctioned projects : 34Sectoral sanctions
Road : 29 Tourism : 02 Health, Warehousing & Logistics, Industry : 03
S. No. Department No. Cost
1 Public Works 21 3,454.62
2 Urban Dev 6 192
3 Commerce & Industries 1 35
4 Sports & Youth Welfare* 1 900
Total 29 4,581.62
* Post award review requested by developer
Awarded/Under Construction Till Date
S. No. Department No. Cost
1 Public Works 7 1,172.51
2 Transport 1 1,094
3 Forest 1 2
Total 9 2,268.51
Under Bidding
S. No. Department No. Cost
1 Public Works 26 2,688.67
2 Health 1 67
3 Tourism 2 20
4 Housing & Environment 2 2
5 Forest 1 10
6 Agriculture 1 138.50
Total 33 2,925.50
No. Department Target (2010-12) Achievement
1 Medical Education 200.00 0.00
2 Public Works (Road Sector) 6000.00 3,861.23
3 School Education (DPI) 900.00 0.00
4 Horticulture & Food Processing 500.00 174.75
5 School Education (Rajya Shiksha Kendra) 500.00 0.00
6 Urban Admin & Development 1000.00 531.40
7 Commerce, Industries & Employment 4000.00 751.00
8 Energy 2000.00 0.00
9 Biotech 200.00 200.00
10 Food & Civil Supplies (Warehousing) 500.00 0.00
11 Transport 1200.00 1,094.00
12 Health 100.00 67.00
13 Higher Education 100.00 0.00
14 Technical Education 100.00 0.00
15 Tourism 200.00 20.00
16 Housing 1000.00 3,042.00
17 Water Resources To be indicated by Department 0.00
18 Forest 0.00 142.00
19 Agriculture 0.00 138.50
20 Sports 0.00 900
Total 18,500.00 10,921.88
Back
Planning Commission is launching ‘Viability Support Fund’ scheme for PPP in social sector. The State Govt. has requested inclusion of ‘Medical Education’ in VSF scheme
Planning commission is preparing model documents for 400 bed medical colleges, which is likely to take some time
Concept paper on medical colleges under PPP prepared by the Department is concurred with
Suggested Thrust Areas
Setting up of super specialty tertiary care facilities / diagnostic facilities in existing medical college hospitals
Setting up of new medical colleges attached / not attached to district hospitals
Way Forward – Medical EducationWay Forward – Medical Education
Back
Pipeline Under Bidding Construction Completed/Operational
Total
Number
Cost Number Cost Number Cost Number Cost Number Cost
0 0 0 0 10 2283.38 15 1958.97 25 4242.35
Pipeline Under Bidding Construction Completed/Operational
Total
Number Cost Number
Cost Number Cost Number Cost Number Cost
Existing
0 0 0 0 10 2283.38 15 1958.97 25 4242.35
New 0 0 26 2,688.67 3 384.78 0 0 29 3073.45
Total 0 0 26 2,688.67 13 2668.16 15 1958.97 54 7315.80
Target : Rs. 6,000 Cr.
Achievements Pre-Sankalp : Rs. 4,242.35 Cr.
Achievements Post-Sankalp : Rs. 384.78 Cr.
Back
Annuity based PPP projects for redevelopment of MDRs
Modified annuity based model as suggested by M/s IDFC may be examined
Post-COD Contract Management Unit (CMU) may be established within Road Development Corp. (RDC) to monitor around 50 projects
Way Forward – PWDWay Forward – PWD
IIPDF approved by ADB/DEA for Model Schools scheme of GoI (Rs. 750 crore) and Girls Hostels for Model Schools (Rs. 150 crore). Projects now abandoned
Planning Commission is launching ‘Viability Support Fund’ scheme for PPP in social sector including school education
No model documents available for this sector Suggested Thrust Areas
Computer-Aided Learning Systems/Computer Training through private sector participation may be pursued in underserved areas
Value-addition (Teachers’ Training, Personality Dev, English, Vocational, Hobby, etc.)
Greenfield projects in underserved areas and brownfield expansion (new rooms, libraries, labs, etc.) may be looked into
Availability-based Private Finance Initiative model could be considered for bigger infrastructure (eg. Secondary schools)
Back
Back
Pipeline Under Bidding Construction Completed/Operational
Total
Number
Cost Number
Cost Number
Cost Number
Cost Number
Cost
3 500 0 0 0 0 0 0 3 500
Pipeline Under Bidding Construction Completed/Operational
Total
Number
Cost Number
Cost Number
Cost Number
Cost Number
Cost
Existing
3 174.75* 0 0 0 0 0 0 3 174.75
New 0 0 0 0 0 0 0 0 0 0Total 3 174.75 0 0 0 0 0 0 3 174.7
5
Target : Rs. 500 Cr.
Achievements Pre-Sankalp : Rs. 0 Cr.
Achievements Post-Sankalp : Rs. 0
* Cost of 3 projects, after revision
Project/Location Type/
Cost
Sector Dept/
Agency
Status/Remarks
Food Park on 80 acres at Karmadi, Dist Ratlam
BOOT
63.25
Industry
Horticulture & Food Processing
M P Agro Dev Corp Ltd
Pipeline : since 2010
IIPDF approved.TA : E&Y. RFQ done, 4 cos shortlisted. Now separate tenders are invited for each food park
Food Park on 50 acres at Adampur Chhawni, Dist Bhopal
BOOT
54.43
Food Park on 60 acres at Anjana Saraiyat, Dist Harda
BOOT
57.07
Back
Back
Suggested Thrust Areas Operations & management of nurseries may be looked into to improve
seed & sapling availability. Concept note on the same submitted by PPP cell on the department’s request
Farmer Service Centres could be set up in rural areas in cooperation with private developers
CONCOR and National Horticulture Board have recently started refrigerated trains with associated facilities (warehousing, etc) on railway land. Department may pursue the matter with these agencies
Way Forward – Horticulture & Food Way Forward – Horticulture & Food ProcessingProcessing
Back
Pipeline Under Bidding Construction Completed/Operational
Total
Number
Cost Number
Cost Number
Cost Number
Cost Number
Cost
10 506.47 2 24.90 4 187.00 2 5.00 18 723.37
Pipeline Under Bidding Construction Completed/Operational
Total
Number
Cost Number
Cost Number
Cost Number
Cost Number
Cost
Existing
10 506.47
2 24.90 4 187.00
2 5.00 18 723.37
New 0 0 0 0 0 0 0 0 0 0
Total 10 506.47
2 24.90 4 187.00
2 5.00 18 723.37
Target : Rs. 1,000 Cr.
Achievements Pre-Sankalp : Rs. 192 Cr.
Achievements Post-Sankalp : Rs. 0 Cr.
Project/Location
Type/
Cost
Sector Dept/
Agency
Status/Remarks
Supply augmentation and 24x7 supply @135 LPCD
Augmentation through river Choti Tawa (back water of Indira Sagar Project near Charkhera village)
Khandwa
BOT
105
Urban Water
UADD
Khandwa M C
Construction
90% grant under UIDSSMT.
Awarded Sep 09.
Concessionaire – Vishwa Infra, Hyderabad.
Rs. 11.95/KL
25-year Concession.
Construction underway - Intake Well, Clear Water Feeder Main, OHTs, etc.
(1805015)
Back
Project/Location Type/
Cost
Sector Dept/
Agency
Status/Remarks
Supply augmentation and 24x7 supply @135 LPCD
New source –
Modhikheda Dam
Shivpuri
BOT
65
Urban Water
UADD
Shivpuri Nagar Palika Parishad
Construction
90% grant under UIDSSMT.
Awarded in Sep 09.
Concessionaire – Doshian-Veolia, Ahmedabad.
Rs. 15.40/KL charge.
25-year Concession.
Financial Closure achieved through IDBI Bank.
Construction underway
(1808018)
Back
Project/Location
Type/
Cost
Sector Dept/
Agency
Status/Remarks
Foot Over Bridges
Rau (near Indore)
BOT
3
Urban UADD
Rau Nagar Palika Parishad
Construction
Concessionaire - Edward (Division of Swift Intermedia Convergence, Indore.
Premium - Rs.20,50,000/-
(1801017)
Back
Project/
Location
Type/
Cost
Sector Dept/
Agency
Status/Remarks
Multi Level Parking at 7 sites
Indore
BOOT
14
Urban UADD
Indore M C
Construction
Awarded in end-2009
(1804014)
Back
Project/Location Type/
Cost
Sector Dept/
Agency
Status/Remarks
Multi Level Parking at Old Bus Stand Kampoo (731.25 Sq Mts and
2027.96 Sq Mts) Gwalior
BOOT
18.55
Urban UADD
Gwalior M C
Pipeline : since 2009
TA : CRISIL.
IIPDF approved
Multi Level Parking in front of Nigam Shopping Complex Daulat Ganj (300.00 Sq Mt) Gwalior
8.2
(1803011/12)
Back
Project/
Location
Type/
Cost
Sector Dept/
Agency
Status/Remarks
Hospital Project at Old Nigam Work Shop, Dholi Bua ka Pul (2330.60 Sq Mts)
Gwalior
BOOT
30.3
Health UADD
Gwalior M C
Pipeline : since 2009
TA : CRISIL. IIPDF approved.RFQ docs prepared
(1803010)
Back
Project/
Location
Type/
Cost
Sector Dept/
Agency
Status/Remarks
Parking Cum Commercial at Gandhi Mkt, Maharaj Bada for 300 cars (5,228 Sq. Mt.)
Gwalior
BOOT
50
Urban UADD
Gwalior M C
Pipeline : since 2009
5 bidders shortlisted.
HC ordered status quo
(1803009)
Back
Project/Location Type/
Cost
Sector Dept/
Agency
Status/Remarks
Multi Level Parking at M.P. Nagar
Bhopal
BOOT
38.67
Urban UADD
Bhopal M C
Pipeline : since 2009
TA : CRISIL.
IIPDF approved.
Feasibility report submitted
Multi Level Parking at New Market
Bhopal
51
(1802001/6)
Back
Project/Location
Type/
Cost
Sector Dept/
Agency
Status/Remarks
Bus Terminals at Nadra, Putlighar and Halapura
Bhopal
BOOT
43.6
Urban UADD
Bhopal M C
Pipeline : since 2009
Feasibility report submitted.IIPDF approved. RFP being prepared
TA – CRISIL
(1802004)
Back
Project/
Location
Type/
Cost
Sector Dept/
Agency
Status/Remarks
24x7 supply and NRW Water reduction atNehru Nagar, Kotra, Ambedkar Nagar Bhopal
OMT
10.96
Urban Water
UADD
Bhopal M C
RFP last date 02-feb-11.
Proposal sent to Council for approval
24x7 supply and NRW Water reduction atRajendra Nagar, Indore
OMT
13.94
UADD
Indore M C
RFP last date 15-jan-11
24x7 supply and NRW Water reduction atGwalior
OMT UADD
Gwalior M C
RFQ done
NRW - Non Revenue Water Back
Project/Location Type/
Cost
Sector Dept/
Agency
Status/Remarks
City-wide Reduction of Non-Revenue Water and Improvement of Water Supply Services
Bhopal
BOT
246.10 Cr
Urban Water
UADD
Bhopal M C
Pipeline
TA : CRISIL
RFQ being prepared
(1802005)
Back
Back
Concept paper on Urban Water prepared and submitted by PPP Cell
Centralised Project Development Facility for streamlined operations may be created by the Department due to large number of municipal entities
Model Concession documents for Urban Water and Waste Water being developed by Planning Commission which is likely to take some time
Suggested Thrust Areas Urban Water
Waste Water
Solid Waste Management
Energy efficiency
Way Forward – UADDWay Forward – UADD
Back
Pipeline Under Bidding Construction Completed/Operational
Total
Number
Cost Number
Cost Number
Cost Number
Cost Number
Cost
2 400 0 0 1 35 0 0 3 435
Pipeline Under Bidding Construction Completed/Operational
Total
Number
Cost Number
Cost Number
Cost Number
Cost Number
Cost
Existing
2 400 0 0 1 35 0 0 3 435
New 1 351 0 0 0 0 0 0 1 351
Total 3 751 0 0 1 35 0 0 4 786
Target : Rs. 4,000 Cr.
Achievements Pre-Sankalp : Rs. 35 Cr.
Achievements Post-Sankalp : Rs. 0 Cr.
Project/Location Type Sector Dept/
Agency
Status/Remarks
Minerals-based SEZ on 250 acres
Village Hargarh, Dist Jabalpur
BOOT
200
Industry Commerce, Industry and Employment
AKVN Jabalpur
Pipeline : since 2009
IIPDF approved.
TA : Feedback Ventures
Back
(1104003)
Project/Location
Type/
Cost
Sector Dept/
Agency
Status/Remarks
Agro-based SEZ on 248 acres
Village Umariya-Dungariya, Jabalpur
BOOT
200
Industry Commerce, Industry and Employment
AKVN Jabalpur
Pipeline : since 2009
IIPDF applied for.TA : Deloitte.RFQ being finalised
Back
(1104004)
Project/Location Type/
Cost
Sector Dept/
Agency
Status/Remarks
2 land parcels -12 acres for parking 500 trucks- 6 acres for warehousing facilities, and other amenities (auto parts, daily needs, dormitories, paved roads, telephone, toilets, chemist, offices, etc)Mandideep, near Bhopal
BOOT
35
Warehousing and Logistics
Commerce, Industry and Employment
AKVN Bhopal
Construction
Concessionaire – Sandhya Prakash.
Awarded in Jul 08.
Premium 3 Cr
Parking cum Logistics – (1102001)
Back
Back
Suggested Thrust Areas DMIC Brownfield development of existing industrial estates Operation & maintenance of existing industrial estates
Way Forward – Commerce, Way Forward – Commerce, Industries and EmploymentIndustries and Employment
Way Forward – EnergyWay Forward – Energy
Model Concession Agreement for transmission of electricity available
Suggested Thrust Areas Distribution District Franchisee Transmission of electricity
Back
Back
Pipeline Under Bidding Construction Completed/Operational
Total
Number
Cost Number
Cost Number
Cost Number
Cost Number
Cost
1 200 0 0 0 0 0 0 1 200
Pipeline Under Bidding Construction Completed/Operational
Total
Number
Cost Number
Cost Number
Cost Number
Cost Number
Cost
Existing
1 200 0 0 0 0 0 0 1 200
New 0 0 0 0 0 0 0 0 0 0
Total 1 200 0 0 0 0 0 0 1 200
Target : Rs. 200 Cr.
Achievements Pre-Sankalp : Rs. 0 Cr.
Achievements Post-Sankalp : Rs. 0 Cr.
Project/Location Type/
Cost
Sector Dept/
Agency
Status/Remarks
BioTech Park on 181 acres (Common research facilities/
Residential/Commercial)
Indore
BOOT
200
Industry
Biotechnology
M P Biotechnology Council
Pipeline : since 2010
IIPDF approved.
TA : Deloitte.
RFQ invited, 3 offers submitted
Biotech Park Indore – (5702001)
Back
Way Forward – Food & Civil Supplies Way Forward – Food & Civil Supplies (Warehousing)(Warehousing)
Model Documents for modern storage facilities being prepared by Planning Commission, which is likely to take some time
FCI is advocating major thrust on PPP for modern storage facilities by advancing longer guarantee period and modifying other essential requirements
Assured market (demand far exceeds supply) Major Thrust Areas
PPP under Bundelkhand Package (RFP for TA prepared and forwarded by PPP Cell)
Logistics Parks / Integrated Farmer Facilitation Centres
Back
Back
Pipeline Under Bidding Construction Completed/Operational
Total
Number
Cost Number
Cost Number
Cost Number
Cost Number
Cost
1 1,094 0 0 0 0 0 0 1 1,094
Pipeline Under Bidding Construction Completed/Operational
Total
Number
Cost Number
Cost Number
Cost Number
Cost Number
Cost
Existing
0 0 0 0 0 0 0 0
New 0 0 0 0 1 1,094 0 0 1 1,094
Total 0 0 0 0 1 1,094 0 0 1 1,094
Target : Rs. 1,200 Cr.
Achievements Pre-Sankalp : Rs. 0 Cr.
Achievements Post-Sankalp : Rs. 1,094 Cr.
Project/Location Type/
Cost
Sector Dept/
Agency
Status/Remarks
Check-Post barriers at entry points of MP (24)
BOT
1,094 Cr
Transport Transport
Transport
Construction
TA : MPRDC
Awarded in Nov 2010.
Concessionaire : MP Border Check Post Dev. Co. Ltd., Mumbai
Back
(0801001)
Back
Pipeline Under Bidding Construction Completed/Operational
Total
Number
Cost Number
Cost Number
Cost Number
Cost Number
Cost
0 0 0 0 0 0 0 0 0 0
Pipeline Under Bidding Construction Completed/Operational
Total
Number
Cost Number
Cost Number
Cost Number
Cost Number
Cost
Existing
0 0 0 0 0 0 0 0 0 0
New 0 0 1 67 0 0 0 0 1 67
Total 0 0 1 67 0 0 0 0 1 67
Target : Rs. 100 Cr.
Achievements Pre-Sankalp : Rs. 0 Cr.
Achievements Post-Sankalp : Rs. 0 Cr.
Project/Location
Type/
Cost
Sector Dept/
Agency
Status/Remarks
Dindayal Chalit Aspatal Yojana in backward areas (diagnostics, primary health care, etc)
BOT
67 Cr
Health Health
NRHM
Bidding
SLEC on 17-01-11 (final approval).
Bids invited
Back
(1702001)
Back
Planning Commission is launching ‘Viability Support Fund’ scheme for PPP in social sector including Health sector
Planning commission is preparing model documents for 200 bed secondary care hospital, which is likely to take some time
Suggested Thrust Areas
Setting up of specialty tertiary care facilities / diagnostic facilities in existing district hospitals
PHC management contract
NCD Towers in existing district hospitals
Avenues in alternative medicine, such as ayurveda and naturopathy, may be explored
Way Forward – HealthWay Forward – Health
Way Forward – Higher EducationWay Forward – Higher Education
New scheme of Planning Commission (Viability Support Fund) announced in Social Sector, includes higher education,
Suggested Thrust Areas Computer-Aided Learning Systems/Computer Training through private
sector participation may be pursued in underserved areas
Value-addition (Teachers’ Training, Personality Dev, English, Vocational, etc.)
Greenfield projects in underserved areas and brown-field expansion (new rooms, libraries, labs, etc.) may be looked into
Availability-based Private Finance Initiative model could be considered for infrastructure
Back
Way Forward – Technical EducationWay Forward – Technical Education
New scheme of Planning Commission (Viability Support Fund) announced in Social Sector, includes skill development
New scheme on skill development under PPP launched by Planning Commission
Suggested Thrust Areas
Skill Development
Centre of Excellence
Teacher’s Training
Availability based Private Finance Initiative model could be considered for infrastructure
Back
Pipeline Under Bidding Construction Completed/Operational
Total
Number
Cost Number
Cost Number
Cost Number
Cost Number
Cost
0 0 0 0 0 0 0 0 0 0
Pipeline Under Bidding Construction Completed/Operational
Total
Number
Cost Number
Cost Number
Cost Number
Cost Number
Cost
Existing
0 0 0 0 0 0 0 0 0 0
New 0 0 2 20 0 0 0 0 2 20
Total 0 0 2 20 0 0 0 0 2 20
Target : Rs. 200 Cr.
Achievements Pre-Sankalp : Rs. 0 Cr.
Achievements Post-Sankalp : Rs. 0 Cr.
Back
Project/Location Type/
Cost
Sector Dept/
Agency
Status/Remarks
Water-based Tourism activities on Indira Sagar Dam – Plot I and II
Village Hanvantiya, Dist Khandwa
DBFOT
10 Cr each
Tourism Tourism
M P Tourism Dev Corp
Bidding
SLEC on 17-01-11 (final approval).
Bids invited
Back
Suggested Thrust Areas Development of way-side amenities
Institutes for training in hospitality and tourist guides
Performance-based contracts for development and marketing of Tourism Circuits
Development of Convention Centers at important business tourist destinations
Way Forward – TourismWay Forward – Tourism
Back
Pipeline Under Bidding Construction Completed/Operational
Total
Number
Cost Number
Cost Number
Cost Number
Cost Number
Cost
5 3,040 2 2 0 0 0 0 7 3,042
Pipeline Under Bidding Construction Completed/Operational
Total
Number
Cost Number
Cost Number
Cost Number
Cost Number
Cost
Existing
5 3,040 2 2 0 0 0 0 7 3,042
New 0 0 0 0 0 0 0 0 0 0
Total 5 3,040 2 2 0 0 0 0 7 3,042
Target : Rs. 1,000 Cr.
Achievements Pre-Sankalp : Rs. 0 Cr.
Achievements Post-Sankalp : Rs. 0 Cr.
Back
Project/Location Type/
Cost
Sector Dept/
Agency
Status/
Remarks
Kalpana Nagar Swimming Pool O & M
Dist Bhopal
OMT
1
Urban Housing & Environment
CPA
Bidding : since 2010
Bids invited and offers received
O & M of Fitness Centre Prakash Swimming Pool
Dist Bhopal
OMT
1
(3202001/2)
Back
Project/Location Type/
Cost
Sector Dept/
Agency
Status/Remarks
Logistics Hub at Talavali Chanda on 151.845 hect
Indore
BOOT
500 Cr
Warehousing and Logistics
Housing & Environment
IDA
Pipeline : since 2010
TA Pre-bid on 22 Jun 2010.
TA : E&Y
(3203003)
Back
Project/Location Type/
Cost
Sector Dept/
Agency
Status/Remarks
Sports Complex on 42.140 hect spread over 3 locations
Indore
BOT
500 Cr
Sports Housing & Environment
IDA
Pipeline : since 2010
TA Pre-bid on 22 Jun 2010.
TA : PwC
(3203004)
Back
Project/Location Type/
Cost
Sector Dept/
Agency
Status/Remarks
ISBT on 10 hect
Indore
BOOT
500 Cr
Transport Housing & Environment
IDA
Pipeline : since 2010
TA Pre-bid on 22 Jun 2010.
TA : Grant Thornton
(3203005)
Back
Project/Location Type/
Cost
Sector Dept/
Agency
Status/Remarks
Convention Centre on Airport Road
Indore
BOT
0 Cr
Industry Housing & Environment
IDA
Pipeline: since 2010
TA : Deloitte
(3203006)
Back
Project/Location Type/
Cost
Sector Dept/
Agency
Status/Remarks
Medical Hub at village Tigaria Badshah on 194.727 hect
Indore
BOT
2,000 Cr
Health Housing & Environment
IDA
Pipeline : since 2010
TA Pre-bid on 22 Jun 2010.
TA : PwC
(3203007)
Back
Pipeline Under Bidding Construction Completed/Operational
Total
Number
Cost Number
Cost Number
Cost Number
Cost Number
Cost
2 140 1 2 0 0 0 0 3 142
Pipeline Under Bidding Construction Completed/Operational
Total
Number
Cost Number
Cost Number
Cost Number
Cost Number
Cost
Existing
1 130 0 0 0 0 0 0 1 130
New 1 10 1 2 0 0 2 12
Total 1 130 1 10 1 2 0 0 3 142
Target : Rs. 0 Cr.
Achievements Pre-Sankalp : Rs. 0 Cr.
Achievements Post-Sankalp : Rs. 2 Cr.
Back
Project/Location
Type/
Cost
Sector Dept/
Agency
Status/Remarks
World-Class Zoological Park on 350 ha
Kerwa Dam, Bhopal
BOT
130
Tourism Forest
Forest
Pipeline : since 2010
IIPDF approved.Estimated PD charges Rs. 2 Cr. RFP for TA to be invited
(1001001)
Back
Pipeline Under Bidding Construction Completed/Operational
Total
Number
Cost Number
Cost Number
Cost Number
Cost Number
Cost
0 0 0 0 0 0 0 0 0 0
Pipeline Under Bidding Construction Completed/Operational
Total
Number
Cost Number
Cost Number
Cost Number
Cost Number
Cost
Existing
0 0 0 0 0 0 0 0 0 0
New 1 138.50
0 0 0 0 0 0 1 138.50
Total 1 138.50
0 0 0 0 0 0 1 138.50
Target : Rs. 0 Cr.
Achievements Pre-Sankalp : Rs. 0 Cr.
Achievements Post-Sankalp : Rs. 0 Cr.
Back
Project/Location
Type/
Cost
Sector Dept/
Agency
Status/Remarks
Logistics Park on 115 acres at Powerkheda
Dist Hoshangabad
BOOT
139
Warehousing & Logistics
Agriculture
M P Agriculture Marketing Board (Mandi Board)
Pipeline
SLEC on 26-Feb-11. RFQ invited. 11 bidders applied. RFP is being issued
(1402001)
Back
Currently no target is allocated to the Department
Pawarkheda Logistic Hub project appears promising; can be a good model for such future projects
Suggested Thrust Areas
Greenfield marketing hubs with integrated warehousing facilities may be considered
Farmer facilitation centers
Way Forward – AgricultureWay Forward – Agriculture
Back
Although the Dairy Sector has not been allocated any target however MP State Cooperative Dairy Federation (MPSCDF) is working on a few projects:
1. Setting up new cooperatives under Bundelkhand Package Increasing milch animal population
Providing veterinary services and artificial insemination services
Supply of animal feed and collection of milk
Setting up of bulk chillers / coolers and provision of refrigerated vehicles
2. Jabalpur Dugdh Sangh Improving efficiency in loss making milk cooperatives
Supplying fixed amount of milk to MPSCDF
Initiative – Animal HusbandryInitiative – Animal Husbandry
Back
Project/Location Type/
Cost
Sector Dept/
Agency
Status/
Remarks
-Sports City with Cricket/Hockey/ Football/Indoor/Aquatic/Admin Block/ Hostel on 50 acres - Star Hotel/Golf/ Residential/Commercial on 122 acres- Total 172 acres
Village Satgarhi, Dist Bhopal
Sports- BT
Others-
BOOT
900
Sports Sports and Youth Welfare
Directorate of Sports and Youth Welfare
Construction
Awarded in Sep 08.
Concessionaire – Essel Infra.
Premium 18.10 Cr. Referred to Cabinet Sub-Committee for post-award review
(0901001)
Back
Two projects sanctioned on 15/4/2011 Agency – MP Ecotourism Dev. Board Projects – Ecotourism at Kerwa Dam, Bhopal and Daulatpur
Forest Rest-house Amount – Rs. 3,00,000 per project or 2% of project cost
(whichever is lower)
Back
Back
In-Campus training held at IIM on 30th September to 1st October 2010 : 26 officers trained 4th October to 8th October 2010 : 30 officers trained 31st January to 4th February 2011 : 46 officers
trained
THANK YOU