8/6/2019 PPM Optimization Workbench 00010 Installation Guide
1/20
PPM Optimization WorkbenchInstallation Guide
Release 00010
http://www.platinumdb.com
March 2011
8/6/2019 PPM Optimization Workbench 00010 Installation Guide
2/20
2
Contents
Table of Contents
Introduction 3
Purpose 3
Integration 3
System Requirements and Prerequisites For Installing 3
Performing the installation of PPM Optimization Workbench 00010 5
Post-installation steps For PPM Optimization Workbench 00010 11
ABAP repository object checks of PPM Optimization Workbench 00010 14
Configuration of PPM Optimization Workbench 00010 15
8/6/2019 PPM Optimization Workbench 00010 Installation Guide
3/20
3
Introduction
Purpose
This guide describes the steps required to install PPM Optimization Workbench 00010.
The guide is not intended to address the implementation steps that will be required to makethe functionality accessible through either the Client SAP Enterprise Portal or website.
It specifies the sequence of the installation activities and their dependencies.
The target groups for this guide are the following:
Technical consultants
Application consultants
Project team members
SAP Customer IT department
Integration
PPM Optimization Workbench 00010 runs on the SAP NetWeaver Application Server (SAPNetWeaver AS) Component of SAP NetWeaver 7.02 with SP06 or higher.
The guide does notaddress the implementation steps that will be required for SmartOrgPortfolio Navigator 4.0 or SAP Business Objects 3.1/4.0 setup. These setup steps are coveredin separate documents. SmartOrg Portfolio Navigator 4.0 is typically setup by SmartOrg
analysts, occasionally in SaaS (Software As A Service) model.
System Requirements and Prerequisites For Installing
An SAP PPM 5.0 system based on SAP NetWeaver 7.02 with SP06 as the minimum patchlevel
Minimum patch level of SAP PPM 5.0 is SP4
In most installations PPM Optimization Workbench 00010 has negligible hardware footprint.
Large implementation (over 10,000 project transfers per day) 4GB of RAM, CPU = 2500 SAPS
Small & mid-size implementations 50 to 900 MB of RAM, CPU = 50 to 250 SAPS
Disk/storage space requirements are very insignificant.
SAP Enterprise portal, patch levels corresponding to underlying NetWeaver stack levels 7.02S06.
SmartOrg Portfolio Navigator 4.0 fully configured installation
(Optional, only required for reporting functionality) SAP Business Objects 3.1 or higher
installation
8/6/2019 PPM Optimization Workbench 00010 Installation Guide
4/20
4
Current versions of kernel, tpand R3trans.
tpand R3translevels have to match SAP requirements for patch requirements in NetWeaver 7.02SP 06.
Current SPAM / SAINT Update
SPAM / SAINT update levels have to match SAP requirements for support package levelrequirements in NetWeaver 7.02 SP 06.
Check whether the following prerequisites are met in your system:
o Prerequisite software components (see table CVERS)
Component SAP PPM 5.0
SAP_BASIS 702
SAP_ABA 702
o Prerequisite support package levels
SAP_BASIS 702 Support Package 6
SAP_ABA 702 Support Package 6
o Additional information about the installation
Space required in the transport directory Approx. 2 MB
Net runtime Approx. 5 minutes.
8/6/2019 PPM Optimization Workbench 00010 Installation Guide
5/20
5
Performing the installation of PPM Optimization Workbench 00010. .
1. Activate CI_RPM_ITEM_ATT structure if its not active already.
This step is not necessary if SAP PPM 5.0 has been installed, activated, and at least one custom PPMfield is added in the system.If this is a brand new installation of SAP PPM 5.0 then activate CI_RPM_ITEM_ATT structure afterinserting one DUMMY field into it as it is shown in the screenshot below.
For installations in systems with closed configuration one can use a transport of such activationchange from a development system.
2. Insert the Add-On Installation CD or make it available via general disk storage
Extract the Add-On package such that S210020598664_0000012.PAT file is in EPS/indirectory.
3. Log on to your SAP system in client 000 and as a user that has SAP_ALL authorization.
Do notuse the user SAP* or DDIC.
4. Loading add-on package into the system
These instructions contain steps for loading the add-on from application server.Load the packages into your system from application server using transaction SAINT.
For more information about this, see the online documentation for Add-On Installation Tool.To do this, choose the help function in the application toolbar and navigate to Online Docu
Loading Installation Packages.
Choose the menu path 'Installation Package -> Load Packages -> From Application Server'.
8/6/2019 PPM Optimization Workbench 00010 Installation Guide
6/20
6
Confirm the package directory (default /usr/sap/trans/EPS/in)
Click Start to start the installation
Highlight the PLATDB Add-On and click Continue
Click Continue
8/6/2019 PPM Optimization Workbench 00010 Installation Guide
7/20
7
Click Continue
Click No
8/6/2019 PPM Optimization Workbench 00010 Installation Guide
8/20
8
Enter password 9C90DE3EBC and click the green check icon
Click the green check icon
8/6/2019 PPM Optimization Workbench 00010 Installation Guide
9/20
9
Click Finish to complete the installation
8/6/2019 PPM Optimization Workbench 00010 Installation Guide
10/20
10
8/6/2019 PPM Optimization Workbench 00010 Installation Guide
11/20
11
Post-installation steps For PPM Optimization Workbench 00010
- Execute SGEN transaction for SAP PPM 5.0 and PPM Optimization Workbench 00010components to generate runtime objects for the application.
- Create Logical Port for PPM Optimization Workbench 00010
Transaction SOAMANAGER -> Seach Single Services for *platdb* naming pattern
in Consumer Proxies and Both Names parameters.
Apply Selection -> Configuration -> Create Logical Port
Use /PLATDB/LP_SO as the name
Use User ID and password as provided by SmartOrg Portfolio Navigator
installation
In Messaging tab:
Use Suppress ID Transfer in Message ID Protocol
Use Minimal Data Transfer in Data transfer scope
In Transport Settings tab
Use /asmx/interop/ProjectManipulation.asmx?WDSL in URL access path
Specify relevant SmartOrg server name and port
8/6/2019 PPM Optimization Workbench 00010 Installation Guide
12/20
12
In Operation Specific tab
Use http://www.smartorg.com/extAPI/ManipulateProject string in SOAP
action for ManipulateProject operation.
Save.
- Create End Points For PlatinumDB WebServices
Transaction SOAMANAGERSearch for *platdb* naming pattern under service parameter
Create end points for both services, use the included screenshots as references
8/6/2019 PPM Optimization Workbench 00010 Installation Guide
13/20
13
Use No Authentication for PLATDB_RPM_SO_INTEGRATION serviceUse UserID/Password for PLATDB_WS_SMARTORG_CFO_DATA service
- Activate Internet Communication ServicesActivate Internet Communication Services in transaction SICF for services with thename pattern of *platdb*
- Import PPM Optimization Workbench 00010 SAP portal archive
- Place the provided PPM Optimization Workbench 00010 portal archive into pcd/Importdirectory
- In SAP portal -> System Administration -> Transport -> Transport Packages -> Import
- Configure/change server pointers in iViews in Portal Content -> Content Provided By OtherVendors -> PPM Optimization Workbench -> iViews
- Change WebDynpro Component Name in Optimization Cockpit
- Add PPM Optimization Workbench portal role to relevant users
- Install/Configure SAP Business Objects 3.1 or later as a Reporting Option (see SAPdocumentation in http://help.sap.com -> Business Objects)
- Install/Configure SmartOrg Portfolio Navigator 4.0 (seehttp://www.platinumdb.com/ppmworkbench for documentation locations)
- Adjust server names and other Business Objects related configuration
8/6/2019 PPM Optimization Workbench 00010 Installation Guide
14/20
14
ABAP repository object checks of PPM Optimization Workbench 00010
Use transaction SE80 to check the contents of imported add-on, use the included screenshot as areference.
8/6/2019 PPM Optimization Workbench 00010 Installation Guide
15/20
15
Configuration of PPM Optimization Workbench 00010
Configuration steps below are example steps of a minimum SAP PPM 5.0 configuration thatsnecessary for communication with SmartOrg Portfolio Navigator. In systems where SAP PPM 5.0is already active and configured many of these steps are already done as part of SAP PPM 5.0implementation. The steps below can be executed exactly as shown only in brand new SAP PPM5.0 installations.
Configure Review ID to be used in SmartOrg Portfolio Navigation integration
Use transaction SM30 make an entry in /PLATDB/DT_KEYPN table
Define ZSMARTORG portfolio type
SPRO-> potf.dependent settings -> zsmartorg ->
8/6/2019 PPM Optimization Workbench 00010 Installation Guide
16/20
16
Configure linking of portfolio type to financial category:
One can use standard three categories:
Define Portfolio Item Types
8/6/2019 PPM Optimization Workbench 00010 Installation Guide
17/20
17
Setup item statuses, nothing in item next statuses:
8/6/2019 PPM Optimization Workbench 00010 Installation Guide
18/20
18
Define custom field configuration
Field Name Work Area
Object Type RIH Item
8/6/2019 PPM Optimization Workbench 00010 Installation Guide
19/20
19
Create Review statuses
Create Next Statuses
Do the same configuration for What-Ifs as the steps above for Review Statuses
8/6/2019 PPM Optimization Workbench 00010 Installation Guide
20/20
20
Configure PPM Optimization Workbench 00010 fields to be included in the implementation