1 An Update of CEPALCO’s Power Supply Condition As of March 29, 2012 )

Power Updates from CEPALCO March 30 2012

Embed Size (px)

DESCRIPTION

CEPALCO updates as of March 30, 2012

Citation preview

Page 1: Power Updates from CEPALCO March 30 2012

11

An Update of

CEPALCO’s Power Supply Condition

As of March 29, 2012

)

Page 2: Power Updates from CEPALCO March 30 2012

2

NGCP’s Mindanao Grid Power Situation Update as of Feb.20, 2012:

•Actual Lake Lanao Elevation as of Feb.20, 2012 is 700.73Meters against the 699.15Meters Critical Operating Level for Agus hydro plants•Mindanao Grid Total Capacity as of Mar.27, 2012

•Mindanao grid demand peak forecast is at 1,347MW for CY 2012 as per DOE.

Plant TypeInstalled Capacity,

MWPeaking Capability,

MW

HYDRO 982 678

COAL 210 200

GEOTHERMAL 108 97

DIESEL 397 135

Total: 1,697 1,110

Page 3: Power Updates from CEPALCO March 30 2012

• Pulangi [3 x 85 = 255MW] Hydro Electric Power Plant shutdown on April 09 – May 09, 2012 for Preventive Maintenance.

• Actual dispatchable capacity for Pulangi 4 HEP as of March 21, 2012 is only 30MW.

3

Page 4: Power Updates from CEPALCO March 30 2012

4

DAILY NGCP SYSTEM ADVISORY VIA SMS MESSAGES:

Date Time

Mindanao Grid Deficiency, MW

System Condition Reason

February 25, 2012 10:00am - 5:30pm 210 RED ALERT Contingency reserve is ZERO due to generation deficiency

5:30pm - 9:00pm 270 RED ALERT Contingency reserve is ZERO due to generation deficiency

February 26, 2012 5:30pm - 9:00pm 180 RED ALERT Contingency reserve is ZERO due to generation deficiency

February 27, 2012 9:30am - 5:30pm 210 RED ALERT Contingency reserve is ZERO due to generation deficiency

5:30pm - 10:00pm 270 RED ALERT Contingency reserve is ZERO due to generation deficiency

February 28, 2012 9:30am - 5:30pm 240 RED ALERT Contingency reserve is ZERO due to generation deficiency

5:30pm - 10:00pm 300 RED ALERT Contingency reserve is ZERO due to generation deficiency

February 29, 2012 9:30am - 5:30pm 240 RED ALERT Contingency reserve is ZERO due to generation deficiency

5:30pm - 10:00pm 300 RED ALERT Contingency reserve is ZERO due to generation deficiency

March 1, 2012 9:30am - 5:30pm 240 RED ALERT Contingency reserve is ZERO due to generation deficiency

5:30PM - 10:00pm 300 RED ALERT Contingency reserve is ZERO due to generation deficiency

March 2, 2012 9:30am - 10:00pm 240 RED ALERT Contingency reserve is ZERO due to generation deficiency

March 3, 2012 9:30am - 10:00pm 240 RED ALERT Contingency reserve is ZERO due to generation deficiency

March 4, 2012 5:30am - 10:00pm 240 RED ALERT Contingency reserve is ZERO due to generation deficiency

March 5, 2012 9:30am - 10:00pm 240 RED ALERT Contingency reserve is ZERO due to generation deficiency

March 6, 2012 9:30am - 10:00pm 240 RED ALERT Contingency reserve is ZERO due to generation deficiency

March 7, 2012 9:00am - 10:00pm 240 RED ALERT Contingency reserve is ZERO due to generation deficiency

March 8, 2012 9:00am - 10:00pm 240 RED ALERT Contingency reserve is ZERO due to generation deficiency

March 9, 2012 9:00am - 10:00pm 240 RED ALERT Contingency reserve is ZERO due to generation deficiency

Page 5: Power Updates from CEPALCO March 30 2012

5

March 10, 2012 9:00am - 10:00pm 240 RED ALERT Contingency reserve is ZERO due to generation deficiency

March 11, 2012 9:00am - 10:00pm 240 RED ALERT Contingency reserve is ZERO due to generation deficiency

March 12, 2012 9:00am - 10:00pm 240 RED ALERT Contingency reserve is ZERO due to generation deficiency

March 13, 2012 9:00am - 10:00pm 240 RED ALERT Contingency reserve is ZERO due to generation deficiency

March 14, 2012 9:00am - 10:00pm 240 RED ALERT Contingency reserve is ZERO due to generation deficiency

March 15, 2012 9:00am - 10:00pm 240 RED ALERT Contingency reserve is ZERO due to generation deficiency

March 16, 2012 9:00am - 10:00pm 240 RED ALERT Contingency reserve is ZERO due to generation deficiency

March 17, 2012 9:00am - 10:00pm 280 RED ALERT Contingency reserve is ZERO due to generation deficiency

March 18, 2012 9:00am - 10:00pm 240 RED ALERT Contingency reserve is ZERO due to generation deficiency

March 19, 2012 9:00am - 10:00pm 240 RED ALERT Contingency reserve is ZERO due to generation deficiency

March 20, 2012 9:00am - 10:00pm 240 RED ALERT Contingency reserve is ZERO due to generation deficiency

March 21, 2012 9:00am - 10:00pm 240 RED ALERT Contingency reserve is ZERO due to generation deficiency

March 22, 2012 9:00am - 10:00pm 320 RED ALERT Contingency reserve is ZERO due to generation deficiency

March 23, 2012 9:00am - 10:00pm 240 RED ALERT Contingency reserve is ZERO due to generation deficiency

March 24, 2012 9:00am - 10:00pm 240 RED ALERT Contingency reserve is ZERO due to generation deficiency

March 25, 2012 9:00am - 10:00pm 200 RED ALERT Contingency reserve is ZERO due to generation deficiency

March 26, 2012 9:00am - 10:00pm 240 RED ALERT Contingency reserve is ZERO due to generation deficiency

March 27, 2012 9:00am - 5:30pm 240 RED ALERT Contingency reserve is ZERO due to generation deficiency

5:30pm - 10:00pm 360 RED ALERT Contingency reserve is ZERO due to generation deficiency

March 28, 2012 9:00am - 5:30pm 280 RED ALERT Contingency reserve is ZERO due to generation deficiency

5:30pm - 10:00pm 240 RED ALERT Contingency reserve is ZERO due to generation deficiency

March 29, 2012 9:00am - 10:00pm 200 RED ALERT Contingency reserve is ZERO due to generation deficiency

Page 6: Power Updates from CEPALCO March 30 2012

6

Load to Maintain in MegaWatts ( Mindanao - A )

40 80 120 160 200 240 280 320 360 400

D3 - NCMA 174,032 168.00 162.21 156.21 150.33 144.33 138.34 132.44 126.56 120.51 114.77

BUSCO 244 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2

DMPI - Plantation 1,449 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4

ECAC 10,298 9.9 9.6 9.2 8.9 8.5 8.2 7.8 7.5 7.1 6.8

MENZI ** - 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

MSMC * - 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

PHIL SINTER 7,590 7.3 7.1 6.8 6.5 6.3 6.0 5.8 5.5 5.2 5.0

CEPALCO 115,000 111.0 107.1 103.1 99.2 95.2 91.2 87.3 83.3 79.3 75.4

BUSECO 14,120 13.6 13.1 12.7 12.2 11.7 11.2 10.7 10.2 9.7 9.3

CAMELCO 2,554 2.5 2.4 2.3 2.2 2.1 2.0 1.9 1.9 1.8 1.7

FIBECO 22,777 21.99 21.21 20.42 19.64 18.85 18.07 17.28 16.50 15.72 14.93

NEIGHBORING COOPS of CEPALCO

MORESCO-I 21,662 21.1 20.5 20.0 19.4 18.9 18.3 17.7 17.2 16.6 16.1

MORESCO-II 11,421 11.1 10.8 10.5 10.2 9.9 9.7 9.4 9.1 8.8 8.5

* Temporary Shutdown

** Exprired Contract

Prepared by:

GIL Z. CESAR ABELARDO S. SAPALARAN PEDRO C. AMBOS, JR. MAXIMO K. ADIONG

Manager (MCRO-A) Manager, Electricity Trading Department OIC-Department Manager Head, Network Operations Division

MCRD-Mindanao Area, NPC PSALM Corporation OPD-MINGEN, NPC NGCP

DISTRICT 3 - NORTHERN CENTRAL MINDANAO AREA

CUSTOMER NAME

MARCH 2012 CONTRACTED DEMAND,

kW

System Deficiency

LOAD TO MAINTAIN (MW)

National Power Corporation

LOAD TO MAINTAIN against MINDANAO GRID SYSTEM DEFICIENCY

for the month of MARCH 2012

Mindanao Power Customers

Page 7: Power Updates from CEPALCO March 30 2012

CEPALCO EMBEDDED GENERATORS

COMPANYGENERATING

CAPACITY, MW

First Gen Bukidnon Power Corp (FGBPC) 1.6

CEPALCO Solar (PV) Plant 1.0

MINERGY 44.4

Total Capacity: 47.0

CABULIG HYDRO POWER PLANT * On line by July 2012

8.0

Bubunawan Power Corporation (BPC)** For Rehabilitation (Damaged by typhoon Sendong)

8.0

7

Page 8: Power Updates from CEPALCO March 30 2012

8

ACTUAL CEPALCO SYSTEM POWER AVAILABILITY

  Curtailment Level @ Grid Deficiency, MW

  200 240 280 320 360 400 440 480 520

CEPALCO Load to Maintain @ Grid Deficiency, MW

95.20 91.20 87.30 83.30 79.30 75.40   71.40 67.40 63.40

CEPALCO Imbedded Generation, MW 47.00 47.00 47.00 47.00 47.00 47.00 47.00 47.00 47.00

TOTAL CEPALCO Available Capacity, MW

142.20 138.20 134.30 130.30 126.30 122.40 118.40 114.40 110.40

CEPALCO Peak Demand, MW Available Capacity vs. Peak Demand : OVER / (SHORT)

115 27.20 23.20 19.30 15.30 11.30 7.40   3.40 (0.60) (4.60)

120 22.20 18.20 14.30 10.30 6.30 2.40   (1.60) (5.60) (9.60)

125 17.20 13.20 9.30 5.30 1.30 (2.60)   (6.60) (10.60) (14.60)

130 12.20 8.20 4.30 0.30 (3.70) (7.60)   (11.60) (15.60) (19.60)

Note: 440MW to 520MW Grid Deficiency is extrapolated based on March 2012 Matrix as provided by NGCP at w/c CD of CEPALCO is 115MW. April 2012 CD of CEPALCO is 121MW hence expectedly the Load to Maintain by CEPALCO will be improved. Extrapolation is done since NGCP did not yet provide their April 2012 Matrix

Page 9: Power Updates from CEPALCO March 30 2012

9

• Based on CEPALCO’s System Power Availability Matrix, CEPALCO will experience a power shortage at 360 MW Mindanao Grid Deficiency when its System Peak Demand reaches 130 MW

• CEPALCO will have a power shortage of 19.6 MW if the Grid Deficiency will reach 520 MW at a CEPALCO System Peak of 130 MW.

• CEPALCO’s System Peak as of March 2012 is 125 MW

9

Page 10: Power Updates from CEPALCO March 30 2012

Interruption Hours in other Areas as of March 30, 2012

• Butuan City and Agusan Norte Areas : 1 to 2 hours per area, only once this week

• Agusan Sur Areas : 1 to 3 hours per area, once this week • Gingoog Areas : 2 to 3 hours per area, twice this week • Iligan City : 1 to 2 hours per area, once this week • Lanao Norte Areas : 1 to 2 hours per area, twice this week • Lanao Sur Areas : 2 to 3 hours per area, twice this week • Zamboanga Areas : 1 to 3 hours per area, once this week • Bukidnon Areas : 2 to 3 hours per area, twice this week • MORESCO 1 Areas : 1 to 2 hours per area, once this week • Surigao Areas : 1 to 2 hours per area, twice this week • CEPALCO : None

Page 11: Power Updates from CEPALCO March 30 2012

CEPALCO’S CONTINGENCY PLAN

• In order to prevent rotating power outages within CEPALCO’s

franchise area CEPALCO initiated an Interruptible Load Program (ILP) with the cooperation and partnership with its bulk power customers.

• The ILP is a basically a voluntary load reduction program.

Page 12: Power Updates from CEPALCO March 30 2012

The following customers have signified their enrollment to the ILP totaling a potential of generation capacity of 23.30 MW:

o LKKS CENTER – 7.0 MWo LKKS MILLING – 1.0 MWo GAISANO – 3.5 MWo DEL MONTE – 2.0 MWo MITIMCO – 1.0 MWo ALWANA – 1.0 MWo CAG. CORN – 2.0 MWo RI CHEM – 1.8 MWo PKI – 2.0 MWo SM CITY – 2.0 MW

TOTAL: 23.30 MW

12

Page 13: Power Updates from CEPALCO March 30 2012

13

Thank You