Copyright Copyright ©© Siemens AG 2010Siemens AG 2010
Energy SectorEnergy Sector
CVMBUPN 2010Qpx fs Usbotn jttjpo boe EjtusjcvujpoPvs Tpmvujpot gps CFMFOF OQQ
Wbsob 0: -11.07.2010
Page 2 June 2010Copyright © Siemens AG 2010
Energy Sector
Power Transmission and DistributionSolutions
Page 3 June 2010Copyright © Siemens AG 2010
Energy Sector
Our Competence as Solution Provider and Turnkey Partner
Analysis
Project Development
Project Management
System planning and consulting
All Competencies from one Source
Civil works
Supply, erection and commissioning
Manufacturing
Maintenance and after-sales-service
Design and engineering
Training
Page 4 June 2010Copyright © Siemens AG 2010
Energy Sector
Power Transmission and DistributionOur Solutions for BELENE NPP
is the selected supplier of
for the 400/110 kV Substation
and
SIEMENS will deliver and install a modern technicalsolution as a turnkey provider for Power Plant
Substations
t
Page 5 June 2010Copyright © Siemens AG 2010
Energy Sector
Power Transmission and DistributionBELENE NPP Plant Overview and Scope of Siemens Supply
400 kV
110 kV
Control Building
400 kV Gas Insulated Line
400/110 kV Autotransformer
Page 6 June 2010Copyright © Siemens AG 2010
Energy Sector
Power Transmission and DistributionSummarized Scope of Supply
400/110/31,5 kV Turn-Key Substation BELENE NPP
400 kV Gas Insulated Substation (GIS)
110 kV Gas Insulated Substation (GIS)
31,5/20/6,3 kV Gas Insulated Substation (GIS)
400 kV Gas Insulated Line, 2 Systems, with approx. 1500 m total length
2 pcs. 400/110/31,5 kV Autotransformer, 250 MVA
Digital Control (SICAM) & Protection (SIPROTEC)
Auxiliary Supply
Control & Switchgear Buildings
Civil Works
Erection, installation, commissioning and testing
Page 7 June 2010Copyright © Siemens AG 2010
Energy Sector
Power Transmission and Distribution400/110 kV Substation Overview
400 kV Gas Insulated LineControlBuilding
400 kV GIS110 kV GIS
400/110 kV Autotransformer
Page 8 June 2010Copyright © Siemens AG 2010
Energy Sector
Power Transmission and Distribution400/110 kV GIS Substations
400 kV Gas Insulated Substations 110 kV Gas Insulated Switchgear GIS
Page 9 June 2010Copyright © Siemens AG 2010
Energy Sector
Power Transmission and DistributionAdvantages of Gas Insulated Transmission Line (GIL)
High reliability and high safety because of the metallic enclosure
No ageing because of insulating gas
Very low electromagnetic fields
No external influence in case of an internalfailure (no fire risk)
Operation like an overhead line, withautoreclosure
35 years of experience with gas insulatedsystems
Page 10 June 2010Copyright © Siemens AG 2010
Energy Sector
Power Transmission and DistributionReferences Gas Insulated Transmission Line (GIL), Status May 2010 *
Schluchseewerk AGWehr, Germany4000 m / 1975
ERTAN Hydro PowerJinping I, China3300 m / 2011
Rheinisch WestfälischeElektrizitätswerkeKelsterbach, Germany5400 m / 2009
BadenwerkRheinhafen, GermanySteampower station unit 7800 m / 1982
NeckarwerkeAltbach, Germany800 m / 1985
Statkraft (NVE)RoD, Norway110 m / 1981
Stadtwerke MünchenHKW-Nord, Germany800 m / 1990
Austria Hydro PowerLimberg II, Austria480 m / 2010
National Grid TranscoElstree, Great Britain750 m / 2004
Energie Ouest SuissePALEXPO, Switzerland2560 m / 2001
China Three GorgesProject Corporation, Xiluodu, China12750 m / 2012
Public Utilities BoardSenoko, Singapore401 m / 1993
Perusahaan UmumListrik Negara PLNGresik Power Plant, Indonesia2300 m / 1992
Electricity GeneratingAuthority of ThailandSai Noi, Thailand3510 m / 2002
Tehri Hydro Develop-ment Corp., TehriHydro Project, India4550 m / 2006
Dubai Electricity andWater AuthorityWarsan, Dubai4050 m / 2007
Saudi ConsolidatedElectricity Company9023, Saudi Arabia21,000 m / 2010
Saudi ConsolidatedElectricity CompanyRabigh/Yanbu, Saudi Arabia1340 m / 1988
Swawek, WindhoekRuacana, Namibia800 m /1976
Atomic Energy Org.Nuclear power station Iran 1, Iran3700 m
Deutsche Babcock AG forMinistery of ElectricityHoms P.S., Libya800 m / 1980
SNEC Jeddah, Saudi Arabia300 m / 1981
Ontario HydroBowmanville, Canada3175 m / 1987
Egyptian Electricity AuthorityItay el Baroud, Egypt670 m / 1993
Cairo ElectricityPower Corp.Cairo, Egypt1850 m / 2004
above ground installation
tunnel installation
directly buried installation
*) overall tube length 85.4 km
National GridStella West, GB 1258 m / 2010
National GridPenwortham, GB770 m / 2010
Dubai Electricity andWater AuthoritySeries Reactors, Dubai1100 m / 2011
Page 11 June 2010Copyright © Siemens AG 2010
Energy Sector
Power Transmission and DistributionReferences Gas Insulated Switchgears / Local content
Intended local content in BulgariaEngineering (civil, primary and secondary design)
Construction of the Substations Buildings
Delivery of auxiliary equipment (steel, cables, secondary cubicles, etc.)
Erection, Installation and Commissioning (civil, primary and secondarypart)
Provision of local technological value added
5153 Feeder since 02/1999 of 110 kV Gas Insulated Switchgear Type 8DN8
1077 Feeder since 05/1989 of 400 kV Gas Insulated Switchgear Type 8DQ1
(The feeder are state-of-the-art, safe and reliable)
Installed Gas Insulated Switchgear Feeder
Page 12 June 2010Copyright © Siemens AG 2010
Energy Sector
Power Transmission and Distribution
For successful realization of Belene NPP
t