Point Engineering Limited
PO INTPO INT
Corporate Profile
A Mark of great impact
www.pointengineering.com
1
Point Engineering LimitedPO INTPO INT
COMPANY CONTACT ADDRESSES
COMPANY OVERVIEW
CORPORATE MISSION & VISION STATEMENTS
CORPORATE STRUCTURE & AFFILIATIONS
SCOPE OF ENGINEERING SERVICES
CASHES POLICY
QUALITY POLICY
ULTRAMODERN OFFICE FACILITIES
PROJECT EXPERIENCES
CONTENTS
2A Mark of great impact
www.pointengineering.com
Point Engineering LimitedPO INTPO INT
COMPANY CONTACT ADDRESSES
Main Office:Point Engineering LimitedFONTE House, 1 Temple Ejekwu CloseBehind Texaco Filling StationFirst Artillery, Port HarcourtRivers StateP.O.BOX, 13595 Port HarcourtTel: 234 – 84 - 611963Fax: 234 – 84 - 612008E-mail: [email protected]: www.pointengineering.com
Lagos Address:Point Engineering Limited2nd Floor, NIM BuildingPlot 22, Idowu Taylor Street, Victoria Island LagosTel: 234 – 1 – 5558602, 2626635, 2626636Fax: 234 – 1 – 5558602 E-mail: [email protected]: www.pointengineering.com
Eket Address:Point Engineering LimitedBlock 3, Usua Amanam EstateEket – Oron Road, Eket, Akwa-Ibom StateTel: 234 – 8023469400Fax: 234 – 84 - 612008E-mail: [email protected]: www.pointengineering.com
Point Engineering Limited (PEL)’s head office is located in Port Harcourt,
Rivers State with Liaison Offices in Lagos and Eket, Akwa-Ibom State.
3A Mark of great impact
www.pointengineering.com
Point Engineering LimitedPO INTPO INT
COMPANY OVERVIEWPoint Engineering Limited (PEL) is an independent and wholly (100%) indigenous engineering consultancy company dedicated to providing responsive high quality and cost-effective services to clients, who are mainly in the oil and gas production, gas processing and oil refining industries.
Point Engineering Limited was formed in 1995, started business in 1997 and active operations in 2000 with a dedicated team of mechanical, process, civil/structural, instrumentation and electrical engineers. Since then, the company has evolved into a full multi-disciplinary consultancy group working on contracts varying in size from individual assignments to over 20,000 man-hours.
Our philosophy is to provide innovative, cost effective solutions, on time, within budget and develop a relationship with our clients for mutual respect, whereby our professional approach places us first on the list when considering new tasks or technologies.
We undertake a wide range of Engineering and Project management tasks for oil exploration and production facilities, gas production and processing facilities, separation, liquefaction and oil refining.
Projects executed include study, analysis, engineering (front-end and detailed), procurement assistance and project management services. We have worked and can still work under a number of contractual arrangements including Reimbursable, Target Price, Lump Sum, Service and Frame Contracts depending on the nature of the project assignment and clients’ preference. Our approach is always flexible and whilst we prefer to be contracted directly with the main client, in order to achieve the clients’ goal, we do engage in sub-contract and/or consortium arrangements in order to draw synergy together in meeting clients’ requirements.
4A Mark of great impact
www.pointengineering.com
Point Engineering LimitedPO INTPO INT
CORPORATE MISSION & VISION STATEMENTS
5
OUR VISION IS:
To be a reference POINT in turning Engineering Concepts
into Reality in the Nigerian Oil and Gas Sector.
OUR MISSION IS:
To prove a POINT for indigenous participation in the
Nigerian Oil and Gas Sector by providing complete;
quality assured engineering services capable of satisfying
the most stringent requirements of our clients wherever it
is required using the best available technical skills.
A Mark of great impact
www.pointengineering.com
Point Engineering LimitedPO INTPO INT
CORPORATE STRUCTURE & AFFILIATION
6
We maintain a wide spread of permanent and contract staff based professionals specialising in various aspects of oil & gas exploitations. A breakdown of our staffs by discipline and number is shown in the following table: GENERAL PEL STAFF BREAKDOWN BY DISCIPLINE
DISCIPLINE NO.
Process
Mechanical / Piping
Instrumentation
Electrical
Civil/Structural / Marine Technology
Safety / Loss Prevention
Cost Engineering / Procurement
Project Management / Document Control
CAD Operation
IT Support
Finance and Administration
Business Development
Secretarial
Others (clerical assistants, cleaner, drivers, etc)
Total
8
7
3
4
5
1
2
5
8
2
3
3
2
7
60
A Mark of great impact
www.pointengineering.com
Point Engineering LimitedPO INTPO INT
7
PIPING / PIPELINE
ENGINEERS
PROPOSALS/ CONTRACTS ENGINEERS
Our Corporate Structure is as follows:
QUALITY SYSTEM MANAGER
CORPORATE ADMINISTRATION
MANAGER
PROCESS DESIGN
ENGINEERS
PROCESS TECHNOLOGY
ENGINEERS
CIVIL / STRUCTURAL ENGINEERS
ELECTRICAL ENGINEERS
MECHANICAL ENGINEERS
PLANNING/ SCHEDULING ENGINEERS
PROJECT SERVICES MANAGER
BOARD OF DIRECTORS
INSTRUMENTATION ENGINEERS
COST ESTIMATE
ENGINEERS
CORPORATEAUDITORS
COMPANY SECRETARY
SAFETY MANAGER
ENGINEERING MANAGER
CORPORATE FINANCE MANAGER
FRONT-END ENGINEERING
MANAGER
DETAIL/FACILITY ENGINEERING
MANAGER
ENGINEERS HYDRAULIC
DESIGN
POINT ENGINEERING’s
FOREIGN PARTNERS
MANAGING DIRECTOR
A Mark of great impact
www.pointengineering.com
Point Engineering LimitedPO INTPO INT
8
AFFILIATES:
In order to pull synergy for effective execution of projects in the Nigerian Oil and
Gas Industry, Point Engineering has enter into strategic technical alliances with
the following companies:
Berwanger Inc., of 4615 Southwest Freeway, Suite 900, Houston, Texas, USAMSL Services Corporation, of 11111 Katy Freeway, Suite 620, Houston, Texas 77079, USA Foster Wheeler (Nigeria) Limited, 12A (Plot 296B), Akin Olugbade street, Victoria Island, Lagos
A Mark of great impact
www.pointengineering.com
Point Engineering LimitedPO INTPO INT
SCOPE OF ENGINEERING SERVICES
9
We have the capability to handle projects from initial feasibility phase right through to
design, implementation and commissioning. Also, we can provide assistance at a
particular stage of the project cycle according to clients’ requirements.
We undertake various kinds of projects which are categorized as follows:
Process / Front-End Engineering
•Field Development Studies•Feasibility & Concept Selection Studies•Debottlenecking, Upgrade / Revamp Studies.• Pipeline Hydraulic Studies.
• Flow Assurance & Riser Analysis.
• Complete Basic Engineering / FEED Packages.
Detailed Engineering Design
•Mechanical / Piping Design & Isometrics
•Corrosion Prevention & Cathodic Protection Design.
•Design of Electrical Systems.
•Detailed Instrumentation Design.(OPEN SYSTEM ARCHITECTURE DESIGN)•Pipeline Mechanical Design.•As-built Drawings.•Discipline Support to EPC Projects.
Project Management / Consultancy Services
•Plant Technical Appraisal / Audit.•Software Development / Training.•Economic Studies.
•Design Verification / Audit.•Design & Safety Reviews (HAZOP, HAZID, FIREPRAN, etc.)•Operational Assistance / Support.•Multi-disciplined Project Management.•Technical Support
A Mark of great impact
www.pointengineering.com
Point Engineering LimitedPO INTPO INT
CASHES POLICY
10
The management of Point Engineering Limited is totally committed to the following
Community Affairs, Safety, Health, Environment and Security (CASHES) Policy:
• to take all reasonable measures to make personnel, information and facilities
secure; minimize the effect of any operation to the host community, minimize
injuries at the workplace and minimize environmental damage.
• to be sensitive to the needs and concerns of all host communities.
• to establish and maintain standards for community affairs, safety, health, the
environment and security within the Company which adhere to all relevant aspects
of applicable laws and meet the high standards applicable to the industry.
• to ensure that all Company personnel are given the necessary information,
instruction and training to enable them to work in a secure and safe manner so
that they understand and can fulfill their responsibilities with regard to Community
Affairs, Safety, Health, Environmental and Security requirements.
• to ensure that safety is an integral part of all the work performed by the Company.
A Mark of great impact
www.pointengineering.com
Point Engineering LimitedPO INTPO INT
QUALITY POLICY
11
The management of Point Engineering Limited is totally committed to the following Quality Policy and Objectives:
• to achieve a quality service by meeting customers’ requirements.
• to define and document the Quality System for all functions of the company to comply with the requirements of ISO 9001 latest edition.
• to develop and use qualified personnel, trained with the necessary skills and experience to perform their duties.
• to perform in accordance with the documented Quality System with the aim of developing all products and services correctly the first time.
• to ensure that services and products provided by Point Engineering are in accordance with the contract, safety and legislative requirements.
• to ensure that quality activities are specified to suppliers to maintain the overall level of quality of the project.
• to continually evaluate the Quality System’s suitability and monitor its operation to improve its effectiveness.
A Mark of great impact
www.pointengineering.com
Point Engineering LimitedPO INTPO INT
ULTRA MODERN FACILITIES
12
OFFICE STRUCTURE:
Point Engineering Limited currently operates and executes projects in an ultra-
modern office in the central city of Niger Delta region, Port Harcourt, Rivers State.
This office, which is the head office is conveniently located along the Port Harcourt –
Aba Express Road. PEL also operates in a well-equipped branch office at Eket, Akwa-
Ibom State, and Victoria Island, Lagos, mainly for Mobil, projects.
We currently occupy about 600 m2 of space at FONTE House (1st & 2nd floors), Port
Harcourt and 200 m2 of space at the Usua Amanam Estate (Block 3), Eket. The offices
are fully furnished and equipped with state-of-the-art facilities including complete
communication systems, computer software and hardware facilities with a Local Area
Computer Network system.
The offices (Head and Branch) are provided with a standby 40 KVA and 27 KVA
power generator sets respectively, to power the office facilities whenever there is
power supply failure from NEPA. We also have four brand new executive cars and
available for use as official/pool cars.
A Mark of great impact
www.pointengineering.com
Point Engineering LimitedPO INTPO INT
13
The following Tables summarize various categories of our office facilities:
PEL’s COMPUTER FACILITIES - HARDWARE
TYPE OF HARDWARE NO. CAPACITY MODEL OTHER SPEC. / COMMENT
Engineering Workstations
Intel Pentium® 4 CPU 2.4 GHz Intel MMX™
Technology
27 256 MB RAM
40 GB HDD
Linea About 80% free space
Integrated with Network system
17” SVGA Monitors
CAD Workstations
Intel Pentium® 4 CPU 2.26 GHz Intel MMX™
Technology
9 256 MB RAM
40 GB HDD
Linea Integrated with Network system
17” SVGA Monitors
Admin. / Sec. Workstations
Intel Pentium® 4 CPU 2.26 GHz Intel MMX™
Technology
14 256 MB RAM
40 GB HDD
Linea Integrated with Network system
14” SVGA Monitors
Server
File Server (HP Proliant 150)
Mail Server (Intel Pentium® 4 CPU 2.4 GHz Intel MMX™)
1
1
512 MB RAM
200 GB HDD
256 MB RAM
40 GB HDD
HP Xion
Linea
17” SVGA Monitors
3Nos. x 10.2GB external storage
Portables / Laptops
HP/ TOSHIBA Pentium 4
10 256 MB RAM
40 GB HDD
Satellite
A Mark of great impact
www.pointengineering.com
Point Engineering LimitedPO INTPO INT
14
PEL’S OFFICE FACILITIES - PERIPHERALS
TYPE OF HARDWARE NO. OTHER SPEC. / COMMENT
Printers HP Deskjet 1220C
HP PSC 7140
HP Deskjet 920C
HP Laserjet 4 plus
HP Laserjet 1300
HP Laserjet 5000N
HP Deskjet 6122
8
1
3
1
1
1
2
Plotter Hewlett Packard Design Jet 450C
2
UPS APC 600VA
Binatone
Power Guard
Linea
Mercury
12
20
8
20
7
Photocopier Officejet G55 (3-in-1)
Minolta Dialta A+ imaging systems
2
2
Paper Trimmer No.8013 Paper Cutter
Kw Trio Cutter
1
1
Size up to B4 (257mm x 364 mm)
Size up to A3
Binding Machine GMP 200 PB Punch & Bind
Strip Binder
1 1
Comb binding system up to 250 sheets
Up to 50 sheets
Stapling Machine
Kw trio No. 50LA Stapling Machine
3
Up to 24mm leg length, 23/24 stable size and 240 sheets
CD Writer 8
A Mark of great impact
www.pointengineering.com
Point Engineering LimitedPO INTPO INT
15
PEL’S OFFICE FACILITIES - PERIPHERALS CONT’D
TYPE OF HARDWARE NO. OTHER SPEC. / COMMENT
HP Copier - Scanner Printer 1 HP G55 Model
Panasonic PABX 4 LINESX 32 EXT
1
CATEGORY
OF SOFTWARE
LICENSOR NAME OF PACKAGE C/O*
Process Simulation
SimSci
Hyprotech
PRO / II
HYSYS.PROCESS
C
O
Process Design / Sizing
PEL
PEL
PEL
PEL
PEL
PEL
PEL
PEL
EQLIST
VSP-V
VSP-H
FLARESIZ
REL_BLD
LINLIST
PUMPSIZ
LIQ-H-UP
O
O
O
O
O
O
O
O
Pipeline SimSci
Baker Jardine
Andrew Palmer
PIPEPHASE
PIPESIM &
PIPESIM-NET
PLUS ONE
O
C
C
C
A Mark of great impact
www.pointengineering.com
Point Engineering LimitedPO INTPO INT
16
CATEGORY OF SOFTWARE
LICENSOR NAME OF PACKAGE C/O*
Piping Design PEL
REBIS
REBIS
Fisher
COADE
R. Malahy
LINESIZ
Autopipe (Stress)
AutoPlant
Valve Sizing
CAESAR II-stress analysis
OffPipe
O
C
C
C
C
C
Instrumentation PEL INSTRSIZ
O
Electrical PEL E-LD-LIST
O
Structural Design Engineering Dynamic
PISCES
PEL
SACS Structural Analysis Suite
Rail/Road Crossing Stress Analysis WT Contr. & COG
C
O
Drafting AutoDesk
Intergraph
AutoCAD 2000 & Vs.14
Microstation
TURBOCAD
C
C
C
Cost Estimating PEL CAPCOSTI
O
PEL’s COMPUTER FACILITIES - SOFTWARE CONT’D
A Mark of great impact
www.pointengineering.com
Point Engineering LimitedPO INTPO INT
17
E-Mail Facilities:
Website:
www.pointengineering.com
Engineering Library:
Comprises of:Professional Textbooks and Journals
Engineering Standards and Codes - API, DEP’s, etc.Regulatory Guidelines - DPR, FEPA, etc.
QA/QC Procedures & Training Manuals, etc.Sample Project Deliverables
Others/Miscellaneous:
40KVA Perkins Power Generating Set27KVA Perkins Power Generating Set
15 Qty of 2HP Air conditioners10 Qty of 1HP Air conditioners
Computer Network System
A Mark of great impact
www.pointengineering.com
Point Engineering LimitedPO INTPO INT
18
PROJECT EXPERIENCE
Point Engineering Limited has a proven track record in providing qualitative and cost effective engineering and project management services to clients specifications, on schedule and within budget. We have worked on various engineering projects for
major oil and gas companies both on / offshore in Nigeria. The following are some major
companies we have either worked directly or indirectly (as sub-contractor) for in Nigeria:
•Mobil Producing Nigeria Unlimited (both Lagos and Eket Divisions)
•Shell Petroleum Development Company (both Western and Eastern Divisions)
•Shell Nigeria Gas Limited
•Nigeria Agip Oil Company
•AMNI International Limited
•Daewoo Nigeria Limited
•ELF Nigeria Limited
•Ozono Nigeria Limted
•Oiltest Well Service Limited
•ENERCO Nigeria Limited
The table overleaf provides a list of some projects successfully executed by Point
Engineering Limited.
A Mark of great impact
www.pointengineering.com
Point Engineering LimitedPO INTPO INT
www.pointengineering.com
19
The sheets attached overleaf contain brief description of some of the key projects previously executed by Point Engineering Limited:
A Mark of great impact
Point Engineering Limited
PO INTPO INT
A Mark of great impact
www.pointengineering.com
20
The Etim field is located offshore Akwa Ibom State, Nigeria in the OML 67 area of the Bight of Biafra. It is south of Company's, Qua Iboe Terminal (QIT) shore base. Water depths range from 100 - 120 ft MLW.Etim D is a wellhead platform installed by MPN in its OML 67. It is planned that production from Etim D wells will be transported through a 14” Full Well Stream pipeline to the Etim Production Platform (Etim PP) for primary separation. The Etim D production stream will thus co-mingle with other production streams (Etim A and B) at Etim PP upstream of the production separator.
The project objective is to:Develop "Issue for Design" (IFD) quality drawings, calculations, analyses, studies, and reports for the topsides piping, deck extension to accommodate 14” receiver, and riser location at Etim PP for the 14" Etim D to Etim PP full well stream pipeline.Consider the FEED for some other projects (EAPM LP FEED) previously completed that affect Etim PP and develop the design to be compatible with the planned
modifications.
Etim PP Top Sides and Tie-in Study for Pig Receiver
Client Name: MPN, LagosLocation: Etim Offshore PlatformDate: Sept. 2004 – January 2005Contract Type: Reimbusable, Basic Engineering
Client Contact: Deepesh [email protected]
Point Engineering Limited
PO INTPO INT
A Mark of great impact
www.pointengineering.com
21
The SPDC Server Consolidation & Upgrade as well as the Enterprise Storage Systems (ESS) projects were initiated to provide hosting for SPDC applications and databases, while reducing the total cost of ownership of the server & storage infrastructure. These projects are introducing new high-end servers and storage devices that need to be hosted within the P-Harcourt data center. The resultant load requirements for these high-end servers and storage infrastructures cannot be accommodated by the existing utilities
configuration. The work involves capacity check of the existing power system in order to ascertain its adequacy to meet the additional load requirement of the proposed power network,carry out detailed design of a reliable system that will efficiently accommodate the required loads with reasonable level of spare capacity, identify the best tie-in points and propose a modification that would minimize shut down time for the operating loads before hook up to the new system.
Detailed Design of Electrical Utilities for Port Harcourt Data Center
Client Name: SPDC, Eastern DivisionLocation: Shell IA, Port HarcourtDate: October 2004 – February 2005Contract Type: Lumpsum, Detail Engineering
Client Contact: Ali [email protected]
Point Engineering Limited
PO INTPO INT
A Mark of great impact
www.pointengineering.com
22
This is a follow up to the basic engineering earlier carried out for MPN in 2002 by Point Engineering.
This scope of the project is the provision of detailed engineering design for the replacement / relocation of BRT Diesel re-fill piping and accessories from the small Boat Dock to the products Loading Dock.
The work entails piping modifications, and civil/structural designs.
Point Engineering Limited carried out necessary piping hydraulics, civil/structural, designs that will enable the replacement / relocation of BRT Diesel re-fill piping and accessories from the small Boat Dock to the products Loading Dock
Detailed Design for Extension Work for BRT Diesel Refill System
Client Name: MPN LagosLocation: Bonny River TerminalDate: Dec. 2004 – February 2005Contract Type: Reimbursable, Detail Engineering
Client Contact: Deepesh [email protected]
Point Engineering Limited
PO INTPO INT
A Mark of great impact
www.pointengineering.com
23
The objective of this detailed engineering is for the restoration of the Glycol Dehydration Unit (GDU), located on Edop Production Platform offshore Eket, to its original design intent and in compliance with MPN Master Specification, DIM and industry standards where practical.
MPN contracted Point Engineering Limited (PEL) to carry out the Detailed Design Engineering works necessary for the restoration of the Tri-ethylene Glycol (TEG) Dehydration Unit. The detailed engineering design works performed by PEL reviewed the Edop Glycol Unit Assessment Report of June 2003 in addition to carrying out detailed engineering activities to provide a fit-for-purpose IFC package necessary for obtaining cost and schedule estimates for the Construction Contractor.
Detailed Engineering Design for Edop TEG Restoration
Client Name: MPN, LagosLocation: Edop Offshore PlatformDate: June. 2004 – September 2004Contract Type: Reimbusable, Detail Engineering
Client Contact: Deepesh [email protected]
Point Engineering Limited
PO INTPO INT
A Mark of great impact
www.pointengineering.com
24
Edop 12 is a minimum facility, single well, wellhead platform that is supported from the single well conductor. This well produces over 4000 Barrels of crude oil per day, flowing through Edop C which is located in the Gulf of Guinea, Nigeria. The facility has a hexagonal shaped boat landing deck supported from the single conductor at an elevation of 5ft above Mean Low Sea Level. The platform is also equipped with a 2 Long Ton lifting device and structure to transfer material from boats to the platform, and vise versa.However, the boat landing is fully submerged at the time of the year when the tide is high, thus preventing personnel access to the platform from a boat. Also the 2 Long Ton lifting device, of the well head platform appears marginal and as such not fit for purpose. Point Engineering Limited performed the detailed engineering design for the provision of additional, round the year, functional boat landings at respective levels and the modification of the lifting device to address its inefficiency
Detailed Design for Edop 12C Platform Lifting Device and Boat Landing Upgrade
Client Name: MPN, LagosLocation: Edop 12C Offshore PlatformDate: August 2004 – November 2004Contract Type: Reimbusable, Detail Engineering
Client Contact: Deepesh [email protected]
Point Engineering Limited
PO INTPO INT
A Mark of great impact
www.pointengineering.com
25
In respect of the fire incident that occurred in April, 2003 on the OSO Gas Compression (RG) Platform main deck in which the LPA Turbine Package located on the south end of Oso RG Platform was damaged, MPN issued a work order to PEL to carryout detailed engineering design for the replacement of this damaged turbine package with an identical unit.The replacement of this LPA Turbine Package involve various work activities which were segregated into seven (7) workpacks as presented below:
•Installation of new shutdown valve•Rerouting of start gas exhaust•Installation of seal leakage drain•Repair or replacement of damaged valves and piping•Piping demolition and reinstallation for skid replacement•Repair of exhaust duct insulation•Inspection and cleaning of equipment and piping
The detailed design was successfully carried out on time and within budget.
Detailed Design for Oso RG LPA Turbine Replacement
Client Name: MPN, LagosLocation: Oso Offshore PlatformDate: August 2004 – December 2004Contract Type: Reimbusable, Detail Engineering
Client Contact: Mike [email protected]
Point Engineering Limited
PO INTPO INT
A Mark of great impact
www.pointengineering.com
26
The objective of the detailed engineering phase of the Oso Flare Segregation project is to provide a fit-for-purpose procurement/construction packages that will segregate the existing comined flare system.
The design eliminate risk of back drafting on the flare systems and balanced the relief load of the flare systems to be within the re-rated capacity of 800 Mscf/D by rerouting the blowdown and relief valves from the 4th and 5th stage compressors from the RG flare to the RK flare.
Some PSV's were also modified to
achieve the design intent.
Detailed Engineering Designs for Oso Flare Segregation Piping and PSVs Modifications
Client Name: MPN, LagosLocation: Oso Offshore PlatformDate: March 2004 – August 2004Contract Type: Reimbursable, Detail Engineering
Client Contact: Deepesh [email protected]
Point Engineering Limited
PO INTPO INT
A Mark of great impact
www.pointengineering.com
27
Escravos Production District is one of the 3 districts in the SPDC-West Northern Swamp Production Area (NSA) with a logistics base located at Escravos Beach. It consists of four Flow-stations namely: Otumara, Saghara, Escravos, and Opuama. The combined production capacity of Escravos District is 180 Mobd of oil, which represents 40% of NSA installed production capacity. There are 8 principal communities in Escravos District. These communities are Ajudiabo, Madangho Ogidigben, Aruton, Ugboegungun, Degele, Opuama and Tsekelewu. SPDC planned to provide power to these host communities in 2 phases with phase 1 being to supply power to the 3 communities around the Escravos Logistic Base i.e. Ajudiabo, Madagho and Ogidigben. Each of the 3 communities identified in phase 1 have their own community distribution network that needs to be upgraded.
Point Engineering Limited perform preliminary engineering studies and detailed engineering design necessary for the proposed Escravos Communities Electrification scheme for the Escravos Logistics Base, Madangho, Ogidigben and Ajudiabo communities.
Detailed Design for Power Generation, Transmission and Distribution to Forcados, Ogidigben, Communities
Client Name: SPDC, Western DivisionLocation: ForcadosDate: January 2004 – June 2004Contract Type: Lumpsum, Detail Engineering
Client Contact: Chris [email protected]
Point Engineering Limited
PO INTPO INT
A Mark of great impact
www.pointengineering.com
28
The Integrated Operations Standards and Practices are the Mandatory minimum requirement to control Operational and Maintenance Activities carried out in the Shell System. They provide the basic rules, procedures, work practices and routines when used with the Health, Safety and Environmental Management Systems, to maintain a safe, efficient working environment.The Integrated Operations Standards consist of mandatory Standing Instructions, Operation Instructions, Procedures, recommended Work Practices and Maintenance Job Routines.
The work entails developing the following Standards and Work Practices:Standing InstructionsField OperationsMaintenance Job Routines
Point Engineering Limited developed the above Standards and Work Practices in line with SNG guidelines..
Preparation of Integrated Operating Standards
Client Name: Shell Nigeria Gas LimitedLocation: Agbara / OtaDate: October 2003 – January 2004Contract Type: Lumpsum, Engineering Studies
Client Contact: John [email protected]
Point Engineering Limited
PO INTPO INT
A Mark of great impact
www.pointengineering.com
29
Shell Nigeria Gas Limited contracted to PEL the task of developing a comprehensive operating and maintenance manual for its Gas
Distribution Network at Aba. Point Engineering Limited carried out these activities in line with SNG guidelines..
Preparation of Operating and Maintenance Manuals
Client Name: Shell Nigeria Gas LimitedLocation: Agbara / OtaDate: October 2003 – December 2003Contract Type: Lumpsum, Engineering Studies
Client Contact: Chucks [email protected]
Point Engineering Limited
PO INTPO INT
A Mark of great impact
www.pointengineering.com
30
On April 29th 2003, a fire occurred on one of MPN’s platforms, OSO, damaging an isolated portion of the platform structure.
Point Engineering carried out the detailed drafting and design on the damaged cooler piping to enable necessary deliverables for procurement and construction
Oso RG Damage Assessment and Restart Project - Piping WorksDesign and Drafting Package
Client Name: MPN LagosLocation: Oso Offshore PlatformDate: May 2003 – July 2003Contract Type: Lumpsum, Detail Engineering
Client Contact: Tolu [email protected]
Point Engineering Limited
PO INTPO INT
A Mark of great impact
www.pointengineering.com
31
Elf Petroleum Nigeria Limited intends to improve its material recovery process by the Installation and construction of a Material Recovery Facility at Obagi in OML 58. The facility will have capability to segregate waste materials from the Obagi district area office/accommodation, recover useable wastes, incinerate discarded wastes and dispose the residues in an environmental friendly way. The facility will also have a sewage treatment plant for centrally treating human waste, a Guard House with Rest-room, a three-room Office block with male /female Rest-rooms, Overhead Water Tank with associated Borehole Pumps and Supporting Structures, Generator House with the Diesel Storage Tank, Waste Processing Shed, Waste Offloading Shed, Ash Shed and a Gas Bottle Shelter. The works also include the installation of a Waste Incinerator, a Sewage Treatment Facility with associated accessories including Block Wall Fence, Firewater System with
associated hydrants
Basic Engineering Studies and Design for the Material Recovery Facilities at Obagi Field – OML 58
Client Name: Elf Petroleum Nigeria LimitedLocation: ObagiDate: May 2003 – December 2003Contract Type: Lumpsum, Detail Engineering
Client Contact: David [email protected]
Point Engineering Limited
PO INTPO INT
A Mark of great impact
www.pointengineering.com
32
This project is necessitated by the recommendation of SPDC-EAST IP report developed in 2001 for the 28” x 17 km NCTL from Krakama manifold to Cawthorne junction manifold. The IP report recommended the sectional replacement of a defective pipe section, about 4 km from Krakama manifold, which has undergone 76% wall loss.In order to carry out the sectional replacement, hot-tapping and stoppling operations are required. This project was awarded to Oilserv Limited who in turn sub-contracted the design
scope of the job to Point Engineering Limited
Detailed Design for 28” Pipeline Sectional Replacement by Hot Tapping
Client Name: Oilserv Limited / SPDCLocation: KrakamaDate: August 2003 – Septeber 2003Contract Type: Lumpsum, Detail Engineering
Client Contact: Austin [email protected]
Point Engineering Limited
PO INTPO INT
A Mark of great impact
www.pointengineering.com
33
In 2001, during the cleaning of 14” Okordia-Rumuekpe trunk line to enable intelligent pigging for integrity data acquisition, it was observed that the cleaning pig was stuck in the trunk line at Sambreiro river crossing as a result of obstruction in the trunk line. Similarly, a dent was revealed during the phase IV internal inspection program for pipelines in 2002 by a caliper survey of the 10” Diebu creek delivery line, approximately 6.97km away from a launcher manifold at Diebu creek flowstation. The dent lies within the river crossing section of the pipeline at Ekowe/Nange-ama. In view of this, planned replacement of these pipeline sections in line with SPDC’s standard is required.
The objective of the Design is to produce necessary engineering drawings to enable effective replacement of the dented or obstructed section of the delivery line and trunk line on the Ekowe/Nange-ama and Sambreiro River crossing sections respectively.These replacements will ensure steady flow of crude oil through these pipelines and allow intelligent pigging for data acquisition in line with DPR’s requirements
Detailed Designs for 14” Pipeline Sectional Replacement at Diebu River Crossing and 10” Pipeline Sectional Replacement at Okordia River Crossing
Client Name: SPDC, easter DivisionLocation: Diebu and OkordiaDate: March 2003 – August 2003Contract Type: Lumpsum, Detail EngineeringClient Contact: Joe [email protected]
Point Engineering Limited
PO INTPO INT
A Mark of great impact
www.pointengineering.com
34
On the backdrop of the turbine blow-out that happened on Oso gas compression platform (RG), MPNU decided to carry out an EIT study on Edop’s Injection Gas Compressors (IGC A/B), to determine the modifications that would be required to forestall such an occurrence on QI.From the EIT recommendations, the following modifications are required:•Segregation of IGC A/B starter gas exhaust lines from existing LP vent header, and routing them to a safe location. •Installation of flame arrestors on new IGC A/B exhaust vent lines.•Installation of shutdown valves (SDV’s) upstream of IGC A/B starter gas control valves to provide automatic cut-off of starter gas supply to the system in the event of starter speed inhibition system failure.•Installation of device such as lube oil flow indicator or a means of confirming lube oil flow after start-up and at any other time. The device is to be installed such that it can be read from outside IGC A/B housing.•Connection of IGC A/B starter pickup speed signal into control room DCS
Point Engineering Ltd performed the detailed engineering design to address these concerns raised by the EIT.
Detailed Design for Edop GIP Turbine Vent System Modification
Client Name: MPN QIT, EketLocation: Edop Offshore PlatformDate: May 2003 – July 2003Contract Type: Reimbursable, Detail Engineering
Client Contact: Jim [email protected]
Point Engineering Limited
PO INTPO INT
A Mark of great impact
www.pointengineering.com
35
Due to the reduction in MPN QIT’s daily crude production as a result of the reduced OPEC quota, QIT no longer produces enough fuel gas to supply all fuel gas users at the QIT. This has resulted in use of alternative fueling (diesel) of the QIT generators. Field Operations Technical Engineering (FOTE) carried out a conceptual study to evaluate different options with a view of identifying the most economical, effective and efficient way of increasing the fuel gas availability at QIT while still keeping the OPEC oil production quota and thereby reducing or eliminating the diesel usage at QIT. To achieve this, FOTE has identified an option involving a means of increasing the overall QIT GOR while the 1st stage separator pressure of 30 Psig is being maintained by injecting up to 15 MMscfd of gas into the following Main Oil Lines (MOL):16” Ekpe-Asabo oil pipeline24” Ubit-QIT oil pipelineMPN has carried out pipeline hydraulic analysis for these oil lines (with the injected gas) and predicted that the potential of slug flow in the incoming pipeline is not likely. Therefore, PEL’s scope on this project is limited to the detailed design for the piping modifications required on Ubit and Ekpe platforms to enable connection of gas stream from a reasonable source to an appropriate point on the MOL location
Detailed Design for Ubit & Ekpe Gas Spiking Project
Client Name: MPN QIT, EketLocation: Ubit & Ekpe Offshore PlatformDate: May 2003 – July 2003Contract Type: Reimbursable, Detail Engineering
Client Contact: Jim [email protected]
Point Engineering Limited
PO INTPO INT
A Mark of great impact
www.pointengineering.com
36
A recent EIU SHE risk assessment conducted by MPNU on Inim PP identified the present Instrument Gas system as a potential risk – fire hazard. Pneumatic systems continuously bleed off gas that power or pressurize them as part of the pneumatic system operations. Inim PP is a manned production platform and has electric powered equipment that are likely sources of ignition of any gathered gas cloud. For this reason and others highlighted in the EIU SHE risk assessment report, Mobil Producing Nigeria Unlimited embarked on the conversion of the Instrument Gas System to Instrument Air System.
PEL carried out this study that considers a number of options for the installation of the proposed Instrument Air System, estimate the instrument air demand, develop equipment specifications, identify required structural modifications and tie-in to existing instrument air header, and develop cost estimates for renting as against outright purchase of compressor units for a period of five years
Preliminary Design for the Conversion of Inim PP Instrument Gas System to Instrument Air System
Client Name: MPN QIT, EketLocation: Inim Offshore PlatformDate: April 2003 – June 2003Contract Type: Reimbursable, Engineering Study
Client Contact: Jim [email protected]
Point Engineering Limited
PO INTPO INT
A Mark of great impact
www.pointengineering.com
37
The project is necessitated by the need for MPN to carry out the complete replacement of some failed pipe supports on 36” and 48” pipeline headers transferring crude to and from tank 5008 respectively at QIT process area .
PEL’s scope of work is the provision of detailed engineering design, calculations, documentation and construction drawings to enable construction of an adequate reinforced concrete pipe support for the 36’’ & 48’’ pipelines.
Detailed soil investigation was carried out at the failed section on the pipelines route.
Four new supports were designed to support the expansion loop section of the pipelines.
Detailed Engineering Design for QIT 36” Inlet Header and 48” Outlet Header Supports UpgradeClient Name: MPN QIT, EketLocation: QIT, EketDate: April 2003 – May 2003Contract Type: Reimbursable, Detail Engineering
Client Contact: Jim [email protected]
Point Engineering Limited
PO INTPO INT
A Mark of great impact
www.pointengineering.com
38
The scope of the project is the provision of detailed engineering design to enable the fabrication and installation of Mezzanine decks on Usari FB and FC platforms.
The work entails the design of an adequate steel structure and grating access platform at both platforms to enable personnel have access to equipment during maintenance
Detailed Design for Usari FB and FC Mezzanine Deck Installation
Client Name: MPN QIT, EketLocation: Usari Offshore PlatformDate: Nov. 2002 – January 2003Contract Type: Reimbursable, Detail Engineering
Client Contact: Jim [email protected]
Point Engineering Limited
PO INTPO INT
A Mark of great impact
www.pointengineering.com
39
Mobil Producing Nigeria Unlimited intended to relocate the diesel refilling piping with the associated pumping and metering facilities at their Bonny River Terminal (BRT) from the present small Boat dock location to the product loading dock at the jetty.
Point Engineering Limited (PEL) was engaged to carry out preliminary engineering design for the new piping systems.
Preliminary Design for Replacement / Relocation of Diesel Refill System at BRT
Client Name: MPN QIT, EketLocation: Bonny River TerminalDate: October 2002 – December 2002Contract Type: Reimbursable, Basic Engineering
Client Contact: Jim [email protected]
Point Engineering Limited
PO INTPO INT
A Mark of great impact
www.pointengineering.com
40
The scope of the project is the provision of detailed engineering design to enable re-routing of the existing Edop vertical atmospheric vent stack to a horizontal stack in a safe location.
The work also entails the design of an in-line detonation arrestor on the new stack and the resetting of the existing CO2 automatic flooding system to be able to sense early fire.
Point Engineering Limited will carried out the necessary process and piping design that enable the above design intent to be achieved.
Detailed Design for Edop QI Atmospheric Vent Re-routing
Client Name: MPN QIT, EketLocation: Edop Offshore PlatformDate: Nov. 2002 – December 2002Contract Type: Reimbursable, Detail Engineering
Client Contact: Jim [email protected]
Point Engineering Limited
PO INTPO INT
A Mark of great impact
www.pointengineering.com
41
The work entails the provision of engineering design services to generate all necessary detailed drawings and documentations required to carry out structural and piping works for installation of a temporary maintenance relief vent line at Inim Platform.
Inim PP Vent Gas Relief Header Modifications Detail Design
Client Name: MPN QIT, EketLocation: Inim Offshore PlatformDate: October 2002 – November 2002Contract Type: Reimbursable, Detail Engineering
Client Contact: Jim [email protected]
Point Engineering Limited
PO INTPO INT
A Mark of great impact
www.pointengineering.com
42
The work entails the provision of engineering design services to generate all necessary detailed drawings/documentions required to carry out structural, piping, electrical and equipment installation works for upgrading the existing 3 tons hoist system to 5 tons hoist system.
It also involves carrying out detailed load analysis that will enable the relocation of the existing diesel firewater engine and housing that may obstruct the planned MOL pumps hoist and monorail track I-beam installation.
Detailed Design for Ubit MOL Pump Hoist & Monorail Track I - Beam
Client Name: MPN QIT, EketLocation: Ubit Offshore PlatformDate: October 2002 – December 2002Contract Type: Reimbursable, Detail Engineering
Client Contact: Jim [email protected]
Point Engineering Limited
PO INTPO INT
A Mark of great impact
www.pointengineering.com
43
The scope of work is to provide detailed Engineering design, drawings and documentation for the installation of in-line flame arrestors on Etim ‘A’,
‘B’, & ‘PP’ sump tank vent lines
Etim A, B, and PP Flame Arrestor Installation Design
Client Name: MPN QIT, EketLocation: Etim Offshore PlatformDate: October 2002 – December 2002Contract Type: Reimbursable, Detail Engineering
Client Contact: Jim [email protected]
Point Engineering Limited
PO INTPO INT
A Mark of great impact
www.pointengineering.com
44
Due to lack of direct access to perform maintenance on the electrical/mechanical components of the 20 Tons Crane Hoist at the Mobil’s QIT power plant machine hall, a safely designed mezzanine deck was required.
Point Engineering Ltd performed detail load analysis, weld/bolting details, deck layout and support details for the project.
Construction scope of work, project schedule and cost estimate were produced for the project.
Detailed Design of Maintenance Platform on Power plant machine Hall for Access to 20 Ton HoistClient Name: MPN QIT, EketLocation: QIT, EketDate: October 2002 – December 2002Contract Type: Reimbursable, Detail Engineering
Client Contact: Jim [email protected]
Point Engineering Limited
PO INTPO INT
A Mark of great impact
www.pointengineering.com
45
The scope of the project is the provision of detailed engineering design for the complete debottlenecking of the Ubit GP / GY Sump system and in line with API RP 14C, which requires that a Sump pump should run on auto mode, while a sump tank should not be a pressurized vessel.
The work also entails the selection of a sump pump, capable of maintaining higher pressure that will overcome production Separator discharge pressure without backing out .
Detailed Design of Ubit GY and GP Sump Tank Debottlenecking
Client Name: MPN QIT, EketLocation: Ubit Offshore PlatformDate: August 2002 – October 2002Contract Type: Reimbursable, Detail Engineering
Client Contact: Jim [email protected]
Point Engineering Limited
PO INTPO INT
A Mark of great impact
www.pointengineering.com
46
The work entails the provision of engineering design services to generate all necessary detailed drawings and documentations required to carry out structural, piping, and electrical equipment installation works for convert ion of the mini portakabin at Ubit PP to a BS&W laboratory, in line with MPN requirements (OIMS System 5-4 (Personnel Safety Management)
Detailed Engineering Design forthe Installation of Ubit BS&W Laboratory Upgrade
Client Name: MPN QIT, EketLocation: Ubit Offshore PlatformDate: August 2002 – October 2002Contract Type: Reimbursable, Detail Engineering
Client Contact: Jim [email protected]
Point Engineering Limited
PO INTPO INT
A Mark of great impact
www.pointengineering.com
47
As part of the activities for Well Clean out and Testing for the EA Project, SPDC issued a work order to Oiltest Services (NIG.) Limited to carry out layout design to enable Oiltest and Halliburton Equipment hook-up on MV Lowell Granstaff Barge in line with safety requirements of API 15 (Hazardous Area Classification).
The project scope also involves Preparation of Process Drawings of the preferred scheme to enable HAZOP of the Oiltest and Halliburton processes
EA PROJECTLayout/Hazardous Area Classification of Granstaff Barge/DP-A Platform
Client Name: SPDC, Eastern DivisionLocation: EA Offshore PlatformDate: October 2002 – November 2002Contract Type: Lumpsum, Detail Engineering
Client Contact: Mr. Ubani
Point Engineering Limited
PO INTPO INT
A Mark of great impact
www.pointengineering.com
48
In 1992 Phase IV of Pipeline Internal Inspection Program was undertaken by SPDC-EAST and modification of the scraper traps on the following three gas lines require immediate attention:
8” x10.52 Km Afam Gas Plant – Afam NEPA MANIFOLD Gas line
10” x10.60 Km Afam Gas Plant – Afam NEPA MANIFOLD Gas line
6” x1.9 Km Kolocreek – Imiringi Gas line
PEL scope includes modifications of the existing pig traps and design of new slug catchers for the above lines necessary to enable cleaning, flushing and internal inspection of the lines in readiness for resumption of gas supply from Afam Gas Plant to NEPA Power Plant after a prolong shutdown of the plants since 1999.
Design of Gas Line Scrapper Traps and Slug Catchers
Client Name: SPDC, Eastern DivisionLocation: Afam and KolocreekDate: April 2002 – October 2002Contract Type: Lumpsum, Detail Engineering
Client Contact: Joe [email protected]
Point Engineering Limited
PO INTPO INT
A Mark of great impact
www.pointengineering.com
49
The Agbara/Ota Gas Distribution System comprises of the following:
* Custody Transfer Station (CTS).* Pressure Reduction & Metering Station (PRMS).* Customer Stations (CS)
Shell Nigeria Gas Limited contracted to PEL the task of developing a comprehensive operating and maintenance manual for these systems.
In addition to the manual preparation, PEL’s scope also include rendering commissioning assistance services for the plant commissioning group and standardization of various engineering drawings.
Agbara/Ota Gas Distribution Systems (Operating Manual & Commissioning Assistance)
Client Name: Shell Nigeria Gas LimitedLocation: Agbara / OtaDate: June 2002 – December 2002Contract Type: Lumpsum, Detail Engineering
Client Contact: Chucks [email protected]
Point Engineering Limited
PO INTPO INT
A Mark of great impact
www.pointengineering.com
50
SPDC Planned to install a Remote Field Manifold (RFM) at Agbada Well, Location 20 as part of her efforts to reduce clusters of flowlines in the field. In addition to the RFM, installation of 3 Nos 6” x 1.6Km Bulklines, 1 Nos 4” x 1.6Km Testline and 1 Nos 2” x 1.6Km Airline were also involved in the project.
PEL performed the detailed engineering phase of the project. The work includes preparation of Pipeline Alignment Sheets, Piping General Arrangement Drawings, Isometric Drawings with MTO’s, PEFS’s Instrument Design based on OPEN SYSTEM ARCHITECTURE etc.
Detailed Design of Remote Field Manifold – RFM (Agbada Loc. 20)
Client Name: SPDC, Eastern DivisionLocation: Agbada FieldDate: August 2002 – November 2002Contract Type: Lumpsum, Detail Engineering
Client Contact: Elisha [email protected]
Point Engineering Limited
PO INTPO INT
A Mark of great impact
www.pointengineering.com
51
Provided HAZOP Leader and Secretary including reports and review services for the Obigbo to IA Gas Pipeline Project.
Provision of Hazop Leader and Secretary
Client Name: SPDC, Eastern DivisionLocation: Shell IADate: April 2002Contract Type: Reimbursable, Engineering Services
Client Contact: Badar S. [email protected]
Point Engineering Limited
PO INTPO INT
A Mark of great impact
www.pointengineering.com
52
Preparation of Operating and Maintenance Manuals for 12 Land flowstations, 5 swamp flowstations and 1 AGG Plant
Preparation of Operating and Maintenance Manuals
Client Name: SPDC, Eastern DivisionLocation: Land and SwampDate: May 2001 - November 2002Contract Type: Lumpsum, Engineering Studies
Client Contact: Felix [email protected]
Point Engineering Limited
PO INTPO INT
A Mark of great impact
www.pointengineering.com
53
SPDC embarked on various gas utilization projects as part of its efforts to eliminate continous gas flaring in its oil production operations, and CCAGG was one of such projects.
The EPC phase of the project was split into pipeline & facility scopes and awarded to Daewoo Nigeria Limited who subcontracted the detailed engineering works to Point Engineering Limited. There were eleven pipelines involved for transportation of gas to and from locations within the AGG node and third party facilities (e.g NLNG, ASCON).
Point Engineering’s scope includes detailed engineering, Sub-Contracting Engineering Survey of the pipeline R.O.W in Swamps & river / creek terain with supervision and management of the surveyors, soil investigation and resistivity survey, etc. Conceptual Design verification, Pipeline relief, vent and blowdown design were done on the eleven pipelines. Corrosion and Cathodic Protection design was also carried out.
Cawthorne Channel AGG Pipeline Project (CCAGG)
Client Name: Daewoo / SPDCLocation: Cawthorne ChannelDate: May 2001 - November 2001Contract Type: Lumpsum, Detail Engineering
Client Contact: Joon [email protected]
Point Engineering Limited
PO INTPO INT
A Mark of great impact
www.pointengineering.com
54
SPDC-E own and operate an existing Gas Plant at Afam located about 40km East of Port Harcourt, Nigeria (OML11). The Gas Plant was seriously vandalised in 1999 to the extent that a complete refurbishment of various facilities such as export pumps, generators, instrumentation items, and electrical system etc. is required to bring the Gas Plant back on stream.
In addition it is also required to debottleneck the Gas Plant to enable the processing of 75MMscfd and at the same time meet the environmental upgrade requirements. The Process Automation System (PAS) is required to be upgraded to a novel OPEN SYSTEM ARCHITECTURE Technology.
Point Engineering performed the conceptual design and full detailed engineering design for the rehabilitation/upgrade works.
Afam Gas Plant Rehabilitation Design
Client Name: SPDC, Eastern DivisionLocation: AfamDate: Nov. 2001 - November 2002Contract Type: Lumpsum, Detail Engineering
Client Contact: Elisha [email protected]
Point Engineering Limited
PO INTPO INT
A Mark of great impact
www.pointengineering.com
55
SPDC-E own and operate an existing Flowstation at Afam located about 40km East of Port Harcourt, Nigeria (OML11). The Flowstation was seriously vandalised in 1999 to the extent that a complete refurbishment of various facilities such as export pumps, generators, instrumentation items, and electrical system etc. is required to bring the Flowstation back on stream.
In addition it is also required to debottleneck the Flowstation to enable the processing of 30,000bopd and at the same time meet the environmental upgrade requirements. The Process Automation System (PAS) is required to be upgraded to a novel OPEN SYSTEM ARCHITECTURE Technology.
Point Engineering performed the conceptual design and full detailed engineering design for the rehabilitation/upgrade works.
Afam Flowstation Rehabilitation Design
Client Name: SPDC, Eastern DivisionLocation: AfamDate: Nov. 2001 - November 2002Contract Type: Lumpsum, Detail Engineering
Client Contact: Elisha [email protected]
Point Engineering Limited
PO INTPO INT
A Mark of great impact
www.pointengineering.com
56
As part of the Field Development plan of the Production Area ‘A’ of SPDC-E, installation of a 12” x 14km crude pipeline is required for bulk production from Gbaran Field to Kolo Creek Flowstation for processing as there is no existing Flowstation at Gbaran. It is also necessary to carry out some modifications/expansion work at Kolo Creek flowstation to enable it to handle the additional fluid from Gbaran.
Point Engineering on behalf of Ozono Nigeria Limited carried out the full detailed engineering design for this project. The design work involved Pipeline Hydraulic simulation, Pipeline Mechanical Design, Corrosion Engineering and Cathodic Protection System Design - Utilizing solar power system, etc.
Gbaran/Kolo Creek Pipelines & Flowstation Expansion Design
Client Name: SPDC, Eastern DivisionLocation: Gbaran and KolocreekDate: Dec. 1999 - February 2000Contract Type: Lumpsum, Detail Engineering
Client Contact: Tayo [email protected]
Point Engineering Limited
PO INTPO INT
A Mark of great impact
www.pointengineering.com
57
Point Engineering carried out production of As-built Engineering Drawings for four SPDC Flowstations (Imo River 1 & 3, Obigbo North and Agbada-2)
The following Engineering drawings were marked up on site to produce the As-built status of the facilities:
Process Flow Schemes.Process Engineering Flow Schemes.Piping General Arrangement Layout.Isometric Drawing etc.
Flowstation As-built Mark-ups
Client Name: SPDC, Eastern DivisionLocation: Imo River and Obigbo NorthDate: March 2000 - August 2000Contract Type: Lumpsum, As-built Documenation
Client Contact: Elisha [email protected]
Point Engineering Limited
PO INTPO INT
A Mark of great impact
www.pointengineering.com
58
Electrification of Bille Community is required as Part of SPDC’s Community Development Project in the Area.
Point Engineering carried out the Detailed Engineering Design of the Electrification Systems including 0.415/11KV and 11/0.415KV transformers, 500KVA Gas Engine Power Generators, 14 kM overhead Transmission line and Hook-Up System.
Route Survey for pole locations and cable stringing was also performed by Point Engineering Limited.
Bille Community Electrification Project
Client Name: SPDC, Eastern DivisionLocation: BilleDate: Feb. 2001 - May 2001Contract Type: Lumpsum, Detail Engineering
Client Contact: Chinedu B. [email protected]
Point Engineering Limited
PO INTPO INT
A Mark of great impact
www.pointengineering.com
59
As a Sub Contractor of OISL, Point Engineering Limited executed detailed engineering design of Gun Barrel Tanks with the associated fire fighting Systems and tie-in to existing facilities located at NAOC’s Brass Terminal.
The work entailed preparation of process drawings (PFD, P & ID etc.), piping general arrangements and isometrics for transfer pumps, development of Valve List, Line List, MTO using NAOC’s Standard Engineering Specifications.Drawings were also prepared for all the associated instrumentations, Civil / Structural works, and electrical Systems.
Brass Terminal Gun Barrel Tank
Client Name: NAOC / OIS Location: Brass TerminalDate: Feb. 2001 - June 2001Contract Type: Lumpsum, Detail Engineering
Client Contact: Chris [email protected]
Point Engineering Limited
PO INTPO INT
A Mark of great impact
www.pointengineering.com
60
AMNI International Limited has an Offshore Storage vessel called AILSA CRAIG with associated Single Buoy Mooring System. This project required the assessment of the failed bridle and fish plate and to carry out detailed design for the replacement.
Point Engineering performed mechanical engineering calculations ( stress & strength analysis) to investigate the most appropriate material for the mooring bridle/fish plate.
Engineering Evaluation of Failed Mooring System & Detailed Design of Replacement Hose and Structure
Client Name: AMNI Location: Offshore Storage PlatformDate: May 2001 - August 2001Contract Type: Lumpsum, Detail Engineering
Client Contact: Wale Olafisan234-84-239079
Point Engineering Limited
PO INTPO INT
A Mark of great impact
www.pointengineering.com
61
AMNI’s IMA Field Platform comprise of a Processing Platform (PP), Well Production Platform (WPP), and interface linkage between WPP and PP. There is an existing 28ft x 6” flexible hose between WPP of compressor discharge and the bridge interface to the Gas Injection Wells. No evaluation was done when this line was installed. To determine the suitability of this line to convey gas from Gaslift compressors to WPP, an evaluation was required.
Point Engineering carried out engineering evaluation of the existing Gas Injection Line and designed a new Gaslift flowline to Ima-2ST4, Ima-7B and additional two slots with a lift pressure of 1500psi in addition to the existing gas injection manifold.
Engineering Evaluation of Existing 6” Gas Injection Line & Design of New Gaslift Line
Client Name: AMNI Location: Langley Offshore PlatformDate: Nov. 2000 - January 2001Contract Type: Lumpsum, Detail Engineering
Client Contact: Wale Olafisan234-84-239079
Point Engineering Limited
PO INTPO INT
A Mark of great impact
www.pointengineering.com
62
The Project is required by SPDC to meet gas supply commitments to Aba customers before and after the AGG gas plant comes on stream in November 2000. Before the AGG comes on, 12mmscf/d off-gas would be taken from Nkali XHP to Imo River 1 Flowstation through the 16” AGG gas pipeline, passed through the existing sales gas scrubber before getting to the customers at Aba.
Point Engineering on behalf of Ozono Nigeria Limited carried out the full detailed engineering design for this project.
Detailed Design for Aba Early Gas Supply and Tie-ins
Client Name: SPDC, Eastern DivisionLocation: Imo Riv., & Nkali F/stationDate: January 2000 - March 2000Contract Type: Lumpsum, Detail Engineering
Client Contact: Joseph [email protected]
Point Engineering Limited
PO INTPO INT
A Mark of great impact
www.pointengineering.com
63
Shell Petroleum Development Company of Nigeria Limited plans to install 9 Centrifugal Pumps at Imo River 1, Obigbo North and Oguta flow stations to replace existing Reciprocating Pumps. SPDC issued an order (ED-054) to Ozono Nigeria Limited to carry out design modifications of 4 bays in each of these stations to enables flexibility in pump hook-up installation and future replacements.
The project scope is also to carry out detail design / engineering and preparation of Approved-for-Construction drawings, construction workscope and materials take-off for pump and driver hook-up to existing facilities. The new Centrifugal Pumps and
Drivers will be vendor supplied .
Point Engineering on behalf of Ozono Nigeria Limited carried out the full detailed engineering design for this project.
DESIGN MODIFICATIONS FOR CP INSTALLATIONS AT IMO RIVER 1, OBIGBO NORTH AND OGUTA FLOWSTATIONS
Client Name: SPDC, Eastern DivisionLocation: Imo Riv., Obigbo & OgutaDate: Dec. 1999 - February 2000Contract Type: Lumpsum, Detail Engineering
Client Contact: Elisha [email protected]
Point Engineering Limited
PO INTPO INT
A Mark of great impact
www.pointengineering.com
64
The Obigbo North field has an existing Water Injection Plant (WIP) with an installed capacity of 15Mbwpd for pressure maintenance. The WIP uses source water from 2 water wells. The Field Development Plan (FDP) of 1997 identified an additional requirement of 20Mbwpd. It also identified Produced Water Re-Injection (PWRI) as an economic alternative to the existing source water injection and produced water disposal. The PWRI will increase oil production in Obigbo North, replace its produced water disposal at Bonny Terminal with a more environmentally friendly alternative and create more ullage in the pipeline trunklines. It will also alleviate the produced water processing capacity of Bonny Terminal in the long term.The FDP recommended this pilot scheme to quantify and thus reduce the risks that may be associated with a full-scale implementation of PWRI.
The design scope for the project is to carry out detail design engineering and preparation of Approved-for-Construction drawings, construction workscope and materials take-off for Separators and Skimmer hook-up to existing facilities.
Obigbo North Water Re-injection Pilot Project
Client Name: Oiltest / SPDCLocation: Obigbo NorthDate: August 1998 - September 1998Contract Type: Lumpsum, Detail Engineering
Client Contact: Patrick Amadi234-84230931