PP VERSUS2 Status Report. Adriano Raspanti USAM-CNMCA. VERSUS Meeting 04/03/2010, Langen. Problems still pending – Versus1. Review of SDO and SAD following suggestions from the STC DONE. Problems still pending – Versus1. - PowerPoint PPT Presentation

Citation preview

Page 1: PP VERSUS2  Status Report

Federal Department of Home Affairs FDHAFederal Office of Meteorology and Climatology MeteoSwiss

PP VERSUS2

Status Report

VERSUS Meeting

04/03/2010, Langen

Adriano Raspanti

USAM-CNMCA

Page 2: PP VERSUS2  Status Report

PP VERSUS, Status Report | COSMO VERSUS Meeting, 04 March 2010, LangenAdriano Raspanti ([email protected])

Problems still pending – Versus1

Review of SDO and SAD following suggestions from the STC

DONE

Page 3: PP VERSUS2  Status Report

PP VERSUS, Status Report | COSMO VERSUS Meeting, 04 March 2010, LangenAdriano Raspanti ([email protected])

Problems still pending – Versus1

• Just before Christmas holidays, through the work done by CSCS, Pirmin and PL team, VERSUS has been succesfully installed at MCH.

• DWD installation is almost completed with installation of patches

• RHM complete installation is still pending, but GUI works. Problems with upload phase reported

Page 4: PP VERSUS2  Status Report

PP VERSUS, Status Report | COSMO VERSUS Meeting, 04 March 2010, LangenAdriano Raspanti ([email protected])

Problems still pending – Versus1

15 -16 December Meeting in Pratica di Mare at CNMCA

Main goals

• Description of new features of VERSUS : COSI and some on EPS systems

• Review of recent changes• Refresh of installation problems with experiences of members

(Greece and also Poland and Rumania)• Refresh on the advanced use • Meeting quite successful with some decision taken on future

tasks• More clear ideas on task 6 about common graphics

Page 5: PP VERSUS2  Status Report

PP VERSUS, Status Report | COSMO VERSUS Meeting, 04 March 2010, LangenAdriano Raspanti ([email protected])

• Task 0: Help Desk, bugs fixing activities and release of VERSUS update

Main Activities by PL team and F. Gofa (HMNS)

• Help Desk activities for VERSUS users

• Software maintenance

• Activity of bugs fixings and test/release of package updates to be delivered to the users through ftp

• Patches test

Patch 2 tested and released; Patch 3 ready to be release in March (with COSI, bugs fixing and some other improvements)

Versus2 – SON and DJF tasks status

Page 6: PP VERSUS2  Status Report

PP VERSUS, Status Report | COSMO VERSUS Meeting, 04 March 2010, LangenAdriano Raspanti ([email protected])

• Task 0: Help Desk, bugs fixing activities and release of VERSUS update

Decision from Dec Meeting…some rules to help the Help Desk

• Collect all the questions

• Send all of them on, e.g, Tuesday morning every week (if any)

• Separate problems due to installations, uploading, scores, graphics in mails

• Reply for the end of the week (Friday)

• Problems fixing as soon as possible

Versus2 – SON and DJF tasks status

Page 7: PP VERSUS2  Status Report

PP VERSUS, Status Report | COSMO VERSUS Meeting, 04 March 2010, LangenAdriano Raspanti ([email protected])

Task 0: Help Desk, bugs fixing activities and release of VERSUS update

Decision from Dec Meeting…some rules to help the Help Desk

• Could we have a page with FAQ on COSMO web site?

Theodore is already working on something similar for all the project.

More news soon

• PL team will be responsible for selection and posting of questions and

answers

Versus2 – SON and DJF tasks status

Page 8: PP VERSUS2  Status Report

PP VERSUS, Status Report | COSMO VERSUS Meeting, 04 March 2010, LangenAdriano Raspanti ([email protected])

Versus2 – SON and DJF tasks status

Task 1: Implementation of COSI global Index

The implementation of COSMO global index COSI will give to COSMO community the possibility of monitoring the long-trend performance of various Cosmo model implementation. COSI index as well as single statistical scores and skill scores used for its calculation will be available through VERSUS with ascii and graphical output.

Page 9: PP VERSUS2  Status Report

PP VERSUS, Status Report | COSMO VERSUS Meeting, 04 March 2010, LangenAdriano Raspanti ([email protected])

Versus2 – SON and DJF tasks status

Task 1: Implementation of COSI global Index

Main Activities (or subtasks) by PL team and all partners

• Task 1a: Preparation of a technical reference document for COSI index: deadline end of October - DONE

• Task1b: Implementation of the index: deadline mid December 2009 - DONE

Deliverables : Patch 3 of Versus (not only COSI)

Update of VERSUS package will include COSI index calculation and graphical/text presentation. Deadline: March 2010 – waiting for checks! (NEW deadline).

Page 10: PP VERSUS2  Status Report

PP VERSUS, Status Report | COSMO VERSUS Meeting, 04 March 2010, LangenAdriano Raspanti ([email protected])

Versus2 – SON and DJ tasks statusTask 1: Implementation of COSI global Index

Page 11: PP VERSUS2  Status Report

PP VERSUS, Status Report | COSMO VERSUS Meeting, 04 March 2010, LangenAdriano Raspanti ([email protected])

Versus2 – SON and DJ tasks statusTask 1: Implementation of COSI global Index

Page 12: PP VERSUS2  Status Report

PP VERSUS, Status Report | COSMO VERSUS Meeting, 04 March 2010, LangenAdriano Raspanti ([email protected])

Versus2 – SON and DJF tasks statusTask 1: Implementation of COSI global IndexTask 1: Implementation of COSI global Index

Page 13: PP VERSUS2  Status Report

PP VERSUS, Status Report | COSMO VERSUS Meeting, 04 March 2010, LangenAdriano Raspanti ([email protected])

Task 2: Implementation of weather type dependent verification and improvement of CV.

• The development of weather type dependent verification has an impact on the understanding of model behaviour and its use at the same time. For this reason, based on the experience at MCH, has been decided to develop such a function in VERSUS software.

Main Activities (PL team and all the partners)

• Task 2a: Preparation of a Guidelines document for the development of Weather dependant verification (WDV) DONE during the meeting dec 2009

• Task 2b: Conditional verification on different space/time - ONGOING• Task 2c: Development of VERSUS software module for the implementation

of WDV, CV and update of Web GUI - ONGOING

Versus2 – SON and DJF tasks status

Page 14: PP VERSUS2  Status Report

PP VERSUS, Status Report | COSMO VERSUS Meeting, 04 March 2010, LangenAdriano Raspanti ([email protected])

Task 2: Implementation of weather type dependent verification and improvement of CV.

Deliverables: new software modules• Update of VERSUS package to include WDV and CV improvement.

Deadline: March 2010.

Decisions from the Dec. meeting

A“standard” Ascii format for VERSUS uploading will be prepared and distributed soon (PL team) : approval from all the partners DONE

Versus2 – SON and DJF tasks status

Page 15: PP VERSUS2  Status Report

PP VERSUS, Status Report | COSMO VERSUS Meeting, 04 March 2010, LangenAdriano Raspanti ([email protected])

Task 2: Implementation of weather type dependent verification and improvement of CV.

Classification Description

1 Zonal Westerly anticyclonic2 Zonal Westerly cyclonic3 Easterly4 Meridional cyclonic 5 Meridional anticyclonic6 Northerly cyclonic 7 Northerly anticyclonic8 Central Mediterranean High9 Central Mediterranean Ridge 10 Central Mediteranean Low 11 Central Mediterranean Trough

--------------------------------------------------------------------------------------------------------------------------------------+

Day(aaaa-mm-gg) Classification (number only)

2010-01-01 (TAB) 1

Versus2 – SON and DJF tasks status

Page 16: PP VERSUS2  Status Report

PP VERSUS, Status Report | COSMO VERSUS Meeting, 04 March 2010, LangenAdriano Raspanti ([email protected])

Task 3: Use of new Observation data

The use of other data than the ones already managed by VERSUS system is important to make the observational sample larger, important especially for conditional verification and for very high resolution models.

Main Activities (PL Team, DWD, MCH)• Task 3a: Identification and analysis of Observations to be loaded following

SDO priorities: Airep, Amdar, Windprofiler, TEMP (non standard pressure level); - ONGOING (by Uli Plufger)

• Task3b: Implementation of Loader module (msgs coded in BUFR format) and creation of tables in DB; - STARTED

Decision from Dec Meeting • Description of verification activities using Airep, Amdar and NSPL: DWD• Description of verification activities using Windprofiler: Francis• Description of verification activities using Non standard pl of temp:

investigation on interpolation possibilities with Field_extra - FrancisDONE

Versus2 – SON and DJF tasks status

Page 17: PP VERSUS2  Status Report

PP VERSUS, Status Report | COSMO VERSUS Meeting, 04 March 2010, LangenAdriano Raspanti ([email protected])

Task 3: Use of new Observation data

Main Activities• Task3c: Integration of the new Upper air observation with the existing

ones for production of Upper air verification (DWD perform separately)

• Task3d: Implementation of verification of Wind gusts using Synop;• Task3e: Analysis and description of Radar wind data for use in

VERSUS system(VAD, radial);• Task3f: Implementation of loader for radar wind data;

Decision from Dec Meeting• Radar wind: lower priority

Deliverables• Update of VERSUS package with the new functionalities. Deadline:

June 2010 (Maybe JULY)

Versus2 – SON and DJF tasks status

Page 18: PP VERSUS2  Status Report

PP VERSUS, Status Report | COSMO VERSUS Meeting, 04 March 2010, LangenAdriano Raspanti ([email protected])

Task 4: Use of gridded observation (analysis fields)

• The use of gridded observation (analysis field) is crucial to check the performance of a model compared to an objective analysis (model oriented verification) and to apply special verification methods for very high-resolution models, as Fuzzy verification (through the use of Fuzzy toolbox) and later object oriented verification (MODE and SAL).

Versus2 – SON and DJF tasks status

Page 19: PP VERSUS2  Status Report

PP VERSUS, Status Report | COSMO VERSUS Meeting, 04 March 2010, LangenAdriano Raspanti ([email protected])

Task 4: Use of gridded observation (analysis fields)

Main Activities (PL team, DWD, MCH, Rumania)• Task4a: Implementation of methods for standard scores - STARTED• Task4b: Implementation of Loader module for gridded observation

(GRIB coded);• Task4c: Detailed documentation of Fuzzy verification toolbox for its

integration and implementation in VERSUS package – DONE (by Uli)• Task4d: Re-writing Fuzzy IDL code in a more manageable C or Fortran

code (TBD) – ONGOING with C coding• Task4e: Implementation of Fuzzy toolbox and updating of WEB GUI

accordingly• Deliverables• Update of VERSUS package with the new functionalities. Deadline:

March 2010 – To be redefined to MAY 2010 – June 2010

Versus2 – SON and DJF tasks status

Page 20: PP VERSUS2  Status Report

PP VERSUS, Status Report | COSMO VERSUS Meeting, 04 March 2010, LangenAdriano Raspanti ([email protected])

Task 4: Use of gridded observation (analysis fields)

Decisions from Dec meeting

• Use of gridded observation producing standard statistical scores: PL team

IMPORTANT

Gridded observations have to be provided on the same grid of the model you to be verified (resolution, area rotation…)

Versus2 – SON and DJF tasks status

Page 21: PP VERSUS2  Status Report

PP VERSUS, Status Report | COSMO VERSUS Meeting, 04 March 2010, LangenAdriano Raspanti ([email protected])

Task 6: Production of common statistical scores and scores

graphic

• Requirements for Common scores plots by WG5 Coordinator

(DONE)

Decision from Dec Meeting

• Precipitation (some thresholds), TC, T2m, 10m Ws, MSLP

• Creation of a the modules to produce common plots through VERSUS: PL Team (some FTE’s more to be assigned)

• responsibility of plots creation due in time: Poland (J. Linkowska)

• At present no common area will be defined (next future)

Versus2 – SON and DJF tasks status

Page 22: PP VERSUS2  Status Report

PP VERSUS, Status Report | COSMO VERSUS Meeting, 04 March 2010, LangenAdriano Raspanti ([email protected])

Task 6: Production of common statistical scores and scores graphicMain Activities (PL team, Poland, all partners)• Pre-Task6: creation of VERSUS module for common scores graph –

new task, deadline MAY (?) – probably later• Task6a: Preparation of scores data to be sent to the responsible

member; - ONGOING• Task6b: Production of seasonal common scores plots and preparation

of presentation for GM; - PENDING

Deliverables• A complete set of common plots following specifications of WG5

Coordinator. Deadline: end of July for SON, DJF and MAM seasons. Beginning of September 2010 for JJA 2010 (depending of the beginning of next GM – if possible)

Versus2 – SON and DJF tasks status

Page 23: PP VERSUS2  Status Report

PP VERSUS, Status Report | COSMO VERSUS Meeting, 04 March 2010, LangenAdriano Raspanti ([email protected])

Task 5 and Task 7: documentation on EPS and Feedback files

(mail from Uli Plufger about FF to be discussed here in Langen)

already started

Versus2 – SON and DJF tasks status