51
1 Electricity Safety Amendment (Bushfire Mitigation Civil Penalties Scheme) Bill 2017 Powercor S120P Annual Compliance Report As at 30 April 2018

Powercor S120P Annual ompliance Report · Report As at 30 April 2018 . 2 Document Information ... GSB REFCL Project Activities Completion Date Percentage Complete Weighting Initiate

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Powercor S120P Annual ompliance Report · Report As at 30 April 2018 . 2 Document Information ... GSB REFCL Project Activities Completion Date Percentage Complete Weighting Initiate

1

Electricity Safety Amendment (Bushfire Mitigation Civil Penalties Scheme)

Bill 2017

Powercor S120P Annual Compliance Report As at 30 April 2018

Page 2: Powercor S120P Annual ompliance Report · Report As at 30 April 2018 . 2 Document Information ... GSB REFCL Project Activities Completion Date Percentage Complete Weighting Initiate

2

Document Information In the event of any inquiries with respect to this document, please contact

Bushfire Mitigation Powercor Australia Ltd 40 Market Street Melbourne 3000 Ph. (03) 9683-4747

Approval

Page 3: Powercor S120P Annual ompliance Report · Report As at 30 April 2018 . 2 Document Information ... GSB REFCL Project Activities Completion Date Percentage Complete Weighting Initiate

3

1 Works carried out during the reporting period .................................................................................................4

1.1 REFCL program status [S120P(1)(a)(i)] ..............................................................................................................5

1.2 ELCA program status [S120P(1)(a)(ii)] ............................................................................................................ 19

1.3 SWER ACR program status [S120P(1)(a)(iii)] .................................................................................................. 20

2 Plans of works to be carried out during the next reporting period ............................................................... 28

2.1 REFCL program status [S120P(1)(c)(i)] ........................................................................................................... 29

2.2 ELCA program status [S120P(1)(c)(ii)] ............................................................................................................ 43

2.3 SWER ACR program status [S120P(1)(c)(iii)] .................................................................................................. 44

Version History

Revision Date Comment

1.0 1 June 2018 Submission to PAL/CP Board for approval

2.0 1 August 2018 Submission of Board approved report to ESV

3.0 13 August 2018 Minor amendments to address ESV feedback

Contents

Page 4: Powercor S120P Annual ompliance Report · Report As at 30 April 2018 . 2 Document Information ... GSB REFCL Project Activities Completion Date Percentage Complete Weighting Initiate

4

1 Works carried out during the reporting period

17 to 30 April 2018

Page 5: Powercor S120P Annual ompliance Report · Report As at 30 April 2018 . 2 Document Information ... GSB REFCL Project Activities Completion Date Percentage Complete Weighting Initiate

5

This section provides details of works carried out during the reporting period (1 May 2017 to 30 April 2018).

1.1 REFCL program status [S120P(1)(a)(i)]

1.1.1 Gisborne (GSB)

GSB REFCL Project Activities Completion

Date Percentage Complete

Weighting

Initiate Business Case commenced 25/02/2016

100% 5%

Business Case approval 25/02/2016

Design Design commenced 26/02/2016

100% 20%

Design complete 6/06/2016

Procurement

Number of REFCL units required 1

REFCL order placed 17/03/2016 100% 15%

REFCL delivered to site 15/08/2016

Construction - Lines Line works commenced 26/02/2016

100% 25%

Line works complete 30/09/2016

Construction - Stations

Station works commenced 19/05/2016 100% 15%

Station works complete 12/04/2017

Construction - Third Party

Number of affected HV Customer Connections 0

HV customer works commenced 0% 0%

HV customer works complete

Testing / Commissioning

REFCL testing / commissioning commenced 12/09/2016 100% 10%

REFCL commissioned and operable 23/09/2016

Close Out REFCL at "required capacity"

0% 10%

Total weighted percentage complete 90%

The zone substation is located at -37.45355146, 144.57636595 (latitude, longitude)

Page 6: Powercor S120P Annual ompliance Report · Report As at 30 April 2018 . 2 Document Information ... GSB REFCL Project Activities Completion Date Percentage Complete Weighting Initiate

6

1.1.2 Woodend (WND)

WND REFCL Project Activities Completion

Date Percentage Complete

Weighting

Initiate Business Case commenced 25/02/2016

100% 5% Business Case approval 25/02/2016

Design Design commenced 26/02/2016

100% 20% Design complete 6/06/2016

Procurement

Number of REFCL units required 2

REFCL order placed 17/03/2016 100% 15%

REFCL delivered to site 15/08/2016

Construction - Lines Line works commenced 26/02/2016

100% 25% Line works complete 30/05/2017

Construction - Stations

Station works commenced 12/05/2016 100% 15%

Station works complete 12/04/2017

Construction - Third Party

Number of affected HV Customer Connections 0

HV customer works commenced 0% 0%

HV customer works complete

Testing / Commissioning

REFCL testing / commissioning commenced 15/12/2016 100% 10%

REFCL commissioned and operable 31/10/2017

Close Out REFCL at "required capacity"

0% 10%

Total weighted percentage complete 90%

This zone substation is located at -37.33449073, 144.51778650 (latitude, longitude)

Page 7: Powercor S120P Annual ompliance Report · Report As at 30 April 2018 . 2 Document Information ... GSB REFCL Project Activities Completion Date Percentage Complete Weighting Initiate

7

1.1.3 Camperdown (CDN)

CDN REFCL Project Activities Completion

Date Percentage Complete

Weighting

Initiate Business Case commenced 1/05/2016

100% 5%

Business Case approval 13/07/2016

Design Design commenced 1/08/2016

100% 20% Design complete 11/01/2018

Procurement

Number of REFCL units required 1

REFCL order placed 24/03/2017 100% 15%

REFCL delivered to site 4/11/2017

Construction - Lines Line works commenced 9/01/2017

80% 25%

Line works complete

Construction - Stations

Station works commenced 30/05/2017 100% 15%

Station works complete 23/04/2018

Construction - Third Party

Number of affected HV Customer Connections 0

HV customer works commenced 0% 0%

HV customer works complete

Testing / Commissioning

REFCL testing / commissioning commenced 0% 10%

REFCL commissioned and operable

Close Out REFCL at "required capacity" 0% 10%

Total weighted percentage complete 75%

This zone substation is located at -38.22702204, 143.15481663 (latitude, longitude)

Page 8: Powercor S120P Annual ompliance Report · Report As at 30 April 2018 . 2 Document Information ... GSB REFCL Project Activities Completion Date Percentage Complete Weighting Initiate

8

1.1.4 Castlemaine (CMN)

CMN REFCL Project Activities Completion

Date Percentage Complete

Weighting

Initiate Business Case commenced 1/05/2016

100% 5% Business Case approval 13/07/2016

Design Design commenced 1/08/2016

80% 15% Design complete

Procurement

Number of REFCL units required 1

REFCL order placed 24/03/2017 95% 10%

REFCL delivered to site

Construction - Lines Line works commenced 24/06/2017

80% 20% Line works complete

Construction - Stations

Station works commenced 30/05/2017 70% 15%

Station works complete

Construction - Third Party

Number of affected HV Customer Connections 4

HV customer works commenced 7/02/2018 30% 20%

HV customer works complete

Testing / Commissioning

REFCL testing / commissioning commenced 0% 10%

REFCL commissioned and operable

Close Out REFCL at "required capacity"

0% 5%

Total weighted percentage complete 59%

This zone substation is located at -37.07236807, 144.20669317 (latitude, longitude)

Page 9: Powercor S120P Annual ompliance Report · Report As at 30 April 2018 . 2 Document Information ... GSB REFCL Project Activities Completion Date Percentage Complete Weighting Initiate

9

1.1.5 Maryborough (MRO)

MRO REFCL Project Activities Completion

Date Percentage Complete

Weighting

Initiate Business Case commenced 1/05/2016

100% 5% Business Case approval 13/07/2016

Design Design commenced 1/12/2016

83% 20% Design complete

Procurement

Number of REFCL units required 1

REFCL order placed 24/03/2017 100% 15%

REFCL delivered to site 14/12/2017

Construction - Lines Line works commenced 22/01/2018

45% 25% Line works complete

Construction - Stations

Station works commenced 22/01/2018 40% 15%

Station works complete

Construction - Third Party

Number of affected HV Customer Connections 0

HV customer works commenced 0% 0%

HV customer works complete

Testing / Commissioning

REFCL testing / commissioning commenced 0% 10%

REFCL commissioned and operable

Close Out REFCL at "required capacity"

0% 10%

Total weighted percentage complete 54%

This zone substation is located at -37.04952584, 143.75473022 (latitude, longitude)

Page 10: Powercor S120P Annual ompliance Report · Report As at 30 April 2018 . 2 Document Information ... GSB REFCL Project Activities Completion Date Percentage Complete Weighting Initiate

10

1.1.6 Colac (CLC)

CLC REFCL Project Activities Completion

Date Percentage Complete

Weighting

Initiate Business Case commenced 1/05/2016

100% 5% Business Case approval 13/07/2016

Design Design commenced 7/11/2016

60% 15% Design complete

Procurement

Number of REFCL units required 2

REFCL order placed 24/03/2017 95% 10%

REFCL delivered to site

Construction - Lines Line works commenced 12/04/2017

50% 20% Line works complete

Construction - Stations

Station works commenced 0% 15%

Station works complete

Construction - Third Party

Number of affected HV Customer Connections 6

HV customer works commenced 0% 20%

HV customer works complete

Testing / Commissioning

REFCL testing / commissioning commenced 0% 10%

REFCL commissioned and operable

Close Out REFCL at "required capacity"

0% 5%

Total weighted percentage complete 34%

This zone substation is located at -38.34056225, 143.60615730 (latitude, longitude)

Page 11: Powercor S120P Annual ompliance Report · Report As at 30 April 2018 . 2 Document Information ... GSB REFCL Project Activities Completion Date Percentage Complete Weighting Initiate

11

1.1.7 Winchelsea (WIN)

WIN REFCL Project Activities Completion

Date Percentage Complete

Weighting

Initiate Business Case commenced 1/05/2016

100% 5% Business Case approval 13/07/2016

Design Design commenced 1/12/2016

87% 20% Design complete

Procurement

Number of REFCL units required 2

REFCL order placed 24/03/2017 95% 15%

REFCL delivered to site

Construction - Lines Line works commenced 12/04/2017

35% 25% Line works complete

Construction - Stations

Station works commenced 0% 15%

Station works complete

Construction - Third Party

Number of affected HV Customer Connections 0

HV customer works commenced 0% 0%

HV customer works complete

Testing / Commissioning

REFCL testing / commissioning commenced 0% 10%

REFCL commissioned and operable

Close Out REFCL at "required capacity"

0% 10%

Total weighted percentage complete 45%

This zone substation is located at -38.23622505, 144.00288820 (latitude, longitude)

Page 12: Powercor S120P Annual ompliance Report · Report As at 30 April 2018 . 2 Document Information ... GSB REFCL Project Activities Completion Date Percentage Complete Weighting Initiate

12

1.1.8 Eaglehawk (EHK)

EHK REFCL Project Activities Completion

Date Percentage Complete

Weighting

Initiate Business Case commenced 6/02/2018

100% 5% Business Case approval 10/03/2017

Design Design commenced 27/11/2017

80% 15% Design complete

Procurement

Number of REFCL units required 2

REFCL order placed 24/03/2017 95% 10%

REFCL delivered to site

Construction - Lines Line works commenced

0% 20% Line works complete

Construction - Stations

Station works commenced 0% 15%

Station works complete

Construction - Third Party

Number of affected HV Customer Connections 8

HV customer works commenced 0% 20%

HV customer works complete

Testing / Commissioning

REFCL testing / commissioning commenced 0% 10%

REFCL commissioned and operable

Close Out REFCL at "required capacity"

0% 5%

Total weighted percentage complete 27%

This zone substation is located at -36.73592644, 144.27855492 (latitude, longitude)

Page 13: Powercor S120P Annual ompliance Report · Report As at 30 April 2018 . 2 Document Information ... GSB REFCL Project Activities Completion Date Percentage Complete Weighting Initiate

13

1.1.9 Ballarat North (BAN)

BAN REFCL Project Activities Completion

Date Percentage Complete

Weighting

Initiate Business Case commenced 11/09/2017

100% 5% Business Case approval 27/10/2017

Design Design commenced

0% 15% Design complete

Procurement

Number of REFCL units required 3

REFCL order placed 0% 10%

REFCL delivered to site

Construction - Lines Line works commenced

0% 20% Line works complete

Construction - Stations

Station works commenced 0% 15%

Station works complete

Construction - Third Party

Number of affected HV Customer Connections 9

HV customer works commenced 0% 20%

HV customer works complete

Testing / Commissioning

REFCL testing / commissioning commenced 0% 10%

REFCL commissioned and operable

Close Out REFCL at "required capacity"

0% 5%

Total weighted percentage complete 5%

This zone substation is located at -37.53477699, 143.84742737 (latitude, longitude)

Page 14: Powercor S120P Annual ompliance Report · Report As at 30 April 2018 . 2 Document Information ... GSB REFCL Project Activities Completion Date Percentage Complete Weighting Initiate

14

1.1.10 Charlton (CTN)

CTN REFCL Project Activities Completion

Date Percentage Complete

Weighting

Initiate Business Case commenced 11/09/2017

100% 5% Business Case approval 27/10/2017

Design Design commenced

0% 15% Design complete

Procurement

Number of REFCL units required 1

REFCL order placed 0% 10%

REFCL delivered to site

Construction - Lines Line works commenced

0% 20% Line works complete

Construction - Stations

Station works commenced 0% 15%

Station works complete

Construction - Third Party

Number of affected HV Customer Connections 4

HV customer works commenced 0% 20%

HV customer works complete

Testing / Commissioning

REFCL testing / commissioning commenced 0% 10%

REFCL commissioned and operable

Close Out REFCL at "required capacity"

0% 5%

Total weighted percentage complete 5%

This zone substation is located at -36.27399871, 143.36318135 (latitude, longitude)

Page 15: Powercor S120P Annual ompliance Report · Report As at 30 April 2018 . 2 Document Information ... GSB REFCL Project Activities Completion Date Percentage Complete Weighting Initiate

15

1.1.11 Ballarat South (BAS)

BAS REFCL Project Activities Completion

Date Percentage Complete

Weighting

Initiate Business Case commenced 11/09/2017

100% 5% Business Case approval 27/10/2017

Design Design commenced

0% 15% Design complete

Procurement

Number of REFCL units required 3

REFCL order placed 0% 10%

REFCL delivered to site

Construction - Lines Line works commenced

0% 20% Line works complete

Construction - Stations

Station works commenced 0% 15%

Station works complete

Construction - Third Party

Number of affected HV Customer Connections 5

HV customer works commenced 0% 20%

HV customer works complete

Testing / Commissioning

REFCL testing / commissioning commenced 0% 10%

REFCL commissioned and operable

Close Out REFCL at "required capacity"

0% 5%

Total weighted percentage complete 5%

This zone substation is located at -37.57505901, 143.82751465 (latitude, longitude)

Page 16: Powercor S120P Annual ompliance Report · Report As at 30 April 2018 . 2 Document Information ... GSB REFCL Project Activities Completion Date Percentage Complete Weighting Initiate

16

1.1.12 Bendigo Terminal Station (BETS)

BETS REFCL Project Activities Completion

Date Percentage Complete

Weighting

Initiate Business Case commenced 11/09/2017

100% 5% Business Case approval 27/10/2017

Design Design commenced

0% 15% Design complete

Procurement

Number of REFCL units required 2

REFCL order placed 0% 10%

REFCL delivered to site

Construction - Lines Line works commenced

0% 20% Line works complete

Construction - Stations

Station works commenced 0% 15%

Station works complete

Construction - Third Party

Number of affected HV Customer Connections 4

HV customer works commenced 0% 20%

HV customer works complete

Testing / Commissioning

REFCL testing / commissioning commenced 0% 10%

REFCL commissioned and operable

Close Out REFCL at "required capacity"

0% 5%

Total weighted percentage complete 5%

This zone substation is located at -36.78490276, 144.25368547 (latitude, longitude)

Page 17: Powercor S120P Annual ompliance Report · Report As at 30 April 2018 . 2 Document Information ... GSB REFCL Project Activities Completion Date Percentage Complete Weighting Initiate

17

1.1.13 Bendigo (BGO)

BGO REFCL Project Activities Completion

Date Percentage Complete

Weighting

Initiate Business Case commenced 11/09/2017

100% 5% Business Case approval 27/10/2017

Design Design commenced

0% 15% Design complete

Procurement

Number of REFCL units required 2

REFCL order placed 0% 10%

REFCL delivered to site

Construction - Lines Line works commenced

0% 20% Line works complete

Construction - Stations

Station works commenced 0% 15%

Station works complete

Construction - Third Party

Number of affected HV Customer Connections 2

HV customer works commenced 0% 20%

HV customer works complete

Testing / Commissioning

REFCL testing / commissioning commenced 0% 10%

REFCL commissioned and operable

Close Out REFCL at "required capacity"

0% 5%

Total weighted percentage complete 5%

This zone substation is located at -36.77055176, 144.27696705 (latitude, longitude)

Page 18: Powercor S120P Annual ompliance Report · Report As at 30 April 2018 . 2 Document Information ... GSB REFCL Project Activities Completion Date Percentage Complete Weighting Initiate

18

1.1.14 Geelong (GL)

GL REFCL Project Activities Completion

Date Percentage Complete

Weighting

Initiate Business Case commenced 11/09/2017

100% 5% Business Case approval 27/10/2017

Design Design commenced

0% 15% Design complete

Procurement

Number of REFCL units required 2

REFCL order placed 0% 10%

REFCL delivered to site

Construction - Lines Line works commenced

0% 20% Line works complete

Construction - Stations

Station works commenced 0% 15%

Station works complete

Construction - Third Party

Number of affected HV Customer Connections 1

HV customer works commenced 0% 20%

HV customer works complete

Testing / Commissioning

REFCL testing / commissioning commenced 0% 10%

REFCL commissioned and operable

Close Out REFCL at "required capacity"

0% 5%

Total weighted percentage complete 5%

This zone substation is located at -38.12868286, 144.34043884 (latitude, longitude)

Page 19: Powercor S120P Annual ompliance Report · Report As at 30 April 2018 . 2 Document Information ... GSB REFCL Project Activities Completion Date Percentage Complete Weighting Initiate

19

1.2 ELCA program status [S120P(1)(a)(ii)]

Total Electric Line Volumes At 1 May 2017 At 30 April 2018 Progress over Reporting Period

Bare conductor in ELCA Route km Route km Percentage Route km Single Phase HV bare conductor 480.03 475.24 -1% -4.79

Multi Phase HV bare conductor 491.85 487.25 -1% -4.60

SWER HV bare conductor 585.58 524.6 -10% -60.98

Covered / underground conductor in ELCA Route km Route km Percentage Route km Single Phase HV conductor 3.85 3.85 0% 0

Multi Phase HV conductor 96.94 120.05 +24% 23.11

SWER HV conductor 129.35 218.13 +69% 88.78

Supplying Substation

(System Normal) Feeder Reason for Construction

Previous Construction New Construction

Completion Date Type Phasing

Length (Route

km) Type Phasing

Length (Route

km) Winchelsea WIN011 New Electric line n/a n/a 0 Underground Cable Polyphase 0.9 11/11/2017

Bendigo Terminal Station BET004 New Electric line n/a n/a 0 Underground Cable Polyphase 0.2 14/11/2017

Eaglehawk EHK24 New Electric line n/a n/a 0 Underground Cable Polyphase 1.3 14/09/2017

Bendigo Terminal Station BET001 Augmented for load Bare Conductor SWER 0.2 Underground Cable Polyphase 0.2 13/10/2017

Woodend WND024 Proactive replacement/direction Bare Conductor SWER 38.8 Underground Cable SWER 48.0 30/06/2017

Castlemaine CMN003 Proactive replacement/direction Bare Conductor SWER 14.3 Underground Cable SWER 19.3 30/08/2017

Castlemaine CMN004 Proactive replacement/direction Bare Conductor SWER 18.7 Underground Cable SWER 21.5 30/08/2017

Winchelsea WIN011 Proactive replacement/direction Bare Conductor Polyphase 9.3 Underground Cable Polyphase 20.5 30/06/2017

Page 20: Powercor S120P Annual ompliance Report · Report As at 30 April 2018 . 2 Document Information ... GSB REFCL Project Activities Completion Date Percentage Complete Weighting Initiate

20

1.3 SWER ACR program status [S120P(1)(a)(iii)]

Over the reporting period Powercor has installed 256 Automatic Circuit Reclosers (ACR) in relation to Single Wire Earth Return (SWER) lines. Details are provided in the following table.

ACR NAME FEEDER COMPLETION DATE

CENTRE SPUR RD P8 ACR CDN001 22/08/2017

KYUNA NTH P2 FUSE SAVER TRG002 3/10/2017

KYUNA P17 FUSE SAVER TRG002 4/10/2017

ALHAMBRI P2 SWER ACR FS CLC003 1/11/2017

NORTH CUNDARE P11 SWER ACR FS CLC003 1/11/2017

SMART P14 SWER ACR FS CLC003 6/11/2017

SHELFORD P112 SWER ACR FS WIN013 8/11/2017

SHELLEY P3 SWER ACR FS WIN013 9/11/2017

JEFFCOTT P3 SWER ACR FS CTN006 14/11/2017

DONALD SOUTH EAST P5 SWER ACR FS CTN006 15/11/2017

TUENA P14 SWER ACR FS ART033 16/11/2017

ROLLOS RD P1 SWER ACR FS WBL012 17/11/2017

YEO P28 SWER ACR FS CLC007 19/11/2017

PEARDON P11 SWER ACR FS CLC007 19/11/2017

MELVILLE P1 SWER ACR FS CLC006 20/11/2017

BANYENA P8 SWER ACR FS CTN006 21/11/2017

NORMANVILLE P3 SWER ACR FS KGT004 21/11/2017

QUAMBATOOK ROAD P2 SWER ACR FS KGT004 21/11/2017

LEEDER P1 SWER ACR FS CTN006 22/11/2017

GILMORE P1 SWER ACR FS CTN006 22/11/2017

FENTONS CREEK P40A SWER ACR FS CTN002 23/11/2017

YEUNGROON P1 SWER ACR FS CTN006 23/11/2017

STONYHURST RD P5A SWER ACR FS CLC003 24/11/2017

CROFTON PARK P1 SWER ACR FS CTN006 24/11/2017

BULOKE P1 SWER ACR FS CTN006 24/11/2017

BRIDGEWATER P1 SWER ACR FS EHK024 24/11/2017

CHARLTON WEST P1 SWER ACR FS CTN006 24/11/2017

MINMINDIE P28A SWER ACR FS CTN002 25/11/2017

UPPER GELLIBRAND P2A SWER ACR FS CLC007 25/11/2017

Page 21: Powercor S120P Annual ompliance Report · Report As at 30 April 2018 . 2 Document Information ... GSB REFCL Project Activities Completion Date Percentage Complete Weighting Initiate

21

SEDGWICK P20 SWER ACR FS BET007 28/11/2017

LITCHFIELD SOUTH P3 SWER ACR FS CTN006 28/11/2017

JUNCTION P2 SWER ACR FS CTN002 28/11/2017

KNOWSLEY P1 SWER ACR FS BGO023 29/11/2017

SEDGWICK NORTH P5 SWER ACR FS BET007 29/11/2017

WINJALLOCK P18 SWER ACR FS CTN006 29/11/2017

CADSON P1 SWER ACR FS. CTN002 29/11/2017

YEUNGROON EAST P1 SWER ACR FS. CTN002 29/11/2017

ROCKY POINT P3 SWER ACR FS ART033 29/11/2017

CATHCART P14 SWER ACR FS ART033 29/11/2017

DERRINAL TIE LINE P1 SWER ACR FS BGO023 30/11/2017

MT CAMEL P1 SWER ACR FS BGO023 30/11/2017

BURRUMBITE P4A SWER ACR FS CTN006 30/11/2017

GOOROC P1A SWER ACR FS CTN006 30/11/2017

RICHMOND PLAINS P2 SWER ACR FS CTN002 30/11/2017

HATELY P1A SWER ACR FS ART033 30/11/2017

ROE PARK P30A SWER ACR FS KYM003 30/11/2017

CROUCH P5 SWER ACR FS ART033 1/12/2017

LITCHFIELD P117 SWER ACR FS CTN006 2/12/2017

ACKERLY P2 SWER ACR FS CLC006 4/12/2017

BARONGAROOK WEST P11 SWER ACR FS CLC006 4/12/2017

TEDDYWADDY WEST P2 SWER ACR FS CTN003 4/12/2017

GREENS LAKE P81 SWER ACR FS KYM001 4/12/2017

SWANWATER P108 SWER ACR FS CTN006 5/12/2017

NULLAWIL SOUTH P12 SWER ACR FS CTN003 5/12/2017

ELVYNWOOD P9A SWER ACR FS CTN003 5/12/2017

KEELY P10 SWER ACR FS CHA003 5/12/2017

HADDON P9 SWER ACR FS CHA005 5/12/2017

BULLARD P6 SWER ACR FS ART033 5/12/2017

BERRIMAL NORTH P1 SWER ACR FS CTN006 6/12/2017

COSTERFIELD P136 SWER ACR FS BGO023 6/12/2017

CARAMWYNNE P1 SWER ACR FS ART033 6/12/2017

CAL P5A SWER ACR FS ART033 6/12/2017

WERCHON P1 SWER ACR FS ART033 6/12/2017

BUNINJON P1 SWER ACR FS ART033 6/12/2017

SMITH SPUR P1 SWER ACR FS CHA006 6/12/2017

KNOWSLEY SOUTH P12 SWER ACR FS BGO023 7/12/2017

Page 22: Powercor S120P Annual ompliance Report · Report As at 30 April 2018 . 2 Document Information ... GSB REFCL Project Activities Completion Date Percentage Complete Weighting Initiate

22

TRAYNORS P19 SWER ACR FS CTN006 7/12/2017

SUMMERHAYES P20A SWER ACR FS CTN003 7/12/2017

STREATHAM P250A SWER ACR FS ART033 7/12/2017

BARWON P12A SWER ACR FS CLC007 8/12/2017

GLENORCHY SOUTH P2 SWER ACR FS STL006 8/12/2017

SWINTON P2 SWER ACR FS STL006 8/12/2017

TRAM P1 SWER ACR FS CTN003 9/12/2017

KALPIENUNG P20 SWER ACR FS CTN003 9/12/2017

BURRUM NORTH P1 SWER ACR FS STL006 9/12/2017

SWAN MARSH P17 SWER ACR FS CLC006 10/12/2017

MARNOO TOWN P11 SWER ACR FS STL006 10/12/2017

COURT P2 SWER ACR FS STL006 10/12/2017

MASSEY EAST P4 SWER ACR FS CTN006 11/12/2017

YARRON P1 SWER ACR FS ART033 11/12/2017

GLEESON P1 SWER ACR FS ART033 11/12/2017

MEAD SOUTH P1 SWER ACR FS CHA006 11/12/2017

BIGGINS P38 SWER ACR FS ART033 12/12/2017

CANAL P1 SWER ACR FS CTN003 12/12/2017

PACKER P1 SWER ACR FS CTN003 12/12/2017

MORTON PLAINS P3 SWER ACR FS CTN001 12/12/2017

WICKLIFFE P1 SWER ACR FS ART033 13/12/2017

PARKER P1 SWER ACR FS CTN003 13/12/2017

QUAMBATOOK SOUTH P14 SWER ACR FS CTN003 13/12/2017

ROONGA P4A SWER ACR FS ART033 14/12/2017

MALIN P21 SWER ACR FS ART033 14/12/2017

TUXION P12 SWER ACR FS CLC007 14/12/2017

NARRAPORT EAST P4 SWER ACR FS CTN001 14/12/2017

HOREFIELD STH P10 SWER ACR FS CHA006 14/12/2017

CROSBIE P1 SWER ACR FS CTN001 14/12/2017

BOX SWAMP P1 SWER ACR FS CTN001 14/12/2017

MINCHA P12 SWER ACR FS CHA006 14/12/2017

WERNETH P18A SWER ACR FS CLC003 15/12/2017

STAVEAST P14 SWER ACR FS ART033 15/12/2017

PHILLIPS P1 SWER ACR FS KGT003 15/12/2017

KELLY P1 SWER ACR FS CTN003 15/12/2017

MINYIP SOUTH WEST P2 SWER ACR FS STL006 15/12/2017

CARRS PLAINS P4 SWER ACR FS STL006 15/12/2017

Page 23: Powercor S120P Annual ompliance Report · Report As at 30 April 2018 . 2 Document Information ... GSB REFCL Project Activities Completion Date Percentage Complete Weighting Initiate

23

BANYENA P1 SWER ACR FS STL006 15/12/2017

MACORNA WEST P4 SWER ACR FS CHA006 15/12/2017

MACORNA P35 SWER ACR FS CHA006 15/12/2017

CONSTABLE P1 SWER ACR FS CTN001 15/12/2017

BARRYS RD P2 SWER ACR FS CLC006 16/12/2017

LINTSOUTH P2 SWER ACR FS BAS021 16/12/2017

COOPER P3 SWER ACR FS STL006 16/12/2017

DONALD RD P29 SWER ACR FS STL006 16/12/2017

SKIPNORTH P10 SWER ACR FS BAS021 16/12/2017

ROCHESTER QUARRY P9 SWER ACR FS KYM001 16/12/2017

TYRELL P2 SWER ACR FS CLC007 17/12/2017

CALLWADDA P42 SWER ACR FS STL006 17/12/2017

CALLAWADDA EAST P7 SWER ACR FS STL006 17/12/2017

DORANSOUTH P12A SWER ACR FS BAS022 17/12/2017

DUNNE P2 SWER ACR FS BAS022 17/12/2017

LAL LAL P6 SWER ACR FS BAS022 17/12/2017

YANDO NORTH P1 SWER ACR FS CTN002 18/12/2017

MALAKOFF P5 SWER ACR FS STL007 18/12/2017

GLADFIELD PARK P11 SWER ACR FS CHA006 18/12/2017

LINDON P2 SWER ACR FS CLC003 19/12/2017

LALBERT WEST P1 SWER ACR FS CTN003 19/12/2017

LODDON RIVER P89 SWER ACR FS KGT004 19/12/2017

ROKEWOOD P1 SWER ACR FS BAS021 19/12/2017

THALIA P3 SWER ACR FS CTN001 19/12/2017

BUNGULUKE P1 SWER ACR FS CTN001 19/12/2017

COROP WEST P1 SWER ACR FS KYM001 (SHP021) 19/12/2017

GREENHILL P15 ISO BAS023 20/12/2017

KINIMAKATKA P1 ACR NHL015 20/12/2017

SANDY LANE P3 SWER ACR FS CLC003 20/12/2017

BERRINGA SOUTH P19 SWER ACR FS BAS021 21/12/2017

CHARLTON EAST P1 SWER ACR FS CTN001 21/12/2017

BALLAPUR P1 SWER ACR FS CTN001 21/12/2017

MCGRATHS RD P25 SWER ACR FS CTN001 21/12/2017

O'DONOGHUE P2 SWER ACR FS EHK024 3/01/2018

TCHAM LAKES NORTH P1 SWER ACR FS CTN001 3/01/2018

TCHAM LAKES SOUTH P1 SWER ACR FS CTN001 3/01/2018

DONALD RD P1 ACR STL006 3/01/2018

Page 24: Powercor S120P Annual ompliance Report · Report As at 30 April 2018 . 2 Document Information ... GSB REFCL Project Activities Completion Date Percentage Complete Weighting Initiate

24

NEILBOROUGH EAST P6 SWER ACR FS EHK024 4/01/2018

WARMUR P33 SWER ACR FS CTN001 4/01/2018

WARMUR P1 SWER ACR CTN001 4/01/2018

MERAN P4 SWER ACR FS KGT004 5/01/2018

GLENLOTH P17 SWER ACR FS CTN003 5/01/2018

YENDOLLOCK P2 SWER ACR FS ART033 8/01/2018

KALANOWA P1 SWER ACR FS ART033 8/01/2018

MARNOO P15 SWER ACR FS STL006 9/01/2018

LANCASTER P6 SWER ACR FS KGT003 10/01/2018

CURYO EAST P1 SWER ACR FS CTN001 10/01/2018

CURYO WEST P1 SWER ACR FS CTN001 10/01/2018

DONALD P238 SWER ACR FS CTN006 11/01/2018

MILNES BRIDGE P14A SWER ACR FS KGT003 12/01/2018

HEEL P2 SWER ACR FS KGT003 12/01/2018

THALIA SOUTH P3 SWER ACR FS CTN001 12/01/2018

SHANROAD P1 SWER ACR FS BMH003 12/01/2018

HAVELOCK P24 SWER ACR FS MRO005 12/01/2018

SKELTON P10 SWER ACR FS BAS023 12/01/2018

KOFOED P3 SWER ACR FS BET007 16/01/2018

WOOROONOOK SOUTH P1 SWER ACR FS CTN006 16/01/2018

WOOROONOOK NORTH P1 SWER ACR FS CTN006 16/01/2018

KERANG EAST P6 SWER ACR FS KGT003 16/01/2018

BOIGBEAT EAST P1 SWER ACR FS CTN003 17/01/2018

GREDGWIN P17A SWER ACR FS CTN002 17/01/2018

BARRAPORT P2 ACR CTN002 17/01/2018

CAMPBELLS CREEK P2 SWER ACR FS CTN004 17/01/2018

KOOREH EAST P2 SWER ACR FS CTN004 17/01/2018

WALLINDUC P1 SWER ACR FS BAS021 17/01/2018

MOSVALE P4 SWER ACR FS ART031 17/01/2018

CHAMPION P3E SWER ACR FS ART031 17/01/2018

PIAVELLA P2 SWER ACR FS EHK024 17/01/2018

DWIGHT P1 SWER ACR FS CTN004 18/01/2018

FREEMAN P1 SWER ACR FS CTN004 18/01/2018

BALLARD P1 SWER ACR FS CHA003 18/01/2018

CULGOA WEST P8 SWER ACR FS CTN003 19/01/2018

EMU P11 SWER ACR FS MRO005 19/01/2018

MOUNTWILL P68A SWER ACR FS ART033 22/01/2018

Page 25: Powercor S120P Annual ompliance Report · Report As at 30 April 2018 . 2 Document Information ... GSB REFCL Project Activities Completion Date Percentage Complete Weighting Initiate

25

KOROOP P1 SWER ACR FS CHA006 22/01/2018

FRONTAGE P4A SWER ACR FS KGT003 23/01/2018

HULL P1 SWER ACR FS STL005 23/01/2018

GLENLOFTY P2A SWER ACR FS ART023 24/01/2018

BURRUM P12A ACR STL006 24/01/2018

GOODBUN P1 SWER ACR FS KGT003 25/01/2018

GOORNONG NORTH P1 SWER ACR FS KYM001 25/01/2018

FAWCETT P1 SWER ACR FS CHA006 25/01/2018

DURHAM OX P126A SWER ACR FS CHA006 25/01/2018

BEN NEVIS P18 SWER ACR FS ART023 30/01/2018

BOORT P319 SWER ACR FS CTN002 30/01/2018

SALISBURY WEST P11 SWER ACR FS EHK024 30/01/2018

MINMINDIE P9 SWER ACR FS CTN002 31/01/2018

DURHAM OX P79 SWER ACR FS CHA006 31/01/2018

QUAMBATOOK P89 SWER ACR FS CTN003 31/01/2018

MURRABIT P93A SWER ACR FS KGT003 1/02/2018

MITIAMO EAST P6 SWER ACR FS CHA006 1/02/2018

TIMOR WEST P6A SWER ACR FS MRO005 2/02/2018

GERANGAMETE P10 SWER ACR FS CLC007 5/02/2018

HORDERN VALE P61A ACR CLC006 6/02/2018

KINYPANIAL P1 SWER ACR FS CTN002 6/02/2018

SNAKE P9 SWER ACR FS KGT003 6/02/2018

BUDGERUM WEST P4 SWER ACR FS CTN003 7/02/2018

BAEL BAEL NORTH P2 SWER ACR FS KGT004 7/02/2018

JAMES P7A SWER ACR FS MRO005 7/02/2018

KERRY P3 SWER ACR FS BET007 9/02/2018

CAPELS P1 SWER ACR FS KGT003 9/02/2018

FRASER P3 SWER ACR FS CTN001 9/02/2018

BURRUM SILO P38 SWER ACR FS STL006 12/02/2018

TULOONA P3 SWER ACR FS HSM004 12/02/2018

LODDON RIVER P5A SWER ACR FS KGT004 13/02/2018

WARRANOOKE P4 SWER ACR FS STL006 13/02/2018

BERRIWILLOCK SOUTH P12 SWER ACR FS CTN003 14/02/2018

LAEN NORTH P1 SWER ACR FS STL006 14/02/2018

LAEN SOUTH SWER ACR FS STL006 14/02/2018

LAEN P69 SWER ACR FS STL006 14/02/2018

CULGOA EAST P9 SWER ACR FS CTN003 15/02/2018

Page 26: Powercor S120P Annual ompliance Report · Report As at 30 April 2018 . 2 Document Information ... GSB REFCL Project Activities Completion Date Percentage Complete Weighting Initiate

26

PERNS LANE P6 SWER ACR FS HSM002 16/02/2018

RUNNYMEDE P1 SWER ACR FS KYM001 16/02/2018

BERRI EAST P4 SWER ACR FS CTN003 18/02/2018

CHERRY P5 SWER ACR FS CTN001 19/02/2018

RABIT P138 SWER ACR FS KGT003 20/02/2018

WIMMERA PARK P1A SWER ACR FS STL006 20/02/2018

BARTON P1 SWER ACR FS ART033 21/02/2018

LODDON RIVER P24 SWER ACR FS KGT004 21/02/2018

WATCHEM WEST P10 SWER ACR FS CTN001 22/02/2018

STUART MILL P68 SWER ACR FS MRO005 22/02/2018

HODGSON P1 SWER ACR FS CTN003 26/02/2018

HOMEWOOD P23 SWER ACR FS CTN003 26/02/2018

WITCHIPOOL P1 SWER ACR FS CTN006 28/02/2018

MEERING WEST P2 SWER ACR FS KGT004 28/02/2018

YARRAWALLA SOUTH P5A SWER ACR FS CHA006 28/02/2018

KOROOP WEST P4E SWER ACR FS KGT003 2/03/2018

GEEROAD P7 SWER ACR FS BAS021 2/03/2018

CLIFTON ESTATE P2 SWER ACR FS CTN003 2/03/2018

WYCHEPROOF P450A ACR CTN003 2/03/2018

MOLOGA P1 SWER ACR FS CHA006 5/03/2018

CARAPOOEE P36 SWER ACR FS CTN004 7/03/2018

BENJEROOP P9 SWER ACR FS KGT003 7/03/2018

CARWARDINE RD P1 SWER ACR FS CHA006 7/03/2018

DOBOOBETIC P8A SWER ACR FS CTN006 8/03/2018

JOEL MARTIN P5A SWER ACR FS STL007 8/03/2018

SEA LAKE SOUTH P16 SWER ACR FS CTN003 8/03/2018

MT HOOGHLY P8 SWER ACR FS MRO005 9/03/2018

WILLAURA P240 SWER ACR FS ART033 9/03/2018

GLENORCHY P387 SWER ACR FS STL006 9/03/2018

MURRABIT WEST P1 SWER ACR KGT003 14/03/2018

APPIN SOUTH P1 SWER ACR FS KGT004 16/03/2018

DURHAM OX P35 SWER ACR FS CHA006 20/03/2018

KAMAROOKA P50 SWER ACR FS EHK024 22/03/2018

REMOVED WARE P2 ACR, CONVERT SWER LINE TO POLYPHASE CLC006 26/03/2018

BORUNG P81 SWER ACR FS CTN001 28/03/2018

WILLOWVALE P1 SWER ACR FS BAS021 29/03/2018

WETTENHALL P1 SWER ACR FS & BAS021 29/03/2018

Page 27: Powercor S120P Annual ompliance Report · Report As at 30 April 2018 . 2 Document Information ... GSB REFCL Project Activities Completion Date Percentage Complete Weighting Initiate

27

HUNTER SOUTH P21A SWER ACR FS KYM001 29/03/2018

HAM P1 SWER ACR FS KYM001 29/03/2018

PARD P3 SWER ACR FS KGT003 10/04/2018

WANGANIP P2 ACR ART033 11/04/2018

GLENTHOMPSON P122 SWER ACR FS ART033 11/04/2018

Page 28: Powercor S120P Annual ompliance Report · Report As at 30 April 2018 . 2 Document Information ... GSB REFCL Project Activities Completion Date Percentage Complete Weighting Initiate

28

2 Plans of works to be carried out during the next reporting period

Page 29: Powercor S120P Annual ompliance Report · Report As at 30 April 2018 . 2 Document Information ... GSB REFCL Project Activities Completion Date Percentage Complete Weighting Initiate

29

This section provides details of works planned to be carried out during the reporting period (1 May 2018 to 30 April 2019).

Percentage Complete is the actual percentage complete as at 30 April 2018.

2.1 REFCL program status [S120P(1)(c)(i)]

2.1.1 Gisborne (GSB)

GSB REFCL Project Activities Forecast

Date Percentage Complete

Weighting

Initiate Business Case commenced 25/02/2016

100% 5%

Business Case approval 25/02/2016

Design Design commenced 26/02/2016

100% 20%

Design complete 6/06/2016

Procurement

Number of REFCL units required 1

REFCL order placed 17/03/2016 100% 15%

REFCL delivered to site 15/08/2016

Construction - Lines Line works commenced 26/02/2016

100% 25% Line works complete 30/09/2016

Construction - Stations

Station works commenced 19/05/2016 100% 15%

Station works complete 12/04/2017

Construction - Third Party

Number of affected HV Customer Connections 0

HV customer works commenced 0% 0%

HV customer works complete

Testing / Commissioning

REFCL testing / commissioning commenced 12/09/2016 100% 10%

REFCL commissioned and operable 23/09/2016

Close Out REFCL at "required capacity" 30/05/2018 0% 10%

Total weighted percentage complete 90%

The zone substation is located at -37.45355146, 144.57636595 (latitude, longitude)

Page 30: Powercor S120P Annual ompliance Report · Report As at 30 April 2018 . 2 Document Information ... GSB REFCL Project Activities Completion Date Percentage Complete Weighting Initiate

30

2.1.2 Woodend (WND)

WND REFCL Project Activities Forecast

Date Percentage Complete

Weighting

Initiate Business Case commenced 25/02/2016

100% 5% Business Case approval 25/02/2016

Design Design commenced 26/02/2016

100% 20% Design complete 6/06/2016

Procurement

Number of REFCL units required 2

REFCL order placed 17/03/2016 100% 15%

REFCL delivered to site 15/08/2016

Construction - Lines Line works commenced 26/02/2016

100% 25% Line works complete 30/05/2017

Construction - Stations

Station works commenced 12/05/2016 100% 15%

Station works complete 12/04/2017

Construction - Third Party

Number of affected HV Customer Connections 0

HV customer works commenced 0% 0%

HV customer works complete

Testing / Commissioning

REFCL testing / commissioning commenced 15/12/2016 100% 10%

REFCL commissioned and operable 31/10/2017

Close Out REFCL at "required capacity" 30/06/2018 0% 10%

Total weighted percentage complete 90%

This zone substation is located at -37.33449073, 144.51778650 (latitude, longitude)

Page 31: Powercor S120P Annual ompliance Report · Report As at 30 April 2018 . 2 Document Information ... GSB REFCL Project Activities Completion Date Percentage Complete Weighting Initiate

31

2.1.3 Camperdown (CDN)

CDN REFCL Project Activities Forecast

Date Percentage Complete

Weighting

Initiate Business Case commenced 1/05/2016

100% 5% Business Case approval 13/07/2016

Design Design commenced 1/08/2016

100% 20% Design complete 11/01/2018

Procurement

Number of REFCL units required 1

REFCL order placed 24/03/2017 100% 15%

REFCL delivered to site 4/11/2017

Construction - Lines Line works commenced 9/01/2017

80% 25% Line works complete 7/05/2018

Construction - Stations

Station works commenced 30/05/2017 100% 15%

Station works complete 23/04/2018

Construction - Third Party

Number of affected HV Customer Connections 0

HV customer works commenced 0% 0%

HV customer works complete

Testing / Commissioning

REFCL testing / commissioning commenced 20/05/2018 0% 10%

REFCL commissioned and operable 15/06/2018

Close Out REFCL at "required capacity" 23/09/2018 0% 10%

Total weighted percentage complete 75%

This zone substation is located at -38.22702204, 143.15481663 (latitude, longitude)

Page 32: Powercor S120P Annual ompliance Report · Report As at 30 April 2018 . 2 Document Information ... GSB REFCL Project Activities Completion Date Percentage Complete Weighting Initiate

32

2.1.4 Castlemaine (CMN)

CMN REFCL Project Activities Forecast

Date Percentage Complete

Weighting

Initiate Business Case commenced 1/05/2016

100% 5% Business Case approval 13/07/2016

Design Design commenced 1/08/2016

80% 15% Design complete 28/06/2018

Procurement

Number of REFCL units required 1

REFCL order placed 24/03/2017 95% 10%

REFCL delivered to site 18/05/2018

Construction - Lines Line works commenced 24/06/2017

80% 20% Line works complete 27/08/2018

Construction - Stations

Station works commenced 30/05/2017 70% 15%

Station works complete 11/09/2018

Construction - Third Party

Number of affected HV Customer Connections 4

HV customer works commenced 7/02/2018 30% 20%

HV customer works complete 30/09/2018

Testing / Commissioning

REFCL testing / commissioning commenced 2/10/2018 0% 10%

REFCL commissioned and operable 29/10/2018

Close Out REFCL at "required capacity" 5/02/2019 0% 5%

Total weighted percentage complete 59%

This zone substation is located at -37.07236807, 144.20669317 (latitude, longitude)

Page 33: Powercor S120P Annual ompliance Report · Report As at 30 April 2018 . 2 Document Information ... GSB REFCL Project Activities Completion Date Percentage Complete Weighting Initiate

33

2.1.5 Maryborough (MRO)

MRO REFCL Project Activities Forecast

Date Percentage Complete

Weighting

Initiate Business Case commenced 1/05/2016

100% 5% Business Case approval 13/07/2016

Design Design commenced 1/12/2016

83% 20% Design complete 23/05/2018

Procurement

Number of REFCL units required 1

REFCL order placed 24/03/2017 100% 15%

REFCL delivered to site 14/12/2017

Construction - Lines Line works commenced 22/01/2018

45% 25% Line works complete 18/05/2018

Construction - Stations

Station works commenced 22/01/2018 40% 15%

Station works complete 6/09/2018

Construction - Third Party

Number of affected HV Customer Connections 0

HV customer works commenced 0% 0%

HV customer works complete

Testing / Commissioning

REFCL testing / commissioning commenced 3/08/2018 0% 10%

REFCL commissioned and operable 11/09/2018

Close Out REFCL at "required capacity" 23/10/2018 0% 10%

Total weighted percentage complete 54%

This zone substation is located at -37.04952584, 143.75473022 (latitude, longitude)

Page 34: Powercor S120P Annual ompliance Report · Report As at 30 April 2018 . 2 Document Information ... GSB REFCL Project Activities Completion Date Percentage Complete Weighting Initiate

34

2.1.6 Colac (CLC)

CLC REFCL Project Activities Forecast

Date Percentage Complete

Weighting

Initiate Business Case commenced 1/05/2016

100% 5% Business Case approval 13/07/2016

Design Design commenced 7/11/2016

60% 15% Design complete 8/08/2018

Procurement

Number of REFCL units required 2

REFCL order placed 24/03/2017 95% 10%

REFCL delivered to site 14/08/2018

Construction - Lines Line works commenced 12/04/2017

50% 20% Line works complete 27/11/2018

Construction - Stations

Station works commenced 28/06/2018 0% 15%

Station works complete 29/01/2019

Construction - Third Party

Number of affected HV Customer Connections 6

HV customer works commenced 30/05/2018 0% 20%

HV customer works complete 12/12/2018

Testing / Commissioning

REFCL testing / commissioning commenced 30/01/2019 0% 10%

REFCL commissioned and operable 5/03/2019

Close Out REFCL at "required capacity" 11/04/2019 0% 5%

Total weighted percentage complete 34%

This zone substation is located at -38.34056225, 143.60615730 (latitude, longitude)

Page 35: Powercor S120P Annual ompliance Report · Report As at 30 April 2018 . 2 Document Information ... GSB REFCL Project Activities Completion Date Percentage Complete Weighting Initiate

35

2.1.7 Winchelsea (WIN)

WIN REFCL Project Activities Forecast

Date Percentage Complete

Weighting

Initiate Business Case commenced 1/05/2016

100% 5% Business Case approval 13/07/2016

Design Design commenced 1/12/2016

87% 20% Design complete 26/06/2018

Procurement

Number of REFCL units required 2

REFCL order placed 24/03/2017 95% 15%

REFCL delivered to site 14/08/2018

Construction - Lines Line works commenced 12/04/2017

35% 25% Line works complete 5/09/2018

Construction - Stations

Station works commenced 28/06/2018 0% 15%

Station works complete 11/10/2018

Construction - Third Party

Number of affected HV Customer Connections 0

HV customer works commenced 0% 0%

HV customer works complete

Testing / Commissioning

REFCL testing / commissioning commenced 17/11/2018 0% 10%

REFCL commissioned and operable 30/11/2018

Close Out REFCL at "required capacity" 7/03/2019 0% 10%

Total weighted percentage complete 45%

This zone substation is located at -38.23622505, 144.00288820 (latitude, longitude)

Page 36: Powercor S120P Annual ompliance Report · Report As at 30 April 2018 . 2 Document Information ... GSB REFCL Project Activities Completion Date Percentage Complete Weighting Initiate

36

2.1.8 Eaglehawk (EHK)

EHK REFCL Project Activities Forecast

Date Percentage Complete

Weighting

Initiate Business Case commenced 6/02/2018

100% 5% Business Case approval 10/03/2017

Design Design commenced 27/11/2017

80% 15% Design complete 29/06/2018

Procurement

Number of REFCL units required 2

REFCL order placed 24/03/2017 95% 10%

REFCL delivered to site 14/08/2018

Construction - Lines Line works commenced 25/06/2018

20%

Line works complete 31/10/2018

Construction - Stations

Station works commenced 2/07/2018

15%

Station works complete 26/10/2018

Construction - Third Party

Number of affected HV Customer Connections 8

HV customer works commenced 15/10/2018 0% 20%

HV customer works complete 30/11/2018

Testing / Commissioning

REFCL testing / commissioning commenced 5/11/2018 0% 10%

REFCL commissioned and operable 10/12/2018

Close Out REFCL at "required capacity" 21/12/2018 0% 5%

Total weighted percentage complete 27%

This zone substation is located at -36.73592644, 144.27855492 (latitude, longitude)

Page 37: Powercor S120P Annual ompliance Report · Report As at 30 April 2018 . 2 Document Information ... GSB REFCL Project Activities Completion Date Percentage Complete Weighting Initiate

37

2.1.9 Ballarat North (BAN)

BAN REFCL Project Activities Forecast

Date Percentage Complete

Weighting

Initiate Business Case commenced 11/09/2017

100% 5% Business Case approval 27/10/2017

Design Design commenced 1/06/2018

0% 15% Design complete 26/10/2018

Procurement

Number of REFCL units required 3

REFCL order placed 13/08/2018 0% 10%

REFCL delivered to site 13/02/2019

Construction - Lines Line works commenced 12/11/2018

0% 20% Line works complete

Construction - Stations

Station works commenced 12/11/2018 0% 15%

Station works complete

Construction - Third Party

Number of affected HV Customer Connections 9

HV customer works commenced 12/11/2018 0% 20%

HV customer works complete

Testing / Commissioning

REFCL testing / commissioning commenced 0% 10%

REFCL commissioned and operable

Close Out REFCL at "required capacity"

0% 5%

Total weighted percentage complete 5%

This zone substation is located at -37.53477699, 143.84742737 (latitude, longitude)

Page 38: Powercor S120P Annual ompliance Report · Report As at 30 April 2018 . 2 Document Information ... GSB REFCL Project Activities Completion Date Percentage Complete Weighting Initiate

38

2.1.10 Charlton (CTN)

CTN REFCL Project Activities Forecast

Date Percentage Complete

Weighting

Initiate Business Case commenced 11/09/2017

100% 5% Business Case approval 27/10/2017

Design Design commenced 1/06/2018

0% 15% Design complete 26/10/2018

Procurement

Number of REFCL units required 1

REFCL order placed 13/08/2018 0% 10%

REFCL delivered to site 13/02/2019

Construction - Lines Line works commenced 12/11/2018

0% 20% Line works complete

Construction - Stations

Station works commenced 12/11/2018 0% 15%

Station works complete

Construction - Third Party

Number of affected HV Customer Connections 4

HV customer works commenced 12/11/2018 0% 20%

HV customer works complete

Testing / Commissioning

REFCL testing / commissioning commenced 0% 10%

REFCL commissioned and operable

Close Out REFCL at "required capacity"

0% 5%

Total weighted percentage complete 5%

This zone substation is located at -36.27399871, 143.36318135 (latitude, longitude)

Page 39: Powercor S120P Annual ompliance Report · Report As at 30 April 2018 . 2 Document Information ... GSB REFCL Project Activities Completion Date Percentage Complete Weighting Initiate

39

2.1.11 Ballarat South (BAS)

BAS REFCL Project Activities Forecast

Date Percentage Complete

Weighting

Initiate Business Case commenced 11/09/2017

100% 5% Business Case approval 27/10/2017

Design Design commenced 17/09/2018

0% 15% Design complete 28/02/2019

Procurement

Number of REFCL units required 3

REFCL order placed 30/11/2018 0% 10%

REFCL delivered to site

Construction - Lines Line works commenced 1/03/2019

0% 20% Line works complete

Construction - Stations

Station works commenced 1/03/2019 0% 15%

Station works complete

Construction - Third Party

Number of affected HV Customer Connections 5

HV customer works commenced 1/03/2019 0% 20%

HV customer works complete

Testing / Commissioning

REFCL testing / commissioning commenced 0% 10%

REFCL commissioned and operable

Close Out REFCL at "required capacity"

0% 5%

Total weighted percentage complete 5%

This zone substation is located at -37.57505901, 143.82751465 (latitude, longitude)

Page 40: Powercor S120P Annual ompliance Report · Report As at 30 April 2018 . 2 Document Information ... GSB REFCL Project Activities Completion Date Percentage Complete Weighting Initiate

40

2.1.12 Bendigo Terminal Station (BETS)

BETS REFCL Project Activities Forecast

Date Percentage Complete

Weighting

Initiate Business Case commenced 11/09/2017

100% 5% Business Case approval 27/10/2017

Design Design commenced 17/09/2018

0% 15% Design complete 28/02/2019

Procurement

Number of REFCL units required 2

REFCL order placed 30/11/2018 0% 10%

REFCL delivered to site

Construction - Lines Line works commenced 1/03/2019

0% 20% Line works complete

Construction - Stations

Station works commenced 1/03/2019 0% 15%

Station works complete

Construction - Third Party

Number of affected HV Customer Connections 4

HV customer works commenced 1/03/2019 0% 20%

HV customer works complete

Testing / Commissioning

REFCL testing / commissioning commenced 0% 10%

REFCL commissioned and operable

Close Out REFCL at "required capacity"

0% 5%

Total weighted percentage complete 5%

This zone substation is located at -36.78490276, 144.25368547 (latitude, longitude)

Page 41: Powercor S120P Annual ompliance Report · Report As at 30 April 2018 . 2 Document Information ... GSB REFCL Project Activities Completion Date Percentage Complete Weighting Initiate

41

2.1.13 Bendigo (BGO)

BGO REFCL Project Activities Forecast

Date Percentage Complete

Weighting

Initiate Business Case commenced 11/09/2017

100% 5% Business Case approval 27/10/2017

Design Design commenced 1/03/2019

0% 15% Design complete

Procurement

Number of REFCL units required 2

REFCL order placed 0% 10%

REFCL delivered to site

Construction - Lines Line works commenced

0% 20% Line works complete

Construction - Stations

Station works commenced 0% 15%

Station works complete

Construction - Third Party

Number of affected HV Customer Connections 2

HV customer works commenced 0% 20%

HV customer works complete

Testing / Commissioning

REFCL testing / commissioning commenced 0% 10%

REFCL commissioned and operable

Close Out REFCL at "required capacity"

0% 5%

Total weighted percentage complete 5%

This zone substation is located at -36.77055176, 144.27696705 (latitude, longitude)

Page 42: Powercor S120P Annual ompliance Report · Report As at 30 April 2018 . 2 Document Information ... GSB REFCL Project Activities Completion Date Percentage Complete Weighting Initiate

42

2.1.14 Geelong (GL)

GL REFCL Project Activities Forecast

Date Percentage Complete

Weighting

Initiate Business Case commenced 11/09/2017

100% 5% Business Case approval 27/10/2017

Design Design commenced 1/03/2019

0% 15% Design complete

Procurement

Number of REFCL units required 2

REFCL order placed 0% 10%

REFCL delivered to site

Construction - Lines Line works commenced

0% 20% Line works complete

Construction - Stations

Station works commenced 0% 15%

Station works complete

Construction - Third Party

Number of affected HV Customer Connections 1

HV customer works commenced 0% 20%

HV customer works complete

Testing / Commissioning

REFCL testing / commissioning commenced 0% 10%

REFCL commissioned and operable

Close Out REFCL at "required capacity"

0% 5%

Total weighted percentage complete 5%

This zone substation is located at -38.12868286, 144.34043884 (latitude, longitude)

Page 43: Powercor S120P Annual ompliance Report · Report As at 30 April 2018 . 2 Document Information ... GSB REFCL Project Activities Completion Date Percentage Complete Weighting Initiate

43

2.2 ELCA program status [S120P(1)(c)(ii)]

ELCA description Project Name Bare OH retired

(kms)

Region 9 Fogarty 26.5

Region 18 Coliban 1 35.4

Page 44: Powercor S120P Annual ompliance Report · Report As at 30 April 2018 . 2 Document Information ... GSB REFCL Project Activities Completion Date Percentage Complete Weighting Initiate

44

2.3 SWER ACR program status [S120P(1)(c)(iii)]

For the next reporting period Powercor plans to install 265 Automatic Circuit Reclosers (ACR) in relation to Single Wire Earth Return (SWER) lines. Details are provided in the following table.

ACR NAME FEEDER FORECAST

COMPLETION DATE

RUSSELLPARK P25 ISO BAS011 Q3 2018

STONORTH P5 ISO BAS011 Q3 2018

EURAMSOUTH 9 ISO BAS011 Q3 2018

BALMORAL SOUTH 16 ISO HSM002 Q3 2018

TELANGATUK P157 ISO HSM002 Q3 2018

GLENVALE 6 ISO HSM002 Q3 2018

DOUGLAS P37 ISO HSM002 Q3 2018

BALMORAL 234 ISO HSM002 Q3 2018

TELANGATUK EAST 35 ISO HSM002 Q3 2018

BRIMPAEN 114 ISO HSM002 Q3 2018

BRIMPAEN 79 ISO HSM002 Q3 2018

TEN MILE P268R ISO HSM002 Q3 2018

DARRAGAN SWAMP P224R ISO HSM002 Q3 2018

LOWAN ISO 5 HSM002 Q3 2018

COLRAINE 3 ISO HSM002 Q3 2018

HOTS-CHM/IKA 138R ISO HSM002 Q3 2018

CLEAR LAKE SOUTH 2 ISO HSM002 Q3 2018

GLENGLEESON P1 ISO HTN001 Q3 2018

MACARTHUR NTH P23 ISO HTN001 Q3 2018

CLOVER LEA P404A ISO HTN001 Q3 2018

BRISBANE HILL ESTATE ISO P665 HTN001 Q3 2018

CARTYS ESTATE ISO P686 HTN001 Q3 2018

ROWE P524 ISO HTN001 Q3 2018

ANNETT P36 ISO HTN001 Q3 2018

WARRABKOOK P553 ISO HTN001 Q3 2018

EMMERSON P39 ISO HTN002 Q3 2018

MORGIANA ISO HTN002 Q3 2018

Page 45: Powercor S120P Annual ompliance Report · Report As at 30 April 2018 . 2 Document Information ... GSB REFCL Project Activities Completion Date Percentage Complete Weighting Initiate

45

TAHARA P108 ISO HTN002 Q3 2018

GLENORCHY 91 ISO HTN002 Q3 2018

SANDFORD SOUTH ISO HTN002 Q3 2018

PASCHENDALE 54 ISO HTN002 Q3 2018

MOCAMBORO RD P3 ISO HTN002 Q3 2018

MIAKITE 15 ISO HTN002 Q3 2018

CORNDALE P33 ISO HTN002 Q3 2018

MIRA 3 ISO KRT012 Q3 2018

TARRONE NTH ISO 38 KRT013 Q3 2018

PYE P118 ISO KRT013 Q3 2018

ORFORD 84 ISO KRT013 Q3 2018

BESSIEBELLE 129 ISO KRT013 Q3 2018

WILLATOOK P8 ISO KRT013 Q3 2018

CARRA P1 ISO MNA014 Q3 2018

MALONEY ISO 26 MNA014 Q3 2018

BALDI P2B ISO MNA034 Q3 2018

MURCHISON ISO 130 MNA034 Q3 2018

LOCHIEL P3 ISO NHL015 Q3 2018

PELLA P4 ISO NHL015 Q3 2018

JEPARIT GOLF P14 ISO NHL015 Q3 2018

RAINBOW EAST P2 ISO NHL015 Q3 2018

ALBACUTYA WEST P6 ISO NHL015 Q3 2018

GLENLEE ISO 39 NHL015 Q3 2018

RAINBOW WEST P23 ISO NHL015 Q3 2018

JEPARIT P590 ISO NHL015 Q3 2018

ANTWERP P2 ISO NHL015 Q3 2018

KENMARE P3 ISO NHL015 Q3 2018

PEPPERS PLAINS P7 ISO NHL015 Q3 2018

ELLAM P5 ISO NHL015 Q3 2018

ARKONA P5 ISO NHL015 Q3 2018

KATYIL P2 ISO NHL015 Q3 2018

JEPARIT P637 ISO NHL015 Q3 2018

TARRANYURK EAST P4 ISO NHL015 Q3 2018

ELLAM NORTH 4 ISO NHL015 Q3 2018

GERANG P22 ISO NHL015 Q3 2018

GERANG WERNER 3 ISO NHL015 Q3 2018

KINWIN 3 ISO NHL015 Q3 2018

Page 46: Powercor S120P Annual ompliance Report · Report As at 30 April 2018 . 2 Document Information ... GSB REFCL Project Activities Completion Date Percentage Complete Weighting Initiate

46

WOORAK 4 ISO NHL015 Q3 2018

NETHERBY NORTH 1 ISO NHL016 Q3 2018

PROPODOLLAH 11 ISO NHL016 Q3 2018

NETHERBY ISO 155 NHL016 Q3 2018

DETPA WEST ISO 87 NHL016 Q3 2018

DOLLAH EAST ISO 2 NHL016 Q3 2018

WOORAK WEST ISO 3 NHL016 Q3 2018

LILLIMUR SOUTH ISO 7 NHL031 Q3 2018

KANIVA SOUTH P18 ISO NHL031 Q3 2018

LEEOR ISO 1 NHL031 Q3 2018

LAWLOIT TOWN 3 ISO NHL031 Q3 2018

BUNYIP 3 ISO NHL031 Q3 2018

YEARINGA P7 ISO NHL031 Q3 2018

YANAC WEST ISO 1 NHL031 Q3 2018

COVE P1 ISO NHL031 Q3 2018

YANAC NORTH ISO 4 NHL031 Q3 2018

PEECHEMBER SWAMP P2 ISO NHL031 Q3 2018

TELOPIA DOWNS 14 ISO NHL031 Q3 2018

BOYEO ISO NHL031 Q3 2018

BOYEO WEST ISO 5 NHL031 Q3 2018

HOMELEIGH 2 ISO NHL031 Q3 2018

KANIVA 184 ISO NHL031 Q3 2018

PURNIM 229 ISO WBL005 Q3 2018

WANGOOM PARK EAST P2 ISO WBL005 Q3 2018

SETTLEMENT 1 ISO WBL005 Q3 2018

PENNYROYAL CREEK P3 ISO WIN011 Q3 2018

EVANSFORD P22 ISO BAN006 Q4 2018

BUNDING 14 ISO BAN011 Q4 2018

LALFALLS 13 ISO BAN011 Q4 2018

JANCOURT EAST ISO 90 CDN001 Q4 2018

HOLLAWAY P36 ISO CDN001 Q4 2018

VITE VITE P6 ISO CDN006 Q4 2018

TRAWALLA ISO 10 CDN006 Q4 2018

PURA PURA RD ISO 134 CDN006 Q4 2018

TARRAYOUKYAN ISO 7 CHM011 Q4 2018

TALLENGOWER P79 ISO CHM011 Q4 2018

FULLERTON RD 7 ISO CHM011 Q4 2018

Page 47: Powercor S120P Annual ompliance Report · Report As at 30 April 2018 . 2 Document Information ... GSB REFCL Project Activities Completion Date Percentage Complete Weighting Initiate

47

BARKALA ISO 2 CHM011 Q4 2018

MUNDARRA P3 ISO CHM011 Q4 2018

PATYAH EAST WEST ISO CHM011 Q4 2018

CHETWYND SOUTH ISO P1 CHM011 Q4 2018

AVONDALE ISO P2 CHM011 Q4 2018

CONNEWIRRECOO ISO 16 CHM011 Q4 2018

PATYAH ISO 53 CHM011 Q4 2018

YARALLA ISO 236 CHM011 Q4 2018

BRINGALBERT ISO 274 CHM011 Q4 2018

ROSEVILLE 2 ISO CHM011 Q4 2018

JALLAKIN 10 ISO CHM011 Q4 2018

MULLINGER ISO 48 CHM011 Q4 2018

ULLSWATER ISO 1 CHM011 Q4 2018

SCRUBBY LAKE ISO 2 CHM011 Q4 2018

WARTOOK 181 ISO HSM001 Q4 2018

ASHENS 7 ISO HSM001 Q4 2018

COROMBY SOUTH ISO 3 HSM001 Q4 2018

BUNGALALLY 6 ISO HSM001 Q4 2018

JUNG NORTH ISO 17 HSM001 Q4 2018

MOOR PARK 5 ISO HSM001 Q4 2018

TAYLORS LAKE 1 ISO HSM001 Q4 2018

TAYLORS SOUTH 2 ISO HSM001 Q4 2018

WARTOOK P131 ISO HSM001 Q4 2018

DIGBY WEST P217 ISO HTN002 Q4 2018

DORODONG 68 ISO HTN002 Q4 2018

BAHGALLAH P58 ISO HTN002 Q4 2018

KILLARA P28 ISO HTN002 Q4 2018

MYARING ISO HTN002 Q4 2018

LAKE MUNDI P4 ISO HTN002 Q4 2018

MERINO DOWNS P193 ISO HTN002 Q4 2018

MERINO 173 ISO HTN002 Q4 2018

SANDFORD EAST P31 ISO HTN002 Q4 2018

PORTLAND RD P2 ISO HTN002 Q4 2018

WALLACEDALE NTH P4 ISO HTN002 Q4 2018

WALLACEDALE NTH P17 ISO HTN002 Q4 2018

CHERITTA P9 ISO HTN002 Q4 2018

RETREAT P1 ISO HTN002 Q4 2018

Page 48: Powercor S120P Annual ompliance Report · Report As at 30 April 2018 . 2 Document Information ... GSB REFCL Project Activities Completion Date Percentage Complete Weighting Initiate

48

TIMBER P1 ISO HTN002 Q4 2018

BARBER P1 ISO HTN002 Q4 2018

BRANXHOLME P334 ISO HTN002 Q4 2018

STRATHDOWNIE P265 ISO HTN002 Q4 2018

STRATHLIN P16 ISO HTN002 Q4 2018

TARRANLEA 2 ISO HTN006 Q4 2018

SHARAM P86 ISO HTN006 Q4 2018

SHINE P81 ISO HTN006 Q4 2018

CARAPOOK P2 ISO HTN006 Q4 2018

COLERAINE P177 ISO HTN006 Q4 2018

COLERAINE P373 ISO HTN006 Q4 2018

VERDANT HILLS P3 ISO HTN006 Q4 2018

COLERAINE P437 ISO HTN006 Q4 2018

POVEY P2 ISO HTN006 Q4 2018

WANDO VALE P4 ISO HTN006 Q4 2018

WANDO VALE P14 ISO HTN006 Q4 2018

COLERAINE 246 ISO HTN006 Q4 2018

PLD-HTN P209 ISO HYT011 Q4 2018

PLD-HTN P301 ISO HYT011 Q4 2018

PAIGNIE ISO 6 OYN001 Q4 2018

WALPEUP SOUTH ISO P2 OYN001 Q4 2018

BOULKA SOUTH ISO 8 OYN001 Q4 2018

KATTYOONG P20A ISO OYN001 Q4 2018

GALAH NORTH ISO 10 OYN001 Q4 2018

OUYEN WEST ISO 3 OYN001 Q4 2018

DUDDO ISO 15 OYN001 Q4 2018

UNDERBOOL SOUTH ISO OYN001 Q4 2018

BOINKA NORTH ISO P2 OYN001 Q4 2018

TORRITA NORTH ISO 7 OYN001 Q4 2018

BOINKA SOUTH ISO 9 OYN001 Q4 2018

COWANGIE SOUTH ISO OYN001 Q4 2018

PANITYA SOUTH ISO 15 OYN001 Q4 2018

TUTYE SOUTH ISO 33 OYN001 Q4 2018

UNDERBOOL NORTH ISO OYN001 Q4 2018

BOLTON 70 ISO OYN003 Q4 2018

COCAMBA ISO 291 OYN003 Q4 2018

WINNAMBOOL ISO 3 OYN003 Q4 2018

Page 49: Powercor S120P Annual ompliance Report · Report As at 30 April 2018 . 2 Document Information ... GSB REFCL Project Activities Completion Date Percentage Complete Weighting Initiate

49

PIER MILLAN ISO P2 OYN003 Q4 2018

LEITPAR ISO 2 OYN003 Q4 2018

KIAMAL EAST ISO 1 OYN003 Q4 2018

BOLAND ISO 2 OYN003 Q4 2018

POHLNER ISO 3 OYN003 Q4 2018

HOPETOUN EAST ISO OYN005 Q4 2018

JOLLY ISO 2 OYN005 Q4 2018

TURRIFF WEST ISO 4 OYN005 Q4 2018

TYRRELL ISO 8 OYN005 Q4 2018

TEMPY NORTH ISO 1 OYN005 Q4 2018

TEMPY EAST ISO 3 OYN005 Q4 2018

EDLESTON ISO 371E OYN005 Q4 2018

BANYAN ISO 3 OYN005 Q4 2018

DERING ISO 1 OYN005 Q4 2018

WATCHUPGA EAST ISO P3 OYN005 Q4 2018

OATS ISO 5 OYN005 Q4 2018

WOOMELANG NORTH ISO OYN005 Q4 2018

WATCHUPGA WEST ISO 2 OYN005 Q4 2018

NYALLO ISO 2 OYN005 Q4 2018

NANDALY WEST ISO 73 OYN005 Q4 2018

NUNGA EAST 1 ISO OYN005 Q4 2018

CLEARY P1 ISO RCT022 Q4 2018

CARWARP WEST ISO 1A RCT022 Q4 2018

HATTAH LAKES ISO 32E RCT022 Q4 2018

YARRARA NTH ISO 311 RCT023 Q4 2018

CULLULLERAINE ISO RCT023 Q4 2018

PIRLTA SOUTH ISO 3 RCT023 Q4 2018

MERRINEE NTH ISO P1 RCT023 Q4 2018

BENETOOK ISO 102 RCT023 Q4 2018

MALLANBOOL ISO 265 RCT023 Q4 2018

MERRINEE SOUTH ISO P3 RCT023 Q4 2018

TUNART ISO 1 RCT023 Q4 2018

LANE ISO 8 SHN024 Q4 2018

MARIONVALE ISO 36 SHN024 Q4 2018

MUNDAY ISO 33 SHP012 Q4 2018

APPLEBY P1 ISO SHP012 Q4 2018

LEES P36 ISO SHP012 Q4 2018

Page 50: Powercor S120P Annual ompliance Report · Report As at 30 April 2018 . 2 Document Information ... GSB REFCL Project Activities Completion Date Percentage Complete Weighting Initiate

50

MEAG ISO 13 SHP014 Q4 2018

TILTON P2 ISO SHP021 Q4 2018

CLARKSON ISO 13 SHP021 Q4 2018

VAN EVERY ISO 8 TRG002 Q4 2018

CREARERS LANE 1 ISO TRG002 Q4 2018

BERRAMBOOL ISO 3 TRG002 Q4 2018

HOPKINS HILL ISO 5 TRG002 Q4 2018

CARAMUT NTH ISO 5 TRG002 Q4 2018

BARWIDGEE EAST 1A ISO TRG002 Q4 2018

TOURAC ISO 1 TRG002 Q4 2018

GASPOWER P4 ISO TRG002 Q4 2018

CAIRNLEA P27 ISO TRG002 Q4 2018

ROCK GROVE P6 ISO TRG002 Q4 2018

EWING P2 ISO TRG002 Q4 2018

ELLERSLIE P55 ISO TRG002 Q4 2018

MATS 7 ISO TRG004 Q4 2018

MCCONNELLS RD 1 ISO TRG004 Q4 2018

BRUCKNELL 1 ISO TRG005 Q4 2018

KOOLOONONG ISO 50 BBD014 Q1 2019

ARNOLD ISO 15 BET001 Q1 2019

DULLARD RD P1 ISO ECA012 Q1 2019

STONECHURCH ISO 2 HSM003 Q1 2019

YELLANGIP 2 ISO HSM003 Q1 2019

LAH EAST ISO 4 HSM003 Q1 2019

ROSEBERY EAST 3 ISO HSM003 Q1 2019

HOPEVALE ISO 384 HSM003 Q1 2019

BEULAH WEST ISO 3 HSM003 Q1 2019

GLENORE ISO 4 HSM003 Q1 2019

LONGERENONG P7 ISO HSM003 Q1 2019

AREEGRA ISO P1 HSM003 Q1 2019

AUBREY ISO HSM003 Q1 2019

HOMECROFT ISO 30 HSM003 Q1 2019

BRIM ISO 23 HSM003 Q1 2019

GOLF HILL ISO 326 HSM003 Q1 2019

HOMECROFT P102 ISO HSM003 Q1 2019

BURROIN 7 ISO HSM003 Q1 2019

GALAQUIL EAST ISO 1 HSM003 Q1 2019

Page 51: Powercor S120P Annual ompliance Report · Report As at 30 April 2018 . 2 Document Information ... GSB REFCL Project Activities Completion Date Percentage Complete Weighting Initiate

51

BRIM EAST ISO 3 HSM003 Q1 2019

ROSEDALE ISO 67 HSM003 Q1 2019

WERRIGAR ISO 15 HSM003 Q1 2019

BYRNEVILLE 2 ISO HSM005 Q1 2019

KELLALAC EAST P3 ISO HSM005 Q1 2019

WARRACKNABEAL P280 ISO HSM005 Q1 2019

AILSA P10 ISO HSM005 Q1 2019

KAPUNDA 4 ISO HSM005 Q1 2019

SHEEP HILLS ISO 7 HSM005 Q1 2019

DOOEN NORTH P2 ISO HSM005 Q1 2019

CANNUM P3 ISO HSM005 Q1 2019

SEACH ISO 2 STN011 Q1 2019

KARRA SCHOOL ISO 1 STN011 Q1 2019

HOARE 4 STN024 Q1 2019

MONTI ISO 4 STN024 Q1 2019

GOOCHS LANE P59 ISO WND013 Q1 2019